Solicitation Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_Round_5.pdf | ||
| Questions_round_4.pdf | ||
| Questions_round_3.pdf | ||
| Questions_round_2.pdf | ||
| Questions_and_answers_WE_9.14.19.pdf | ||
| ATT_4_Data_Item_Transmittal_Acceptance_Rejection_Form_.doc | DOC document | |
| ATT_2_P1_Pricing_Spreadsheet_SSP.xlsx | XLSX spreadsheet | |
| Exhibit_A_ECW-50_CDRLs__05.15.19.pdf | ||
| Att_1_ECW-50_Specifications.docx | DOCX document | |
| Att_3_Cross_Reference_Matrix_Template.docx | DOCX document | |
| Att_1_ECW-50_Specifications.docx | DOCX document | |
| N68335-19-R-0202.docx | DOCX document | |
| ATT_4_Data_Item_Transmittal_Acceptance_Rejection_Form_.doc | DOC document | |
| Exhibit_A_ECW-50_CDRLs__05.15.19.pdf | ||
| ATT_2_P1_Pricing_Spreadsheet_SSP.xlsx | XLSX spreadsheet | |
| Att_3_Cross_Reference_Matrix_Template.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6833519R0202
Section A - Solicitation/Contract Form
POINTS OF CONTACT
CONTRACT SPECIALIST:
Dorri Petterson
PHONE: 732-323-1983
EMAIL: dorri.petterson@navy.mil
GOVERNMENT TECHNICAL/ WAWF POC:
TBD
PHONE:
EMAIL:
CONTRACTOR POC:
TBD
PHONE:
EMAIL:
The ship to address is:
COMMANDER, NAWCAD St. Inigoes ATTN: Receiving Officer, Bldg. 8115
M/F: TPOC
17598 Webster Field Road St. Inigoes, MD 20684
This solicitation is for a five (5) year Indefinite Delivery / Indefinite Quantity (IDIQ) type contract for the Electronics Cooling Water System ECW-50
Offerors may submit questions requesting clarification of solicitation requirements to Dorri Petterson at dorri.petterson@navy.mil. All questions will be consolidated and answers will be sent to all offerors via the FedBizOpps website. The offeror is expected to comply with all requirements of the RFP. It is requested that all questions be received within seven (7) days of the date this solicitation was posted.
EARLY AND PARTIAL DELIVERIES ARE ACCEPTABLE AND ENCOURAGED
VENDOR: IF ELECTRONICE EQUIPMENT, PLEASE MARK PACKAGE CONTAINING ELECTRONIC EQUIPMENT WITH THE “DO NOT SCAN” STICKER
RECEIVING DOCK HOURS ARE MONDAY THROUGH FRIDAY, 0630-1500 EST.
NAWCAD, Webster Field Annex at St. Inigoes, MD is designated as an operational restricted area. In accordance with the provisions of NASPAXRIVINST 5230.1A, foreign nationals must be escorted by Government personnel for the entire duration of a visit to such facility. As a result, be advised that a delivery truck driver intending to enter this facility with the purpose of delivering material/equipment contracted for in this purchase order/contract must be a U.S. citizen. It is operationally unfeasible and inefficient for the Government to provide 100% escort for a foreign nationals in such instances.
MINIMUM/ MAXIMUM QUANTITIES
This solicitation states a maximum quantity per year that has been established based on the Government’s estimated quantity to be procured in each ordering year. However, if requirements dictate, and a greater quantity is needed in any given ordering year, the Government may order up to the total maximum quantity per item, as indicated in the table below. In accordance with NAVAIR clause 5252.216-9506, the contract minimum quantity is one (1) FAT ECW-50 and CDRLs A001-A007 (CLINs 0002 and 0003).
| Part Name |
| UI |
| FAT |
| Ordering Period 1 Est. Max. Qty. |
| Ordering Period 2 Est. Max. Qty. |
| Ordering Period 3 Est. Max. Qty. |
| Ordering Period 4 Est. Max Qty. |
| Ordering Period 4 Est. Max Qty. |
| Total Max. Qty. |
| ECW-50 |
| EA |
| 2 |
| 4 |
| 5 |
| 5 |
| 5 |
| 5 |
| 26 |
The ordering period for this contract is as follows:
· Year One is from date of contract award through 365 days after contract award.
· Year Two is from 366 days after date of contract award through 730 days after date of contract award.
· Year Three is from 731 days after date of contract award through 1,095 days after date of contract award.
· Year Four is from 1,096 days after date of contract award through 1,460 days after date of contract award.
· Year Five is from 1,461 days after date of contract award through 1,825 days after date of contract award.
The Product Service Code (PSC) for this requirement is: 2930
Proposal validity is for a period of 180 days
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
FIRST ARTICLE ECW-50
FFP
First article for the ECW-50 in accordance with (IAW) Statement of Work (SOW) Section C and Specification, attachment 1 in Section J FOB: Destination
PSC CD: 2930
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
CDRLs
NSP. IAW DD 1423, Exhibit A, CDRLs A001-A006
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Installation Control Drawings (ICDs)
NSP. ICDs IAW SOW in CDRL A007, Section C and Specification, Attachment 1 in Section J.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Environment Testing |
FFP
Environment Testing IAW CDRLs A008-A018
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4 |
| Each |
Ordering YEAR ONE
Ordering Period One is from date of contract award through 365 days after contract award. ECW-50; IAW SOW SECTION C; Specification ATTCHMENT 1 SECTION J.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
Ordering YEAR TWO
Ordering Period Two is from 366 days after date of contract award through 730 days after contract award. ECW-50; IAW SOW SECTION C; Specification ATTCHMENT 1 SECTION J.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
Ordering YEAR THREE
Ordering Period Three is from 731 days after date of contract award through 1,095 days after contract award. ECW-50; IAW SOW SECTION C; Specification ATTCHMENT 1 SECTION J.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
Ordering YEAR FOUR
Ordering Period Four is from 1,096 days after date of contract award through 1,460 days after contract award. ECW-50; IAW SOW SECTION C; Specification ATTCHMENT 1 SECTION J.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
Ordering YEAR FIVE
Ordering Period Five is from 1,461 days after date of contract award through 1,825 days after contract award. ECW-50; IAW SOW SECTION C; Specification ATTCHMENT 1 SECTION J.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
Section C - Descriptions and Specifications
SOW
STATEMENT OF WORK FOR THE AN/SPN-50 SHIPBOARD AIR TRAFFIC CONTROL RADAR ELECTRONICS COOLING WATER SUBSYSTEM
STATEMENT OF WORK FOR THE AN/SPN-50 SHIPBOARD AIR TRAFFIC CONTROL RADAR ELECTRONICS COOLING WATER SUBSYSTEM
1.0 SCOPE. This Statement of Work (SOW) defines the efforts required to develop and deliver the Electronics Cooling Water (ECW-50) system for the Navy’s AN/SPN-50 Shipboard Air Traffic Control (ATC) Radar System. It includes the associated program management, human engineering, and logistic support planning requirements.
1.1. Background. The ECW-50 system is a liquid cooling system that will provide chilled liquid to the AN/SPN-50 Radar System components that are designed to rely on the liquid cooling to dissipate the large amounts of heat generated by those components. The AN/SPN-50 Radar System components that require liquid cooling are the Solid State Transmitter (SSTX), and two Signal Data Units (SDUs).
2.0 SPECIFICATIONS AND STANDARDS. Unless otherwise specified, the revision level and date for each specification or standard cited herein shall be considered the most recent.
2.1. NAWCAD 4.11.7. Specifications.
SPN-50 SWAP-C dated 6/15/18 AN/SPN-50 Size Weight and Power (SWAP) requirements
4K7_ECW50_001 ECW-50 Requirements
2.2. Other Specifications.
MIL-S-901D Shock Tests, H.I. (High- Impact) Shipboard Machinery, Equipment, and Systems, Requirements for
MIL-STD-882D System Safety
MIL-STD-810G Environmental Engineering Considerations and Laboratory Test
MIL-STD-1399-300 Low/Medium Voltage Electric Power, Alternating Current
MIL-STD-464C Electromagnetic Environmental Effects, Requirements for Systems
MIL-STD-167-1A Mechanical Vibrations of Shipboard Equipment
MIL-STD-1472G Human Engineering
MIL-STD-129R Military Marking for Shipment and Storage
3.0 REQUIREMENTS.
3.1. Detailed Tasks.
3.1.1 The vendor shall provide operations, maintenance, and technical manuals, drawings, and documentation with the first article units in accordance with (IAW) CDRL A001. The vendor shall provide any revisions to the operations, maintenance, technical manuals, drawings, and documentation with the first production unit IAW CDRL A002.
3.1.2 The vendor shall hold, at the vendor site, a Technical Interchange Meeting (TIM) within 60 calendar days after contract award. The TIM will not exceed one (1) business day and will be the venue to present the design of the proposed cooled water solution to no more than six (6) on-site Government representatives prior to building the first article test units.
3.1.3 The vendor shall perform a First Article Test (FAT) on the first article unit IAW the Contractor developed and Government approved First Article Test Procedure/Plan as described in CDRL A003. The vendor shall conduct and document the results of a Government witnessed, vendor conducted FAT at the vendor’s facility no later than 210 calendar days after contract award. The FAT shall be conducted to identify any manufacturing defects and validate the cooler meets the ECW-50 requirements. If Optional CLIN 0004 is not exercised: The Government shall perform the environmental testing. First Article must demonstrate satisfaction of the environmental testing requirements for production unit ordering. The First Article shall be approved on condition of satisfactorily passing the FAT and the environmental testing. The approved First Article serves as the manufacturing standard.
3.1.3.a. The vendor shall quote the option for them to perform environmental testing on the first article and provide CDRLs A008 through A018.
3.1.4 The results of the FAT shall be provided to the Government IAW CDRL A004. Acceptance of the FAT unit constitutes ability of the Government to proceed with the issuance of production delivery orders.
3.2. Program Planning.
3.2.1 Safety. The ECW-50 shall not be comprised of toxic chemicals, hazardous materials, or ozone-depleting substances, and shall not be produced using manufacturing processes that have a detrimental impact upon the environment from the time of design and manufacture through its life-cycle using MIL-STD-882D as a guide.
3.3 Logistic Support Planning. The vendor shall develop and deliver the documents indicated in the below paragraphs to the Government.
3.3.1 Interim Spares List. The vendor shall provide an Interim Spares List for the initial two-year period post contract award IAW CDRL A006.
3.3.2 Train-the-Trainer Event. The vendor shall conduct one (1) train-the-trainer event for no more than ten (10) Government representatives not to exceed one (1) business day at the Government’s facility at Webster Outlying Field, St. Inigoes, MD, at a time mutually agreeable with the Government, but not later than thirty (30) days after accepted delivery of the first article units. The objective of this event is to provide the In-Service Engineering Agents (ISEA) at Webster Outlying Field the knowledge and expertise to train the end users on how to setup, use, and maintain the ECW-50.
3.3.3 The vendor shall also provide an On-the-Job-Training (OJT) handbook during the train-the-trainer event or earlier IAW CDRL A005.
3.3.4 Reliability. The vendor shall provide a reliability prediction report in accordance with CDRL A001.
3.3.5 ICD. Provide a draft copy of the installation control drawings (ICD) in accordance with CDRL A007.
3. 4 Diminishing Manufacturing Sources of Material Supply (DMSMS) / Parts Obsolescence. The vendor shall resolve all parts obsolescence issues that arise during production. These costs may not be charged to this contract or any other line items or contracts.
Section D - Packaging and Marking
CLAUSES INCORPORATED BY FULL TEXT
| 5252.223-9502 | HAZARDOUS MATERIAL (NAVAIR) (APR 2009) |
| (a) Packaging, Packing, Marking, Labeling and Certification of Hazardous materials for shipment by any mode or combination of transportation modes shall be prepared (properly classed, described, packaged, marked, labeled, transport vehicle placarded, etc.) for shipment in accordance with MIL-STD-129 and Title 49 Code of Federal Regulations (CFR), Part 100-199 as applicable. In the event of any contradictions between the documents, 49 CFR shall govern or the applicable modal transport regulation. | |
| (b) In the event of a conflict between specific requirements in the contract or order and existing applicable modal transport regulations, the regulations shall take precedence. Under no circumstances shall the contractor knowingly use materials, markings or procedures that are not in accordance with laws and regulations applicable to the mode of transportation employed. | |
| (c) To ascertain which Department of Defense, or local installation regulations, concerning hazardous materials may have impact on this contract, the contractor should contact: Environmental Director TBD at time of award |
| 5252.247-9503 | MARKING OF WARRANTED ITEMS (NAVAIR) (OCT 2005) | |
| (a) Each item covered by a warranty shall be stamped or marked in accordance with MIL-STD-129, Marking for Shipment and Storage, and MIL-STD-130, Identification Marking of U.S. Military Property, current at the date of award. Where this is impracticable, written notice shall be attached to or furnished with the warranted item. | ||
| (b) Each item covered by a warranty shall have a written notice attached to or furnished with the warranted item, and marked with the following: | ||
| (1) National stock number or manufacturer's part number. | ||
| (2) Serial number or other item identifier (if the warranty applies to uniquely identified items). | ||
| (3) Contract number. | ||
| (4) Indication that a warranty applies. | ||
| (5) Manufacturer or entity (if other than the contractor) providing the warranty. | ||
| (6) Date or time when the warranty expires. | ||
| (7) Indication of whether or not attempted on-site repair by Government personnel will void the warranty. |
| 5252.247-9507 | PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005) | |
| (a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M. | ||
| (b) The contractor shall prominently display on the cover of each report the following information: | ||
| (1) Name and business address of contractor. | ||
| (2) Contract Number/Delivery/Task order number. | ||
| (3) Contract/Delivery/Task order dollar amount. | ||
| (4) Whether the contract was competitively or non-competitively awarded. | ||
| (5) Name of sponsoring individual. | ||
| (6) Name and address of requiring activity. |
| 5252.247-9508 | PROHIBITED PACKING MATERIALS (NAVAIR)(JUN 1998) |
| The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use. |
| 5252.247-9509 | PRESERVATION, PACKAGING, PACKING AND MARKING (NAVAIR)(JUL 1998) |
| (a) Preservation, packaging and packing shall conform to prevailing industry standards for the type of commodity purchased under this contract. | |
| (b) All packages will be clearly marked with applicable contract number/delivery order number, and will contain appropriate packing slip. All deliveries will be marked for and/or consigned as follows: |
COMMANDER, NAWCAD St. Inigoes ATTN: Receiving Officer, Bldg. 8115
M/F: TPOC
17598 Webster Field Road St. Inigoes, MD 20684
| (c) In the event of any discrepancy in material shipped (overage, technical rejection, damage), the contractor shall, immediately upon request of the Contracting Officer, furnish disposition instructions. Normally, such disposition instruction shall be a properly completed Commercial Bill of Lading, which includes, but is not limited to, the mode of shipment, routing, special handling, and so forth. |
| (d) If the contractor is required to install equipment upon delivery, then the contractor shall inform the Government of the date of shipment from the contractor's facilities and the anticipated date of arrival at the site. This report shall be made no later than the actual date that the shipment is made from the contractor’s facilities. The report may be made by facsimile or e-mail, to the point of contact listed in Section G. All transportation, rigging, drayage, packing, unpacking, and handling necessary to accomplish the installation shall be the responsibility of the contractor. |
| 5252.247-9514 | TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999) |
| Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M. |
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 1000 |
| Destination |
| Government |
| Destination |
| Government |
| 2000 |
| Destination |
| Government |
| Destination |
| Government |
| 3000 |
| Destination |
| Government |
| Destination |
| Government |
| 4000 |
| Destination |
| Government |
| Destination |
| Government |
| 5000 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
| 52.246-11 | HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) | ||||
| (a) The Contractor shall comply with the higher-level quality standard selected below. | |||||
| [The Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.] | |||||
| Title | Number | Date | Tailoring |
ISO 9001:2008
| (b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-- | |
| (1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or | |
| (2) When the technical requirements of a subcontract require-- (i) Control of such things as design, work operations, in-process control, testing, and inspection; or (ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology. |
| 5252.246-9512 | INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005) |
| (a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by *To be filled in at time of award. | |
| (b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements. |
| 5252.246-9514 | INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995) |
| Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled NAWCTSD 4330/60 Data Item Transmittal/Acceptance/ Rejection Form. The attached form will not be used for high cost data such as drawings, specifications, and technical manuals. |
| 5252.246-9517 | CONSTRUCTIVE ACCEPTANCE PERIOD (NAVAIR) (MAR 1999) |
| For the purpose of FAR Clause 52.232-25, "Prompt Payment", paragraph (a)(5)(i), Government acceptance shall be deemed to have occurred constructively on the 30th day after the contractor delivered the supplies or performed the services. |
Section F - Deliveries or Performance
PERIOD OF PERFORMANCE
The “Delivery Information” section represents the ordering yeard (maximum days after contract award that each CLIN may be ordered against). Each individual delivery order will specify a delivery date IAW FAR Clasue 52.211-8 TIME OF DELIVERY (Jun 1997).
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| 210 dys. ADC |
| 2 |
| N/A |
| 0002 |
| N/A |
| N/A |
| N/A |
| N/A |
| 0003 |
| 60 dys. ADC |
| 1 |
| N/A |
| 0004 |
| 90 dys. ADC |
| 1 |
| N/A |
| 1000 |
| 365 dys. ADC |
| 4 |
| N/A |
| 2000 |
| 730 dys. ADC |
| 5 |
| N/A |
| 3000 |
| 1095 dys. ADC |
| 5 |
| N/A |
| 4000 |
| 1460 dys. ADC |
| 5 |
| N/A |
| 5000 |
| 1825 dys. ADC |
| 5 |
| N/A |
| 52.211-17 |
| Delivery of Excess Quantities |
| SEP 1989 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.247-17 |
| Charges |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 52.247-48 |
| F.O.B. Destination--Evidence Of Shipment |
| FEB 1999 |
| 52.211-8 | TIME OF DELIVERY (JUN 1997) | |
| (a) The Government requires delivery to be made according to the following schedule: | ||
| REQUIRED DELIVERY SCHEDULE |
| CLIN |
| DESCRIPTION |
| REQUIRED DELIVERY |
| DELIVERY ADDRESS |
| 0001 |
| FIRST ARTICLE ECW-50 |
| 210 Days ADC |
| RECEIVING OFFICER |
MARTA BIERRIA, AD-4.11.7
NAWCAD
17598 WEBSTER FIELD ROAD
BLDG. 8115
ST. INIGOES, MD 20684-0010
| 0002 |
| Base Year CDRLs A001-A006 |
| IAW CONTRACT DATA REQUIREMENTS LIST (DD 1423) |
IAW CONTRACT DATA REQUIREMENTS LIST (DD 1423)
| 0003 |
| ICD’s CDRL A007 |
| 60Days ADC |
| IAW CONTRACT DATA REQUIREMENTS LIST (DD 1423) |
OPTION
| Environmental Testing CDRLs A008-A018 |
| Testing is to be completed NLT 90 days after completion of first article. CDRLs are due IAW contract data requirements list (DD 1423) |
| IAW CONTRACT DATA REQUIREMENTS LIST (DD 1423) |
| 1000 |
| Ordering YEAR ONE |
| 210 Days ADC |
| SAME AS PREVIOUS LOCATION |
| 2000 |
| Ordering YEAR TWO |
| 210 Days ADC |
| SAME AS PREVIOUS LOCATION |
| 3000 |
| Ordering YEAR THREE |
| 210 Days ADC |
| SAME AS PREVIOUS LOCATION |
| 4000 |
| Ordering YEAR FOUR |
| 210 Days ADC |
| SAME AS PREVIOUS LOCATION |
| 5000 |
| Ordering YEAR FIVE |
| 210 Days ADC |
| SAME AS PREVIOUS LOCATION |
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor’s date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term “working day” excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
| 5252.216-9506 | MINIMUM AND MAXIMUM QUANTITIES (NAVAIR)(MAR 1999) |
| As referred to in paragraph (b) of FAR 52.216-22 " Indefinite Quantity" of this contract, the contract minimum quantity is 1 FAT ECW-50 and CDRLs A001-A007 (CLINs 0002 and 0003); the maximum quantity is 26 ECW-50, CDRLs A001-A007 (CLINs 0002, 0003) and Option CDRLs A008-A018 (CLIN 0004). |
| 5252.225-9506 | VERIFICATION OF "SHIP TO" AND/OR "NOTICE OF AVAILABILITY" ADDRESS (NAVAIR) (JAN 1992) |
| The contractor shall submit a request in duplicate to the Transportation Office of the cognizant Contract Administration Office for verification of the "Ship to" address. If the offer/release instructions require a "Notice of Availability" the contractor shall also request verification of the address to which notification will be made (the 'IAC 3' address). Such requests shall be submitted at least ten (10) days in advance of (i) date Notice of Availability is to be submitted, or (ii) actual shipping date, if shipment is to be released automatically. |
| 5252.247-9505 | TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995) | |
| Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit A, CDRLs A001-A018 attached hereto, and the following: | ||
| (a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423. | ||
| (1) PCO, Code 2.5.2.4.1 | ||
| (2) ACO, Code to be filled in at time of award | ||
| (b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO. | ||
| (c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6. | ||
| (d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above. | ||
| (e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government. | ||
| (f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection. | ||
| (g) DD Form 1423, Block 14 Mailing Addresses: NAWCAD 4.11.7.2 |
Section G - Contract Administration Data
| 52.232-13 |
| Notice Of Progress Payments |
| APR 1984 |
| 52.232-16 |
| Progress Payments |
| APR 2012 |
| 252.204-7006 |
| Billing Instructions |
| OCT 2005 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| DEC 2018 |
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
_________COMBO___________________________________________________
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
| Field Name in WAWF |
| Data to be entered in WAWF |
| Pay Official DoDAAC |
| TBD |
| Issue By DoDAAC |
| N68335 |
| Admin DoDAAC** |
| TBD |
| Inspect By DoDAAC |
| N3335A |
| Ship To Code |
| SEE SCHEDULE |
| Ship From Code |
| ____ |
| Mark For Code |
| ____ |
| Service Approver (DoDAAC) |
| ____ |
| Service Acceptor (DoDAAC) |
| ____ |
| Accept at Other DoDAAC |
| ____ |
| LPO DoDAAC |
| ____ |
| DCAA Auditor DoDAAC |
| TBD |
| Other DoDAAC(s) |
| ____ |
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
___TBD______________________________________________________________
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
| 5252.201-9500 | TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012) |
| (a) The Technical Point of Contact (TPOC) for this contract is TBD | |
| (b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order. Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO). | |
| (c) The contractor may use this technical POC for technical questions related to the existing contract or order. Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires. | |
| (d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract. |
| 5252.204-9503 | EXPEDITING CONTRACT CLOSEOUT (NAVAIR) (JAN 2007) |
| (a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party might be considered to the extent permitted by law. | |
| (b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered. |
| 5252.242-9511 | CONTRACT ADMINISTRATION DATA (NAVAIR)(NOV 2017) | |
| (a) Contract Administration Office. | ||
| (1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order. | ||
| (b) Special Instructions (see FAR 42.202(b) and (c)): | ||
| (1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)): | ||
| Functions Retained | ||
| Retained for Performance By: |
N/A No additional functions are retained besides the functions stated in FAR 42.302(a)
| (2) The following additional contract administration functions are assigned (see FAR 42.302(b)): |
| Additional Functions |
| Retained for Performance By: |
N/A No additional functions are retained besides the functions stated in FAR 42.302(a)
(c) Inquiries regarding payment should be referred to: MyInvoice through the Wide Area Workflow eBusiness Suite: https://wawf.eb.mil.
Section H - Special Contract Requirements
| 52.245-1 |
| Government Property |
| JAN 2017 |
| 52.247-55 |
| F.O.B. Point For Delivery Of Government-Furnished Property |
| JUN 2003 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 52.209-4 | FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989) | |
| (a) The Contractor shall deliver __1_____ units(s) of Lot/Item __0001_____ within _210____ calendar days from the date of this contract to the Government at DESTINATION_for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract. | ||
| (b) Within __30_____calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval. | ||
| (c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval . The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. | ||
| (d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract. | ||
| (e) Unless otherwise provided in the contract, the Contractor-- | ||
| (1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and | ||
| (2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense. | ||
| (f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price , and any other contractual term effected by the delay. | ||
| (g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test. | ||
| (h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government. | ||
| (i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver. |
| 5252.211- 9510 | CONTRACTOR EMPLOYEES (NAVAIR)(MAY 2011) | |
| (a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall: | ||
| (1) Not by word or deed give the impression or appearance of being a Government employee; | ||
| (2) Wear appropriate badges visible above the waist that identify them as contractor employees when in Government spaces, at a Government-sponsored event, or an event outside normal work spaces in support of the contract/order; | ||
| (3) Clearly identify themselves as contractor employees in telephone conversations and in all formal and informal written and electronic correspondence. Identification shall include the name of the company for whom they work; | ||
| (4) Identify themselves by name, their company name, if they are a subcontractor the name of the prime contractor their company is supporting, as well as the Government office they are supporting when participating in meetings, conferences, and other interactions in which all parties are not in daily contact with the individual contractor employee; and | ||
| (5) Be able to provide, when asked, the full number of the contract/order under which they are performing, and the name of the Contracting Officer’s Representative. | ||
| (b) If wearing a badge is a risk to safety and/or security, then an alternative means of identification maybe utilized if endorsed by the Contracting Officer’s Representative and approved by the Contracting Officer. | ||
| (c) The Contracting Officer will make final determination of compliance with regulations with regard to proper identification of contractor employees. |
| 5252.216-9512 | PAPERLESS CONTRACTING (NAVAIR)(JUN 2009) |
| (a) Orders and requests for proposals are hereby authorized to be issued by facsimile or by electronic commerce (including e-mail and paperless methods of delivery). Nothing in this contract should be read to prohibit these types of orders. In the event of a conflict with any other provision of this contract, this clause shall govern. | |
| (b) To the extent the terms "written", "mailed", or "physically delivered" appear in other provisions of this contract, these terms are hereby defined to explicitly include electronic commerce, email, or paperless delivery methods. |
| 5252.227-9511 | DISCLOSURE, USE AND PROTECTION OF PROPRIETARY INFORMATION (NAVAIR)(FEB 2009) |
| (a) During the performance of this contract, the Government may use an independent services contractor (ISC), who is neither an agent nor employee of the Government. The ISC may be used to conduct reviews, evaluations, or independent verification and validations of technical documents submitted to the Government during performance. | |
| (b) The use of an ISC is solely for the convenience of the Government. The ISC has no obligation to the prime contractor. The prime contractor is required to provide full cooperation, working facilities and access to the ISC for the purposes stated in paragraph (a) above. | |
| (c) Since the ISC is neither an employee nor an agent of the Government, any findings, recommendations, analyses, or conclusions of such a contractor are not those of the Government. | |
| (d) The prime contractor acknowledges that the Government has the right to use ISCs as stated in paragraph (a) above. It is possible that under such an arrangement the ISC may require access to or the use of information (other than restricted cost or pricing data), which is proprietary to the prime contractor. | |
| (e) To protect any such proprietary information from disclosure or use, and to establish the respective rights and duties of both the ISC and prime contractor, the prime contractor agrees to enter into a direct agreement with any ISC as the Government requires. A properly executed copy (per FAR 9.505-4) of the agreement will be provided to the Procuring Contracting Officer. |
Section I - Contract Clauses
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights |
| APR 2014 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-7 |
| System for Award Management |
| OCT 2018 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| OCT 2018 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| OCT 2015 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.211-5 |
| Material Requirements |
| AUG 2000 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-14 |
| Integrity of Unit Prices |
| OCT 2010 |
| 52.215-23 Alt I |
| Limitations on Pass-Through Charges (Oct 2009) - Alternate I |
| OCT 2009 |
| 52.219-14 |
| Limitations On Subcontracting |
| JAN 2017 |
| 52.222-1 |
| Notice To The Government Of Labor Disputes |
| FEB 1997 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-19 |
| Child Labor -- Cooperation with Authorities and Remedies |
| JAN 2018 |
| 52.222-20 |
| Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 |
| MAY 2014 |
| 52.222-26 |
| Equal Opportunity |
| SEP 2016 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| OCT 2015 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUL 2014 |
| 52.222-37 |
| Employment Reports on Veterans |
| FEB 2016 |
| 52.222-50 |
| Combating Trafficking in Persons |
| JAN 2019 |
| 52.222-54 |
| Employment Eligibility Verification |
| OCT 2015 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-11 |
| Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons. |
| JUN 2016 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.225-25 |
| Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications. |
| AUG 2018 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.227-14 |
| Rights in Data--General |
| MAY 2014 |
| 52.229-3 |
| Federal, State And Local Taxes |
| FEB 2013 |
| 52.230-6 |
| Administration of Cost Accounting Standards |
| JUN 2010 |
| 52.232-1 |
| Payments |
| APR 1984 |
| 52.232-8 |
| Discounts For Prompt Payment |
| FEB 2002 |
| 52.232-9 |
| Limitation On Withholding Of Payments |
| APR 1984 |
| 52.232-11 |
| Extras |
| APR 1984 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-23 Alt I |
| Assignment of Claims (May 2014) - Alternate I |
| APR 1984 |
| 52.232-25 |
| Prompt Payment |
| JAN 2017 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| OCT 2018 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.242-4 |
| Certification of Final Indirect Costs |
| JAN 1997 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.243-1 |
| Changes--Fixed Price |
| AUG 1987 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| JAN 2019 |
| 52.246-23 |
| Limitation Of Liability |
| FEB 1997 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| APR 2012 |
| 52.249-8 |
| Default (Fixed-Price Supply & Service) |
| APR 1984 |
| 52.249-14 |
| Excusable Delays |
| APR 1984 |
| 52.252-6 |
| Authorized Deviations In Clauses |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| NOV 2011 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 |
| Antiterrorism Awareness Training for Contractors. |
| FEB 2019 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| OCT 2016 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| DEC 1991 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| OCT 2015 |
| 252.219-7011 |
| Notification to Delay Performance |
| JUN 1998 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| JUN 2013 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| DEC 2017 |
| 252.225-7009 |
| Restriction on Acquisition of Certain Articles Containing Specialty Metals |
| OCT 2014 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| DEC 2017 |
| 252.225-7016 |
| Restriction On Acquisition Of Ball and Roller Bearings |
| JUN 2011 |
| 252.225-7028 |
| Exclusionary Policies And Practices Of Foreign Government |
| APR 2003 |
| 252.226-7001 |
| Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns |
| APR 2019 |
| 252.227-7039 |
| Patents--Reporting Of Subject Inventions |
| APR 1990 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.247-7023 |
| Transportation of Supplies by Sea |
| FEB 2019 |
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management Management via https://www.sam.gov.
(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments--
(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by--
(i) Government personnel and authorized users performing business on behalf of the Government; or
(ii) The Contractor, when viewing data on itself; and
(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for--
(i) Past performance reviews required by subpart 42.15;
(ii) Information that was entered prior to April 15, 2011; or
(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.
(c) The Contractor will receive notification when the Government posts new information to the Contractor's record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a…
This is the start of the file's text. The full file is on GovTribe.