Attachment_3_WD RI20240001_12_13_2024.pdf
PDF 4 MB Posted
- Attached to
- Construction - B110 Rm120 Flooring Replacement
- Solicitation number
- N6660425Q0108
About this file
This is a Department of Labor wage determination document for Rhode Island (General Decision Number RI20240001) effective December 13, 2024, which supersedes RI20230001. It covers building construction, heavy construction (including heavy and marine), and highway construction projects throughout Rhode Island, excluding residential construction of single-family homes and apartments up to 4 stories.
The document provides detailed wage rates and fringe benefits for various construction trades, including hazardous material handlers ($49.91/hour plus $36.63 fringe), electricians ($52.11/hour plus 47.25% fringe), plumbers ($52.49/hour plus $33.60 fringe), and truck drivers (ranging from $30.71 to $31.66/hour plus benefits). The wage determination includes Executive Order requirements for minimum wages ($17.20/hour for contracts entered after January 30, 2022, or $12.90/hour for earlier contracts), paid sick leave provisions, and holiday pay requirements. It also contains detailed classifications for various worker categories, premium pay requirements for hazardous work, and specific provisions for different types of construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 003.pdf | ||
| RFI 002.pdf | ||
| N6660425Q0108.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .