N6449822R4052.docx
DOCX document 155 KB Posted
- Attached to
- Electro-Mechanical Cable Assembly
- Solicitation number
- N6449822R4052
About this file
This is a combined synopsis and solicitation for noncommercial items seeking sources to fabricate, assemble, and test cable assemblies. The Naval Surface Warfare Center, Philadelphia Division is the requiring activity. Interested parties must request drawings and provide JCP certification or Cage code by email to Jenny Tomeo by May 13, 2022. The NAICS code is 335929 and it is a 100% small business set-aside. The proposed contract is firm-fixed price for a two-year period of performance. The solicitation incorporates FAR and DFARS clauses by reference. In accordance with FAR Subpart 16.505(a)(4), brand name parts are specified.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6449822R4052
Section A - Solicitation/Contract Form
SECTION A NOTES
1. CONTRACT TYPE: Naval Surface Warfare Center Philadelphia Division, Philadelphia, PA proposes to award a Firm-Fixed-Price (FFP) Contract for cable assemblies including fabrication, assembly, and testing.
2. BASIS OF COMPETITION: A Single Contract shall result from this Solicitation. This requirement is being solicited as a Small Business Set Aside.
3. SUBMISSION OF QUESTIONS AND COMMENTS:
Offerors may submit questions, concerns, or request clarification of any aspect of this solicitation electronically as follows:
TO: Jenny.E.Tomeo.civ@us.navy.mil CC: Jillian.N.Staskin.civ@us.navy.mil SUBJECT LINE: Question (insert name of Offeror) Tow Cable Assemblies RFP: N64498-22-R-4052
The questions should include the page number and paragraph number or identifier which pertains to the Offeror’s question. Questions received without this information may not be answered. The deadline for receipt of questions is two weeks after date of solicitation issuance. Although every effort will be made, the Government makes no guarantee that questions received after this deadline will be answered. Acknowledgement of receipt of questions will not be made.
5. SUBMISSION OF OFFERS: SEE SECTION L FOR PROPOSAL PREPARATION REQUIREMENTS. As detailed in Section L of this solicitation, Offerors are required to submit both a technical and a price proposal as part of their offer. Failure to comply with instructions set forth in Section L of this solicitation or to provide all information requested may result in rejection of the proposal.
6. POINT OF CONTACT: The point of contact regarding this solicitation/contract is Jenny Tomeo, who can be reached at jenny.e.tomeo.civ@us.navy.mil.
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Engineering Services
FFP
Engineering Costs, IAW SOW, Section C FOB: Destination
PSC CD: 5995
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
10' Prototype Units Fabrication
Cable Assembly Prototype Fabrication - 10', IAW SOW, Section C
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
1500' Prototype Units Fabrication
Cable Assembly Prototype Fabrication - 1500', IAW SOW , Section C
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each |
Unit Fabrication
Unit Fabrication IAW SOW, Section C
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
Statement of Work (SOW) for Electro-Mechanical Cable Assembly
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 402, which is responsible for Propulsion, Power and Auxiliary Machinery Systems.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied
1.0.3 Government/Contractor Relationship
1.0.3.1 The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.0.3.3 Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
1.0.4 Employee Relationship:
1.0.4.1 The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
1.0.4.3 Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.
1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.
1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
| (i) | Confirm the conduct is in violation and when necessary direct the mode of further performance, |
| (ii) | Countermand any communication regarded as a violation, |
| (iii) | Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or |
| (iv) | In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor. |
1.1 BACKGROUND
The Propulsion, Power and Auxiliary Machinery Systems Department (Code 40) provides the US Navy with engineering required to maintain and increase propulsion, power, and auxiliary machinery system capabilities and upgrade/modernize systems to enhance fleet readiness. These improvements are installed on fleet hulls via Alteration Installation Teams (AIT’s), which are comprised of contractor personnel and NSWCPD technical representatives.
1.2 SCOPE OF WORK
1.2.1. The contractor shall fabricate, assemble, test, and deliver six (6) cable assemblies. The contractor shall maintain PRO-20 Certification in accordance with section 2.4 for the life of the contract.
Each cable assembly shall consist of three discrete components:
(a) A subsea electro-mechanical communications cable complete with machined cable mounting components
(b) Dry-mate electrical connectors
(c) Water isolating, depth pressure splice material/kits
1.2.2 Manufacturing, Testing, and Quality Assurance (QA) procedures shall be developed for:
(a) Quality Assurance Program Plan (A003)
(b) Manufacturing Plan (A002)
(c) Test and Inspection Plan (A004)
1.2.3 The contractor shall fabricate two prototypes that shall undergo First Article Testing (FAT). The prototypes consist of one Cable Assembly with a final length of 10’ (+1.0’/-0.0’) and another with a length of 1,500’ (+10.0’/-0.0’)
1.2.4 The contractor shall perform First Article Testing (FAT) on the two prototypes.
1.2.5. Upon successful FAT, the contractor shall produce Cable Assemblies (Units) consistent with the approved design and production methods.
2.0 APPLICABLE DOCUMENTS
2.1. NAVSEA Drawing No. 8628326 Rev -
2.2. 8628327 Rev -
2.3. 8628328 Rev -
2.4. NAVSEA S9320-AM-PRO-020/MLDG REV 02, Molding and Inspection Procedures for Fabricating Connector Plugs
2.5. NAVSEA S9320-AM-PRO-030/MLDG REV 0, Plasma Spray Procedure
2.6. Cable Shipping – Storage Box Operating Procedures
2.7. SD-22, Diminishing Manufacturing Sources and Material Shortages Handbook
3.0 REQUIREMENTS
3.1. Engineering Services (CLIN 0001)
3.1.1. Prior to any fabrication, the contractor shall develop the following monthly plans and procedures:
3.1.1.1. Quality Assurance Program Plan (CDRL A003)
3.1.1.2. Manufacturing Plan (CDRL A002)
3.1.1.3. Test and Inspection Plan (CDRL A004)
3.2. Component Procurement
3.2.1. Raw Cable (Rochester Wire and Cable; Cage 77870 ; P/N: AM711307)
3.2.1.1. Contractor shall procure the raw cable directly from Rochester Wire and Cable LLC, in accordance with applicable reference 2.2 and the Manufacturing Plan (CDRL A002).
3.2.1.2. All material shall be compatible with a seawater environment.
3.2.1.3. The cable shall consist of eight (8) conductive elements (wires).
3.2.1.4. The cable shall meet the following mechanical specifications:
3.2.1.4.1. Cable armor shall retain relative position when cut
3.2.1.4.2. Cable shall be torque balanced
3.2.1.4.3. Cable shall have a minimum breaking strength of 10,500 lbs
3.2.1.4.4. Outer diameter of completed cable assembly shall be 0.357"(±.004)
3.2.1.4.5. Fairing strips shall be made of non‐gloss black polyether urethane with a hardness of 90 ± 5 Shore A durometer and a minimum, tensile strength of 7,000 psi
3.2.1.4.6. Fairing strips shall be 7/16” wide by 6.00” long by .012” thick (all nominal)
3.2.1.4.7. Cable assembly operational temperatures shall meet -15°C to 50°C and non-operational (storage) temperatures of -62°C to 75°C
3.2.2. Dry-Mate Electrical Connector (Seacon; Cage; P/N: MSSK12CCP/MSSL12CCP)
3.2.2.1. Contractor shall procure dry-mate electrical connectors directly from Seacon, in accordance with applicable reference 2.1 and the Manufacturing Plan (CDRL A003).
3.2.3. Splice Assembly (Seal) (PMI Industries; Cage; P/N: 9210041)
3.2.3.1. Contractor shall procure the cable splice assembly directly from PMI Industries, in accordance with applicable reference 2.1 and the Manufacturing Plan (CDRL A003)
3.3. Component Testing
3.3.1. Raw Cable
3.3.1.1. Upon receipt of the raw cable, the contractor shall perform tests of the raw cable (i.e., without connectors) in accordance with applicable reference 2.2, Table 2. Specifically:
3.3.1.1.1. Insulation Continuity
3.3.1.1.2. Insulation Resistance
3.3.1.1.3. Dialectic Withstanding Voltage
3.3.1.1.4. D.C. Resistance
3.3.1.1.5. Capacitance
3.3.1.1.6. Hydrostatic Integrity (Resistance)
3.3.1.1.7. Strength
3.3.1.1.8. Flexibility
3.3.1.1.9. Sheaves
3.3.1.1.10. Loading Conditions
3.3.1.1.11. Hydrostatic Test
3.3.1.2. The contactor shall provide the complete test results, indicating successful performance, to NSWCPD for acceptance. (CDRL A005)
3.4. Prototype Fabrication (CLINS 0002 & 0003)
3.4.1. Contractor shall fabricate two Unit prototypes in accordance with applicable reference 2.1 and the Manufacturing Plan (CDRL A002).
3.4.1.1. The prototypes consist of one Cable Assembly with a final length of 10’ (+1.0’/-0.0’) and another with a final length of 1,500’ (+10.0’/-0.0’)
3.4.1.2. Other than the cable length, all other aspects of the assemblies are identical (i.e., connectors, splices/seals and cable composition)
3.4.2. Manufacturing of prototypes shall be completed within 6 weeks after Government approval of the Manufacturing Plan (CDRL A002) and the Quality Assurance Program Plan (CDRL A003).
First Article Testing (FAT) CLINS 0002 & 0003
3.4.3. Contractor shall conduct FAT in accordance with applicable reference 2.3, the Test and Inspection Plan (CDRL A004) and SOW 2.7.2.1 (Full Tension Testing).
3.4.4. Testing of the prototypes shall be scheduled within 2 weeks (CDRL A007) and performed within 4 weeks after prototype fabrication is complete.
3.4.4.1. Contractor shall notify NSWCPD of date and location of FAT at least two weeks prior to testing event. (CDRL A007)
3.4.5. Upon completion of FAT, the contractor shall develop a report of the results and recommendations. (CDRL A006)
3.4.5.1. If the results of FAT produce changes to the manufacturing plan, the quality assurance plan, or the test and inspection plan, a repeat FAT event may be required.
3.4.5.2. If subsequent FAT is required, the contractor shall submit a report of the results and recommendations of each FAT event. (CDRL A006)
3.4.6. All destructive and non-destructive testing material shall be delivered to NSWCPD. Shipping and delivery of this material shall be in accordance with 3.8.
3.5. Unit Fabrication (CLINS 0004)
3.5.1. Contractor shall fabricate each 1,500’ (+10.0’/-0.0’) Production Unit in accordance with applicable references 2.1, 2.3, 2.5, 2.6, and the Manufacturing Plan (CDRL A003).
3.5.2. Each Unit shall be mounted and attached to a government furnished Cable Shipping/Storage Box (NAVSEA; Cage 53711; P/N: 8603581-1).
3.5.3. The contractor shall adhere to the following manufacturing requirements:
3.5.3.1. Dust caps shall be installed on Unit connectors unless work is being performed on the connector ends.
3.5.3.2. Machined cable parts shall be protected with bubble wrap or equivalent to prevent scratches and to protect during other operations such as grit blasting.
3.5.3.3. Per SOW 2.4, the polyurethane resin and hardener shall be degassed both when heated and at room temperature. Wood shall not be used to mix the compounds.
3.5.3.4. The contractor shall document the cable serial number and its corresponding cable box serial number. This documentation shall be submitted along with each Unit shipment/delivery.
3.5.3.5. Metal primer (PR-420) shall be applied to all metal surfaces of the staff, connector shell, and three grounding wires that will come into contact with polyurethane (IAW sections 4-3.4 and 4-6 of SOW 2.4) and shall be allowed to cure in accordance with manufacturer’s instructions. Primer shall not be applied to the ends of the grounding wires where they will be soldered to the connector.
3.5.3.6. Connector shell shall be treated with a metal primer (PR-420 or alternate per NAVSEA S9320-AM-PRO-030 MLDG Rev 03 procedures) in order to bond to a polyurethane injection molding material. Each connector will require 12 insert pins, and will be potted to an electromechanical cable using an injection-molded process.
3.5.3.7. Digital photographs shall be provided for all Units. Pictures shall show the cable’s condition (1) during manufacturing milestones, (2) when installed in the cable boxes prior to assembly, and (3) when installed in the cable boxes post-assembly. Photographs of the cables installed in boxes shall include views or text descriptions of the serial numbers for both the cable assembly and cable storage box. (CDRL A008)
Unit Testing
3.5.4. Contractor shall conduct Unit testing in accordance with applicable reference 2.3 and the Test and Inspection Plan (CDRL A004).
3.5.5. Full Length Tension Test
3.5.5.1. Contractor shall conduct a full-length tension test on all FAT cable and all production cable assemblies. The Tension Test Facility shall be a climate-controlled building that is maintained between 50 - 80°F and 35 – 55% relative humidity. Testing shall be conducted in accordance with the following steps:
3.5.5.1.1. Begin test at zero tension
3.5.5.1.2. Increase cable tension to 3,000 lbs. Hold for this tension for a minimum of 5 minutes.
3.5.5.1.3. Reduce tension to near zero and hold for 5 minutes minimum
3.5.5.1.4. Repeat the cycle 2 more times (steps a, b, and c). Dwell times shall be identical for all 3 cycles.
3.5.5.1.5. Increase cable tension to 3,000 lbs and hold for 1 hour minimum
3.5.5.1.6. After cable tension has been held for 1 hour, maintain 3,000 lbs of tension and measure insulation resistance at 500 VDC.
3.5.5.1.7. Contractor shall measure and record DC resistance during the course of all steps.
3.5.5.2. The full length of cable shall be simultaneously loaded to the test tension. It is not acceptable to tension sections of the cable. Any cable bend radii shall be a minimum of 18” with coefficients of friction and groove diameters as required in document (2.2) table 2, section 6.1. Tension testing must occur prior to hydrostatic testing.
3.5.6. Upon completion of successful tension test as outlined in section 3.7.2 Contractor shall conduct hydrostatic testing of the cable in accordance with section 4.1.1.1 of reference 2.3. Hydrostatic tank shall have an operating pressure of 650psi.
3.5.7. At conclusion of Unit testing and Full-length Tension testing, the contractor shall develop a report of the results. (CDRL A005)
3.6. Quality Assurance (QA)
3.6.1. The contractor shall adhere to the following QA requirements:
3.6.1.1. Equipment calibration requirements shall be identified in the inspection and testing section of the Quality Assurance Program Plan (CDRL A003). Equipment calibration testing data shall be identified in the Calibration Report (CDRL A009).
3.6.1.2. A review and sign-off authentication that all fabrication steps have occurred shall be provided in the Certificate of Compliance (CDRL A010).
3.6.1.3. In accordance with applicable reference 2.3, Environmental conditions such as temperature, atmospheric pressure, and relative humidity during test and curing events shall be documented to ensure consistency for all cable production activities. (CDRL A011)
3.6.1.4. In accordance with applicable references 2.1-2.3, raw cable, cable assembly, and molding dimensional checks are required for all cables. Contractor shall clearly distinguish between required dimensions and actual measured dimensions. (CDRL A011).
3.6.1.5. The contractor shall verify connector fit check and keyway locations. Assure mating connectors are in good working condition, pin contacts are straight and not recessed. The connectors shall mate without binding or excessive force. (CDRL A011).
3.6.1.6. Any cable with out-of-tolerance dimensions, as well as physical defects (kinking, armor displacement, etc.), or electrical defects (DC resistance, capacitance, etc) shall be documented and submitted to the Government (CDRLS A011 and A012).
3.6.1.7. The contractor shall conduct visual inspection of all moldings. Acceptable molds are free of flash, blowholes, cloudiness or other imperfections. Small bubbles that form on the face and top surface are not be a cause for rejection provided the molds are in accordance with applicable document 2.3. Any bubbles present in the molding shall be documented and submitted to the government with pictures for approval prior to proceeding with any fabrication activities (CDRLs A008 and A012).
3.7. Shipping, Handling, and Storage
3.7.1. Each cable assembly shall be installed onto a GFM cable box (NAVSEA; Cage 53711; P/N: 8603581-1) and shipped to the designated delivery address. NSWCPD will perform a final verification and approval of a sample size of cables (if shipped as a lot).
3.7.2. Connectors and pigtails shall be fixed securely with heavy-duty zip ties on both sides of the spool on the inside of the spool flanges.
3.7.3. Connectors, staff hardware, and drum side hardware shall be orientated to allow access for Government QA inspection without unspooling the cable reels.
3.7.4. Connectors shall be covered in protective wrap to ensure no damage during shipping.
3.7.5. Cables shall be installed onto the cable box with the staff and fairing end installed first.
3.7.6. Completed cable assemblies shall be reeled and stored onto the GFM cable boxes per the equipment requirements, safety cautions, and user procedures outlined in SOW 2.6. Ensure reel locking pins and drag assembly are properly installed to prevent reel rotation during transit.
3.7.7. Prior to shipping, cable shall be stored in a non-stacked configuration within a climate-controlled facility that is maintained between 50-80°F and 35-55% relative humidity. Storage facility shall be capable of storing up to 40 full assembly cables.
3.7.8. All Units will be shipped to the Mechanicsburg, PA geographical area. The specific shipping/delivery location will be specified in each individual order.
4.0 DATA REQUIREMENTS
Digital submittals will be delivered via DOD safe at the website safe.apps.mil. Request access for a secure drop from the TPOC. Uploaded files shall be encrypted with a minimum 16-character passphrase.
3.0 4.0
4.1. Status Report (CDRL A001)
4.1.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.1.2. The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
4.2. Manufacturing Plan (CDRL A002)
4.2.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.3. Quality Assurance Program Plan (CDRL A003)
4.3.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.4. Test and Inspection Plan (CDRL A004)
4.4.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.4.2. Refer to Sections 3.5.1 and 3.7.1.
4.5. Acceptance Test Report (CDRL A005)
4.5.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.5.2. Refer to Sections 3.3.1.2 and 3.7.3.
4.6. Test/Inspection Report (CDRL A006)
4.6.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.7. Notification of Test/Trials (CDRL A007)
4.7.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.8. Unit Pictures (CDRL A008)
4.8.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.9. Calibration Report (CDRL A009)
4.9.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.10. Certificate of Compliance (CDRL A010)
4.10.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.11. Final Inspection Report (CDRL A011)
4.11.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.12. Request for Wavier (CDRL A012)
4.12.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.13. Counterfeit Prevention Plan (CDRL A013)
4.13.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.14. Government Furnished Property Inventory Baseline Report (CDRL A014)
4.14.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.15. Risk Management Status Report (CDRL A015)
4.15.1. This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
5.0 SECURITY REQUIREMENTS
Not used.
5.2 ON SITE WORK.
Not Used.
5.3 DD254 REQUIREMENT.
Not Used.
5.4 OPERATIONS SECURITY (OPSEC)
5.4.1 The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NSWC Philadelphia Division's (NSWCPD) Critical Information List (CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted. Performance under this contract requires the contractor to adhere to OPSEC requirements. The Contractor may not impose OPSEC requirements on its subcontractors unless NSWCPD approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NSWCPD’s CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency. Questions concerning these requirements shall be directed to the PCO.
5.4.2 CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.
Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.
5.4.3 NSWCPD’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NSWCPD Public Release Authority for review.
5.4.4 Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NSWC PD Security Division (Code 105).
5.5 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED INFORMATION (CUI) All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.
5.6 PLANNING, PROGRAMMING, BUDGETING AND EXECUTION (PPBE) DATA.
Not Used.
5.7 U-NNPI SECURITY REQUIREMENTS
Not Used.
5.8 U-NNPI
Not Used.
6.0 PLACE OF PERFORMANCE
The contractor's primary place of performance shall be at contractor’s facilities. It is expected that 100% of the work will occur off-site at the contractor facility.
7.0 TRAVEL
Not Used.
8.0 GOVERNMENT FURNISHED PROPERTY
The following non-consumable equipment shall be delivered to the contractor within 15 days of award:
Non-Consumable GFE
| Item |
| Description |
| Part Number |
| QTY |
| NC-1 |
| Connector Watertight Dummy Plug |
| MSSKDSR |
| 2 |
| NC-2 |
| Connector Watertight Dummy Plug |
| MSSLDSR |
| 2 |
| NC-3 |
| Air Motor with stand |
| 4AM-70C-CB60 |
| 1 |
| NC-4 |
| Cable Box |
| 8603581-1 |
| 100 |
The Air Motor and Dummy Plugs will be provided to the contractor to facilitate FAT and Unit testing.
The contractor shall return this GFE to NSWCPD within 15 days of the completion of the contract or upon request by NSWCPD.
8.1 Issuance of the DD 1149 “Requisition and Invoice/Shipping Document”
The contractor must obtain a DD-1149s before removing any Government Furnished Property, including Plant, Property, and Equipment (PP&E) from NSWCPD premises for general use. For situations where the contractor picks up/replaces NSWCPD property for maintenance purposes, the contractor shall provide an equipment receipt, showing Manufacturer, Model/Part Number, Serial Number and Asset Number/Barcode, on their company letterhead to the COR.
9.0 GOVERNMENT FURNISHED INFORMATION
Not Used.
10.0 PURCHASES
Not Used.
11.0 COUNTERFEIT MATERIAL PREVENTION
11.1 Non-Electronic Materiels
11.1.1 Department of the Navy contractors (and their subcontractors at all tiers) who obtain critical or high risk materiel shall implement a risk mitigation process as follows:
11.1.1.1 If the materiel is currently in production or currently available, materiel shall be obtained only from authorized suppliers
11.1.1.2 If the materiel is not in production or currently available from authorized suppliers, materiel shall be obtained from suppliers that meet appropriate counterfeit avoidance criteria
11.1.1.3 Contractor shall notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized supplier;
11.1.1.4 Contractor shall take mitigating actions to authenticate the materiel if purchased from an unauthorized supplier
11.1.1.5 Contractor shall report instances of counterfeit and suspect counterfeit materiel to the contracting officer and the GIDEP as soon as the contractor becomes aware of the issue.
12.0 PERSONNEL
Not Used.
13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING (ECRAFT) SYSTEM
Not Used.
14.0 SPECIAL REQUIREMENTS
14.1 Quality Management System
Not Used.
14.2 Risk Management (CDRL A015)
14.2.1 The contractor shall develop an internal risk management program and work jointly with the TPOC to develop an overall risk management program.
14.2.2 Assign responsibility for risk mitigation activities, and monitor progress through a formal tracking system.
14.2.3 Conduct risk identification and analysis during all phases of the program, including proposal development. Develop appropriate risk mitigation strategies and plans.
14.2.4 Use projected consequences of high probability risks to help establish the level of management reserve and schedule reserve.
14.2.5 Assess impact of identified performance, schedule and costs risks to estimate at completion, and include in the estimate as appropriate. Develop a range of estimates (best case, most likely, worst case).
14.2.6 The Contractor shall capture risks and associated mitigation plans in a risk database and provide status updates to the Government for all documented risks upon request.
15. DELIVERY
Naval Surface Warfare Center- Philadelphia Division Building 542 542 Langley Avenue Philadelphia, PA 19112 Attn: Kevin Harrington 215-897-1727
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department means the Department of the Navy.
(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA) (OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-209-H001 FIRST ARTICLE (CONTRACTOR TESTING) (NAVSEA) (OCT 2018)
(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used.
(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A.
(c) Pursuant to paragraph (e) of the clause entitled "First Article Approval--Contractor Testing" (FAR 52.209-3), the First Article shall not be delivered as part of the production quantity.
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
None
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal TBD dated TBD in response to Solicitation No. N6449822R4052.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) CDRL A001-A015, attached hereto.
(End of Text)
C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)
(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.
(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:
(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;
(2) Description of work necessary to undo work already completed which has been deleted by the change;
(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;
(4) Description of interference and inefficiencies in performing the change;
(5) Description of each element of disruption and exactly how work has been, or will be disrupted:
(i) The calendar period of time during which disruption occurred, or will occur;
(ii) Area(s) aboard the vessel where disruption occurred, or will occur;
(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;
(iv) Scheduling of trades before, during, and after period of disruption;
(v) Description of measures taken to lessen the disruptive effect of the change;
(6) Delay in delivery attributable solely to the change;
(7) Other work attributable to the change;
(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, crossreferenced to the detailed information provided as required above; and
(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.
(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.
(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph (b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
C-242-H002 POST AWARD MEETING (NAVSEA) (OCT 2018)
(a) A post-award meeting with the successful offeror will be conducted within [ 30 ] days after award of the contract. The meeting will be held via phoneconference.
(b) The contractor will be given 10 working days notice prior to the date of the meeting by the Contracting Officer.
(c) The requirement for a post-award meeting shall in no event constitute grounds for excusable delay by the contractor in performance of any provisions in the contract.
(d) The post-award meeting will include, but is not limited to, the establishment of work level points of contact, determining the administration strategy, roles and responsibilities, and ensure prompt payment and close out. Specific topics shall be mutually agreed to prior to the meeting.
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
(End of text)
Section D - Packaging and Marking
D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.
D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
| (1) name and business address of the Contractor |
| (2) contract number |
| (3) sponsor: |
| TBD |
(Name of Individual Sponsor)
TBD
(Name of Requiring Activity)
TBD
(City and State)
D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)
For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts shall be marked in accordance with generally accepted commercial practice.
(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020)
Item(s) 0002- 0004 The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.
D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (FEB 2022)
(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM-D-3951-18 approved 1 May 2018, Standard Practice for Commercial Packing.
(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.
(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.
D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-4 |
| Inspection Of Services--Fixed Price |
| AUG 1996 |
| 52.246-15 |
| Certificate of Conformance |
| APR 1984 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.
E-246-H015 INSPECTION AND ACCEPTANCE OF ENGINEERING SERVICES IN SUPPORT OF SUPPLIES (NAVSEA) (FEB 2019)
Item(s) 0001 - For engineering services in support of delivered supplies, authorization for services shall be made by the PCO or Contracting Officer’s Representative (COR). Inspection and acceptance shall be made by the COR or a designated representative of the Government following the receipt of the certification of performance on the delivered hardware.
E-246-H016 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES (NAVSEA) (OCT 2018)
Item(s) 0001-0004 - Inspection and acceptance shall be made at destination by a representative of the Government.
E-246-W002 CERTIFICATE OF COMPLIANCE (NAVSEA) (OCT 2018)
(a) A certification…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .