N6449821R4005-0003.pdf

PDF 169 KB Posted

Attached to
Procurement of Plastic Waste Processing Equipment RFP N6449821R4005
Solicitation number
N6449821R4005
Issued by

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er questions from prospective Offerors. As such, the follow ing changes are made to the RFP:

1) Inspection and Acceptance locations have been changed to "origin";

2) Tw o draw ings have been added as attachments.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6449821R4005

X 9B. DATED (SEE ITEM 11)

08-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Sep-2021

CODE

NAVAL SURFACE WARFARE CENTER PHILA

CODE 02321, MICHAEL NOLAN

215-897-8914, MICHAEL.D.NOLAN@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

N64498 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6449821R4005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

QUESTIONS

Amednment 0003

Question 1: On page 28 – Section G of the solicitation, drawing 593-8729158 and 593-872-9159 are referenced but not included in the list of Attachment A – Drawing_of_Record_13JUL20. Can you please provide a copy of those drawings?

Answer 1: Both of these drawings have been added as attachments to the RFP and have been uploaded to Beta.SAM.

Question 2: On page 40 & 41 of the solicitation, “inspection” and “acceptance” are both listed as “destination”. Can you please confirm this should still be “destination” and not “origin”

Answer 2: Inspection and Acceptance locations should be “origin.” Inspection and Acceptance locations have been updated via Amendment 0003.

Amendment 0002

Question 1: Amendment 0001 added Attachment 5, Small Business Participation Commitment Document (SBPCD). But I can’t seem to find the attachment on SAM.Gov.

Answer 1: Attachment 5, SBPCD has been uploaded to beta.SAM.gov on 23 August 2021.

Question 2: The RFP States "The proposal shall contain four (4) separate volumes …, please confirm this should read six (6) separate volumes.

Answer 2: Yes. This should read six (6) separate volumes. This has been corrected via Amendment 0002.

Question 3: How would the government like industry to demonstrate submission to obtain a QMS acceptance letter? Is email receipt confirmation acceptable?

Answer 3: Email receipt confirmation of the submission to the SEA04RP inbox is acceptable.

Question 4: Is the delivery schedule noted for Clin/SubClins 005 thru 0011 valid for Delivery Orders with multiple quantities?

Answer 4: The delivery schedule noted for CLINs/SLINs 005 through 0011 is valid for Delivery Orders with multiple quantities.

Question 5: Does the requirement for IUID labeling apply for each CLIN, or any component of the CLIN over $5,000?

Answer 5: The IUID requirement applies to any unit with a unit acquisition cost greater than $5,000.

SECTION E - INSPECTION AND ACCEPTANCE

The Acceptance/Inspection Schedule for CLIN 0001 has been changed from:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Origin Government Destination Government

To:

Origin Government Origin Government

The Acceptance/Inspection Schedule for CLIN 0002 has been changed from:

Origin Government Destination Government

To:

The Acceptance/Inspection Schedule for CLIN 0003 has been changed from:

Origin Government Destination Government

To:

The Acceptance/Inspection Schedule for CLIN 0004 has been changed from:

Origin Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0005AA has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0005AB has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0005AC has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0005AD has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0005AE has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0006AA has been changed from:

Destination Government Destination Government

The Acceptance/Inspection Schedule for SUBCLIN 0006AB has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0006AC has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0006AD has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0006AE has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0007AA has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0007AB has been changed from:

Destination Government Destination Government

The Acceptance/Inspection Schedule for SUBCLIN 0007AC has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0007AD has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0007AE has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0008AA has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0008AB has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0008AC has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0008AD has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0008AE has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0009AA has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0009AB has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0009AC has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0009AD has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0009AE has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0010AA has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0010AB has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0010AC has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0010AD has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0010AE has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0011AA has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0011AB has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0011AC has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0011AD has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for SUBCLIN 0011AE has been changed from:

Destination Government Destination Government

To:

The Acceptance/Inspection Schedule for CLIN 0012 has been changed from:

Destination Government Destination Government

To:

The following have been added by full text:

E-246-H017 INSPECTION AND ACCEPTANCE OF F.O.B. ORIGIN DELIVERIES (NAVSEA) (OCT 2018)

Item(s) 0001 to 0011 - Inspection and acceptance shall be made at source by a representative of the cognizant Contract Administration Office or other representative of the Government.

(End of text)

The following have been deleted:

E-246-H016 INSPECTION AND ACCEPTANCE OF F.O.B.

DESTINATION DELIVERIES (NAVSEA) (OCT 2018)

OCT 2018

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRLs A001 - A009 18 12-FEB-2021 Exhibit B CDRL A0010 - Small

Business Utililzation Report

2 29-JUL-2021

Attachment 1 Drawings of Record 2 13-JUL-2020 Attachment 2 CMU Test Procedures 27 13-JUL-2020 Attachment 3 Mini AU and AU Test

Procedures

7 13-JUL-2020

Attachment 4 GFP Attachment 1 20-JUL-2020 Attachment 5 Small Business

Participation Commitment Document

(SBPCD)

3 29-JUL-2021

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRLs A001 - A009 18 12-FEB-2021 Exhibit B CDRL A0010 - Small

Business Utililzation Report

2 29-JUL-2021

Attachment 1 Drawings of Record 2 13-JUL-2020 Attachment 2 CMU Test Procedures 27 13-JUL-2020

Attachment 3 Mini AU and AU Test Procedures

7 13-JUL-2020

Attachment 4 GFP Attachment 1 20-JUL-2020 Attachment 5 Small Business

Participation Commitment Document

(SBPCD)

3 29-JUL-2021

Attachment 6 Drawing No. 593- 8729158

6 01-SEP-2021

Attachment 7 Drawing No. 593- 8729159

2 01-SEP-2021

(End of Summary of Changes)

File details come from the government source that posted it. Updated .