8 - GFP Attachment 1 - PWP.xlsx

XLSX spreadsheet 9 MB Posted

Attached to
Procurement of Plastic Waste Processing Equipment RFP N6449821R4005
Solicitation number
N6449821R4005
Issued by

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT INFO

ERROR:#REF! GOVERNMENT FURNISHED PROPERTY * denotes a required field

Attachment Number* 1 Attachment Date* 2020-08-07

GOVERNMENT CONTRACTING OFFICER

Name John Stefano Email john.stefano@navy.mil Phone 215-897-8437

Document Description* Solicitation Mod Number Amendment No.

CUSTODIAL PROCUREMENT INSTRUMENT IDENTIFICATION

Contract Number Type* DoD Contract (FAR)

SOLICITATION, CONTRACT or UNIFORM PIID NUMBER*Order NumberOR
PIID FORMAT (FY16+)Old Order Format

N64498 FY21 FFP TBD Issuing Office DoDAAC Issuing Year Contract Type Sequence Number

Consolidated GFP Attachment Version 2.1

Requisitioned /xl/drawings/drawing1.xml#Requisition!A1NON-Serially Managed /xl/drawings/drawing1.xml#'NON-Serially%20Managed%20Items'!A1Serially Managed /xl/drawings/drawing1.xml#'Serially%20Managed%20Items'!A1 Serially Managed Items

* denotes a required field † A minimum of one of these fields is required for each item record †† If either "Mfr CAGE" or "Part Number" is entered, the other is required.

If any one of duration, time unit, or delivery event are populated, all 3 must be populated.

Serially Managed Items

LINE NUMBER*ITEM NAME*ITEM DESCRIPTION*NSN†MFR CAGE†,††PART NUMBER†,††MODEL NUMBER†QTY*UNIT OF MEASURE*UNIT ACQ COSTUSE AS-IS*DELIVERY DATEDURATIONTIME UNITDELIVERY EVENTNOTES
1Mod I Compress Melt UnitAllen Bradley PLC USB Programming ModuleN/A1N0X4PLC-AB-CMU-02202080-MEMBAK1.00000Each50.00true72.00MonthsAward DateDelivery date will be within 30 days of award.
2Mod I Compress Melt UnitMaple System HMI USB Programming ModuleN/A1N0X4HMI-AB-CMU-0220N/A1.00000Each25.00true72.00MonthsAward DateDelivery date will be within 30 days of award.
3SWAMIMaple System HMI USB Programming ModuleN/A1N0X42010B24N/A1.00000Each25.00true72.00MonthsAward DateDelivery date will be within 30 days of award.

Requisitioned /xl/drawings/drawing2.xml#Requisition!A1NON-Serially Managed /xl/drawings/drawing2.xml#'NON-Serially%20Managed%20Items'!A1Contract Information /xl/drawings/drawing2.xml#'CONTRACT%20INFO'!A1 Non-Serially Managed Items

* denotes a required field † A minimum of one of these fields is required for each item record †† If either "Mfr CAGE" or "Part Number" is entered, the other is required.

If any one of duration, time unit, or delivery event are populated, all 3 must be populated.

NON-Serially Managed Items

LINE NUMBER* ITEM NAME* ITEM DESCRIPTION* NSN† MFR CAGE†,†† PART NUMBER†,†† MODEL NUMBER† QTY* UNIT OF MEASURE* UNIT ACQ COST USE AS-IS* DELIVERY DATE DURATION TIME UNIT DELIVERY EVENT NOTES

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .