Section_J-12_ELINS_Amend_02.xlsx
XLSX spreadsheet 68 KB Posted
- Attached to
- Refuse Collection and Disposal
- Solicitation number
- N6247318R1408
About this file
Section_J-12_ELINS_Amend_02.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section_J-12_ELINS_Amend_01.xlsx | XLSX spreadsheet | |
| N6247318R1408_Section_C_Amend_01.docx | DOCX document | |
| N6247318R1408_Amend_01.docx | DOCX document | |
| 110_-_Section_J_-_ELINS_UnPopulated.xlsx | XLSX spreadsheet | |
| N6247318R1408_Solicitation_12July2018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
ATTACHMENT J-12
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT # |
| EXHIBIT A - CLIN 9000 |
Line Item 0001 Base Year, MCAS Yuma
PROVIDE PRICES FOR REFUSE COLLECTION IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN A001 THROUGH A003
| Client ELIN | DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL AMOUNT |
| A001 | Perform Recurring Refuse Collection Services | 12 | M | ||
| A002 | LITTER BARRELS - Perform Recurring Refuse Collection Services | 12 | M | ||
| A003 | LANDFILL & DISPOSAL FEES - Perform | 1 | YR | NTE | |
| Recurring Refuse Collection Services |
(Historical data: FY17 = 1,900 tons)
TOTAL FFP LINE ITEMS - A001 THROUGH A003
ATTACHMENT J-12
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT # |
| EXHIBIT A - CLIN 9000 |
Line Item 0002 Base Year - Indefinite Delivery Indefinite Quantity Work
PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELIN A004
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | ||||
| PRICE | TOTAL |
AMOUNT
| A004 | IDIQ WORK | Summation of total prices for exhibit line items numbers (ELINs) A001A through A001R. Pricing shall include all equipment, labor, materials, supervision and overhead required to complete the described task. Work associated with this CLIN is at the Marine Corps Air Station and Cannon Air Defense Center, Yuma, AZ, remote training areas associated with MCAS Yuma, and Camp Billy Machen, Niland, California. | ||
| A004A | Area 1 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 20 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 80 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 12 | EA | ||
| 20 CYD | 60 | EA | ||
| 40 CYD | 60 | EA | ||
| 60 CYD | 10 | EA | ||
| A004B | Area 1 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 30 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 400 | EA | ||
| 8 CYD | 30 | EA | ||
| 12 CYD | 20 | EA | ||
| 20 CYD | 80 | EA | ||
| 40 CYD | 200 | EA | ||
| 60 CYD | 80 | EA | ||
| A004C | Area 2 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 5 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 50 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 50 | EA | ||
| 40 CYD | 50 | EA | ||
| A004D | Area 2 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 5 | EA | ||
| 6 CYD | 400 | EA | ||
| 8 CYD | 10 | EA | ||
| 12 CYD | 5 | EA | ||
| 20 CYD | 50 | EA | ||
| 40 CYD | 100 | EA | ||
| A004E | Area 3 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 15 | EA | ||
| A004F | Area 3 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 1 | EA | ||
| 12 CYD | 5 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 80 | EA | ||
| A004G | Area 4 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 1 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| A004H | Area 4 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 15 | EA | ||
| A004I | Area 5 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 20 | EA | ||
| A004J | Area 5 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 100 | EA | ||
| 8 CYD | 10 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 100 | EA | ||
| 40 CYD | 200 | EA | ||
| A004K | Stencil & Restencil Dumpsters & Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall stencil and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 10 | EA |
| A004L | Clean Dumpsters | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| A004M | Clean Litter Barrels | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 10 | EA |
| A004N | Provide Replacement Dumpster | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean, paint, and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| A004O | Replace Non-Reparable Dumpster and Containers | Non-Repairable Dumpster or Containers to be determined by the Contractor. When repair work is expected to exceed the FFP limits for any sub-annex, the contractor is to replace with a New Dumpster or Container when the dumpster or container is deemed Not-Repairable. The new dumpster or container shall be clean, painted, and restencil as required by the Government. The Contractor shall notify the KO withing 48 hours after the Non-Repairable Dumpster or Container is discovered. Completed when requirement is secured and whithin 5 working days. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| A004P | Provide Replacement Container Lid | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall replace dumpster and container lids as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| A004Q | Service Petroleum Contaminated Soil (PCS) Container | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove container as required by the Government. The contractor shall service the 20 CYD PCS container as requested by the Government. The contractor must dipose PCS waste at an authorized land fill. The contractor must provide a liner to cover the entire interior surface of the container to prevent leaks and with capability to close the liner when container is full. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 8 | TON |
| A004R | Landfill & Disposal Fees | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall dispose dumpsters and containers contents as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 600 | TON |
| TOTAL IQ LINE ITEMS - A004 |
TOTAL FOR ALL LINE ITEMS A001 THROUGH A004
Opt Year 1
ATTACHMENT J-12
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT # |
| EXHIBIT A - CLIN 9000 |
Line Item 0003 Option Year 1, MCAS Yuma
PROVIDE PRICES FOR REFUSE COLLECTION IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN B001 THROUGH B003
| Client ELIN | DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL AMOUNT |
| B001 | Perform Recurring Refuse Collection Services | 12 | M | ||
| B002 | LITTER BARRELS - Perform Recurring Refuse Collection Services | 12 | M | ||
| B003 | LANDFILL & DISPOSAL FEES - Perform | 1 | YR | NTE | |
| Recurring Refuse Collection Services |
(Historical data: FY17 = 1,900 tons)
TOTAL FFP LINE ITEMS - B001 THROUGH B003
ATTACHMENT J-12
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT # |
| EXHIBIT A - CLIN 9000 |
Line Item 0004 Option Year 1 - Indefinite Delivery Indefinite Quantity Work
PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELIN B004
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | ||||
| PRICE | TOTAL |
AMOUNT
| B004 | IDIQ WORK | Summation of total prices for exhibit line items numbers (ELINs) B001A through B001R. Pricing shall include all equipment, labor, materials, supervision and overhead required to complete the described task. Work associated with this CLIN is at the Marine Corps Air Station and Cannon Air Defense Center, Yuma, AZ, remote training areas associated with MCAS Yuma, and Camp Billy Machen, Niland, California. | ||
| B004A | Area 1 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 20 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 80 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 12 | EA | ||
| 20 CYD | 60 | EA | ||
| 40 CYD | 60 | EA | ||
| 60 CYD | 10 | EA | ||
| B004B | Area 1 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 30 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 400 | EA | ||
| 8 CYD | 30 | EA | ||
| 12 CYD | 20 | EA | ||
| 20 CYD | 80 | EA | ||
| 40 CYD | 200 | EA | ||
| 60 CYD | 80 | EA | ||
| B004C | Area 2 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 5 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 50 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 50 | EA | ||
| 40 CYD | 50 | EA | ||
| B004D | Area 2 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 5 | EA | ||
| 6 CYD | 400 | EA | ||
| 8 CYD | 10 | EA | ||
| 12 CYD | 5 | EA | ||
| 20 CYD | 50 | EA | ||
| 40 CYD | 100 | EA | ||
| B004E | Area 3 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 15 | EA | ||
| B004F | Area 3 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 1 | EA | ||
| 12 CYD | 5 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 80 | EA | ||
| B004G | Area 4 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 1 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| B004H | Area 4 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 15 | EA | ||
| B004I | Area 5 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 20 | EA | ||
| B004J | Area 5 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 100 | EA | ||
| 8 CYD | 10 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 100 | EA | ||
| 40 CYD | 200 | EA | ||
| B004K | Stencil & Restencil Dumpsters & Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall stencil and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 10 | EA |
| B004L | Clean Dumpsters | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| B004M | Clean Litter Barrels | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 10 | EA |
| B004N | Provide Replacement Dumpster | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean, paint, and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| B004O | Replace Non-Reparable Dumpster and Containers | Non-Repairable Dumpster or Containers to be determined by the Contractor. When repair work is expected to exceed the FFP limits for any sub-annex, the contractor is to replace with a New Dumpster or Container when the dumpster or container is deemed Not-Repairable. The new dumpster or container shall be clean, painted, and restencil as required by the Government. The Contractor shall notify the KO withing 48 hours after the Non-Repairable Dumpster or Container is discovered. Completed when requirement is secured and whithin 5 working days. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| B004P | Provide Replacement Container Lid | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall replace dumpster and container lids as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| B004Q | Service Petroleum Contaminated Soil (PCS) Container | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove container as required by the Government. The contractor shall service the 20 CYD PCS container as requested by the Government. The contractor must dipose PCS waste at an authorized land fill. The contractor must provide a liner to cover the entire interior surface of the container to prevent leaks and with capability to close the liner when container is full. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 8 | TON |
| B004R | Landfill & Disposal Fees | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall dispose dumpsters and containers contents as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 600 | TON |
| TOTAL IQ LINE ITEMS - B004 |
TOTAL FOR ALL LINE ITEMS B001 THROUGH B004
Opt Year 2
ATTACHMENT J-12
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT # |
| EXHIBIT A - CLIN 9000 |
Line Item 0005 Option Year 2 MCAS Yuma
PROVIDE PRICES FOR REFUSE COLLECTION IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN C001 THROUGH C003
| Client ELIN | DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL AMOUNT |
| C001 | Perform Recurring Refuse Collection Services | 12 | M | ||
| C002 | LITTER BARRELS - Perform Recurring Refuse Collection Services | 12 | M | ||
| C003 | LANDFILL & DISPOSAL FEES - Perform | 1 | YR | NTE | |
| Recurring Refuse Collection Services |
(Historical data: FY17 = 1,900 tons)
TOTAL FFP LINE ITEMS - C001 THROUGH C003
ATTACHMENT J-12
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT # |
| EXHIBIT A - CLIN 9000 |
Line Item 0006 Option Year 2 - Indefinite Delivery Indefinite Quantity Work
PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELIN C004
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | ||||
| PRICE | TOTAL |
AMOUNT
| C004 | IDIQ WORK | Summation of total prices for exhibit line items numbers (ELINs) C001A through C001R. Pricing shall include all equipment, labor, materials, supervision and overhead required to complete the described task. Work associated with this CLIN is at the Marine Corps Air Station and Cannon Air Defense Center, Yuma, AZ, remote training areas associated with MCAS Yuma, and Camp Billy Machen, Niland, California. | ||
| C004A | Area 1 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 20 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 80 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 12 | EA | ||
| 20 CYD | 60 | EA | ||
| 40 CYD | 60 | EA | ||
| 60 CYD | 10 | EA | ||
| C004B | Area 1 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 30 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 400 | EA | ||
| 8 CYD | 30 | EA | ||
| 12 CYD | 20 | EA | ||
| 20 CYD | 80 | EA | ||
| 40 CYD | 200 | EA | ||
| 60 CYD | 80 | EA | ||
| C004C | Area 2 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 5 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 50 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 50 | EA | ||
| 40 CYD | 50 | EA | ||
| C004D | Area 2 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 5 | EA | ||
| 6 CYD | 400 | EA | ||
| 8 CYD | 10 | EA | ||
| 12 CYD | 5 | EA | ||
| 20 CYD | 50 | EA | ||
| 40 CYD | 100 | EA | ||
| C004E | Area 3 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 15 | EA | ||
| C004F | Area 3 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 1 | EA | ||
| 12 CYD | 5 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 80 | EA | ||
| C004G | Area 4 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 1 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| C004H | Area 4 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 15 | EA | ||
| C004I | Area 5 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 20 | EA | ||
| C004J | Area 5 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 100 | EA | ||
| 8 CYD | 10 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 100 | EA | ||
| 40 CYD | 200 | EA | ||
| C004K | Stencil & Restencil Dumpsters & Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall stencil and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 10 | EA |
| C004L | Clean Dumpsters | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| C004M | Clean Litter Barrels | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 10 | EA |
| C004N | Provide Replacement Dumpster | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean, paint, and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| C004O | Replace Non-Reparable Dumpster and Containers | Non-Repairable Dumpster or Containers to be determined by the Contractor. When repair work is expected to exceed the FFP limits for any sub-annex, the contractor is to replace with a New Dumpster or Container when the dumpster or container is deemed Not-Repairable. The new dumpster or container shall be clean, painted, and restencil as required by the Government. The Contractor shall notify the KO withing 48 hours after the Non-Repairable Dumpster or Container is discovered. Completed when requirement is secured and whithin 5 working days. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| C004P | Provide Replacement Container Lid | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall replace dumpster and container lids as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| C004Q | Service Petroleum Contaminated Soil (PCS) Container | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove container as required by the Government. The contractor shall service the 20 CYD PCS container as requested by the Government. The contractor must dipose PCS waste at an authorized land fill. The contractor must provide a liner to cover the entire interior surface of the container to prevent leaks and with capability to close the liner when container is full. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 8 | TON |
| C004R | Landfill & Disposal Fees | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall dispose dumpsters and containers contents as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 600 | TON |
| TOTAL IQ LINE ITEMS - C004 |
TOTAL FOR ALL LINE ITEMS C001 THROUGH C004
Opt Year 3
ATTACHMENT J-12
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT # |
| EXHIBIT A - CLIN 9000 |
Line Item 0007 Option Year 3, MCAS Yuma
PROVIDE PRICES FOR REFUSE COLLECTION IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN D001 THROUGH D003
| Client ELIN | DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL AMOUNT |
| D001 | Perform Recurring Refuse Collection Services | 12 | M | ||
| D002 | LITTER BARRELS - Perform Recurring Refuse Collection Services | 12 | M | ||
| D003 | LANDFILL & DISPOSAL FEES - Perform | 1 | YR | NTE | |
| Recurring Refuse Collection Services |
(Historical data: FY17 = 1,900 tons)
TOTAL FFP LINE ITEMS - D001 THROUGH D003
ATTACHMENT J-12
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT # |
| EXHIBIT A - CLIN 9000 |
Line Item 0008 Option Year 3 - Indefinite Delivery Indefinite Quantity Work
PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELIN D004
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | ||||
| PRICE | TOTAL |
AMOUNT
| D004 | IDIQ WORK | Summation of total prices for exhibit line items numbers (ELINs) D001A through D001R. Pricing shall include all equipment, labor, materials, supervision and overhead required to complete the described task. Work associated with this CLIN is at the Marine Corps Air Station and Cannon Air Defense Center, Yuma, AZ, remote training areas associated with MCAS Yuma, and Camp Billy Machen, Niland, California. | ||
| D004A | Area 1 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 20 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 80 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 12 | EA | ||
| 20 CYD | 60 | EA | ||
| 40 CYD | 60 | EA | ||
| 60 CYD | 10 | EA | ||
| D004B | Area 1 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 30 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 400 | EA | ||
| 8 CYD | 30 | EA | ||
| 12 CYD | 20 | EA | ||
| 20 CYD | 80 | EA | ||
| 40 CYD | 200 | EA | ||
| 60 CYD | 80 | EA | ||
| D004C | Area 2 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 5 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 50 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 50 | EA | ||
| 40 CYD | 50 | EA | ||
| D004D | Area 2 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 5 | EA | ||
| 6 CYD | 400 | EA | ||
| 8 CYD | 10 | EA | ||
| 12 CYD | 5 | EA | ||
| 20 CYD | 50 | EA | ||
| 40 CYD | 100 | EA | ||
| D004E | Area 3 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 15 | EA | ||
| D004F | Area 3 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 1 | EA | ||
| 12 CYD | 5 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 80 | EA | ||
| D004G | Area 4 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 1 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| D004H | Area 4 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 15 | EA | ||
| D004I | Area 5 - Provide, Service and Remove Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 2 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 2 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 20 | EA | ||
| D004J | Area 5 - Service Dumpsters and Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 10 | EA | ||
| 5 CYD | 2 | EA | ||
| 6 CYD | 100 | EA | ||
| 8 CYD | 10 | EA | ||
| 12 CYD | 2 | EA | ||
| 20 CYD | 100 | EA | ||
| 40 CYD | 200 | EA | ||
| D004K | Stencil & Restencil Dumpsters & Containers | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall stencil and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 10 | EA |
| D004L | Clean Dumpsters | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| D004M | Clean Litter Barrels | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | 10 | EA |
| D004N | Provide Replacement Dumpster | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean, paint, and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| D004O | Replace Non-Reparable Dumpster and Containers | Non-Repairable Dumpster or Containers to be determined by the Contractor. When repair work is expected to exceed the FFP limits for any sub-annex, the contractor is to replace with a New Dumpster or Container when the dumpster or container is deemed Not-Repairable. The new dumpster or container shall be clean, painted, and restencil as required by the Government. The Contractor shall notify the KO withing 48 hours after the Non-Repairable Dumpster or Container is discovered. Completed when requirement is secured and whithin 5 working days. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA | ||
| 12 CYD | 1 | EA | ||
| 20 CYD | 10 | EA | ||
| 40 CYD | 10 | EA | ||
| D004P | Provide Replacement Container Lid | When repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall replace dumpster and container lids as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day. | ||
| 4 CYD | 1 | EA | ||
| 5 CYD | 1 | EA | ||
| 6 CYD | 10 | EA | ||
| 8 CYD | 5 | EA |