Section_J-12_ELINS_Amend_02.xlsx

XLSX spreadsheet 68 KB Posted

Attached to
Refuse Collection and Disposal
Solicitation number
N6247318R1408
Issued by

About this file

Section_J-12_ELINS_Amend_02.xlsx

View the file

Other files

File Type Posted
Section_J-12_ELINS_Amend_01.xlsx XLSX spreadsheet
N6247318R1408_Section_C_Amend_01.docx DOCX document
N6247318R1408_Amend_01.docx DOCX document
110_-_Section_J_-_ELINS_UnPopulated.xlsx XLSX spreadsheet
N6247318R1408_Solicitation_12July2018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

ATTACHMENT J-12

EXHIBIT LINE ITEM NUMBERS
CONTRACT #
EXHIBIT A - CLIN 9000

Line Item 0001 Base Year, MCAS Yuma

PROVIDE PRICES FOR REFUSE COLLECTION IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN A001 THROUGH A003

Client ELINDESCRIPTIONQTYUNIT OF ISSUEUNIT PRICETOTAL AMOUNT
A001Perform Recurring Refuse Collection Services12M
A002LITTER BARRELS - Perform Recurring Refuse Collection Services12M
A003LANDFILL & DISPOSAL FEES - Perform1YRNTE
Recurring Refuse Collection Services

(Historical data: FY17 = 1,900 tons)

TOTAL FFP LINE ITEMS - A001 THROUGH A003

ATTACHMENT J-12

EXHIBIT LINE ITEM NUMBERS
CONTRACT #
EXHIBIT A - CLIN 9000

Line Item 0002 Base Year - Indefinite Delivery Indefinite Quantity Work

PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELIN A004

ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

A004IDIQ WORKSummation of total prices for exhibit line items numbers (ELINs) A001A through A001R. Pricing shall include all equipment, labor, materials, supervision and overhead required to complete the described task. Work associated with this CLIN is at the Marine Corps Air Station and Cannon Air Defense Center, Yuma, AZ, remote training areas associated with MCAS Yuma, and Camp Billy Machen, Niland, California.
A004AArea 1 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD20EA
5 CYD2EA
6 CYD80EA
8 CYD2EA
12 CYD12EA
20 CYD60EA
40 CYD60EA
60 CYD10EA
A004BArea 1 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD30EA
5 CYD2EA
6 CYD400EA
8 CYD30EA
12 CYD20EA
20 CYD80EA
40 CYD200EA
60 CYD80EA
A004CArea 2 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD5EA
5 CYD1EA
6 CYD50EA
8 CYD5EA
12 CYD1EA
20 CYD50EA
40 CYD50EA
A004DArea 2 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD5EA
6 CYD400EA
8 CYD10EA
12 CYD5EA
20 CYD50EA
40 CYD100EA
A004EArea 3 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD2EA
6 CYD10EA
8 CYD2EA
12 CYD2EA
20 CYD10EA
40 CYD15EA
A004FArea 3 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD1EA
6 CYD10EA
8 CYD1EA
12 CYD5EA
20 CYD10EA
40 CYD80EA
A004GArea 4 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD1EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
A004HArea 4 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD2EA
6 CYD10EA
8 CYD2EA
12 CYD2EA
20 CYD10EA
40 CYD15EA
A004IArea 5 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD1EA
6 CYD10EA
8 CYD2EA
12 CYD1EA
20 CYD10EA
40 CYD20EA
A004JArea 5 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD2EA
6 CYD100EA
8 CYD10EA
12 CYD2EA
20 CYD100EA
40 CYD200EA
A004KStencil & Restencil Dumpsters & ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall stencil and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.10EA
A004LClean DumpstersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
A004MClean Litter BarrelsWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.10EA
A004NProvide Replacement DumpsterWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean, paint, and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
A004OReplace Non-Reparable Dumpster and ContainersNon-Repairable Dumpster or Containers to be determined by the Contractor. When repair work is expected to exceed the FFP limits for any sub-annex, the contractor is to replace with a New Dumpster or Container when the dumpster or container is deemed Not-Repairable. The new dumpster or container shall be clean, painted, and restencil as required by the Government. The Contractor shall notify the KO withing 48 hours after the Non-Repairable Dumpster or Container is discovered. Completed when requirement is secured and whithin 5 working days.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
A004PProvide Replacement Container LidWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall replace dumpster and container lids as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
A004QService Petroleum Contaminated Soil (PCS) ContainerWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove container as required by the Government. The contractor shall service the 20 CYD PCS container as requested by the Government. The contractor must dipose PCS waste at an authorized land fill. The contractor must provide a liner to cover the entire interior surface of the container to prevent leaks and with capability to close the liner when container is full. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.8TON
A004RLandfill & Disposal FeesWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall dispose dumpsters and containers contents as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.600TON
TOTAL IQ LINE ITEMS - A004

TOTAL FOR ALL LINE ITEMS A001 THROUGH A004

Opt Year 1

ATTACHMENT J-12

EXHIBIT LINE ITEM NUMBERS
CONTRACT #
EXHIBIT A - CLIN 9000

Line Item 0003 Option Year 1, MCAS Yuma

PROVIDE PRICES FOR REFUSE COLLECTION IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN B001 THROUGH B003

Client ELINDESCRIPTIONQTYUNIT OF ISSUEUNIT PRICETOTAL AMOUNT
B001Perform Recurring Refuse Collection Services12M
B002LITTER BARRELS - Perform Recurring Refuse Collection Services12M
B003LANDFILL & DISPOSAL FEES - Perform1YRNTE
Recurring Refuse Collection Services

(Historical data: FY17 = 1,900 tons)

TOTAL FFP LINE ITEMS - B001 THROUGH B003

ATTACHMENT J-12

EXHIBIT LINE ITEM NUMBERS
CONTRACT #
EXHIBIT A - CLIN 9000

Line Item 0004 Option Year 1 - Indefinite Delivery Indefinite Quantity Work

PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELIN B004

ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B004IDIQ WORKSummation of total prices for exhibit line items numbers (ELINs) B001A through B001R. Pricing shall include all equipment, labor, materials, supervision and overhead required to complete the described task. Work associated with this CLIN is at the Marine Corps Air Station and Cannon Air Defense Center, Yuma, AZ, remote training areas associated with MCAS Yuma, and Camp Billy Machen, Niland, California.
B004AArea 1 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD20EA
5 CYD2EA
6 CYD80EA
8 CYD2EA
12 CYD12EA
20 CYD60EA
40 CYD60EA
60 CYD10EA
B004BArea 1 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD30EA
5 CYD2EA
6 CYD400EA
8 CYD30EA
12 CYD20EA
20 CYD80EA
40 CYD200EA
60 CYD80EA
B004CArea 2 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD5EA
5 CYD1EA
6 CYD50EA
8 CYD5EA
12 CYD1EA
20 CYD50EA
40 CYD50EA
B004DArea 2 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD5EA
6 CYD400EA
8 CYD10EA
12 CYD5EA
20 CYD50EA
40 CYD100EA
B004EArea 3 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD2EA
6 CYD10EA
8 CYD2EA
12 CYD2EA
20 CYD10EA
40 CYD15EA
B004FArea 3 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD1EA
6 CYD10EA
8 CYD1EA
12 CYD5EA
20 CYD10EA
40 CYD80EA
B004GArea 4 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD1EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
B004HArea 4 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD2EA
6 CYD10EA
8 CYD2EA
12 CYD2EA
20 CYD10EA
40 CYD15EA
B004IArea 5 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD1EA
6 CYD10EA
8 CYD2EA
12 CYD1EA
20 CYD10EA
40 CYD20EA
B004JArea 5 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD2EA
6 CYD100EA
8 CYD10EA
12 CYD2EA
20 CYD100EA
40 CYD200EA
B004KStencil & Restencil Dumpsters & ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall stencil and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.10EA
B004LClean DumpstersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
B004MClean Litter BarrelsWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.10EA
B004NProvide Replacement DumpsterWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean, paint, and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
B004OReplace Non-Reparable Dumpster and ContainersNon-Repairable Dumpster or Containers to be determined by the Contractor. When repair work is expected to exceed the FFP limits for any sub-annex, the contractor is to replace with a New Dumpster or Container when the dumpster or container is deemed Not-Repairable. The new dumpster or container shall be clean, painted, and restencil as required by the Government. The Contractor shall notify the KO withing 48 hours after the Non-Repairable Dumpster or Container is discovered. Completed when requirement is secured and whithin 5 working days.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
B004PProvide Replacement Container LidWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall replace dumpster and container lids as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
B004QService Petroleum Contaminated Soil (PCS) ContainerWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove container as required by the Government. The contractor shall service the 20 CYD PCS container as requested by the Government. The contractor must dipose PCS waste at an authorized land fill. The contractor must provide a liner to cover the entire interior surface of the container to prevent leaks and with capability to close the liner when container is full. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.8TON
B004RLandfill & Disposal FeesWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall dispose dumpsters and containers contents as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.600TON
TOTAL IQ LINE ITEMS - B004

TOTAL FOR ALL LINE ITEMS B001 THROUGH B004

Opt Year 2

ATTACHMENT J-12

EXHIBIT LINE ITEM NUMBERS
CONTRACT #
EXHIBIT A - CLIN 9000

Line Item 0005 Option Year 2 MCAS Yuma

PROVIDE PRICES FOR REFUSE COLLECTION IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN C001 THROUGH C003

Client ELINDESCRIPTIONQTYUNIT OF ISSUEUNIT PRICETOTAL AMOUNT
C001Perform Recurring Refuse Collection Services12M
C002LITTER BARRELS - Perform Recurring Refuse Collection Services12M
C003LANDFILL & DISPOSAL FEES - Perform1YRNTE
Recurring Refuse Collection Services

(Historical data: FY17 = 1,900 tons)

TOTAL FFP LINE ITEMS - C001 THROUGH C003

ATTACHMENT J-12

EXHIBIT LINE ITEM NUMBERS
CONTRACT #
EXHIBIT A - CLIN 9000

Line Item 0006 Option Year 2 - Indefinite Delivery Indefinite Quantity Work

PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELIN C004

ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

C004IDIQ WORKSummation of total prices for exhibit line items numbers (ELINs) C001A through C001R. Pricing shall include all equipment, labor, materials, supervision and overhead required to complete the described task. Work associated with this CLIN is at the Marine Corps Air Station and Cannon Air Defense Center, Yuma, AZ, remote training areas associated with MCAS Yuma, and Camp Billy Machen, Niland, California.
C004AArea 1 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD20EA
5 CYD2EA
6 CYD80EA
8 CYD2EA
12 CYD12EA
20 CYD60EA
40 CYD60EA
60 CYD10EA
C004BArea 1 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD30EA
5 CYD2EA
6 CYD400EA
8 CYD30EA
12 CYD20EA
20 CYD80EA
40 CYD200EA
60 CYD80EA
C004CArea 2 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD5EA
5 CYD1EA
6 CYD50EA
8 CYD5EA
12 CYD1EA
20 CYD50EA
40 CYD50EA
C004DArea 2 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD5EA
6 CYD400EA
8 CYD10EA
12 CYD5EA
20 CYD50EA
40 CYD100EA
C004EArea 3 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD2EA
6 CYD10EA
8 CYD2EA
12 CYD2EA
20 CYD10EA
40 CYD15EA
C004FArea 3 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD1EA
6 CYD10EA
8 CYD1EA
12 CYD5EA
20 CYD10EA
40 CYD80EA
C004GArea 4 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD1EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
C004HArea 4 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD2EA
6 CYD10EA
8 CYD2EA
12 CYD2EA
20 CYD10EA
40 CYD15EA
C004IArea 5 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD1EA
6 CYD10EA
8 CYD2EA
12 CYD1EA
20 CYD10EA
40 CYD20EA
C004JArea 5 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD2EA
6 CYD100EA
8 CYD10EA
12 CYD2EA
20 CYD100EA
40 CYD200EA
C004KStencil & Restencil Dumpsters & ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall stencil and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.10EA
C004LClean DumpstersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
C004MClean Litter BarrelsWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.10EA
C004NProvide Replacement DumpsterWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean, paint, and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
C004OReplace Non-Reparable Dumpster and ContainersNon-Repairable Dumpster or Containers to be determined by the Contractor. When repair work is expected to exceed the FFP limits for any sub-annex, the contractor is to replace with a New Dumpster or Container when the dumpster or container is deemed Not-Repairable. The new dumpster or container shall be clean, painted, and restencil as required by the Government. The Contractor shall notify the KO withing 48 hours after the Non-Repairable Dumpster or Container is discovered. Completed when requirement is secured and whithin 5 working days.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
C004PProvide Replacement Container LidWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall replace dumpster and container lids as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
C004QService Petroleum Contaminated Soil (PCS) ContainerWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove container as required by the Government. The contractor shall service the 20 CYD PCS container as requested by the Government. The contractor must dipose PCS waste at an authorized land fill. The contractor must provide a liner to cover the entire interior surface of the container to prevent leaks and with capability to close the liner when container is full. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.8TON
C004RLandfill & Disposal FeesWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall dispose dumpsters and containers contents as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.600TON
TOTAL IQ LINE ITEMS - C004

TOTAL FOR ALL LINE ITEMS C001 THROUGH C004

Opt Year 3

ATTACHMENT J-12

EXHIBIT LINE ITEM NUMBERS
CONTRACT #
EXHIBIT A - CLIN 9000

Line Item 0007 Option Year 3, MCAS Yuma

PROVIDE PRICES FOR REFUSE COLLECTION IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN D001 THROUGH D003

Client ELINDESCRIPTIONQTYUNIT OF ISSUEUNIT PRICETOTAL AMOUNT
D001Perform Recurring Refuse Collection Services12M
D002LITTER BARRELS - Perform Recurring Refuse Collection Services12M
D003LANDFILL & DISPOSAL FEES - Perform1YRNTE
Recurring Refuse Collection Services

(Historical data: FY17 = 1,900 tons)

TOTAL FFP LINE ITEMS - D001 THROUGH D003

ATTACHMENT J-12

EXHIBIT LINE ITEM NUMBERS
CONTRACT #
EXHIBIT A - CLIN 9000

Line Item 0008 Option Year 3 - Indefinite Delivery Indefinite Quantity Work

PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELIN D004

ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D004IDIQ WORKSummation of total prices for exhibit line items numbers (ELINs) D001A through D001R. Pricing shall include all equipment, labor, materials, supervision and overhead required to complete the described task. Work associated with this CLIN is at the Marine Corps Air Station and Cannon Air Defense Center, Yuma, AZ, remote training areas associated with MCAS Yuma, and Camp Billy Machen, Niland, California.
D004AArea 1 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD20EA
5 CYD2EA
6 CYD80EA
8 CYD2EA
12 CYD12EA
20 CYD60EA
40 CYD60EA
60 CYD10EA
D004BArea 1 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD30EA
5 CYD2EA
6 CYD400EA
8 CYD30EA
12 CYD20EA
20 CYD80EA
40 CYD200EA
60 CYD80EA
D004CArea 2 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD5EA
5 CYD1EA
6 CYD50EA
8 CYD5EA
12 CYD1EA
20 CYD50EA
40 CYD50EA
D004DArea 2 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD5EA
6 CYD400EA
8 CYD10EA
12 CYD5EA
20 CYD50EA
40 CYD100EA
D004EArea 3 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD2EA
6 CYD10EA
8 CYD2EA
12 CYD2EA
20 CYD10EA
40 CYD15EA
D004FArea 3 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD1EA
6 CYD10EA
8 CYD1EA
12 CYD5EA
20 CYD10EA
40 CYD80EA
D004GArea 4 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD1EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
D004HArea 4 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD2EA
6 CYD10EA
8 CYD2EA
12 CYD2EA
20 CYD10EA
40 CYD15EA
D004IArea 5 - Provide, Service and Remove Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall Provide a dumpster/container, service the dumpster/container, and remove the dumpster and container. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD2EA
5 CYD1EA
6 CYD10EA
8 CYD2EA
12 CYD1EA
20 CYD10EA
40 CYD20EA
D004JArea 5 - Service Dumpsters and ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall provide and remove dumpsters and containers as required by the Government. The contractor shall service a dumpster/container as requested by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD10EA
5 CYD2EA
6 CYD100EA
8 CYD10EA
12 CYD2EA
20 CYD100EA
40 CYD200EA
D004KStencil & Restencil Dumpsters & ContainersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall stencil and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.10EA
D004LClean DumpstersWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
D004MClean Litter BarrelsWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.10EA
D004NProvide Replacement DumpsterWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall clean, paint, and restencil dumpsters and containers as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
D004OReplace Non-Reparable Dumpster and ContainersNon-Repairable Dumpster or Containers to be determined by the Contractor. When repair work is expected to exceed the FFP limits for any sub-annex, the contractor is to replace with a New Dumpster or Container when the dumpster or container is deemed Not-Repairable. The new dumpster or container shall be clean, painted, and restencil as required by the Government. The Contractor shall notify the KO withing 48 hours after the Non-Repairable Dumpster or Container is discovered. Completed when requirement is secured and whithin 5 working days.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA
12 CYD1EA
20 CYD10EA
40 CYD10EA
D004PProvide Replacement Container LidWhen repair work is expected to exceed the FFP limits for any sub-annex, the Contractor shall replace dumpster and container lids as required by the Government. The Contractor shall notify the KO within two hours, shall detail those costs which will exceed the established limit responsibility, and provide an estimate of the cost of completion to the KO. Completed when requirement is secured and within 1 working day.
4 CYD1EA
5 CYD1EA
6 CYD10EA
8 CYD5EA

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.