N6247318R1408_Section_C_Amend_01.docx
DOCX document 44 KB Posted
- Attached to
- Refuse Collection and Disposal
- Solicitation number
- N6247318R1408
About this file
N6247318R1408_Section_C_Amend_01.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section_J-12_ELINS_Amend_02.xlsx | XLSX spreadsheet | |
| Section_J-12_ELINS_Amend_01.xlsx | XLSX spreadsheet | |
| N6247318R1408_Amend_01.docx | DOCX document | |
| 110_-_Section_J_-_ELINS_UnPopulated.xlsx | XLSX spreadsheet | |
| N6247318R1408_Solicitation_12July2018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
TABLE OF CONTENTS
| PARAGRAPH |
| TITLE |
| C.1 |
| GENERAL – Annex 0100000 |
| C.2 |
| MANAGEMENT – Annex 0200000 |
| C.3 |
| DISPOSAL AND DISPOSAL FEES |
(STATION, HOUSING, AND IQ)
| C.4 |
| EXAMINATION OF REFUSE |
| C.5 |
| INDEFINITE QUANTITY |
| C.6 |
| FACILITIES SUPPORT - Annex 15030 |
C.1 GENERAL
a. GENERAL REQUIREMENTS
1. The Contractor shall provide all containers, pickup/disposal of refuse, labor, supervision, licenses, permits, tools, materials, equipment, and transportation necessary to provide refuse services for Marine Corps Air Station, Yuma, AZ. Marine Corps Air Station Yuma includes areas in both California and Arizona. See Section J – Maps and Locations for the location of ranges Area 1 through Area 5 that will require services. Schedules for pickup of refuse shall be made by the Contractor to ensure they are meeting the Government’s requirements. Work shall consist of but is not limited to: providing various types and sizes of refuse containers, cleaning refuse containers, litter barrel services, painting and stenciling of Contractor owned refuse containers, collection and removal of refuse.
b. FACILITIES
1. Location: Work shall be performed at Marine Corps Air Station Yuma, Cannon Air Defense Complex, Camp Billy Machen, and outlying areas. See Section J – Maps and Locations.
2. Hazards: Many areas are subject to flash floods, washouts, soft sand, hard to reach areas, tight workspaces, children (walking, playing, going to school, etc.), and heavy traffic.
c. WORKING HOURS
1. Regular working hours shall be Monday to Saturday, 6:00 AM - 3:30 PM, except as described for the federal holidays. In the case of emergencies, or for the completion of emergency work initiated during regular working hours, the Contractor shall be required to work outside regular working hours. The Contractor shall also be required to work on certain tasks outside regular working hours, as described in specifications herein.
C.2 MANAGEMENT
a. GENERAL: The Contractor shall manage the total work effort associated with the contract as required herein to assure fully adequate and timely completion of these services. Included in this function will be a full range of management duties including, but not limited to, work reception, planning, scheduling, cost accounting, work status, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide an adequate staff of personnel with the necessary expertise to assure the execution of the work in accordance with sound and efficient management practices.
b. WORK RECEPTION: The Contractor shall supply a Point Of Contact for emergency situations that may arise outside normal business hours of operation. Persons receiving calls shall be fully familiar with the Contractor's organization and procedures, as well as the terms of this contract. Service calls and work (firm fixed price and delivery order) shall be received and dispatched in a courteous and efficient manner.
C.3 DISPOSAL AND DISPOSAL FEES (STATION, AND IQ)
a. Refuse shall be removed and disposed of off the station. Disposal and landfill permits shall be the responsibility of the Contractor. Breakdown of landfill fees (Station, and IQ) and costs at each landfill shall be placed on invoices.
C.4 EXAMINATION OF REFUSE
a. The Government reserves the right to examine the refuse being removed from the any location included in the contract at any time.
C.5 INDEFINITE QUANTITY
a. Indefinite quantity work shall consist of work to be performed that is not covered by the firm fixed portion of the contract. All work shall be performed properly and completed by the date specified on the delivery order.
b. The Contractor shall make deliveries and pick up additional refuse within four (4) hours when so directed verbally and/or in writing by the Contracting Officer.
c. The Contractor shall be required by the Contracting Officer or Government Representative to provide refuse collection to various locations within Areas 1-5 (see Section J – Maps and Locations). Locations may be in areas, which are not easily accessible and may require four-wheel drive vehicles provided by the Contractor.
d. Delivery Orders: Delivery orders are used to order work under the IQ portion of the contract. A copy of the completed Delivery Orders shall be submitted to the Contracting Officer with monthly invoices or within five working days after the work has been completed.
SECTION C.1 GENERAL INFORMATION
1.1. Outline of Services
Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Marine Corps Air Station, Yuma, AZ and Camp Billy Machen, Niland, CA. The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annex 15 contains the technical requirements.
Annex 1 General Information Annex 2 Management and Administration Annex 15 Facilities Support 1503 Facilities Services 1503030 Refuse Collection
1.2. Project Location
The work shall be performed at various locations and could vary from location to location. The following is an example of the dispersion of work for the refuse portion of the contract:
· MCAS Yuma
· Cannon Air Defense Complex
· Camp Billy Machen
· Various Range Locations (Area 1-5)
1.3. Background Information
MCAS Yuma is located adjacent to the city of Yuma, Arizona in the southwestern Sonoran Desert. The climate has hot dry summers with temperatures reaching 120 degrees Fahrenheit, and mild winters with an annual rainfall of approximately 3 inches.
1.4. Verification of Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as maps and tables to represent the type, quantity and location of services to be provided. However, offerors are encouraged to visit the project site during the site visit for offerors as part of its due diligence to assess the nature of work and conditions under which work is to be performed.
1.5. Climate Patterns
For the past seven years both Yuma and Imperial counties are in documented drought patterns. Water conservation measures the Government may establish could affect Contractor performance.
1.6. Related Information
There are four types of related information that can be found in the description and related information of the specification as follows:
1. Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.
2. Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
3. Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
4. Requirement Information further describes client requirements associated with each Performance Objective.
1.7. Navy Approach to Service Contracting
The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations. The Navy also supports the following principles:
1.7.1. Partnering Philosophy
The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion. Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.
1.7.2. Contractor's Knowledge
The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.7.3. Industry Best Practices
The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).
1.8. Standard Template
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Firm Fixed-Price (FFP) requirements. Specification item 4 will always contain the Indefinite Delivery-Indefinite Quantity (IDIQ) requirements. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.
1.9. Navy PBSC Approach
The Navy’s approach to performance-based service contracting (PBSC) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.10. Technical Proposal Certification
The contractor warrants that its proposal incorporated herein by reference including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives set forth in this contract during execution thereof. The contractor is not excused from meeting such performance objectives in the event such proposal proves inadequate as conceived or executed to meet such performance objectives. The contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objective.
SECTION C.2 - MANAGEMENT AND ADMINISTRATION
2.1 Definitions and Acronyms
Seen J-06 for Acronyms.
2.1.1 Contracting Officer (KO)
That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
2.1.2 Contractor
That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
2.1.3 Contractor Representative
That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
2.1.4 Direct Material Costs
The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
2.1.5 Equipment
Contractor Provided Machinery to perform the requirements of the contract.
2.1.6 Facility
A building or structure designed and created to serve a particular function.
2.1.7 Frequency of Service
· Annual (A) - Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.
· Biennial (B) - Services performed once during each 24-month period of the contract at internals of 670 to 790 days.
· Daily (D5) - Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
· Daily (D7) - Services performed once each calendar day, seven days per week, including weekends and holidays.
· Monthly (M) - Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.
· Every Other Month (OM) - Services performed 6 times during each 12-month period of the contract at intervals of 56 to 62 calendar days
· Quarterly (Q) - Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.
· Semiannual (SA) - Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
· Semimonthly (SM) - Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.
· Six times weekly (6W) - Services performed six times a week, Monday through Saturday, including holidays unless otherwise noted.
· Three times weekly (3W) - Services performed three times a week, such as Monday, Wednesday, and Friday.
· Twice weekly (2W) - Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.
· Weekly (W) - Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.
2.1.8 Maintenance and Repair
The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
2.1.9 Means Repair and Remodeling Cost Data
A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. Data has been targeted for residential, commercial, and industrial repair/remodeling projects. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".
2.1.10 Operation and Maintenance and Support Information (OMSI) OMSI is a set of consultant-prepared data manuals that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle. Generally prepared following completion of new construction facility or major facility upgrade. OMSI’s typically include staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data.
2.1.11 Performance Assessment
A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
2.1.12 Performance Assessment Representative (PAR)
That individual designated by the KO to be responsible for the monitoring of Contractor performance.
2.1.13 Pre-expended Bin Materials and Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less. Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
2.1.14 Quality Control (QC)
A method used by the Contractor to control the quality of goods and services produced.
2.1.15 Response Time
The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
2.1.16 Unit Priced Labor (UPL) Hour
The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.
2.2 General Information
2.2.1 Government Regular Working Hours
The Government's regular working hours are Monday to Friday, 7:00 AM - 3:30 PM, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes may require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1 Observed Federal Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to Contractor Working Hours
Contractor shall request adjustment of regular work hours in writing within one working day of the change. The Government shall contact the Contractor by telephone, cell phone, or email in the event of contract restriction because of heightened National Security.
2.2.2 Wage Determinations
Refer to J-13 for wage determinations.
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
The Contractor may be required to attend administrative and coordination meetings. The Contractor shall attend meetings as shown in J-01.
2.3.2 Partnering
Partnering sessions shall be conducted as needed and identified by the Government.
2.3.3 Permits and Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable federal, state and local laws and regulations. Provide evidence of such permits and licenses to the KO before work commences and at other times as requested by the KO.
2.3.4 Insurance
Within 15 days after award of this contract, the Contractor shall furnish the KO a certificate of insurance as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-05, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.
2.3.4.1 Certificate of Insurance
The Certificate of Insurance shall provide for at least 30 days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.4.2 Minimum Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
· Comprehensive General Liability: $500,000 per occurrence
· Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
· Workmen's Compensation: As required by Federal and State worker's compensation and occupational disease statutes
· Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers - Other as required by State Law
2.3.5 Protection of Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government. The Contractor shall report any damage to the KO within 4 hours of the incident.
2.3.6 Access to Work Areas
The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities, range, ordnance, flight line and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Contractor is responsible to obtain license and permits to enter controlled areas. The Government may issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction. Many areas are subject to flash floods, washouts, soft sand, tight hard to reach areas, children, and heavy traffic.
2.3.7 Instructions, Directives, and References
Applicable Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other directives, instructions, and references are listed in J-02.
2.3.8 Invoicing Procedures
Refer to J-03.
2.3.9 Forms
Forms are located in Attachment J-04 additional forms shall be provided by the Government on an as needed basis.
2.4 Government-Furnished Property, Materials and Services
In accordance with NAVFAC Clause 5252.245-9300, GOVERNMENT-FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities, utilities, materials, and equipment for use in connection with the prime contractor’s effort. Additional property, materials or services may be provided as identified in J-05.
2.4.1 Government-Furnished Facilities (GFF)
N/A
2.4.2 Government-Furnished Utilities (GFU)
No utilities will be provided other than in support of this Contract. The Government will provide water, and electricity access as necessary. No modifications to existing systems shall be made by or for the Contractor.
2.4.3 Government-Furnished Materials (GFM)
N/A
2.4.4 Government-Furnished Equipment (GFE)
The Government will furnish the litter barrels of approximately 32 gallon size. The Government will furnish no other equipment.
2.5 Contractor-Furnished Items
The contractor shall provide trash bags for litter barrels, landfill permits, appropriate vehicles, and dumpsters/ containers in accordance with J-08. Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and PCB’s shall not be brought on site. The KO may at any time require samples, Material Safety Data Sheets (MSDS); manufacturer’s data cut sheets of materials used in this contract.
2.6 Management
The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide staffs with the necessary management expertise to assure performance objectives and standards are met.
In the event the new contract is awarded to a different Contractor from the current contract holder, there shall be a phase-in and phase-out period. See Section I, FAR 52.237-3 CONTINUITY OF SERVICES (JAN 1991).
2.6.1 Work Control
The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and status reports shall be provided when requested by the KO. A written status report of any item of work must be provided within one hour of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours. A copy of all completed work authorizations shall be submitted by 0800 the following work day. At any time the Contractor’s collection is detained for more than one-hour the Government Representative shall be notified.
2.6.2 Work Schedule
Refuse pickup schedules shall be made by the Contractor to ensure they are meeting the Government’s requirements. The Contractor's work shall not interfere with normal Government business. In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.
2.6.3 Service Interruptions
The Contractor shall notify the Government Representative as soon as possible if Government activities prevent the Contractor from fulfilling contract requirements. If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers within 7 calendar days. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.
2.6.4 Government's Computerized Maintenance Management Systems (CMMS) N/A
2.6.5 Quality Management System (QMS)
The Contractor shall establish and maintain a complete QC program in accordance with the provisions specified herein. The Contractor’s QC Program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QC program shall address:
· Accurate documentation of work processes, procedures, and output measures.
· A systematic procedure for assessing compliance with performance objectives and standards.
· Accurate documentation of quality inspections conducted throughout the execution of work.
· Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
2.6.6 QC Inspection
The Contractor shall establish and maintain an inspection system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall maintain a file of all scheduled and performed QC inspections, inspection results, and dates and details of corrective and preventive actions. The file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of the end of the month.
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
The PM must have relevant experience at a comparable level of responsibility in projects of similar size, scope and complexity. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be available during the Government's regular working hours and shall be available within one hour after the Government's regular working hours. The PM or alternate shall have a designated contact available at work locations. The PM or alternate shall have a designated contact available on location when requested by the Government within two hours during normal working hours. The PM and any alternates shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can read and understand printed regulations, detailed written orders, operating procedures, training instructions and materials.
2.7.1.2 Quality Control Manager (QCM)
The Contractor shall provide a QCM who shall have full authority and responsibility for assuring performance objectives and standards identified in this contract are met. The QCM and any alternate shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can read and understand printed regulations, detailed written orders, operating procedures, training instructions and materials.
2.7.2 Employee Requirements
The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can read and understand printed regulations, detailed written orders, operating procedures, training instructions and materials.
2.7.2.1 Employee Appearance
The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.
2.7.2.2 Employee Conduct
Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.
2.7.2.3 Removal of Employees
The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.
2.7.2.4 Proof of Citizenship
No employee or representative of the Contractor will be admitted to the site of work unless satisfactory proof of citizenship is furnished, or, if an alien, legal residency within the United States is confirmed.
2.8 Security Requirements
The Contractor shall comply with all federal, state, local and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.
2.8.1 Employee Listing
The Contractor shall maintain and provide upon request a current listing of employees. The list shall include employee’s name, social security number, job title, and level of security clearance.
2.8.2 Vehicles
The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code. All displays mentioned shall be fixed displays, no magnetic and/or temporary displays are allowed. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.
2.8.3 Passes and Badges
All Contractor employees shall obtain the required employee and vehicle passes. The Government will issue badges without charge. Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's pass and badge shall be returned immediately.
2.8.4 Access to Buildings
The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.
2.8.5 Access Arrangements
The Contractor shall make all arrangements necessary to obtain access to buildings, facilities, range, ordnance, flight line and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority.
2.8.6 Security Clearances
The Contractor shall obtain all required corporate and personnel Security Clearances prior to commencement of work. The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending.
2.9 Safety Requirements
The Contractor shall develop and maintain a safety program in compliance with U.S. Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1, Public Law 91-596 Occupational Safety and Health Act. Contractor personnel shall work in a safe manner and comply with all applicable safety regulations. The Contractor shall be subject to safety inspections of its work sites by the Government. Contractor safety records shall be available upon request by the KO. The Contractor shall have Safety Data Sheets (SDS), operating manuals, and descriptive data available.
2.9.1 Accident Reporting
The Contractor shall report to the Performance Assessment Representative and Contracting Officer, in the manner and on the forms prescribed by the Government, exposure data and all accidents that occur on or related to Government property. See J-03.
2.9.2 Damage Reporting
The Contractor shall submit to the Performance Assessment Representative and Contracting Officer in the manner and on the forms prescribed by the Government all damage to Government property by Contractor employees. See J-03.
2.9.3 Fire Protection
The Contractor shall know where fire alarms are located and how to activate them. The Contractor shall handle and store all combustible supplies, materials, waste and trash in a manner that prevents fire or hazards to persons, facilities, and materials. Call 911 to report a fire. The Contractor shall know the procedure for calling 911 on station.
2.10 Environmental Protection
The Contractor shall comply with all applicable federal, state, and local laws. All environmental protection matters shall be coordinated with the KO. Inspection of any of the facilities operated by the Contractor may be accomplished by the Activity Environmental Protection Coordinator, or authorized officials on a no-notice basis during Government regular working hours. In the event that a regulatory agency assesses a monetary fine against the Government for violations caused by Contractor negligence, the Contractor shall reimburse the Government for the amount of that fine and other costs. The Contractor shall comply with the instructions of the cognizant Navy Medical Department with respect to avoidance of conditions which create a nuisance or which may be hazardous to the health of military or civilian personnel.
2.10.1 Disposal
The Contractor shall load, dispose refuse, and return containers to the pickup location. Refuse spilled or strewn while lifting or dumping containers, or wind strewn during hauling, shall be immediately picked up by the Contractor. The Contractor is not responsible for refuse deliberately stacked outside and around the container, the Contractor is responsible to notify the PAR immediately if this occurs. Should any obstruction block the Contractor from making pickup, it shall be designated on the working copy noting time, license number or other identifying information, and the approximate fullness of the dumpster or container. The Government Representative shall be notified immediately.
2.10.1.1 Non-Hazardous Waste
The Contractor shall dispose of debris and rubbish resulting from the work under this contract in an off-Station licensed landfill.
2.10.1.2 Hazardous Waste
The Contractor shall dispose of all hazardous waste in accordance with the Resource Conservation and Recovery Act and all other applicable federal, state and local laws and regulations. No on-installation disposal of hazardous waste is allowed.
2.10.2 Spill Prevention, Containment, and Clean-up
The Contractor shall contain, clean up, and report all spills on Government property in a manner that complies with applicable federal, state, and local laws and regulations or otherwise stated herein, and the Marine Corps Order (MCO) P5090.2A, Subject: Oil/Hazardous Substance Spills (OHSS) and Spill Prevention Control & Countermeasures (SPCC) Plan at no cost to the Government.
2.10.3 Hazardous Material Use
The Contractor shall ensure that procedures are in place to deal with hazardous materials, pursuant to the FAR Clause 52.223-3, HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA.
2.10.4 Protection of Endangered and Threatened Species (Flora and Fauna) The Contractor shall not disturb endangered and threatened species and their habitat. The Contractor shall carefully protect in-place and report immediately to the KO endangered and threatened species discovered in the course of work. The Contractor shall stop work in the immediate area of the discovery until directed by the KO to resume work.
2.10.5 Noise Control
The Contractor shall comply with all applicable federal, state and local laws, ordinances, and regulations relative to noise control.
2.10.6 Salvage
N/A
2.10.7 Asbestos Containing Material (ACM)
Asbestos containing insulation, flooring, and other building materials may be encountered by the Contractor during the performance of work under this contract, and the Contractor shall remain alert to this possibility. If ACM is encountered or suspected in the performance of work, the Contractor shall avoid removing, sanding, abrading, or disturbing the material. The Contractor shall verbally notify the KO within one hour and follow-up with written notification within 24 hours.
2.11 Disaster Preparedness
The Contractor shall comply with the activity's Warnings and Conditions of Readiness Concerning Hazardous or Destructive Weather Station Order 3145.1M. The Contractor shall prepare the installation before, and perform damage evaluation and emergency recovery after, natural disasters and other emergencies as directed by the KO. Typical preparation and recovery work may include but is not limited to securing waste containers, locking or securing doors and windows, posting safety signs. Requirement is dependent on nature of work function performed.
2.12 Energy Management
The Contractor shall comply with the activity's Energy Management Program Station Order 11300.2H. Use of high energy consuming tools or equipment is subject to approval by the KO prior to use.
2.13 Technical Library
N/A
2.14 Warranty Management
The Contractor shall report to the KO all defects in workmanship, material, parts, or improper installation by others and found by the Contractor to be covered by a warranty prior to performing repair work. The Contractor is responsible for knowing which equipment and components are covered by the original warranty and the warranty duration. The KO will provide available warranty documents.
2.15 FFP Work Procedures
2.15.1 Work Reception
The Contractor shall establish a work reception function with the capability to receive, classify, issue, correspond, and respond to service calls. The Contractor shall maintain a toll free telephone number that shall be continuously attended (24 hours per day, 7 days per week, and 365 days per year) for receiving all Government requests and emergency service calls. Persons receiving calls shall be fully familiar with the Contractor’s organization, procedures, and the terms of this contract. Emergency calls shall be responded to within one hour of notification.
2.15.2 Notification to the Government for Work Above the FFP Limitations N/A
2.15.3 FFP Exhibit Line Item Numbers (ELINs)
See J-12.
2.16 IDIQ Work
IDIQ work is identified in each applicable annex or sub-annex. IDIQ work may consist of Unit Priced Tasks (UPT) Work (non-negotiated) and Unit Priced Labor (UPL) Work (negotiated). The Contractor shall perform all IDIQ task work as ordered by the KO. IDIQ work will consist of Unit Priced Tasks and Unit Priced Labor Work which may be ordered by the Government as separate items or in combinations of items from the Schedule of Indefinite Quantity Work (Bid Schedule) in Section B on an as needed basis.
2.16.1 Unit Priced Task Work (Non-Negotiated)
A Unit Priced Task (UPT) is defined as an IDIQ work item that includes all direct and indirect costs plus profit associated with the particular unit of work. All materials and equipment (rented or owned) required for the accomplishment of a UPT shall be included within the respective exhibit line item prices. The FFP for the task order is determined by multiplying the exhibit line item unit prices by the quantities ordered. The Contractor is not required to submit cost estimates for UPTs.
2.16.1.1 Acceptance and Performance
The Contractor shall possess the capability to accept and perform IDIQ work via an electronic medium with Clients utilizing their Government Purchase Card. The work shall be performed in accordance with the stated descriptions in the IDIQ ELINs.
2.16.1.2 Invoicing and Receiving Payment
The Contractor shall possess the capability to invoice and receive payment for IDIQ work via an electronic medium with Clients utilizing their GPC. The Contractor shall have and maintain a credit card account to accept GPC transactions. The contractor shall obtain access to the Government’s EMALL program and be capable of receiving orders and payments electronically. The Contractor is required to report monthly all services ordered from the internet. This shall be closely coordinated with the KO to ensure appropriate procedures are identified and in accordance with all terms and conditions of the contract. No partial or advance payments are provided.
2.16.2 Unit Priced Labor Work (Negotiated)
The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated. Unit Priced Labor (UPL) work is defined as IDIQ work that utilizes negotiated labor hours and materials to accomplish a task not required by the fixed-price portion of the contract. UPL includes separately priced labor, materials, and equipment exhibit line items. The Contractor shall prepare and furnish a detailed cost estimate identifying proposed labor, material, and equipment costs, which upon approval by the KO, becomes a FFP.
2.16.2.1 IDIQ Preparation of Proposals
N/A
2.16.2.1.1 Labor Requirements
N/A
2.16.2.1.2 Material Requirements
N/A
SECTION C.6 – FACILITIES SUPPORT
1503030 – REFUSE COLLECTION AND RECYCLING
1. General Information The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform refuse collection, and disposal at Marine Corps Air Station Yuma, Arizona with its surrounding properties, and Camp Billy Machen, Niland, California. Marine Corps Air Station Yuma includes areas in both California and Arizona. See Section J for the service of Area 1 through Area 5.
2. MANAGEMENT AND ADMINISTRATION
· A wash area will not be provided to the Contractor for sanitation.
· If the scheduled collection day falls on an observed holiday, pick up on the following work day.
2.1. Definitions and Acronyms
2.1.1. Ashes
The residue from burned wood, coal, coke, and other combustible material.
2.1.2. Collection Station
The designated points where solid wastes will be placed for collection by the Contractor. May also be referred to as collection point, pick-up stations, or collection site.
2.1.3. Bulky Items
Any bagged waste or items outside of a container but in a waste depository area is considered bulky.
2.1.4. Debris
Grass cuttings, tree trimmings, leaves, pine straw, limbs, stumps, street sweepings, roofing and construction wastes, and similar waste material.
2.1.5. Garbage
Animal and vegetable wastes (and containers thereof) result from the handling, preparation, cooking, and consumption of foods.
2.1.6. Hazardous Waste
A solid waste or combination of solid wastes, which because of its quantity, concentration, or physical, chemical, or infectious characteristics may: (1) cause, or significantly contribute to, an increase in mortality or an increase in serious irreversible, or incapacitating reversible, illness; or (2) pose a substantial present or potential hazard to human health or the environment when improperly treated, stored, transported, disposed of, or otherwise managed.
2.1.7. Open Burning
The combustion of solid waste without (a) control of combustion air to maintain adequate temperature for efficient combustion, (b) containment of the combustion reaction in an enclosed device to provide sufficient residence time and mixing for complete combustion, or (c) control of the emission of the combustion products. OPEN BURNING IS PROHIBITED and is not an authorized means of ultimate waste disposal.
2.1.8. Recyclable Waste
Waste material which can be transformed into new products in such a manner that the original product may lose its identity.
2.1.9. Refuse
All garbage, ashes, debris, rubbish, and other similar waste materials. Not included are explosive and incendiary waste and contaminated waste from medical and radiological processes.
2.1.10. Rubbish
A variety of unsalvageable waste materials such as metal, glass, crockery, floor sweepings, paper, wrapping, containers, cartons, and similar articles not used in preparing or dispensing food.
2.1.11. Solid Waste
Refuse and other discarded solid materials resulting from commercial, industrial, residential, and community activities. It does not include hazardous wastes, infectious/medical wastes, solids or dissolved materials in domestic sewage, or other significant pollutants in water resources such as silt, dissolved or suspended solids in industrial waste, water effluents, dissolved materials in irrigation return flow, or other common water pollutants.
2.1.12. Spillage
Any refuse dislodged from containers and/or solid waste collecting equipment in the course of collection and disposal. Any spillage within five feet of the container shall be the Contractor’s responsibility.
2.1.13. Waste Deposit Area
Designated points where solid wastes will be placed for collection by the Contractor.
2.1.14. Rework
Poor workmanship and neglect requiring re-performance to correct at no additional cost to the Government.
2.2. Cost Account Code Reporting
N/A
2.3. Recyclable Accounting
N/A
2.4. Weight Ticketing
Individual weight tickets denoting the date, type of truck or container, truck or container number, and tonnage disposed of shall be available upon request for each load disposed of. The contractor shall submit each month with the Contractor's invoice the total tabulated tonnage disposed of during the month denoting the date, type of truck or container, truck or container number, and tonnage.
2.5. Records and Reports
Records and reports are listed in Section F of the solicitation. The Contractor shall submit accurate and complete documents within the required timeframes.
3. FFP Work
· Performance Objective: