N5005421R0009-A0010.pdf
PDF 271 KB Posted
- Attached to
- DYNAMIC (AFDL-6) AND BARGE (YFND-30) Federal contract opportunity
- Solicitation number
- N5005421R0009
About this file
This document provides an amendment to a solicitation for the FY22 Docking Planned Maintenance Availability for the DYNAMIC (AFDL-6) and Barge (YFND-30). The amendment extends the proposal due date to November 17, 2021 at 12:00pm local time. It also adds a third ship check opportunity from October 25-29, 2021 and extends the deadline for bidders questions to November 3, 2021. The solicitation is a request for proposals for a firm-fixed price contract set aside for small businesses. Offerors are required to submit technical, past performance, and price proposals in accordance with the specified factors and instructions. The Navy intends to award a single contract by February 18, 2022 to the offeror providing the best value based on an evaluation of price and non-price factors.
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment is to extend proposal due date, add a third ship check and to extend bidders questions.
Bidder’s questions due by – 03 November 2021 Solicitation date change – 17 November 2021 Estimated Aw ard date- 18 February 2022
All other terms remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Oct-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N5005421R0009
X 9B. DATED (SEE ITEM 11)
09-Sep-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Oct-2021
CODE
MID-ATLANTIC REGIONAL MAINTENANCE CENTER
CODE 400,
9727 AVIONICS LOOP,
NAVAL STATION NORFOLK
NORFOLK VA 23511-2124
N50054 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N5005421R0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 03-Nov-2021 12:00 PM to 17-Nov-2021 12:00 PM.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS & (GENERAL INFORMATION)
The Government intends to award a single Fixed-Price contract to the offeror whose proposal represents the Best Value to the Government, price and other factors considered after evaluation in accordance with Section M of this solicitation. This solicitation package is a Request for Proposals (RFP) that will result in the award of a Firm-Fixed Price (FFP) Contract for the FY22 Docking Planned Maintenance Availability (DPMA) for the DYNAMIC (AFDL-
6) and Barge (YFND-30). Proposal due date is 17 November 2021 at 1200pm local time.
This procurement is a 100% Small Business Set Aside.
The NAICS Code for the solicitation is 336611 Shipbuilding and Repair.
I. INTRODUCTION
A. This solicitation is a Request for Proposals (RFP) that will result in the award of a single Fixed-Price contract to complete FY22 Docking Planned Maintenance Availability (DPMA) for the USS DYNAMIC (ADRL-6) and associated Barge (YFND-30).
B. The Government intends to award a single Fixed-Price contract to the offeror whose proposal represents the Best Value to the Government, price and other factors considered after evaluation in accordance with Section M of this solicitation.
C. ALL INQUIRIES shall be made in writing and directed to April Smith at april.s.smith33.civ@us.navy.mil and Krystle Jones at Krystle.jones@navy.mil To ensure the Government is able to adequately address and respond to Offeror’s Request for Specification Clarification (Bidder’s Questions) via amendment(s), it is requested questions be submitted no later than 3 November 2021 at 1200pm local time. The Navy reserves the right to not answer any requests received after this date and time. Furthermore, Offerors should note that the proposal due date will not be extended solely on the basis of requests received after this date and time. Solicitation questions should reference the solicitation and/or specification page and paragraph number and be submitted on the Request for Specification Clarification (Bidder’s Questions) (Attachment S-7) provided with this solicitation.
D. Estimated Award Date: The Government anticipates making an award by 18 February 2022.
II. INSTRUCTIONS FOR THE SUBMISSION OF OFFERS
A. Proposal Submission:
mailto:april.s.smith33.civ@us.navy.mil
Due to ongoing restrictions resulting from the global COVID-19 pandemic, hand delivery of proposals is not possible at this time to the Mid-Atlantic Regional Maintenance Center. Offerors are instructed to submit their proposal electronically via the DoD SAFE application located at https://safe.apps.mil
1. Offerors wishing to submit a proposal in response to this notification shall notify the Contracting Officer and Contracts Specialist noted as points of contact on this solicitation no later than three business days prior to the proposal deadline of this solicitation and no earlier than 14 calendar days prior to the proposal deadline. The Offeror shall provide their name and e-mail as contact information so the Government can generate a pick-up request from the DoD SAFE application to be sent to the Offeror, which is valid for 14 calendar days.
2. Offerors shall address their package with the RFP number and Offeror’s company name. Offerors shall click the “Confirm Delivery” button within the DoD SAFE app in order to receive a confirmation of pick up by the Government. The DoD SAFE system records the time that files are submitted for transmission. Offerors are responsible for ensuring that they drop-off their proposal and generate a drop-off time prior to the proposal submission date and time. In the event of a dispute of proposal time submission, the pick-up e-mail with the system-generated drop off time within the body of the e-mail shall serve as the official time that the proposal was submitted to the Government. Late proposal submissions will be handled in accordance with FAR 52.215-1.
3. Proposals must be submitted as one .zip file, formatted so that the “Original Technical Proposal”, “Original Past Performance Proposal and “Original Price Proposal” are submitted in separate file folders clearly marked. Each Volume shall be formatted with separate files submitted for each Factor and Emphasis Area.
4. All files uploaded must be scanned to ensure that there are no computer viruses within the file. The files shall be in a format that is compatible with and capable of being opened in the most current Microsoft Office Suite or Adobe Acrobat. The material presented in electronic format shall be identical to the paper copy of the proposal, if submitted. In cases where the hard copy and the electronic copy of the proposal conflict, the electronic copy shall take precedence. The proposal shall have separate files.
All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious and traceable. No fields or documents shall be password protected. If files are compressed, the necessary decompression program must be included.
III. GENERAL INFORMATION
A. Ship Checks:
1. The vessel will be available for inspection on Monday, September 13, 2021 through Friday, September 17, 2021 upon request from the offeror. All offerors interested in a ship check must provide advance notice when they plan to ship check the vessel. All offerors shall contact the PM, a minimum two (2) days prior to the Ship Check for detailed requirements due to COVID. Ship Check for USS DYNAMIC (AFDL-6) is located at JEBLC, Pier 58.
2. A second shipcheck is available on Monday, September 27 through Wednesday, September 29, 2021. A third ship check is now available on Monday 25 October through 29 October from 0800 to 1300.
3. The Ship Check requirements concerning access to the vessel due to COVID are as follows:
Temperature check will be taken prior to going on board the vessel.
N95 masks are required, no cloth masks.
No one gets within 6 feet of any crewmember.
Contractors must wear gloves, no touching of any surfaces with bare hands.
https://safe.apps.mil/
MARMC schedules each contractor team for a separate day for the Ship Check.
MARMC- max 2 people Prime Contractor - max 2 people SubContractor - max 2 people per subcontractor, only 1 subcontractor team onboard at a time, the rest will socially distance and stage on the pier.
Only one prime/subcontractor team onboard at a time.
4. Any questions regarding a ship check form may be directed to John Johnson, MARMC Industrial Security Specialist, (757-400-0356) or john.i.johnson@navy.mil
Arrangements for inspection may be made by communicating with:
Project Manager Robert Jessen
(757) 814-0436 robert.s.jessen.civ@us.navy.mil
Project Manager Bashaan Hameed
(757) 602-2650 bashaan.hameed@navy.mil
Offeror's representatives inspecting vessel(s) will be subject to security, safety, and other applicable regulations established by the activity at which the vessel(s) is/are located and the Commanding Officer of the vessel(s).
5. Contractors conducting MARMC related work efforts must visit MARMC security website for latest forms and instructions at: http://www.navsea.navy.mil/Home/RMC/MARMC/
B. Specifications and associated reference documentation
1. Upon request, the Government will provide the Specification Package (Attachment J-2).
2. Drawings, plans and test memos will be distributed with the solicitation. Not all drawings, plans and test memos will be printed on paper but may well be aperture cards (microfilm). Offerors will be responsible for printing their own drawings. Only one copy of each reference drawing, plan, or test memos will be provided regardless of the number of times it is referenced in separate work items within the specification package. Offerors are required to maintain accountability if internal distribution of drawings, plans, and test memos to their various departments and subcontractors.
Transportation of reference material shall be at the contractor's expense.
Manufacturer's instruction manuals and equipment technical manuals concerning shipboard equipment are generally available aboard ship with some available for inspection by offerors.
For more information about this, please contact:
DYNAMIC (AFDL-6)
Project Manager Robert Jessen
(757) 814-0436 robert.s.jessen.civ@us.navy.mil mailto:john.i.johnson@navy.mil mailto:bashaan.hameed@navy.mil http://www.navsea.navy.mil/Home/RMC/SWRMC/ mailto:robert.s.jessen.civ@us.navy.mil
NAVSHIPS Technical Manual, NAVSHIP NOTES, MIL-Standards, MIL SPEC, NAVSHIP Instructions, Electronics Field Change Bulletins, Electronic Information Bulletins, Navy Medical Manuals, General Specifications for Ships for the U.S. Navy (NAVSEA 5990-AA-SPN-010/GEN- SPEC), Design Service Allocation Manual (NAVSHIPS 0900-060-0210), and NAVSEA S9300-AW- EDG-010/EPISM (Electric Plant Installation-Standard Methods) are available for inspection by offerors.
3. Offerors may request solicitation attachments by submitting a request to:
a) April Smith at april.s.smith33.civ@us.navy.mil; and
b) Krystle Jones at Krystle.jones@navy.mil
4. Additional work item references not already in the possession of the Offerors, commercially available, listed under 52.211-2, are available through the following websites:
a) https://jedmics.net/
b) https://mfom.sscno.nmci.navy.mil/MFOM/DoDStatement.aspx
c) https://nsedr.nnsy.navy.mil/
C. Alteration of Solicitation
Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award. Exceptions will not be considered and will be considered a proposal alteration.
D. Proposal Information
1. Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, Offerors are advised conclusory statements regarding an offeror’s experience such as: “the Offeror understands”, “the Offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors shall provide specific and concise information to validate all assertions.
2. If the electronic media cannot be opened and read by the Government, the offeror shall have a reasonable amount of time, typically 72 hours, after notification of the same to correct the deficiency.
After that time, if the electronic media cannot be opened and read by the Government, the offer may be ineligible for award. It is the sole responsibility of the offeror to ensure that the electronic media submitted is virus free and can be opened and read by the Government.
E. Amendments
The Government may revise the solicitation at any time by means of an Amendment.
F. Teaming Arrangements Proposal shall be submitted by the prime contractor. Offerors may be listed as subcontractors in multiple proposals but shall only submit one (1) proposal as a prime contractor with a unique Commercial and Government Entity code and Taxpayer Identification Number.
G. One-bid Situation
If the government receives only one bid for solicitation N5005421R0009 the Government reserves the right to require Certified Cost and Pricing Data in accordance with DFARS 252.215-7008.
IV. PROPOSAL FORMAT
A. To facilitate efficiency and consistency in proposal evaluation the following is mandatory.
B. Electronic Proposals: All proposals shall be submitted via DOD SAFE as outlined above. Pages, except the Integrated Master Schedule and Gantt charts, shall be formatted to 11 x 17 inch paper with one-point margins. The text used shall be Times New Roman with a minimum of 12-point font. Any type contained on the Gantt charts and/or graphics shall not be smaller than 10-point font, shall be legible and readable.
Any revisions to Offeror’s proposals (if required) shall be submitted in two (2) forms: (1) a final clean revised document; and (2) a redlined document outlining the offeror’s changes.
The cover sheet, table of contents (not to exceed one page per volume) glossary, tabs and dividers will not count toward the page limit. Each page of every copy should be affixed with the date, solicitation number, offeror’s name and the following legend: Source Selection Information, See FAR 2.101 and 3.104. Pages submitted in excess of the page limitations described will not be evaluated.
C. Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Sections where required. At the time of the solicitation closing date, offerors shall submit the information specified in paragraphs Volume (1) One, Volume (2) Two, Volume (3) Three, Volume (4) Four, and Volume (5) Five below. For Volume Three (Technical), the proposal shall be arranged and outlined exactly including the sub-factors. For example, the paragraph describing the requirements for Sub-factor:
paragraph A3 shall be labeled, A3 in the offeror’s proposal. THE PROPOSAL SHALL ADDRESS
EVERY ASPECT OF FACTORS.
D. Requirements for Style: Each offeror shall submit a proposal that clearly and concisely describes and defines the contractor’s response to the requirements contained in the RFP. Unnecessary elaboration or other presentations beyond that sufficient to present a complete and effective proposal are not desired and may be construed as an indication of the offeror’s lack of understanding of cost consciousness. Elaborate art work, expensive paper or bindings, and expensive visual or other presentation aids are neither necessary nor desired. The proposal shall contain all the pertinent information in sufficient detail in the one area of the proposal where it contributes most critically to the discussion of the same information. When necessary, the offeror shall refer to the initial discussion and identify its location within the submitted proposal.
Page Limits:
Volume One has no page limit with the exception of the cover letter, which shall not exceed Five (5) pages.
Volume Two,
a) Pre-Award Information
Volume Three, Technical
Volume Four, Past Performance
Volume Five, Price
Each volume above shall be submitted separately. Under no circumstances should the Technical or Past Performance volumes contain any pricing information. Each volume should contain the following items in addition to the other information required by this solicitation:
Cover: The cover should indicate the following:
− Title of the proposal − Volume Number (One, Two, Three, Four, & Five) − Proposal category (Technical, Past Performance, or Price Proposal) − Request for Proposal (RFP) Number − Name and address of offeror, Cage Code, DUNS, Business Size and applicable Tax I.D. Number
(TIN)
− Identification if original or a copy of the proposal − Proposal validity period of 180 calendar days from the date specified for receipt of offers.
Table of Contents: The table of contents should provide sufficient detail as to allow the important elements to be easily located. The use of tabs and dividers is encouraged.
V. PROPOSAL CONTENT
Submitted proposals shall be clear, concise, and include sufficient detail for effective evaluation. The proposal shall provide convincing rationale and support to address how the offeror intends to meet the requirements in accordance with the Section C and the Specifications. Non-conformance with the instructions provided and/or failure to meet a requirement shall result in an offer being considered unacceptable and will render the proposal ineligible for contract award.
Offerors will assume the Government has no prior knowledge of their facilities or experience and shall base its evaluation solely on the information presented in the offeror's proposal.
VOLUME (1) ONE:
Cover Letter will include - Eligibility and Plans
The signed cover letter, which shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v).
In order to be eligible for the award of any job order resulting from this solicitation, the offeror must have executed the current MASTER AGREEMENT FOR REPAIR AND ALTERATION OF VESSELS:
MASTER SHIP REPAIR AGREEMENT (MSRA)
Certification of Insurance as required by DFARS 252.217-7012
The dry-dock certification MIL-Strep or Third party. In accordance with the most current version of MIL- STD-1625D, or third party certification provide a current dry-dock certification applicable to the dry-dock proposed for the Availability. The dry-dock will remain certified throughout the entire proposed use of the dry-dock. If the proposed dry-dock is currently uncertified, or if the certification (to include third party certification) will expire prior to the end of the Offeror's proposed docking period, the Offeror shall provide a detailed plan and schedule to certify or re-certify the dry-dock in order to remain certified throughout the proposed docking period in the Milestones (Attachment J-3). For third party recertification, please use the requirements below as a guideline for your plan submission. Recertification plan shall include:
− Timeline to complete the requirements of MIL-STD-1625D prior to certification expiration, including:
− Contractor Navy Audit request, − Contractor preparation of facility spaces to be inspected. Contractor shall describe when they expect these facilities to be available to complete necessary inspections and any risks to their availability.
− Navy examination of the facility, facility certification report, maintenance program documentation, and operational records
− Navy observation of a docking or undocking operation, whenever possible. In the case of a floating dry dock, this operation shall include a submergence test to the maximum dock draft.
− Navy evaluation of the control inspection, operating, and maintenance procedures.
− Navy preparation of exit brief and formalized in a written report − Contractor actions to resolve any identified deficiencies. Contractor shall explain the time allotted to deficiency resolution and any associated risks, − Navy examination of actions to resolve deficiencies.
BASIC CONTRACT DELIVERABLES & REQUIREMENTS
Offerors are to submit with Volume One:
o QUALITY ASSURANCE MANAGEMENT SYSTEM (in accordance with NAVSEA Standard Item 009-04) o SAFETY PLAN (in accordance with NAVSEA Standard Item 009-74) o HEAVY WEATHER PLAN (in accordance with NAVSEA Standard Item 009-69) o SECURITY PLAN (in accordance with NAVSEA Standard Item 009-72) o FIRE PREVENTION PLAN (in accordance with NAVSEA Standard Item 009-07)
Organization Chart. The chart is to show each management, technical, engineering and production position from the highest company level to the lowest supervisory level. Attached to the chart are to be descriptions of each position shown fully describing the duties, responsibilities, authority and names of the individuals filling the positions.
Contractor must provide a statement regarding Property Management System In accordance with FAR 45.2, when submitting a proposal, contractors shall indicate which of the following your Property Management Systems (PMS more than one may apply:
____ Voluntary Consensus Standards (VCS) ____ Industry-Leading Practices (ILP) ____ Existing approved Property Control System ____ other: ________________________________________
Contractor’s Property Management System has been reviewed by MARMC within the last 12 months.
Provide the date last PMS was reviewed and list any changes which have been instituted (if none, must state none):_________________________________________________________________________
VOLUME (2) TWO: Pre-Award Information
Offerors must provide the following to demonstrate eligibility for Award. Offerors shall submit with their proposal the selected pre-award information outlined in (a) through (o) below. (There is no page limit):
a) Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific pier and dock intended to be used for each proposed availability and indicates that the pier and dock meet the minimum characteristics identified in Attachment S-5.
b) If the Offeror is utilizing a subcontractor for physical resources for the pier, a letter signed by the subcontractor identifying and confirming committed access to the proposed pier required. The subcontractor representative who signs the letter must be authorized to contractually bind the company. The proposed pier and facilities, whether owned by the Offeror or subcontractor, must be accessible by the DYNAMIC (AFDL-6) and Barge (YFND-30) without any modification to the vessel. Subcontractor facilities equivalent to requirements of a MSRA as described in DFARS 217.71 Master Agreement for Repair and Alteration of Vessels (MARAV).
c) Submit a berthing plan showing where the ship and auxiliary craft (such as berthing barge) will be berthed in the contractor's plant during the entire overhaul. The berthing plan must include a water depth-sounding chart and capacity of services available to meet specification requirements. The water depth-sounding chart is to show the date the soundings were taken. Submit this information in the same format as required by NAVSEA Standard Item 009-101.
d) Submit mooring calculations in accordance with NAVSEA Standard Item 009-101.
e) Provide the number, size, material and arrangement of mooring lines. Submit this information in the same format as required by NAVSEA Standard Item 009-101.
f) Submit sketches that show the proposed vessel navigation/ maneuvering route from the navigation channel to the berthing position. Detail the water depths of all areas along the route to verify compliance with Drawing and that the 2-foot minimum vessel clearance (MLW) is maintained at all times. State whether there are any overhead projections along the route and how much clearance will be available between the highest point of the ship and the overhead projection. (See NAVSEA Standard Item 009-101) for requirements.
g) Proposed docking/undocking schedule. Include docking schedules of other work anticipated during the relative time-frame utilizing the same drydock/railway.
h) List other ships berthed during the availability of this solicitation.
i) Provide a copy of current certification signed by an independent certifying authority of the weight handling capacity of the crane, derrick, railway, travel lift or drydock proposed for docking this vessel.
j) Provide location of railway, travel lift or dry dock proposed for docking this vessel
k) Resume of the contractor's dockmaster who will dock/undock the vessel for this solicitation.
l) Describe the plan for acquiring any facilities required by the specifications that are not available in-house (or pre-committed) at the time of submission of the offer.
m) State location where (a) messing and/or, (b) berthing of ship's force will be accomplished. Include intended dates for removal/return of ship's force from/to the ship.
n) Provide a list of special equipment, tools and facilities required for this solicitation. Indicate whether the equipment, tools and facilities are owned by the offeror, a proposed subcontractor or are to be obtained through some other source (identify the source and the arrangements made to obtain them, including the date(s) that it will be available for use).
o) Provide a plan for the supply of electricity, steam and water to the ship in the event of loss of any of these services for a period in excess of 4 hours.
p) Contractors must acknowledge the requirements of Contract Data Requirements (DD Form 1423)
q) Identification of written inspection system which will be in effect during the accomplishment of work under the contract.
An updated list of qualified welders and silbrazers by name and badge number and list of qualifications.
Updated list of qualified welding and brazing procedures.
A list of Quality Assurance Representatives who will be present at Check Points.
VOLUME (3) THREE: Technical
Factor 1 - Physical Resource Capacity Manpower and Schedule) (There is no page limit):
Manpower (Manning Curves)
(1) Manning schedule by specification item, showing shift work and premium time aboard ship and in shop.
(2) Trade manning curves for the subject solicitation and all other projected work. Averages are not acceptable for any period greater than one (1) week in the curves. Include Quality Assurance, Inspection, Test and Checkout Personnel.
(3) Composite manning curves showing manning for all work (by ship or contract) during the contract performance period. Averages are not acceptable for any period greater than one (1) week in the curves.
(4) Number of production employees currently onboard broken down by trade category and skill level.
(5) Hiring and training plans to obtain any needed employees or statement that the contractor possesses sufficient labor at the necessary skill levels to perform all work detailed by the solicitation.
(6) Statement of impact of work required under this solicitation on other work to which the offeror is committed and the impact the other work to which the offeror is committed will have on the work required under this solicitation.
(7) Provide your method for preparing production schedules and describe your plan to manage and accurately update production schedules as necessary.
Production Schedule (Key Event, Milestone, and Controlling Work Item Schedules)
(1) Develop and furnish a Key Event or Milestone Schedule for the accomplishment of an orderly and systematic production program for this solicitation. Develop a schedule of all controlling work item. This schedule should include, but not be limited to, all work items in excess of 100 mandays or 30 calendar days, and key events or milestones such as docking, undocking, crew move ashore, crew move aboard, electronics systems checkout, completion of LOE related work, dock and sea trials, GFM required dates and contractor material ordering schedules. Include start and completion dates for each. Subcontractor work is to be integrated into this schedule.
(2) Prepare a Production Schedule for each milestones identified under Section F – Deliveries or Performance and Key milestones Attachment 3. The Production Schedule shall list:
i. Each activity shall be displayed to reflect its relevancy to the applicable key events and milestones. Assign each activity in the Production Schedule a short title to describe the nature of the activity, system and equipment or machinery involved.
ii. The latest allowable receipt date for contractor and government furnished material to maintain schedule.
iii. Scheduled key events/milestones.
iv. Critical path and controlling Work Items.
v. Scheduled start and completion dates of tests.
The offeror shall provide the electronic version of the schedule and associated reports shall be fully traceable and be compatible with Microsoft Project, Microsoft Excel or Adobe Acrobat Reader.
VOLUME (4) FOUR: Past Performance
Factor 2 – Past Performance (There is no page limit):
Past Performance
Offerors may provide past performance information for up to three (3) previous contracts. If the offeror has not completed any contracts as a prime Contractor, within three (3) years of the date of the initial solicitation’s posting to beta.SAM.gov, information regarding the offeror’s performance with regard to subcontracts and/or commercial contracts may be submitted. Offerors shall complete (Attachment S-2) Past Performance Contractor Performance Assessment Reporting System (CPARS) Reference List for each of the contracts provided where CPARS contract data is available. If CPARS data is not available for a contract, Offerors shall provide (Attachment S-3) Past Performance Questionnaire (PPQ).
Offerors shall demonstrate within either (Attachment S-2) or (Attachment S-3) that the referenced contracts are recent and relevant to the efforts required by this solicitation. Offerors shall also address unfavorable reports of past performance and their response, or lack thereof, will be taken into consideration.
• “Recent” is defined as a contract in-progress or completed within the last three (3) years as of the date of the initial solicitation.
• “Relevant” is defined as a contract that is of similar scope, magnitude, and complexity to the requirements set forth in this solicitation.
o Scope: The measure of the similarity in work item requirements as set forth in (Attachment J-2) Work Specification Package, and other requirements of this solicitation.
o Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the requirements of this solicitation.
o Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the requirements of this solicitation.
An offeror that does not have recent and relevant past performance to provide for consideration is requested to affirmatively state that it does not have recent and relevant past performance for the Government to consider.
If the Offeror does not have CPARS and is required to submit (Attachment S-3), the Offeror shall instruct their customers to complete the Past Performance Questionnaires and return them before the closing date of this solicitation.
E-mail to both:
− April Smith at april.s.smith33.civ@us.navy.mil ; and − Krystle Jones at Krystle.jones@navy.mil
Relevant past performance for proposed subcontractor(s) may be submitted. If subcontractor contracts are submitted, the offeror must also clearly indicate the percentage of work that the subcontractor(s) will perform under each task/category of effort throughout the course of the contract. If subcontractor past performance is provided as part of the three (3) contracts or efforts, the subcontractor past performance will be given weight relative to the amount of effort under the solicitation that the subcontractor is proposed to perform. Therefore, the offeror’s proposal should detail clearly the aspects of the work in the solicitation that the subcontractor is proposed to perform. Offerors may also provide references where they have performed as a subcontractor.
Any questionnaire received after the proposal due date/time may be considered as late and may not be considered in the Offeror’s past performance evaluation. The Government, at its discretion, will determine whether or not questionnaires received after the proposal due date will be considered.
VOLUME (5) FIVE: Price
Factor 3 - Price
Pricing Workbook: The Price Proposal shall not contain non-price factor information. The Price submission shall include all elements of price and other information as appropriate to support the proposed price. The Price submission is not page limited. Offers shall consist of and shall include the following:
a) A completed SF 33 with blocks 12 through 18 completed as well as all sections with applicable fill-ins and a completed Section B. Submission of a signed offer to the Government constitutes agreement and acceptance of the solicited terms and conditions.
b) A completed Pricing breakdown including Options, Labor, and Material Burden Rates (Attachment J-1).
Offerors shall provide fully burdened ship repair labor rates and material burden rates as described in Section B. These rates shall be completed for all potential work items and the Labor and Material Burden Rates Price Sheet must be (Attachment J-1) provided with this solicitation.
c) The breakdown of CLIN prices, corresponding to the work item pricing, must add up to the total of each
CLINs both base and Options. If there is a discrepancy between the two, the CLIN price in Section B, shall govern
(End of Summary of Changes)