This document contains a pricing workbook and related federal contract opportunity solicitation for ship repair services. The pricing workbook provides work specification line items for repair and maintenance of Dynamic (AFDL-6), a floating dry dock barge, and YFND-30, a crane barge. The total evaluated price for all base work is $1,790,767. The related solicitation seeks proposals for a firm-fixed price contract to perform the FY22 docking planned maintenance availability for the two vessels. Key details include a 100% small business set-aside; an inspection period from September 13-17, 2021; and points of contact for the ship check and additional attachments. Proposals are due in response to solicitation N5005421R0009 issued by the Department of the Navy Naval Sea Systems Command.
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Items
| Offeror to Insert Name Here | Prime | Subcontractor | |||||||||||
| Work Spec | CLIN | Base/Option | Title | Labor Hours | Total Labor ($) | Material ($) | Price | Labor Hours Sub | Total Labor ($) Sub | Material ($) Sub | Price sub | Work Item Price | |
| 042-00-001 | Base | Barge (YFND-30) Work Completion Certification Data; provide | $0 | $0 | $0 | ||||||||
| 042-00-002 | Base | DYNAMIC AFDL-6 Work Completion Certification Data; provide | $0 | $0 | $0 | ||||||||
| 042-11-001 | Base | Dynamic (AFDL 6) Accountability of Manhour and Material Reservation; accomplish | $0 | $0 | $0 | ||||||||
| 042-11-002 | Base | Barge (YFND-30) Accountability of Manhour and Material Reservation; accomplish | $0 | $0 | $0 | ||||||||
| 042-39-001 | Base | Dynamic (AFDL 6) General Requirements for Concurrent Work Within a Contractor Facility; accomplish | $0 | $0 | $0 | ||||||||
| 042-39-002 | Base | Barge (YFND-30) General Requirements for Concurrent Work Within a Contractor Facility; accomplish | $0 | $0 | $0 | ||||||||
| 077-11-001 | Base | Dynamic (AFDL 6) Hazardous Waste Produced on Naval Vessel; control | $0 | $0 | $0 | ||||||||
| 077-11-002 | Base | Barge (YFND-30) Hazardous Waste Produced on Naval Vessel; control | $0 | $0 | $0 | ||||||||
| 110-11-001 | Base | Barge (YFND-30) Structural Ultrasonic Test (UT) Inspection; accomplish | $0 | $0 | $0 | ||||||||
| 110-11-002 | Base | Barge (YFND-30) Underwater Hull; repair and preserve | $0 | $0 | $0 | ||||||||
| 110-11-003 | Base | DYNAMIC (AFDL-6) Pontoon Deck Structural Ultrasonic Test (UT) | |||||||||||
| Inspection and Visual Inspection; accomplish | $0 | $0 | $0 | ||||||||||
| 110-11-004 | Base | Dynamic (AFDL-6) Pontoon Deck; repair and preserve | $0 | $0 | $0 | ||||||||
| 110-11-005 | Base | DYNAMIC (AFDL-6) Side Shell, Wing Walls, and Weather Decks Structural Ultrasonic Test (UT) Inspection and Visual Inspection; accomplish | $0 | $0 | $0 | ||||||||
| 110-11-006 | Base | DYNAMIC (AFDL-6) Side Shell, Wing Wall, and Weather Deck Structural | |||||||||||
| Repair and Preservation; accomplish | $0 | $0 | $0 | ||||||||||
| 110-11-007 | Base | DYNAMIC (AFDL-6) Underwater Hull Structural Ultrasonic Test (UT) | |||||||||||
| Inspection and Visual Inspection; accomplish | $0 | $0 | $0 | ||||||||||
| 110-11-008 | Base | DYNAMIC (AFDL-6) Underwater Hull Repair and Preservation; accomplish | $0 | $0 | $0 | ||||||||
| 110-11-009 | Base | DYNAMIC (AFDL-6) Second Level Deck Structural Ultrasonic Test (UT) Inspection; accomplish | $0 | $0 | $0 | ||||||||
| 110-11-010 | Base | DYNAMIC (AFDL-6) Second Level Deck; repair and preserve | $0 | $0 | $0 | ||||||||
| 110-21-001 | Base | Barge (YFND-30) Side Shell plating; inspect | $0 | $0 | $0 | ||||||||
| 110-21-002 | Base | Barge (YFND-30) Side Shell Plate; repair and preserve | $0 | $0 | $0 | ||||||||
| 110-21-003 | Base | Dyanmic (AFDL 6) Flying Bridge; repair | $0 | $0 | $0 | ||||||||
| 114-11-001 | Base | Dynamic (AFDL 6) Wood Altar, Wood Fender, Keel Block and Bilge Block; install | $0 | $0 | $0 | ||||||||
| 123-11-001 | Base | Dynamic (AFDL 6) Tank Sounding Tube; repair | $0 | $0 | $0 | ||||||||
| 123-11-002 | Base | Dynamic (AFDL-6) Tank Inspection; accomplish | $0 | $0 | $0 | ||||||||
| 123-11-003 | Base | Dynamic (AFDL-6) Tank Repair and Preserve; accomplish | $0 | $0 | $0 | ||||||||
| 123-19-001 | Base | Barge (YFND-30) Collection, Holding and Transfer (CHT) Tank; inspect and repair | $0 | $0 | $0 | ||||||||
| 167-11-001 | Base | Dynamic (AFDL-6) Watertight Hatch, Steel, Raised, Individual Dog, With Scuttle; repair | $0 | $0 | $0 | ||||||||
| 167-11-002 | Base | Dynamic (AFDL-6) Watertight Door, Steel, Exterior, Individually Dogged; repair | $0 | $0 | $0 | ||||||||
| 167-11-003 | Base | Barge (YFND-30) Watertight Hatch, Steel, Raised, Individual Dog, With Scuttle; repair | $0 | $0 | $0 | ||||||||
| 167-11-004 | Base | Barge (YFND-30) Watertight Door, Steel, Exterior/Interior, Individually Dogged; repair | $0 | $0 | $0 | ||||||||
| 169-11-001 | Base | YFND-30) Roller Cargo Door; repair | $0 | $0 | $0 | ||||||||
| 311-22-001 | Base | Ship Service Diesel Generator (SSDG); clean and inspect | $0 | $0 | $0 | ||||||||
| 320-11-002 | Base | DYNAMIC AFDL-6 Electrical Systems; test and repair | $0 | $0 | $0 | ||||||||
| 320-80-001 | Base | Barge (YFND-30) ShipAlt-WI 09 Power Distribution Modification; accomplish | $0 | $0 | $0 | ||||||||
| 433-11-001 | Base | Dynamic (AFDL 6) 1MC Announcing System inspect; accomplish | $0 | $0 | $0 | ||||||||
| 512-11-001 | Base | Dynamic (AFDL 6) Dock Vent Fan and Ventilation; repair | $0 | $0 | $0 | ||||||||
| 512-80-001 | Base | Barge (YFND-30) ShipAlt-WI 07, HVAC Modifications; accomplish | $0 | $0 | $0 | ||||||||
| 513-80-001 | Base | Barge YNFD30, SHIPALT 35, Low Pressure Air Installation, Main Deck; accomplish | $0 | $0 | $0 | ||||||||
| 521-11-001 | Base | Dynamic (AFDL 6) Firemain Pipe; install | $0 | $0 | $0 | ||||||||
| 521-21-001 | Base | Dynamic (AFDL 6) Fire Pump and Motor; replace | $0 | $0 | $0 | ||||||||
| 529-21-001 | Base | Dynamic (AFDL 6) Remote Valve Operator Assembly; install | $0 | $0 | $0 | ||||||||
| 529-21-002 | Base | Dynamic (AFDL 6) Flood Valve; overhaul | $0 | $0 | $0 | ||||||||
| 529-21-003 | Base | Dynamic (AFDL 6) Cross Connect Valve; overhaul | $0 | $0 | $0 | ||||||||
| 529-21-004 | Base | Dynamic (AFDL 6) Overboard Discharge Valve; overhaul | $0 | $0 | $0 | ||||||||
| 529-21-005 | Base | Dynamic (AFDL 6) Remote Operator Grease Line Tubing; install | $0 | $0 | $0 | ||||||||
| 529-80-005 | Base | Dynamic (AFDL 6) ShipAlt Number (S/A AFDL 6-0001K), Automation/Remote Ballast Control Alteration, Alteration Installation Team (AIT) Support Service; accomplish | $0 | $0 | $0 | ||||||||
| 533-11-001 | Base | Dynamic (AFDL 6) Fresh Water Pipe; install | $0 | $0 | $0 | ||||||||
| 533-80-001 | Base | Barge (YFND-30) ShipAlt-WI 24, Fresh Water Piping Modification; accomplish | $0 | $0 | $0 | ||||||||
| 551-53-001 | Base | Dynamic (AFDL 6) Low Pressure Air Compressor Unit and Pipe; install | $0 | $0 | $0 | ||||||||
| 581-11-001 | Base | DYNAMIC (AFDL-6) Spreadmoor Anchoring System; remove, inspect, preserve, set and tension | $0 | $0 | $0 | ||||||||
| 582-11-001 | Base | Dynamic (AFDL 6) Line Handling Capstan, Motor, and Controller; repair | $0 | $0 | $0 | ||||||||
| 593-11-001 | Base | Vacuum, Collecting, Holding and Transfer (VCHT) Ejector Pump and Motor; repair | $0 | $0 | $0 | ||||||||
| 612-11-001 | Base | Dynamic (AFDL 6) Handrail; install | $0 | $0 | $0 | ||||||||
| 623-80-001 | Base | Dynamic (AFDL 6) SHIPALT 424D Main Deck Accesss Ladder Port & Starboard; install | $0 | $0 | $0 | ||||||||
| 625-11-001 | Base | Dynamic (AFDL 6) Ballast Control Room; repair | $0 | $0 | $0 | ||||||||
| 631-80-001 | Base | Barge (YFND-30) ShipAlt-WI 52, Interior Compartment Preservation; accomplish | $0 | $0 | $0 | ||||||||
| 633-11-001 | Base | Barge (YFND-30) Hull Zinc Anode; install | $0 | $0 | $0 | ||||||||
| 633-21-001 | Base | Dynamic (AFDL 6) Impressed Current Cathodic Protection (ICCP) System Reference Electrode Assembly; install | $0 | $0 | $0 | ||||||||
| 635-11-001 | Base | Dynamic (AFDL 6) Bulkhead and Overhead Insulation; Remove existing and install | $0 | $0 | $0 | ||||||||
| 635-11-002 | Base | Barge (YNFD-30) Compartment Insulation; install | $0 | $0 | $0 | ||||||||
| 643-80-001 | Base | Barge (YFND-30), ShipAlt-WI 04, Berthing Modification; accomplish | $0 | $0 | $0 | ||||||||
| 643-80-002 | Base | Barge (YFND-30) ShipAlt-WI 10, Head Modification; accomplish | $0 | $0 | $0 | ||||||||
| 643-80-003 | Base | Barge (YFND-30) ShipAlt-WI 15, Command Suite Modification; accomplish | $0 | $0 | $0 | ||||||||
| 651-80-001 | Base | Barge (YFND-30) ShipAlt-WI 01, Modifications to Galley; accomplish | $0 | $0 | $0 | ||||||||
| 655-80-001 | Base | Barge (YFND-30) ShipAlt-WI 06, Laundry Upgrade; accomplish | $0 | $0 | $0 | ||||||||
| 857-11-003 | Base | Barge (YFND-30) Temporary Duty Section Berthing Off-Ship; provide | $0 | $0 | $0 | ||||||||
| 982-10-001 | Base | Barge (YFND-30) Light Off Assessment (LOA) Reservation Pool; provide | $0 | $0 | $0 | ||||||||
| 982-31-001 | Base | DYNAMIC AFDL-6 Machinery Space Production Completion and Requirement for Light-Off Assessment (LOA) (Non-Complex); accomplish | $0 | $0 | $0 | ||||||||
| 992-00-001 | Base | DYNAMIC (AFDL-6) and Barge (YFND-30) Heavy Weather Plan (Demobilization); accomplish | $0 | $0 | $0 | ||||||||
| 992-00-002 | Base | DYNAMIC (AFDL-6) and Barge (YFND-30) Heavy Weather Plan (Remobilization); accomplish | $0 | $0 | $0 | ||||||||
| 992-11-001 | Base | Barge (YFND-30) Towing Service; provide | $0 | $0 | $0 | ||||||||
| 992-11-002 | Base | DYNAMIC (AFDL-6) Towing Service To and From Contractor Facility; provide | $0 | $0 | $0 | ||||||||
| 992-11-003 | Base | Dynamic (AFDL 6) Temporary Service; provide | $0 | $0 | $0 | ||||||||
| 992-11-004 | Base | Barge (YFND-30) Temporary Service; provide | $0 | $0 | $0 | ||||||||
| 992-21-001 | Base | Barge (YFND-30) Heavy Metal Paint Removal; assist | $0 | $0 | $0 | ||||||||
| 992-21-002 | Base | Dynamic (AFDL 6) Heavy Metal Paint Removal; assist | $0 | $0 | $0 | ||||||||
| 992-21-003 | Base | Barge (YFND-30) Asbestos Removal; assist | $0 | $0 | $0 | ||||||||
| 992-21-004 | Base | DYNAMIC (AFDL 6) Asbestos Removal; assist | $0 | $0 | $0 | ||||||||
| 992-31-001 | Base | Dynamic (AFDL 6) Cleaning and Pumping; accomplish | $0 | $0 | $0 | ||||||||
| 992-31-002 | Base | Barge (YFND-30) Cleaning and Pumping; accomplish | $0 | $0 | $0 | ||||||||
| 992-35-001 | Base | Office Space Without Computer for In-Plant Availability; provide | $0 | $0 | $0 | ||||||||
| 993-11-001 | Base | Crane, Transportation, Forklift and Rigging Services and Ship's Force Container Express Box; provide | $0 | $0 | $0 | ||||||||
| 997-11-001 | Base | Barge (YFND-30) Drydock, Fleet and Undock; accomplish | $0 | $0 | $0 | ||||||||
| 997-11-002 | Base | DYNAMIC AFDL-6 Drydock, Fleet, and Undock; accomplish | $0 | $0 | $0 | ||||||||
| TOTAL: | 0 | 0 | 0 | $0 | 0 | 0 | 0 | $0 | $0 |
Labor and Matl Price Sheet
Offeror Name:
| CLIN XXXX | |||||
| Fully Burdened Ship Repair Labor Rate | TOTAL | ||||
| Hours | Rate | Price | Total Hours | Total Price | |
| Direct Production Labor Hours | 38,737.00 | $0 | 38,737 | $0 | |
| Total Labor | 38,737 | $0 |
| Material Burden Rate | Insert Rate -> | |
| Material | $ 1,790,767 | |
| Total Material Price | $1,790,767 |
| Total Base Year | 38,737 | $1,790,767 | |
| NOTES: | Attachment J1 | ||
| 1. Fully Burdened Ship Repair Labor Rates must be entered as dollars and cents. | |||
| 2. Labor Price is calculated as follows: Rate*Hours | |||
| 3. Total Material is calculated as follows: Material * (1+ Material Burden Rate) |
| The number of hours and material dollar values are for evaluation purposes only. |
| While the hour and material dollar values are based on historical data |
| and are indicative of the typical requirements for growth/new work, |
| the proposed labor and material burden rates will be the fixed rates |
| for the entire availability regardless of how many hours and how much material are procured. |
Total Proposed Evaluated Price Dynamic and Barge
Total Proposed/Evaluated Price
| Total Base Work Item Price | $0 |
| Proposed Labor & Material Burden Rate Price (New Work & Growth Reservation) | $ 1,790,767 |
Total Evaluated Price $1,790,767
File details come from the government source that posted it. Updated .