J-3,_UF_9_and_11_5-Way_Breakout.xls

XLS spreadsheet 58 KB Posted

Attached to
Docking & Maintenance of UF 9 &11
Solicitation number
N4523A-17-R-0014
Issued by

About this file

Attachment J-3, UF 9 and 11 5-Way Breakout

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UF 9

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Utility Float 9DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HLABOR PRICEMATERIAL PRICEM/HLABOR PRICEMATERIAL PRICEOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0
1.5Required Documents$0
1.6Progress Meetings$0
1.7Availability Requirements$0
1.8Care of Vessel$0
1.11CFR Reports$0
1.16Preservation OQE$0
1.17Environmental/Hazwaste Managemment$0
1.21Gas Free$0
1.22Test Plan$0
3.1Docking & Undocking$0
3.2.1Identify Distinguishing Figures & Markings$0
3.2.2Rubber Fender$0
3.2.3Zinc Anodes$0
3.2.4Hull Blasting & Preservation$0
3.2.5Hull and Freeboard Visual Inspection$0
3.2.6Hull and Freeboard UT Inspection$0
3.4.1Open, Pump, Clean, Vent, Gas free$0
3.4.2Tanks/Void Visual Inspection$0
3.4.4Preliminary Air Tests$0
3.4.5Blast and Preserve Access Covers$0
3.4.6Final Air Test$0
3.4.7Closeout Inspection$0
3.5.1Main Deck Non-skid repair$0
3.5.2Main Deck Visual Inspection$0
3.5.3Main Deck UT inspection$0
Column Totals0$0$00$0$0$0$0$0$0

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.

UF 11

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Utility Float 11DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HLABOR PRICEMATERIAL PRICEM/HLABOR PRICEMATERIAL PRICEOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0
1.5Required Documents$0
1.6Progress Meetings$0
1.7Availability Requirements$0
1.8Care of Vessel$0
1.11CFR Reports$0
1.16Preservation OQE$0
1.17Environmental/Hazwaste Managemment$0
1.21Gas Free$0
1.22Test Plan$0
3.1Docking & Undocking$0
3.2.1Identify Distinguishing Figures & Markings$0
3.2.2Rubber Fender$0
3.2.3Zinc Anodes$0
3.2.4Hull Blasting & Preservation$0
3.2.5Hull and Freeboard Visual Inspection$0
3.2.6Hull and Freeboard UT Inspection$0
3.4.1Open, Pump, Clean, Vent, Gas free$0
3.4.2Tanks/Void Visual Inspection$0
3.4.4Preliminary Air Tests$0
3.4.5Blast and Preserve Access Covers$0
3.4.6Final Air Test$0
3.4.7Closeout Inspection$0
3.5.1Main Deck Non-skid repair$0
3.5.2Main Deck Visual Inspection$0
3.5.3Main Deck UT inspection$0
Column Totals0$0$00$0$0$0$0$0$0

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.