Attachment_J-2_PSNS IMF_HII-NNS_Gap_Comparison_Matrix.pdf
PDF 298 KB Posted
- Attached to
- CVN Aircraft Carrier Nuclear Touch Labor
- Solicitation number
- N4523A-16-R-0024
About this file
Attachment J-2_PSNS IMF HII-NNS Gap Comparison Matrix
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4523A-16-R-0024-0001_Amendment_1.pdf | ||
| Attachment_J-2_PSNS IMF_Comparison_Matrix.xlsx | XLSX spreadsheet | |
| Exhibit_J-2_CDRL_A002.pdf | ||
| Attachment_J-1_Contract_Support_Request.xlsx | XLSX spreadsheet | |
| Attachment_J-4_Pre-Proposal_Information_(PPI)_Form.doc | DOC document | |
| Exhibit_J-5_CDRL_A005.pdf | ||
| Exhibit_J-8_CDRL_A008.pdf | ||
| Exhibit_J-10_DD254.pdf | ||
| Exhibit_J-3_CDRL_A003.pdf | ||
| Attachment_J-3_PSNS IMF_Gap_Training_CVN_74.xlsx | XLSX spreadsheet | |
| Exhibit_J-1_CDRL_A001.pdf | ||
| Exhibit_J-4_CDRL_A004.pdf | ||
| Exhibit_J-7_CDRL_A007.pdf | ||
| N4523A-16-R-0024_RFP.pdf | ||
| Exhibit_J-9_CDRL_A009.pdf | ||
| Exhibit_J-6_CDRL_A006.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NNS Legacy codes
PSNS course number COURSE TITLE Training Equivalent Y/N
GAP briefing required
Y/N GAP description Notes
PSNS
S/56
NNS
X42
PSNS
S/57
NNS
X33
PSNS
S/71
NNS
X33
PSNS
S/38
NNS
X43
PSNS
S/38
FS
NNS
X43
PSNS
S/38
PV
NNS
X43
PSNS
S/26
NNS
X18
PSNS
S/11 shielder
NNS X11
PSNS
S/11
NNS
X11
PSNS
S/17
NNS
X32 GAP delivery
Notional hrs per student
355D crane safety awareness Y N
NNS personnel will get some additional information during
C/400 indoctrination briefings
X X X X X X X NA NA
B drape Y N Drape GAPs will be included in Q
GAP briefing package.
X X X X X X X NA NA
P glovebag Y N
Note: NNS glovebag qualified personnel are NOT drape qualified or qualified to change glovebag gloves or transfer sleeves. All other Glovebag GAPs will be included in Q GAP briefing package.
X X X X X X NA NA
I portal monitor Y N X X X X X X X NA NA
STD 73X100001 349C
man made vitreous fibers (non asbestos)
Y N X NA NA
IN insulating trade skill Y N S/57 CTD X NA NA
INAS
non nuclear structural insulator attribute TSD
Y N S/57 CTD X NA NA
INP6
non nuclear piping and vent insulator TDS
Y N S/57 CTD X NA NA
STD 750X33INSU PS-S9041
confined space awareness N N, NA See Notes
NNS will provide their own gas free services and be qualified and assigned work on confined spaces per the NNS confined space program by NNS supervisor
X X X X X X X NA NA
NNS currency Insulator
(HULL)
RESPIRATOR respirator N N, NA See Notes
NNS will provide their own respirators and be qualified and assigned work per the NNS respirator program by NNS supervisor. NNS will also be responsible for respirator cleaning and cartridges for their personnel
X X X X NA NA
STD 73X100001 280D hazard communication N Y
See HW32: HW32 GAP briefing covers the required 280D required
GAP information
X X X X X X X NA NA
IH LEADTRNG, IH
CADMTRNG, IH HEXCTRN, IH
LDSTRNG, & IH LEADCADTRN
356D environmental awareness N Y
See HW32: HW32 GAP briefing covers the required 280D required
GAP information
X X X X X X X NA NA
Attachment J-2 george.rutt Typewritten Text george.rutt Typewritten Text george.rutt Typewritten Text
PSNS&IMF/HII-NNS
"GAP" COMPARISON MATRIX
ATTACHMENT 3.2
george.rutt Typewritten Text Updated 03/01/2016 george.rutt Typewritten Text number COURSE TITLE Training Equivalent Y/N
GAP briefing required
Y/N GAP description Notes
PSNS
S/56
NNS
X42
PSNS
S/57
NNS
X33
PSNS
S/71
NNS
X33
PSNS
S/38
NNS
X43
PSNS
S/38
FS
NNS
X43
PSNS
S/38
PV
NNS
X43
PSNS
S/26
NNS
X18
PSNS
S/11 shielder
NNS X11
PSNS
S/11
NNS
X11
PSNS
S/17
NNS
X32 GAP delivery
Notional hrs per student
PMTA precision measurement Y N
NOTE: NNS will ensure personnel being requested to have this precision measurement module are proficient in the following instruments prior to arrival 1.
DIAL CALIPER/VERNIER CALIPERS
2. DIAL INDICATOR
3. INTRA MICROMETER
4. INSIDE, OUTSIDE, DEPTH
MICROMETERS
5. PRESS/TEMP/VACUUM GAGES
6. TORQUE WRENCHES
7. UNIVERSAL BEVEL VERNIER
PROTRACTOR
8. FEELER/SMALL HOLE GAGES
9. TELESCOPE/THREAD GAGE
X X X X NA NA
STD 740X100081 & STD
QHAZWASTE
PMTE precision measurement Y N
NOTE: NNS will ensure personnel being requested to have this precision measurement module are proficient in the following instruments prior to arrival
1. TORQUE WRENCHES
2. FEELER GAGES
NA NA
PMTK precision measurement Y N PSNS S/71 CTD
NOTE: PSNS S/71 CTD
responsible to brief painters on instruments per PSNS&IMFINST
P12410.12
X PSNS
OO69 structural fit-up Y N See Memo Ser 138/083 for requirements
X PSNS
P1P2 Pipe fittter fit up Y N See Memo Ser 138/083 for requirements
PSNS
IH ASBTRNG2DW or IH
ABSTRNG4DW
4379 CPR y N
NNS uses RED CROSS PSNS uses AMERICAN HEART
NA NA
IH ASBTRNG2DW or IH
ABSTRNG4DW
PS-N9030
Nuc production pipefitter
Y N NA NA
IH ASBTRNG2DW or IH
ABSTRNG4DW
end prep machine operator
Y N NA NA
FALL
fall protection authorized N N, NA See Notes
NNS will provide their own fall protection equipment and be qualified and assigned work requiring fall protection per the
NNS fall protection program by
NNS supervisor
X X NA NA
PIC
Protective insulation and coating Y N
NNS personnel are required to have attended PIC vender training or view NNS PIC vendor training video prior to arrival.
X NNS 0.5 hr
NNS currency Insulator
Journeyman level
Nuclear/Non-Nuclear interface training for non-nuc prodution workers
N Y
NNS personnel will be briefed the full course material required for all NNS non-nuclear support personnel X X X X X X X NNS 2 hrs george.rutt Typewritten Text
PSNS&IMF/HII-NNS
"GAP" COMPARISON MATRIX
ATTACHMENT J-2
number COURSE TITLE Training Equivalent Y/N
GAP briefing required
Y/N GAP description Notes
PSNS
S/56
NNS
X42
PSNS
S/57
NNS
X33
PSNS
S/71
NNS
X33
PSNS
S/38
NNS
X43
PSNS
S/38
FS
NNS
X43
PSNS
S/38
PV
NNS
X43
PSNS
S/26
NNS
X18
PSNS
S/11 shielder
NNS X11
PSNS
S/11
NNS
X11
PSNS
S/17
NNS
X32 GAP delivery
Notional hrs per student
STD FLUTEPLUG, STD
750X342132, STD
TRITOOLCUT, and STD
750X342102
NNQC
non nuclear quality control N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews required for all NNS non-nuclear support personnel X X X X X X X NNS 6 hrs
RPTS4020, STD
750X342101,STD
750X342102, and STD
750X342132
2989 heat stress general N Y NNS personnel will view the 2989 video X X NNS 0.5 hrs lead/cad/crom/arsen worker N Y
Local vent, barrier, and signage differences and
NNS PEL in microgram vs
PSNS PEL in milligram
X X X NNS 0.5 hrs
HW32
hazardous materials hazcom environmental awareness
N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
X X X X X X X X X NNS 0.5 hrs
NN-N3001 Nuc Worker N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
X X X X X X X X X NNS 4 hrs
STD ESDTRNG1C & STD
ESDTRNG4
NN-N3002 NQC for supervisors N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
X X X X X X X X X NNS 4 hrs
STD SP1/SP2, STD SP3/SP11,
& STD BRUSH&ROLL
990B (PH-S9046) HEC affected employees N Y
NNS personnel will view the PH-S9046 Hec affected employee video
NNS 5 min
4000NQCMQUAL
4000NQCNQUAL
ESDC electrostatic discharge N Y
NNS Level 1 or level 4 personnel with GAP briefing on PSNS Terms and failure types
NNS 0.5 hr
4000M1019SHIP 4314 fire watch N Y
Local definitions of hot work and fire classification terminology
Note: NNS personnel will not be qualified to use 3/4 water hoses for fire watch. This GAP will not be included in the GAP briefing due to normally only being used on IRR projects
X X X X NNS 0.5 hrs
4000NQCMQUAL
4000NQCNQUAL
HW19CAL Business plan California N Y
HW19CAL computer based training
Only require if working in
California X X X X X X X X X X NNS 1 hr
NN-N9054
(0909) steam plant cleanliness N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
NNS non-nuclear qualified support personnel are also required to receive the NNQC
GAP briefing (6 hrs). NNS personnel with legecy code
4000M1019SHIP are not qualified to perform fushes, tank work, or high pressure water work.
X X X X NNS 4 hrs
STD MECHFITCON, STD
X42TORQUE, STD
BASECLEAN, & STD
GSKTHZDTRG
PT-N9053 nuclear material control N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
Nuc workers only X X X X NNS 5 hrs george.rutt Typewritten Text george.rutt Typewritten Text george.rutt Typewritten Text
PSNS&IMF/HII-NNS
number COURSE TITLE Training Equivalent Y/N
GAP briefing required
Y/N GAP description Notes
PSNS
S/56
NNS
X42
PSNS
S/57
NNS
X33
PSNS
S/71
NNS
X33
PSNS
S/38
NNS
X43
PSNS
S/38
FS
NNS
X43
PSNS
S/38
PV
NNS
X43
PSNS
S/26
NNS
X18
PSNS
S/11 shielder
NNS X11
PSNS
S/11
NNS
X11
PSNS
S/17
NNS
X32 GAP delivery
Notional hrs per student
STD 74X331056, STD
TUBETRANSPK, STD
CIHUINTRO, STD SIGCBLSPLC,
STD CVNOWW, STD
LOCALWW+CI, STD CVNOCI,
STD CABLRIPOUT, STD
EQINSINTRO, STD
CABREPRCVN, and STD
Y1076CMTC
FMEA type I cleanliness N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
NNS personnel with legecy code
4000NQCMQUAL are not qualified to perform fushes, tank work, or high pressure water work.
X x NNS 4 hrs
STD EQINSINTRO, STD
EQCVN78, STD EQVCS, STD
CIHUINTRO, STD ETEPOVCS,
STD ETGEN, STD
ETMOTORCON, STD
ETSHRPWRCV, STD ETSWBD,
STD ETXFMR, STD
CABREPRCVN, STD
CABLRIPOUT, STD CVNOCI,
STD LOCALWWCI, STD
TUBETRANPK, STD
CVNOWW, STD X31NOICTVA,
STD FOMTBASH, STD
FOMTCONN, STD
FOCABCUTIN, STD
FOCABTYPES, STD FOCLEAN,
STD FOCONTIN, STD
FOCPRTEST, STD FOTHEORY,
STD FOFCCONN, STD
FOFUSION, STD FOHYBRID,
STD FOLCCONN, STD
FOMQJTEST, STD FOOLLTEST,
STD FOORLTEST, STD
FOOTDR, STD FOSAFETY, STD
FOSTSCCONN, STD
751X231057, STD
X31LOCKWRE, STD
X31SAFTCBL, and STD
NN-T9007 Basic Meters N Y
NNS personnel will be briefed the full course material
NNS 24 hrs
STD QX31AOV, STD QX31EC-
ARC, and STD Q600VACES
PT-T9010 -PT-
T9024 intro to corporate cableways N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
NNS 3 hrs
PT-T9002 ELECTRICAL SAFETY N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
NNS 0.5 hrs
PT-T9039
electrical workmanship
& non-nuclear quality control
N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
NNS 5 hrs
IVV/FRISK
Shop 51-52-67
CTDIVV/Frisk N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
NNS 3 hrs george.rutt Typewritten Text
PSNS&IMF/HII-NNS
number COURSE TITLE Training Equivalent Y/N
GAP briefing required
Y/N GAP description Notes
PSNS
S/56
NNS
X42
PSNS
S/57
NNS
X33
PSNS
S/71
NNS
X33
PSNS
S/38
NNS
X43
PSNS
S/38
FS
NNS
X43
PSNS
S/38
PV
NNS
X43
PSNS
S/26
NNS
X18
PSNS
S/11 shielder
NNS X11
PSNS
S/11
NNS
X11
PSNS
S/17
NNS
X32 GAP delivery
Notional hrs per student
ASBF full asbestos worker N Y
Local requirements for vent, PPE, barriers, signage, storage, waste disposal, wetting solution.
GAP briefing must be delivered by PSNS certified instructor to certify workers for asbestos work at PSNS facilities.
X PSNS 4hrs
ASBGF asbestos w/glove bag N Y
Local requirements for vent, PPE, barriers, signage, storage, waste disposal, wetting solution.
GAP briefing must be delivered by PSNS certified instructor to certify workers for asbestos work at PSNS facilities.
X PSNS 1 hrs
STD QTAGPLUS Vacuum user Nuc Vacuum user N
Y (only if NNS personnel are required to use a nuclear vacuum system during work at PSNS)
Local Tiger vac familiarization briefing X X X X X X X X PSNS 2 hr
STD CIHUINTRO & STD
Y1076CMTC
Q Contamination worker N Y
Briefing package as required by C/105.4
Note: NNS personnel that are
QP qualified are not also QB qualified
X X X X X X X X X PSNS 2 hrs
WS 001ILT 4963 PCB awareness training N Y
NNS personnel will be briefed the full course material for course 4963 and 4963W
X PSNS 1.5 hrs
4000NQCFQUAL PT-T9008
Corporate disconnect/reconnect N Y
NNS personnel will be briefed the full course material
PSNS 2 hrs
ASBL limited asbestos worker N Y
Local requirements for vent, PPE, barriers, signage, storage, waste disposal, wetting solution.
GAP briefing must be delivered by PSNS certified instructor to certify workers for asbestos work at PSNS facilities.
X X X X X PSNS 4 hrs
71OR (SSPC C-1
equivalent) S/71 orientation N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
GAP briefing will not cover spray painting or SHT sections of PSNS course 71OR. NNS personnel are not qualified to spray paint or work SHT.
X PSNS 3 hrs
4000NWS4016
4000NWS4018
R Radiation worker N Y
Briefing package as required by C/105.4 PSNS 1 hr
PRCS
Production contamination and
Radiation supervisor
N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
Required only for NNS supervisors assigning contamination and/or radiation work
PSNS 4hrs
5326 mechanical joint makeup N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
X PSNS 8 hrs
OO14 radiological poly bottle N Y
NNS personnel will be briefed the full course material
NT S/56 only PSNS 8 hrs
RPTS4015 OO47 Hydrogen monitoring N Y
NNS personnel will be briefed the full course material
X X X PSNS 1 hr
4000NQCMQUAL 3835 Randolph pump N Y
NNS personnel will be briefed the full course material
X X X X PSNS 1 hr george.rutt Typewritten Text george.rutt Typewritten Text
PSNS&IMF/HII-NNS
number COURSE TITLE Training Equivalent Y/N
GAP briefing required
Y/N GAP description Notes
PSNS
S/56
NNS
X42
PSNS
S/57
NNS
X33
PSNS
S/71
NNS
X33
PSNS
S/38
NNS
X43
PSNS
S/38
FS
NNS
X43
PSNS
S/38
PV
NNS
X43
PSNS
S/26
NNS
X18
PSNS
S/11 shielder
NNS X11
PSNS
S/11
NNS
X11
PSNS
S/17
NNS
X32 GAP delivery
Notional hrs per student
RPTS4020 N026 vortex freeze seal N Y
Gap will include local manuals, requirements, paperwork, machinery, and gages associated with work at PSNS
GAP requires use of mock ups located at PSNS.
X PSNS 32 hrs
STD QX31AOV, STD
Y1076CMTC, STD
751X3231057, and STD
TEMPLIGHT,
5600 Nuc test pipefitter N Y
Gap will include local manuals, requirements, and paperwork associated with work at PSNS
GAP requires use of mock ups located at PSNS. NT S/56 only PSNS 16 hrs electrical connection fab training N
Y (only if NNS personnel are required to work RF or fiber connections at
PSNS. See Notes column)
NNS has equivalent training for all 4733 connection methods except RF and fiber connection.
NOTE: NNS will ensure personnel being requested to have this course are proficient in the connection fabrication methods included in course 4733 (except fiber and RF connections) prior to arrival. If NNS personnel are required to work RF or fiber connections at PSNS S/51 CTD program will conduct as need familiarization briefings prior to that work.
PSNS
PMT38 precision measurement N
Y, only if NNS personnel will be required to use
PRESS/TEMP/VACUUM
GAGES. NNS training for all other instruments listed in module PMT38
(see Notes column) is equivalent.
If NNS personnel are required to use
PRESS/TEMP/VACUUM
GAGES while at PSNS the requesting shop shall request C/1000T to provide personnel GAP briefing on the
PRESS/TEMP/VACUUM
GAGE section of the
PMT38 training module.
NOTE: NNS will ensure personnel being requested to have this precision measurement module are proficient in the following instruments prior to arrival 1.
DIAL CALIPER
2. DIAL INDICATOR
3. INTRA MICROMETER
4. INSIDE, OUTSIDE, DEPTH
MICROMETERS
5. TORQUE WRENCHES
6. FEELER/SMALL HOLE GAGES
7. TELESCOPE/THREAD GAGE
X PSNS 1 hr
STD QX31EC-ARC, STD
Q600VACES, STD QX31AOV,
STD EQINSINTRO, STD
TEMPLIGHT, Y-1078, and STD
BATTERYBRF
PS-N9001 primary valve mechanic N Y
C/1000T GAP briefing will consist of LP 6, LP 7, and
LP 10 of PS-N9001 lesson plan along with local manuals and forms as needed. S/38 CTD program will be used to familiarise
NNS personnel on the
SCCM as needed
C/1000T poration of GAP requires use of mock ups located at PSNS.
X
PSNS C/1000T
and S/38 CTD program
C/1000T 16 hrs CTD hrs as determined by
S/38 management
357D dry dock evacuation N Y Course 357D
NNS personnel will get this during C/400 indoctrination briefings
X X X X X X X X X X PSNS C/400
5607 Nuc pipe covering N Y Entire CDT training package X
PSNS S/57 CTD
program
TSDCSWA5 Shipwright N Y
Briefing package will contain information developed using NNS and
PSNS lesson plan reviews
PSNS S/64 CTD Program will conduct GAP briefings apon arrival of NNS stagebuilders.
PSNS S/64 CTD
Program george.rutt Typewritten Text
PSNS&IMF/HII-NNS
File details come from the government source that posted it. Updated .