Attachment_J-1_Statement_of_Work_701-16.pdf
PDF 1009 KB Posted
- Attached to
- Decking (USS NIMITZ CVN 68) Federal contract opportunity
- Solicitation number
- N4523A-15-R-5019
About this file
Attachment J-1 Statement of Work 701-16
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATCH_J-2_-_Request_for_Clarification_1.pdf | ||
| ITEM_NO_634-11-001_e-1_701-16.pdf | ||
| ATCH_J-2_-_Request_for_Clarification_2.pdf | ||
| ATCH_J-2_-_Request_for_Clarification_3.pdf | ||
| N4523A-15-R-5019.pdf | ||
| Atch_J-10_Environ_Guide_for_Ktrs _Everett_15_Jun_11.pdf | ||
| Atch_J-10_Environ_Guide_for_Ktrs _Everett_15_Jun_11.pdf | ||
| Atch_J-8_Updated_ESH_requirements _20_Sep_2010.pdf | ||
| Atch_J-5_PSNS IMF_Notice_5239.pdf | ||
| ATCH_J-2_-_Request_for_Clarification.doc | DOC document | |
| Atch_J-9_6_Jun_11_Amend_ESH_Ltr_of_20_Sep_10.pdf | ||
| Atch_J-7_CPDS_Form.doc | DOC document | |
| Atch_J-6_DD254.doc | DOC document | |
| Atch_J-9_6_Jun_11_Amend_ESH_Ltr_of_20_Sep_10.pdf | ||
| Atch_J-4_CIA_Vehicle_Pass.doc | DOC document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text
USS NIMITZ CVN 68
DECKING CONTRACT WORK
PERIOD OF PERFORMANCE
9/28/2015 TO 2/23/2016
PSNS & IMF CIA PIER B
christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text
NWRMC CODE 400
808 BURWELL STREET
BREMERTON, WA 98337-5001
christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text christopher.archut Typewritten Text
Typewritten Text
INDEX
SHIP: USS NIMITZ (CVN 68) NWRMC-701-16
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE DATE
009-01 General Criteria; accomplish 01/02/2015
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 01/02/2015
009-03 Toxic and Hazardous Substances; control 01/02/2015
009-04 Quality Management System; provide 01/02/2015
009-05 Temporary Accesses; provide 01/02/2015
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
01/02/2015
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 01/02/2015
009-08 Fire Protection at Contractor's Facility; accomplish 01/02/2015
009-10 Shipboard Asbestos-Containing Material (ACM); control 01/02/2015
009-18 Magnetic Material; control 01/02/2015
009-19 Provisioning Technical Documentation (PTD); provide 01/02/2015
009-20 Government Property; control 01/02/2015
009-21 Logistics and Technical Data; provide 01/02/2015
009-23 Interferences; remove and install 01/02/2015
009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 01/02/2015
009-28 Fire Prevention Requirements; accomplish 01/02/2015
009-29 Asbestos-Free Pipe Hanger Liner Material; install 01/02/2015
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/02/2015
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish
01/02/2015
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide
01/02/2015
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish
01/02/2015
009-59 Organotin Antifouling Material; control 01/02/2015
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
01/02/2015
009-61 Shipboard Use of Fluorocarbons; control 01/02/2015
009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 01/02/2015
009-65 Polychlorinated Biphenyls (PCBs); control 01/02/2015
009-67 Integrated Total Ship Testing; manage 01/02/2015
009-69 Heavy Weather/Mooring Plan; provide 01/02/2015
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
01/02/2015
009-72 Physical Security at Private Contractor's Facility; accomplish 01/02/2015
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 01/02/2015
Page 1 of 4 EXECUTING WORK christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight
Highlight
ITEM_NO. TITLE DATE
009-74 Occupational, Safety and Health Requirements; accomplish 01/02/2015
009-77 Cofferdam Requirements; accomplish 01/02/2015
009-79 Government Owned Material (GOM); status reporting 01/02/2015
009-80 Ship's Facilities; provide 01/02/2015
009-81 Compartment Closeout; accomplish 01/02/2015
009-82 Data Requirements When Installing an Equal Component Vice Specified Component;
provide
01/02/2015
009-83 Wire Rope Fitting Verfication; provide 02/19/2015
009-84 Accountability of Temporary Fasteners; provide 02/13/2015
009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish
02/13/2015
009-87 Chemical disinfection Procedures; accomplish 02/13/2015
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
01/02/2015
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;
accomplish
01/02/2015
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
01/02/2015
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/02/2015
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 01/02/2015
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide
01/02/2015
009-99 Ship Departure Report; provide 01/02/2015
009-100 Ship's Stability Process Control Procedure (PCP); maintain 01/02/2015
009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 01/02/2015
009-102 Alteration Verification; provide 01/02/2015
009-103 Weight and Moment Change Data; provide 01/02/2015
009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/02/2015
009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish
01/02/2015
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;
accomplish
01/02/2015
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 01/02/2015
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;
provide and manage
01/02/2015
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 01/02/2015
009-118 CG Deck Loading; accomplish 01/02/2015
009-120 Fact Finding and Critique of Unplanned Events; manage 01/02/2015
009-121 Ship Assessment/Inspection Requirements; provide 01/02/2015
Page 2 of 4 EXECUTING WORK christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight christopher.archut Highlight
Highlight
DATETITLEITEM NO.
CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
009-26 Deck Covering Requirements; accomplish 02-Jan-15
009-32 Cleaning and Painting Requirements; accomplish 02-Jan-15
Page 3 of 4 EXECUTING WORK
Lead Planner Ref TypeWork Spec Work Spec Title
PAGE: 1NMD - REFERENCE IDENTIFICATION
DATE:05/11/2015 & TIME:10:02:21AM
SHIP NAME: USS NIMITZ CVN 68
NWRMC-701-16 ERP OPEN
SSP NO AVAIL TYPE STATUS
042-01-001 Workplace Requirements and Scheduling; accomplish Archut , Christopher
O2.1 Standard Items
O2.2 DOD Instruction 5200.8, Security of DOD Installations and Resources
O2.3 OPNAVINST 5530.15A, CH-2 Navy Physical Security
OT2.4 Dated 10 May 2013, Environmental, Safety, and Health Requirements for Contractors Performing Shipboard Work at the Bremerton Naval Complex
SER 106/0077
077-01-001 Hazardous Waste Produced on Naval Vessels; control Archut , Christopher
O2.1 Resource Conservation and Recovery Act (RCRA)42 U.S.C. 6901
O2.2 Federal Hazardous Materials Transportation Act49 U.S.C. 5103
O2.3 Repair or Maintenance of Naval Vessels; handling of hazardous waste10 U.S.C. 7311
O2.4 Dated 10 May 2013, Environmental, Safety, and Health Requirements for Contractors Performing Shipboard Work at the Bremerton Naval Complex
SER 106/0077
634-11-001 Porcelain Tile Deck Covering System; replace Archut , Christopher
O2.1 Standard Items
634-11-002 Cosmetic Polymeric Deck; install Archut , Christopher
O2.1 Standard Items
992-10-001 Contractor Facilities and Temporary Services; provide Archut , Christopher
O2.1 Standard Items
O2.2 Dated 10 May 2013, Environmental, Safety, and Health Requirements for Contractors Performing Shipboard Work at the Bremerton Naval Complex
106/0077
Lead Planner Ref TypeWork Spec Work Spec Title
PAGE: 2NMD - REFERENCE IDENTIFICATION
DATE:05/11/2015 & TIME:10:02:21AM
SHIP NAME: USS NIMITZ CVN 68
NWRMC-701-16 ERP OPEN
SSP NO AVAIL TYPE STATUS
END OF REPORT
Reference Type Total Total-No Duplicates
1OTHER 1
8OTHER-DO NOT INCLUDE IN DIGITAL WORK PKG 11
Type Descriptions:
AER: AER MS: Military Standard
DR: Drawing O: Other - Do NOT include
DWP
E: Test OT: Other
I: Other - Include DWP PF: Plan Files
M: 4720 STD: Standard
ITEM NO. TITLE
Workplace Requirements and Scheduling; accomplish042-01-001
Hazardous Waste Produced on Naval Vessels; control077-01-001
Porcelain Tile Deck Covering System; replace634-11-001
Cosmetic Polymeric Deck; install634-11-002
Contractor Facilities and Temporary Services; provide992-10-001
Page 4 of 4 EXECUTING WORK
SHIP: USS NIMITZ (CVN 68) ITEM NO: 042-01-001
COAR: 16 PCN: CNAF-Q390
CMP: NONE
PLANNER: ARCHUT ,
CHRISTOPHER
SSP: NWRMC-701-16 1 of 3 ITEM NO: 042-01-001
1. SCOPE:
1.1 Title: Workplace Requirements and Scheduling; accomplish
1.2 Location of Work:
1.2.1 Throughout Naval Base Kitsap Complex
1.2.2 Throughout the Ship
1.2.3 Puget Sound Naval Shipyard, Controlled Industrial Area (CIA)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 DOD Instruction 5200.8, Security of DOD Installations and Resources
2.3 OPNAVINST 5530.15A, CH-2 Navy Physical Security
2.4 SER 106/0077, Dated 10 May 2013, Environmental, Safety, and Health Requirements for Contractors Performing Shipboard Work at the Bremerton Naval Complex
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.1 through 2.4 for work
specifications assigned to this delivery order.
3.1.1 Provide for each contractor and subcontractor employee, for work accomplished at location listed in 1.2.3, one of the following documents that establish both identity and employment eligibility to Pass & ID Office at time of badge application, in accordance with the requirements of Department of Homeland Security, OMB No. 1615-0047, Form I-9, Employment Eligibility Verification:
3.1.1.1 A letter, on contractor company letterhead, signed by a company official verifying that the employee is a United States citizen and that a citizenship document has been visually verified.
3.1.1.2 Birth Certificate with a raised state seal.
3.1.1.3 Hospital birth certificate with authenticating seal.
3.1.1.4 Certificate of citizenship issued by the Immigration and Naturalization Service.
3.1.1.5 Report of birth abroad (Form: FS-240).
3.1.1.6 Certificate of birth (Form: FS-545 or DS-1350).
3.1.1.7 Certification Naturalization Service (Original only).
3.1.1.8 United States passport.
3.1.2 During the badging process, each contractor and subcontractor employee must watch a 30 minute radiological, security and safety training video.
SHIP: USS NIMITZ (CVN 68)
SSP: NWRMC-701-16 2 of 3 ITEM NO: 042-01-001
3.2 General Workplace Requirements.
3.2.1 Prohibit contractor and subcontractor employees from eating food or drinking beverages aboard ship or in the shipyard except at Government designated areas. No coveralls or soiled work clothes are permitted in designated eating areas.
3.2.2 Ensure all contractor and subcontractor employee hard hats are labeled with the company and employee name and are clearly visible.
3.2.3 Notify contractor and subcontractor employees that personal property, such as tool boxes, special tools, clothing and so forth taken aboard ship is subject to search and inventory daily on arrival and departure. Prohibit employees from leaving personal property onboard ship unattended.
3.2.3.1 Contractor and subcontractor employees may be subject to additional screening when boarding the vessel by being required to pass through metal detection devices and additional security checks at point of entry to the ship.
3.2.4 Restrict access to Government facilities, for work
accomplished by this contract, of employees who are currently on probation or parole as a result of a felony conviction, foreign nationals or persons affiliated with, or employed by a foreign owned company. Pass this requirement to all subcontracts.
3.3 Schedule Requirements.
3.3.1 Ensure work is scheduled for not more than two shifts a day.
The hours for the shifts shall coincide with the PSNS & IMF standard work hours for Day Shift and Swing Shift. All noise producing work shall cease at 2000 hours.
3.3.1.1 The Standard work hour shifts for PSNS & IMF are Day
Shift from 0720 - 1602 and Swing Shift from 1542 - 0012.
3.3.2 Accomplish work specification requirements of 634-11-001 per the below schedule timeframes:
JSN COMPARTMENT START DATE COMPLETION DATE DURATION
VB06-0661 2-44-7-L 10/5/2015 11/13/2015 38
VF40-0064 01-25-1-L 11/2/2015 11/30/2015 28
MH01-2405 2-108-2-L 11/2/2015 11/27/2015 25
CS54-0552 02-225-3-L 12/1/2015 1/7/2016 36
SS06-1337 2-210-4-L 12/2/2015 12/23/2015 21
ER03-0515 2-64-4-L 1/4/2016 1/15/2016 11
VF02-0698 03-245-3-L 1/4/2016 1/22/2016 18
CS11-0144 02-59-1-L 1/27/2016 2/19/2016 22
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
SSP: NWRMC-701-16 3 of 3 ITEM NO: 042-01-001
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
HAZMAT
SHIP: USS NIMITZ (CVN 68) ITEM NO: 077-01-001
COAR: 16 PCN: CNAF-Q391
CMP: NONE
PLANNER: ARCHUT ,
CHRISTOPHER
SSP: NWRMC-701-16 1 of 5 ITEM NO: 077-01-001
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout Naval Base Kitsap Complex
1.2.2 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 42 U.S.C. 6901, Resource Conservation and Recovery Act (RCRA)
2.2 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act
2.3 10 U.S.C. 7311, Repair or Maintenance of Naval Vessels; handling of hazardous waste
2.4 SER 106/0077, Dated 10 May 2013, Environmental, Safety, and Health Requirements for Contractors Performing Shipboard Work at the Bremerton Naval Complex
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with the requirements of 2.1 through 2.4.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
Report: DISPOSAL FACILITY REPORT Date: + 2
3.1.3 Submit one legible copy, in hard copy or electronic media, of
2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.3.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence
SSP: NWRMC-701-16 2 of 5 ITEM NO: 077-01-001 with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2,
2.3 and 3.2.2.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT TYPE NAVY CO-GENERATED CONTRACTOR
SSP: NWRMC-701-16 3 of 5 ITEM NO: 077-01-001
Acid Solutions (may include N/A N/A N/A spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) N/A N/A N/A
Sodium Hydroxide N/A N/A N/A
Cleaning Solvents N/A N/A 5 GAL
Sodium Phosphates (Tri, Bi, N/A N/A N/A or Mono)
Fluorocarbons N/A N/A N/A
Morpholine N/A N/A N/A
Sodium Chromates N/A N/A N/A
Hydrazine N/A N/A N/A
Carbohydrazide N/A N/A N/A
Methyl Ethyl Ketone N/A N/A N/A
Spent Abrasive Blast Material N/A N/A N/A
(contaminated with a known hazardous waste)
Trichloroethane N/A N/A N/A
Miscellaneous Chemicals N/A N/A N/A
(Ignitable)
(Corrosive)
(TCLP Toxic)
(Reactive)
Oil (Synthetic) N/A N/A N/A
Paints (Enamel, Latex, Epoxy, N/A N/A 5 Gal.
thinners, oil based, rubber paint, non-skid, lacquer, SSP: NWRMC-701-16 4 of 5 ITEM NO: 077-01-001 remover, varnishes)
Paints (May include lead, N/A N/A N/A cadmium, or chrome)
Paint Strippers (phenols, N/A N/A N/A lead, chromium)
Sludge (Contaminated with N/A N/A N/A a known hazardous waste)
Wool Felt (contaminated with N/A N/A N/A chromium and PCB's)
Ventilation Debris/Residue N/A N/A N/A
(heavy metals, e.g., cadmium, Chromium)
3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
Report: DISPOSAL OF WASTE REPORT Date: + 5
3.7 Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the
SUPERVISOR.
3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.7.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation pursuant to Paragraph (b) of 2.3. The contractor is expected to use best
SSP: NWRMC-701-16 5 of 5 ITEM NO: 077-01-001 management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in 3.5 does not preclude the contractor from taking action consistent with 2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.3. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
4.2.2 Reference to a Material Safety Data Sheet (MSDS).
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
SHIP: USS NIMITZ (CVN 68) ITEM NO: 634-11-001
COAR: 16 PCN: See Attachment A
CMP: NONE
PLANNER: ARCHUT ,
CHRISTOPHER
SSP: NWRMC-701-16 1 of 3 ITEM NO: 634-11-001
1. SCOPE:
1.1 Title: Porcelain Tile Deck Covering System; replace
1.2 Location of Work:
1.2.1 CREW WASHROOM (2-44-7-L), approximately 800 SF - REPLACEMENT
1.2.2 CREW WASHROOM (2-59-1-L), approximately 470 SF - REPLACEMENT
1.2.3 VESTIBULE (2-64-4-L), approximately 10 SF - REPAIR
1.2.4 CREW WASHROOM (2-210-4-L), approximately 640 SF - REPLACEMENT
1.2.5 CREW WASHROOM (01-25-1-L), approximately 288 SF - REPLACEMENT
1.2.6 CREW WASHROOM (02-225-3-L), approximately 90 SF - REPAIR
1.2.7 CREW WASHROOM (02-245-3-L), approximately 110 SF - REPLACEMENT
1.2.8 CREW WASHROOM (03-88-3-L), approximately 250 SF - REPLACEMENT
1.3 Identification:
1.3.1 Unglazed Porcelain Tile, Conforming to ANSI A137.1, With Minimum Coefficient of Friction (COF) of 0.7 Dry and 0.6 Wet When Tested Per ASTM C1028, Size 3 IN x 3 IN, Color: Crossville A585 Sea- Mist Blue or Crossville A825 Mercury or equivalent.
2. REFERENCES:
2.1 Standard Items
3. REQUIREMENTS:
3.1 Remove existing decking systems and repair or replace with new, with material in 1.3 as designated in locations listed in 2.1.
3.1.1 Accomplish the requirements of 009-26 of 2.1, including Attachment A.
(V)(G) "COMPARTMENT CLEANLINESS"
3.2 Demonstrate to SUPERVISOR and Ship's Force, at each location listed in 2.1, that compartment surfaces are free of dust, debris and foreign materials generated as a result of Contractor work.
(V)(G) "FINAL INSPECTION"
3.3 Accomplish final inspection close-out with SUPERVISOR and Ship's Force representatives to inspect product installation at each location listed in 2.1 upon completion of work.
3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None.
SSP: NWRMC-701-16 2 of 3 ITEM NO: 634-11-001
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
SSP: NWRMC-701-16 3 of 3 ITEM NO: 634-11-001
Attachment A
PCN Identification
CS11-0144 DECK PRESERVATION REQUIRED
VF40-0064 DECK PRESERVATION REQUIRED
VB22-0661 MISSING CORRODED DECK
SS06-1337 DECK PRESERVATION REQUIRED
ER03-0515 DECK PRESERVATION REQUIRED
CS54-0552 DEGRADED DECK TILES
SS05-3796 DECK PRESERVATION REQUIRED
VF02-0698 DECK PRESERVATION REQUIRED
SHIP: USS NIMITZ (CVN 68) ITEM NO: 634-11-002
COAR: 16 PCN: MH01-2405
CMP: NONE
PLANNER: ARCHUT ,
CHRISTOPHER
SSP: NWRMC-701-16 1 of 2 ITEM NO: 634-11-002
1. SCOPE:
1.1 Title: Cosmetic Polymeric Deck; install
1.2 Location of Work:
1.2.1 WARD BATH, (2-108-2-L), Approximately 135 SF - REPLACEMENT
1.3 Identification:
1.3.1 Cosmetic Polymeric Deck Covering Type I Class 1, in accordance with MIL-PRF-24613. Color: Blue with Black and White flakes. Include aggregate glass beads.
2. REFERENCES:
2.1 Standard Items
3. REQUIREMENTS:
3.1 Remove existing decking and install new decking detailed in 1.3.1 at location listed in 1.2.1.
3.1.1 Accomplish the requirements of 009-26 of 2.1 including
Attachment C.
(V)(G) "COMPARTMENT CLEANLINESS"
3.2 Demonstrate to SUPERVISOR and Ship's Force that compartment surfaces are free of dust, debris, and foreign materials generated as a result of Contractor work.
(V)(G) "FINAL INSPECTION"
3.3 Accomplish final inspection close-out with SUPERVISOR and Ship's Force representative to inspect product installation at completion of work.
3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
SSP: NWRMC-701-16 2 of 2 ITEM NO: 634-11-002
SHIP: USS NIMITZ (CVN 68) ITEM NO: 992-10-001
COAR: 16 PCN: CNAF-Q392
CMP: NONE
PLANNER: ARCHUT ,
CHRISTOPHER
SSP: NWRMC-701-16 1 of 2 ITEM NO: 992-10-001
1. SCOPE:
1.1 Title: Contractor Facilities and Temporary Services; provide
1.2 Location of Work:
1.2.1 Throughout Naval Base Kitsap Complex
1.2.2 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 106/0077, Dated 10 May 2013, Environmental, Safety, and Health Requirements for Contractors Performing Shipboard Work at the Bremerton Naval Complex
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.1 and 2.2 regarding work specifications for this delivery order.
3.2 Provide Contractor Facilities.
3.2.1 Provide a flammable storage facility sized to support paint, solvent, and other hazardous and flammable material requirements, conforming to NFPA Standard 30, Sheets 29 and 30, 2012 Edition.
3.2.2 Install and maintain a temporary reusable sign at each
entrance to each compartment being worked with notification of Contractor Company name and point of contact information.
3.2.2.1 Install the sign no lower than 50 inches or higher than 75 inches from the deck. The sign shall measure a minimum of 12 inches by 30 inches with lettering a minimum of one-inch high in four consecutive rows, each row spaced a minimum of one-half inches apart and reading as follows:
DO NOT
ENTER
DECK COVERING WORK IN
PROGRESS
COMPANY NAME
POINT OF CONTACT
INFORMATION
3.2.3 Request Contractor lay-down area via SUPERVISOR for equipment and supplies required both shipboard and if necessary on the pier.
3.2.3.1 Submit request no later than Delivery Order award plus 3 Business days.
3.3 Provide Temporary Services.
3.3.1 Install, maintain and remove temporary electrical, ventilation
SSP: NWRMC-701-16 2 of 2 ITEM NO: 992-10-001 and tool air systems and equipment for Contractor work associated with work specifications for this delivery order.
3.4 Submit request for Government provided crane lifts and temporary service support as follows:
3.4.1 Complete an Assist Work Request (AWR), PSNS Form No. 4850/385 (11-13) for each request and submit to the Government Contracting Officer's Representative (COR) a minimum of 3 business days in advance of the requirement.
3.4.1.1 Provide hardwood pallets for materials to be lifted or moved by forklift.
3.4.1.2 Provide lifting pad eye certification for equipment
lifts with the submission of the AWR form.
(V)(G) "PIER - LAYDOWN AREA INSPECTION"
3.5 Conduct a final inspection of Government provided lay-down areas on ship and pier to ensure all work equipment, supplies, debris and waste has been removed and area is clean.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
| Cover Sheet |
| CAT I STD Item Index |
| CAT II STD Item Index |
| References |
| Work Item Index |
| 042-01-001 Workplace Requirements and Scheduling; accomplish |
| 077-01-001 Hazardous Waste Produced on Naval Vessels; control |
| 634-11-001 Porcelain Tile Deck Covering System; replace |
| Attachment A |
| 634-11-002 Cosmetic Polymeric Deck; install |
| 992-10-001 Contractor Facilities and Temporary Services; provide |
File details come from the government source that posted it. Updated .