ATCH_J-2_-_Request_for_Clarification_2.pdf
PDF 84 KB Posted
- Attached to
- Decking (USS NIMITZ CVN 68) Federal contract opportunity
- Solicitation number
- N4523A-15-R-5019
About this file
Request for Clarification 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATCH_J-2_-_Request_for_Clarification_1.pdf | ||
| ITEM_NO_634-11-001_e-1_701-16.pdf | ||
| ATCH_J-2_-_Request_for_Clarification_3.pdf | ||
| N4523A-15-R-5019.pdf | ||
| Atch_J-10_Environ_Guide_for_Ktrs _Everett_15_Jun_11.pdf | ||
| Atch_J-10_Environ_Guide_for_Ktrs _Everett_15_Jun_11.pdf | ||
| Atch_J-8_Updated_ESH_requirements _20_Sep_2010.pdf | ||
| Attachment_J-1_Statement_of_Work_701-16.pdf | ||
| Atch_J-5_PSNS IMF_Notice_5239.pdf | ||
| ATCH_J-2_-_Request_for_Clarification.doc | DOC document | |
| Atch_J-9_6_Jun_11_Amend_ESH_Ltr_of_20_Sep_10.pdf | ||
| Atch_J-7_CPDS_Form.doc | DOC document | |
| Atch_J-6_DD254.doc | DOC document | |
| Atch_J-9_6_Jun_11_Amend_ESH_Ltr_of_20_Sep_10.pdf | ||
| Atch_J-4_CIA_Vehicle_Pass.doc | DOC document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
ATTACHMENT J-2
DATE OF REQUEST: 7/7/15 QUESTION NO: 2
SHIP/HULL NO: Nimitz (CVN-68) SOLICITATION NO: N4523A-15-R-5019
ITEM NO: 634-11-001 SSP# N/A
TITLE: Porcelain Tile Deck Covering System; replace PSNS&IMF CONTRACTS POC & PHONE:
Melvin Jones 360-476-4071 melvin.jones5@navy.mil
LeRoy Rushing, (360) 476-4108 leroy.rushing@navy.mil
PARA. NO: 1.2.3 PAGE NO: CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
Location 1.2.3:
2-64-4-L is a Head vs. Vestibule which is 2-64-2-L.
KTR has ship checked this space to find 1 SF around deck pot FWD of toilet that needs repairs. Rest of decking is covered by protective diamond tuck.
KTR needs clarification for 10 SF of repairs.
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
2-64-4-L is a crew washroom. An errata (E1) is attached to the e-mail response correcting the discrepancy on the work specification.
10 SF of repairs was the total of all spot locations within this area with either chip tiles and/or coamings;
1 SF around deck pod forward of the toilet, 2-3 SF by the walkway, 3-4 SF by the overboard discharge aft portside corner, 1 SF coving by the aft portside corner, and 1 SF coving mid portside. Any other area missed will be pointed during execution and/or after award of contract.
ALL BIDDERS QUESTIONS MUST BE RECEIVED NO LATER THAN 10:00 A.M. (PST),
8 July 2015. QUESTIONS RECEIVED AFTER THIS DATE MAY NOT BE ANSWERED.
mailto:melvin.jones5@navy.mil mailto:leroy.rushing@navy.mil
File details come from the government source that posted it. Updated .