ATCH_J-2_-_Request_for_Clarification_3.pdf
PDF 84 KB Posted
- Attached to
- Decking (USS NIMITZ CVN 68) Federal contract opportunity
- Solicitation number
- N4523A-15-R-5019
About this file
Request for Clarification 3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATCH_J-2_-_Request_for_Clarification_1.pdf | ||
| ATCH_J-2_-_Request_for_Clarification_2.pdf | ||
| ITEM_NO_634-11-001_e-1_701-16.pdf | ||
| N4523A-15-R-5019.pdf | ||
| Atch_J-10_Environ_Guide_for_Ktrs _Everett_15_Jun_11.pdf | ||
| ATCH_J-2_-_Request_for_Clarification.doc | DOC document | |
| Atch_J-9_6_Jun_11_Amend_ESH_Ltr_of_20_Sep_10.pdf | ||
| Atch_J-7_CPDS_Form.doc | DOC document | |
| Atch_J-6_DD254.doc | DOC document | |
| Atch_J-10_Environ_Guide_for_Ktrs _Everett_15_Jun_11.pdf | ||
| Atch_J-8_Updated_ESH_requirements _20_Sep_2010.pdf | ||
| Attachment_J-1_Statement_of_Work_701-16.pdf | ||
| Atch_J-5_PSNS IMF_Notice_5239.pdf | ||
| Atch_J-9_6_Jun_11_Amend_ESH_Ltr_of_20_Sep_10.pdf | ||
| Atch_J-4_CIA_Vehicle_Pass.doc | DOC document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
ATTACHMENT J-2
DATE OF REQUEST: 7/7/15 QUESTION NO: 3
SHIP/HULL NO: Nimitz (CVN-68) SOLICITATION NO: N4523A-15-R-5019
ITEM NO: 634-11-001 SSP# N/A
TITLE: Porcelain Tile Deck Covering System; replace PSNS&IMF CONTRACTS POC & PHONE:
Melvin Jones 360-476-4071 melvin.jones5@navy.mil
LeRoy Rushing, (360) 476-4108 leroy.rushing@navy.mil
PARA. NO: 1.2.6 PAGE NO: CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
Crew Washroom (02-225-3-L) KTR has ship checked this space to find both shower stall runs need replacement due to water underneath deck covering. Dry off area and rest of Washroom tiles appearance fine except a few broken field tiles & cove pieces.
KTR needs clarification for 90 SF of repairs.
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
Crew Washroom (02-225-3-L) needs a total of 90 SF of repairs in several spot locations of the space.
The shower area tiles/coving needs to be removed and replaced including the coving in the aft entryway to the shower stall.
There are several cracked/chip deck tiles and coving throughout this space; the deck tiles aft by the toilets, The cracked and chip coving around the corner of the stainless steel separator, the coaming under the entry door forward. Any other area missed will be pointed during execution and/or after award of contract.
ALL BIDDERS QUESTIONS MUST BE RECEIVED NO LATER THAN 10:00 A.M. (PST),
8 July 2015. QUESTIONS RECEIVED AFTER THIS DATE MAY NOT BE ANSWERED.
mailto:melvin.jones5@navy.mil mailto:leroy.rushing@navy.mil
File details come from the government source that posted it. Updated .