Additional Responses to RFQ Questions 09-09-22.pdf

PDF 370 KB Posted

Attached to
Audiovisual Equipment and Installation-Command Briefing Room Federal contract opportunity
Solicitation number
N4215822QE088
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains a federal solicitation notice and related questions and responses for audiovisual equipment and installation services for a Command Briefing Room. The solicitation seeks a firm fixed price single award contract to provide audiovisual upgrades including a sound masking system covering 3,600 square feet, eight speakers, a laser tracking camera, and removal of the existing projector screen and housing. Questions are due by September 8th and responses by September 13th. The awarded contract will have a one year period of performance from September 30, 2022 through September 29, 2023. The solicitation is set aside for small businesses with less than 750 employees and a NAICS code of 334310. The Department of the Navy Naval Sea Systems Command is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to Audiovisual Equipment and Installation-Command Briefing Room, newest first.
File Type Posted
Amendment 3- N4215822QE088 P0003.docx DOCX document
Amendment 2-N4215822QE088-P0002.docx DOCX document
Questions and Responses 9.9.22.pdf PDF
Amendment 1- N4215822QE088-P0001.docx DOCX document
-ATTACHMENT F- CBR location simple dwg.pdf PDF
-ATTACHMENT C- PRICE EVALUATION FACTORS.docx DOCX document
-ATTACHMENT B- PRICING WORKSHEET.xlsx XLSX spreadsheet
-ATTACHMENT A- TECHNICAL CAPABILITY CERTIFICATIONS.docx DOCX document
N4215822QE088- 9.2.22.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Response

What is the desired function of the described sound masking system? What areas is it supposed to influence? Please be specific and indicate on the diagram where the impact is desired. Does the gov desire additional ambient noise (sound masking) in these areas, or less noise (sound-proofing or sound-absorption)?

The sound masking will need to cover the entrance doors. This will eliminate the ability for outside personnel from hearing discussions, whether classified or unclassified (protected), that are discussed in confidant of the presenter. The sound masking will need to be controlled from the inside of the CBR and can be secured from alteration and damage.

What commercial product served as your market research for the following equipment item? What is the exact make and model of a sound masking system that meets the government requirement?

No brand, make or model has been identified by the government. The requirement is to ensure people standing outside the Command Briefing Room does not hear what is being said inside. The sound masking system should cover up to 3,600 square feet and white in color.

SOW state contractor will remove and dispose of the projector screen. What about the soffit that contains the screen? Should the soffit be removed to allow for a straight curtain track? Is the vendor supposed to make facility modifications to restore the ceiling?

When government modifies the wall for the video wall, the screen housing will be removed also. Therefore the cutrain track will run straight across the top.

What is meant by laser tracking? What is a commercial product that has this desired functionality?

Laser tracking camera as in a camera that has autotracking and follows the presenter as he moves across the stage. Aver, Lummens, PTZ Optics, Obsbot, and Sony are some of the companies that makes these types of cameras.

Is the vendor expected to install 8 speakers, or propose a different number if required?

The vendor is expected to install eight (8) speakers.

Questions N4215822QE088-CBR Audiovisual Equipment Upgrades

One thing to consider is the instructions state all items must be ordered within 30 days of award. Do you want to do this?

This can be done but could impact the warranty period on some items.

The contractor shall order all equipment, tools and parts in such a way that it all arrives at the contractor’s warehouse at approximately the same time. Confirmation is required from the contractor to the government when each item is ordered and its estimated time of arrival.

File details come from the government source that posted it. Updated .