152_031422 ASBESTOES REPORT.pdf
PDF 2 MB Posted
- Solicitation number
- N400857520568
About this file
This document is an Asbestos Re-inspection report for Building 152, a steam plant located at MCAS Cherry Point, conducted by AH Environmental Consultants in March 2022. The inspection identified multiple asbestos-containing materials (ACM) throughout the facility, including furnace door insulation, pipe insulation and fittings, sink undercoating, floor tiles, tile mastic, transite panel material, caulking, roofing material, and gasket material. The building, originally constructed as a coal-burning facility and now transitioned to natural gas, contains large quantities of insulated piping and systems, many of which still contain asbestos.
The report emphasizes special caution is required when working in the building, as many asbestos-containing lines are present, some without clear demarcation. The inspection found that while some systems are no longer in use, they remain abandoned in place. The building has a hazard rank of 2, with abundant friable ACM identified and maintained in good condition. The report recommends implementing special protocols to prevent disturbance of ACM and suggests that any work involving insulating materials should include sampling and analysis. Previous inspections are noted as potentially unverifiable due to lack of proper chain of custody and analysis reports.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003 7520568.pdf | ||
| Amendment 0002 7520568.pdf | ||
| Amendment 0001 7520568.pdf | ||
| Amendment 0001 7520568.pdf | ||
| 7520568-STATEMENTOFWORK.Macc.2.pdf | ||
| 7520568 RFP.pdf | ||
| 7520568-STATEMENTOFWORK.Macc.2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos Reinspection
Building 152 Assessment of known Asbestos
Containing Materials (ACM) in MCAS
Cherry Point buildings.
Building Hazard Rank: [2]
Abundant Friable ACM identified, maintained in good condition.
! SPECIAL CAUTION !
Sample TSI prior to any disturbance.
March 14, 2022
AH Environmental Consultants Inc.
11837 Rock Landing Drive, Suite 300 Newport News, VA 23606 757.873.4959
ACM Re-inspection 2022
David Dobson March 14, 2022
NC #11963, #20836, #40515
There is a well-established link between the inhalation of asbestos fibers and various diseases such as asbestosis, mesothelioma, lung and other cancers. Federal regulations governing asbestos include the Asbestos Hazard Emergency Response Act (40 CFR 763, AHERA) and the
Occupational Safety and Health Administration (OSHA) regulations (29 CFR 1910.1001, General
Industry Asbestos Standard) to address the hazard. These regulations apply to Naval and Marine
Corps facilities as referenced in Office of the Chief of Naval Operations Instructions
(OPNAVINST) 5100.23G, Chapter 17 (Asbestos Control) and Marine Corps Orders (MCO)
5100.29B, Part 4 (Managing an Installation wide safety and occupational health program inclusive of MCO P5100.8, OSHA 29 CFR 1910, 1926 and 1960). These are the governing documents for dealing with asbestos issues at a Naval/ Marine Corps facility. Proper policy, recordkeeping, and surveillance are vital to limiting a facility’s liability resulting from exposing personnel to a hazardous condition
In order to comply with this regulation, building/ facility owners (Department of Defense, United States Marine Corps Installations East- MCAS Cherry Point) continue asbestos inspection of buildings under their command in a timely and competent manner by periodically verifying the condition of the ACM in a building since most building materials degrade with time, and damaged or degraded ACM may pose an evolving hazard to building occupants.
Information gathered during these reinspections are incorporated into the Cherry Point
Asbestos Management Program/Plan in compliance with Subpart (j)(2)(ii) of the OSHA 1910.1001 standard.
The primary focus of the inspections were to evaluate of the condition of existing ACM, compare the condition rating to previous ratings, and assign a hazard priority ranking for the building. Assessment of potential ACM issues in other sections of the building where ACM was not listed, were not investigated. Inspections include evaluation of the condition of documented ACM according to the current facility asbestos records. Findings of the asbestos inspection are incorporated as the official record of ACM at the facility and place buildings containing ACM under the jurisdiction of the Asbestos Program Manager (APM) under the implementation of a facility wide O&M Program.
Building re-inspections were limited to previously identified ACM. The National Emission
Standards for Hazardous Air Pollutants (NESHAPs) apply to buildings to be renovated or demolished, and require a thorough asbestos inspection prior to such activities.
AH Environmental Consultants, Inc. (AH) North Carolina licensed inspectors conducted the bulk of asbestos inspection activities as required for the project buildings during the period from
February to April 2022 under contract with Cherokee Nation 3S, Contract number 22700-0172;
delivery order W9127819D0043; task order 9127821F0409.
Findings during the most recent inspection are summarized in the following table, including;
material description, locations identified, damage assessment, and hazard ranking. ACM are cataloged in homogenous material groups (of similar color, size, and function). ACM are shown in
Bold Red.
Listed ACM in Building 152 includes:
Furnace door insulation
Pipe insulation and fittings
Sink undercoating, black
9” Black floor tile
Tile mastic
Beige floor tile
Transite panel material
Caulking
Roofing material
Gasket material
Photos of ACM follow to aid in later identification. A current building inspection sketch is also provided to graphically depict known locations of ACM.
HOMOGENOUS MATERIAL RECORDS
HM# Description Status/ Location(s) Condition Rank 2000 HM’s Identified
01 12” Green floor tile and mastic Non ACM
02 4” Black vinyl base and adhesive Non ACM
03 Non-skid material Non ACM
04 Black textured coating UNKNOWN UNK 3
05 Plaster material, ceiling NE Office area & hall GOOD 3
06 Plaster material, walls Non ACM
07 Furnace insulation I Non ACM
08 Tank insulation I Non ACM
09 Tank insulation II Non ACM
10 Tank insulation III Non ACM
11 Tank insulation IV Non ACM
12 Tank insulation V Non ACM
13 Tank insulation VI Non ACM
14 Furnace insulation II, gray REMOVED
15 Cloth lagging on large drum REMOVED
16 Cloth lagging on small drum Non ACM
17 Misc. debris at drums Non ACM
18 Wall insulation, block material Non ACM
19 Sink undercoating, black 01 level SW
20 Plaster ceiling, white II Non ACM
21 Pipe insulation I, 4” Mixed throughout GOOD 2
22 Pipe insulation II, 6” (primary HM#) Mixed throughout GOOD 2
23 Pipe insulation III, 10” Mixed throughout GOOD 2
24 Pipe insulation IV, 12” Mixed throughout GOOD 2
25 Pipe insulation V, 18” Mixed throughout GOOD 2
26 Pipe insulation VI, 24” Mixed throughout GOOD 2
28 Mudded fitting insulation, 4” Mixed throughout GOOD 2
HM# 2004 HM’s Identified Status/ Location(s) Condition Rank 21a Gasket material, white/black (see also
HM51, 57)
Mixed throughout GOOD 3
21b Flexible duct connectors
HM# 2006 HM’s Identified Status/ Location(s) Condition Rank
30 Mudded fittings (unlabeled), 02 level HP steam
Non ACM
31 Pipe insulation (unlabeled) Non ACM
32 Boiler flue insulation, beige Non ACM
33 Mudded fittings (unlabeled), 03 level Non ACM
34 Pipe insulation, old steam lines, 03 level 03 at Flues GOOD 2
HM# 2010 HM’s Identified Status/ Location(s) Condition Rank
40 Fiberglass sealant, black Non ACM
41 Window sill material, gray Non ACM
42 12” Black w/white tile and adhesive Non ACM
43 9” Brown w/red tile and adhesive NE office area GOOD 3
44 9” Beige tile and adhesive NE office area GOOD 3
45 Misc. floor covering (4th layer) NE office area GOOD 3
46 9” Black floor tile and mastic East Kitchen GOOD 3
47 Vapor barrier material Non ACM
48 Interior caulking, white Non ACM
49 Fiberglass sealant, gray Non ACM
50 Lab counter material, black Non ACM
51 Gasket material, white Mixed throughout GOOD 3
52 Transite panel material, gray North center office GOOD 3
53 12” Beige w/brown tile and adhesive Non ACM
54 Beige tile (under HM53) North Cntr office GOOD 3
55 12” Acoustical tile, wall and ceiling Non ACM
56 12” Acoustical tile, wall patch
57 Gasket material, gray Mixed througout GOOD 3
58 Fibrous debris, welding blanket Non ACM
59 Silver sealant, furnace brick Non ACM
60 Misc. sealant, white, furnace brick Non ACM
61 Roof sealant, gray (main roof) Non ACM
62 Asphalt rolled roofing Non ACM
63 Roof sealant, gray (upper roof) Non ACM
64 Exterior caulking, gray Non ACM
SUMMARY
Building 152 is the Cherry Point main steam plant. Originally constructed as a coal burning facility, transition to natural gas has occurred. Due to the date of construction, the building contained large quantities of insulated piping and systems, many containing asbestos. Although some systems are no longer used, they have been abandoned in place.
Many lines are marked as “DANGER ACM”. However, there is the possibility of ACM lines without demarcation. Therefore, any disturbance of insulating materials in this structure should consist of sampling and analysis. Various inspections have taken place but without the chain of custody and reports of analysis, the most significant one with an estimated 500 samples is not verifiable.
Various other ACM is also present, including multiple layers of ACM flooring, plaster ceiling material, and gaskets which may also be present throughout. Transite panel material is also present as siding for a control booth on the North first floor.
In general, special protocols should be in place to prevent disturbance of ACM for this building.
PHOTOS
UNKNOWN LOCATIONS
[HM04] Black textured coating, ACM [HM05] Plaster material, ceiling, ACM
[HM14] Furnace insulation, ACM REMOVED [HM15] Cloth lagging, ACM
[HM19] Sink Undercoating, ACM [HM22] Pipe insulation, ACM
[HM28/30] Mudded fittings, ACM [HM28/30] Mudded fittings, ACM
[HM43-46] Flooring, ACM [HM52] Transite panel material, ACM
[HM54] 12” Beige tile, ACM [HM57] Gasket material (sample 57-50), ACM
N
U P
C A
U T
I O
N
D I S
T U
R B
A N
C E
O
F
I N
S U
L A
T I O
N
I
S
T E
A M
P
L A
S
T
I N
C L
U D
E
S
A M
P L
I N
G
F
R
B
E S
T O
S
U
N L
E S
S
I N
S U
L A
T I O
N
C L
E A
R L
Y
I D
E N
T I F
I E
D
A
S
A
O N
A
C M
E
X A
C T
L O
C A
T I O
T
E S
T E
D
A
S U
L A
T I O
N
N
H O
W N
L E
G E
N D
MCAS, CHERRY POINT, NC
152-01
APPROVEDDATEDESCRIPTION
REVISIONS
REV
C H
E C
K E
D
B
Y
D
D
D R
A W
N
B
Y
B
H
S C
A L
A C
E
S H
E
F
D A
T
J
N
T R
N
O
D E
L I V
E R
Y
N
W
D
ASBESTOS BUILDING RE-INSPECTION 2022
ARMY CORPS OF ENGINEERS, MOBILE
S A
M P
D
E N
T I F
I C
A T
I O
N
P O
S I T
I V
E
N
E G
A T
I V
E
O
R
T
R A
C E
T
R
F
E
S E
N C
E
O
F
A
S B
E S
T O
S
S A
M P
G
E N
D
I D
H O
M O
G E
N O
T
E R
I A
L
DATE
O P
E R
A T
I O
N S
C E
N T
E R
F I R
S T
M
A
O
O R
K N
O W
N
A
S U
L A
T I O
N
A
R E
A
H
M
F L
O O
R
T
I
S
T
M
T R
A N
S I T
E
P
A N
T
E R
I A
L
H
M
C
M
I D
E N
T I F
I E
D
B L A
K
A
T I N
G
O
N
S
U P
P O
A
M S
P
L A
S T
C
O U
S T
I C
A L
C
I E
L I N
G
F
L U
E
F
U R
N A
S U
L A
T I O
N
G A
S K
T
E R
I A
L
A
V
R
I O
P
E
I N
S U
L A
T I O
N
R
U N
S
MCAS, CHERRY POINT, NC
152-02
APPROVEDDATEDESCRIPTION
REVISIONS
REV
C H
E C
K E
D
B
Y
D
D
D R
A W
N
B
H
S C
A L
A C
E
S H
E
F
D A
T
N
T R
N
O
D E
L I V
E R
Y
N
D
ASBESTOS BUILDING RE-INSPECTION 2022
ARMY CORPS OF ENGINEERS, MOBILE
S A
M P
E N
T I F
I C
A T
I O
N
P O
S I T
I V
E
N
E G
A T
I V
E
O
R
T
R A
C E
T
R
F
E
S E
N C
E
O
F
A
S B
E S
T O
S
S A
M P
G E
H O
M O
G E
N O
T
E R
I A
L
DATE
V A
L U
E
U
N I T
P I P
E
I N
S U
L A
T I O
N
H
M
M U
D D
T
T I N
G
M
L E
G E
N D
S E
C O
O
O R
I N
S U
L A
T E
D
P
I P
S
E R
S
C A
U T
I O
N
D I S
T U
R B
A N
I N
S U
L A
T I O
N
E
A
S
T
I N
C L U
M
P L I N
G
F
B
E S
T O
S
U
N L E
S U
L A
T I O
N
C L E
A R
E N
T I F
I E
D
A
S
A
O N
A
C M
E
X A
C T
L O
C A
T I O
T
E S
T E
D
A
S U
L A
T I O
N
N
O
W
C
M
I D
E N
T I F
I E
D
B L A
A
T I N
G
O
N
S
U P
P O
A
M S
P
L A
S T
C
O U
S T
I C
A L
C
I E
L I N
G
F
L U
E
F
U R
N A
S U
L A
T I O
N
G A
S K
T
E R
I A
L
A
R
I O
P
E
I N
S U
L A
T I O
N
R
U N
S
MCAS, CHERRY POINT, NC
152-03
APPROVEDDATEDESCRIPTION
REVISIONS
REV
C H
E C
K E
D
B
Y
D
D
D R
A W
N
B
H
S C
A L
A C
E
S H
E
F
D A
T
N
T R
N
O
D E
L I V
E R
Y
N
D
ASBESTOS BUILDING RE-INSPECTION 2022
ARMY CORPS OF ENGINEERS, MOBILE
S A
M P
E N
T I F
I C
A T
I O
N
P O
S I T
I V
E
N
E G
A T
I V
E
O
R
T
R A
C E
T
R
F
E
S E
N C
E
O
F
A
S B
E S
T O
S
S A
M P
G E
H O
M O
G E
N O
T
E R
I A
L
DATE
B R
E E
C H
I N
G B
R E
E C
H I N
G
P I P
E
I N
S U
L A
T I O
N
H
M
M U
D D
T
T I N
M
L E
G E
N D
T H
I R
D
F
L O
O R
C A
U T
I O
N
D I S
T U
R B
A N
I N
S U
L A
T I O
N
E
A
S
T
I N
C L U
M
P L I N
G
F
B
E S
T O
S
U
N L E
S U
L A
T I O
N
C L E
A R
E N
T I F
I E
D
A
S
A
O N
A
C M
E
X A
C T
L O
C A
T I O
T
E S
T E
D
A
S U
L A
T I O
N
N
O
W
C
M
I D
E N
T I F
I E
D
B L A
A
T I N
G
O
N
S
U P
P O
A
M S
P
L A
S T
C
O U
S T
I C
A L
C
I E
L I N
G
F
L U
E
F
U R
N A
S U
L A
T I O
N
G A
S K
T
E R
I A
L
A
R
I O
P
E
I N
S U
L A
T I O
N
R
U N
S
MCAS, CHERRY POINT, NC
152-04
APPROVEDDATEDESCRIPTION
REVISIONS
REV
C H
E C
K E
D
B
Y
D
D
D R
A W
N
B
H
S C
A L
A C
E
S H
E
F
D A
T
N
T R
N
O
D E
L I V
E R
Y
N
D
ASBESTOS BUILDING RE-INSPECTION 2022
ARMY CORPS OF ENGINEERS, MOBILE
S A
M P
E N
T I F
I C
A T
I O
N
P O
S I T
I V
E
N
E G
A T
I V
E
O
R
T
R A
C E
T
R
F
E
S E
N C
E
O
F
A
S B
E S
T O
S
S A
M P
G E
H O
M O
G E
N O
T
E R
I A
L
DATE
WATER TANK
P I P
E
I N
S U
L A
T I O
N
H
M
M U
D D
T
T I N
M
L E
G E
N D
F O
U T
H
F
L O
O R
C A
U T
I O
N
D I S
T U
R B
A N
I N
S U
L A
T I O
N
E
A
S
T
I N
C L U
M
P L I N
G
F
B
E S
T O
S
U
N L E
S U
L A
T I O
N
C L E
A R
E N
T I F
I E
D
A
S
A
O N
A
C M
E
X A
C T
L O
C A
T I O
T
E S
T E
D
A
S U
L A
T I O
N
N
O
W
MCAS, CHERRY POINT, NC
152-RF
APPROVEDDATEDESCRIPTION
REVISIONS
REV
C H
E C
K E
D
B
Y
D
D
D R
A W
N
B
H
S C
A L
A C
E
S H
E
F
D A
T
N
T R
N
O
D E
L I V
E R
Y
N
D
ASBESTOS BUILDING RE-INSPECTION 2022
ARMY CORPS OF ENGINEERS, MOBILE
S A
M P
E N
T I F
I C
A T
I O
N
P O
S I T
I V
E
N
E G
A T
I V
E
O
R
T
R A
C E
T
R
F
E
S E
N C
E
O
F
A
S B
E S
T O
S
S A
M P
G E
H O
M O
G E
N O
T
E R
I A
L
DATE
M A
O
F
M
V E
L
R O
O F
U P
P E
R
L E
V E
L
R O
O F
M A
O
F
L O
W E
R
R
O O
F
P I P
E
I N
S U
L A
T I O
N
H
M
M U
D D
T
T I N
M
L E
G E
N D
R O
O
O R
C A
U T
I O
N
D I S
T U
R B
A N
I N
S U
L A
T I O
N
E
A
S
T
I N
C L U
M
P L I N
G
F
B
E S
T O
S
U
N L E
S U
L A
T I O
N
C L E
A R
E N
T I F
I E
D
A
S
A
O N
A
C M
E
X A
C T
L O
C A
T I O
T
E S
T E
D
A
S U
L A
T I O
N
N
O
W
File details come from the government source that posted it. Updated .