This document is an Asbestos Re-inspection report for Building 152, a steam plant located at MCAS Cherry Point, conducted by AH Environmental Consultants in March 2022. The inspection identified multiple asbestos-containing materials (ACM) throughout the facility, including furnace door insulation, pipe insulation and fittings, sink undercoating, floor tiles, tile mastic, transite panel material, caulking, roofing material, and gasket material. The building, originally constructed as a coal-burning facility and now transitioned to natural gas, contains large quantities of insulated piping and systems, many of which still contain asbestos.

The report emphasizes special caution is required when working in the building, as many asbestos-containing lines are present, some without clear demarcation. The inspection found that while some systems are no longer in use, they remain abandoned in place. The building has a hazard rank of 2, with abundant friable ACM identified and maintained in good condition. The report recommends implementing special protocols to prevent disturbance of ACM and suggests that any work involving insulating materials should include sampling and analysis. Previous inspections are noted as potentially unverifiable due to lack of proper chain of custody and analysis reports.

View the file

Other files

File Type Posted
Amendment 0003 7520568.pdf PDF
Amendment 0002 7520568.pdf PDF
Amendment 0001 7520568.pdf PDF
Amendment 0001 7520568.pdf PDF
7520568-STATEMENTOFWORK.Macc.2.pdf PDF
7520568 RFP.pdf PDF
7520568-STATEMENTOFWORK.Macc.2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asbestos Reinspection

Building 152 Assessment of known Asbestos

Containing Materials (ACM) in MCAS

Cherry Point buildings.

Building Hazard Rank: [2]

Abundant Friable ACM identified, maintained in good condition.

! SPECIAL CAUTION !

Sample TSI prior to any disturbance.

March 14, 2022

AH Environmental Consultants Inc.

11837 Rock Landing Drive, Suite 300 Newport News, VA 23606 757.873.4959

ACM Re-inspection 2022

David Dobson March 14, 2022

NC #11963, #20836, #40515

There is a well-established link between the inhalation of asbestos fibers and various diseases such as asbestosis, mesothelioma, lung and other cancers. Federal regulations governing asbestos include the Asbestos Hazard Emergency Response Act (40 CFR 763, AHERA) and the

Occupational Safety and Health Administration (OSHA) regulations (29 CFR 1910.1001, General

Industry Asbestos Standard) to address the hazard. These regulations apply to Naval and Marine

Corps facilities as referenced in Office of the Chief of Naval Operations Instructions

(OPNAVINST) 5100.23G, Chapter 17 (Asbestos Control) and Marine Corps Orders (MCO)

5100.29B, Part 4 (Managing an Installation wide safety and occupational health program inclusive of MCO P5100.8, OSHA 29 CFR 1910, 1926 and 1960). These are the governing documents for dealing with asbestos issues at a Naval/ Marine Corps facility. Proper policy, recordkeeping, and surveillance are vital to limiting a facility’s liability resulting from exposing personnel to a hazardous condition

In order to comply with this regulation, building/ facility owners (Department of Defense, United States Marine Corps Installations East- MCAS Cherry Point) continue asbestos inspection of buildings under their command in a timely and competent manner by periodically verifying the condition of the ACM in a building since most building materials degrade with time, and damaged or degraded ACM may pose an evolving hazard to building occupants.

Information gathered during these reinspections are incorporated into the Cherry Point

Asbestos Management Program/Plan in compliance with Subpart (j)(2)(ii) of the OSHA 1910.1001 standard.

The primary focus of the inspections were to evaluate of the condition of existing ACM, compare the condition rating to previous ratings, and assign a hazard priority ranking for the building. Assessment of potential ACM issues in other sections of the building where ACM was not listed, were not investigated. Inspections include evaluation of the condition of documented ACM according to the current facility asbestos records. Findings of the asbestos inspection are incorporated as the official record of ACM at the facility and place buildings containing ACM under the jurisdiction of the Asbestos Program Manager (APM) under the implementation of a facility wide O&M Program.

Building re-inspections were limited to previously identified ACM. The National Emission

Standards for Hazardous Air Pollutants (NESHAPs) apply to buildings to be renovated or demolished, and require a thorough asbestos inspection prior to such activities.

AH Environmental Consultants, Inc. (AH) North Carolina licensed inspectors conducted the bulk of asbestos inspection activities as required for the project buildings during the period from

February to April 2022 under contract with Cherokee Nation 3S, Contract number 22700-0172;

delivery order W9127819D0043; task order 9127821F0409.

Findings during the most recent inspection are summarized in the following table, including;

material description, locations identified, damage assessment, and hazard ranking. ACM are cataloged in homogenous material groups (of similar color, size, and function). ACM are shown in

Bold Red.

Listed ACM in Building 152 includes:

Furnace door insulation

Pipe insulation and fittings

Sink undercoating, black

9” Black floor tile

Tile mastic

Beige floor tile

Transite panel material

Caulking

Roofing material

Gasket material

Photos of ACM follow to aid in later identification. A current building inspection sketch is also provided to graphically depict known locations of ACM.

HOMOGENOUS MATERIAL RECORDS

HM# Description Status/ Location(s) Condition Rank 2000 HM’s Identified

01 12” Green floor tile and mastic Non ACM

02 4” Black vinyl base and adhesive Non ACM

03 Non-skid material Non ACM

04 Black textured coating UNKNOWN UNK 3

05 Plaster material, ceiling NE Office area & hall GOOD 3

06 Plaster material, walls Non ACM

07 Furnace insulation I Non ACM

08 Tank insulation I Non ACM

09 Tank insulation II Non ACM

10 Tank insulation III Non ACM

11 Tank insulation IV Non ACM

12 Tank insulation V Non ACM

13 Tank insulation VI Non ACM

14 Furnace insulation II, gray REMOVED

15 Cloth lagging on large drum REMOVED

16 Cloth lagging on small drum Non ACM

17 Misc. debris at drums Non ACM

18 Wall insulation, block material Non ACM

19 Sink undercoating, black 01 level SW

20 Plaster ceiling, white II Non ACM

21 Pipe insulation I, 4” Mixed throughout GOOD 2

22 Pipe insulation II, 6” (primary HM#) Mixed throughout GOOD 2

23 Pipe insulation III, 10” Mixed throughout GOOD 2

24 Pipe insulation IV, 12” Mixed throughout GOOD 2

25 Pipe insulation V, 18” Mixed throughout GOOD 2

26 Pipe insulation VI, 24” Mixed throughout GOOD 2

28 Mudded fitting insulation, 4” Mixed throughout GOOD 2

HM# 2004 HM’s Identified Status/ Location(s) Condition Rank 21a Gasket material, white/black (see also

HM51, 57)

Mixed throughout GOOD 3

21b Flexible duct connectors

HM# 2006 HM’s Identified Status/ Location(s) Condition Rank

30 Mudded fittings (unlabeled), 02 level HP steam

Non ACM

31 Pipe insulation (unlabeled) Non ACM

32 Boiler flue insulation, beige Non ACM

33 Mudded fittings (unlabeled), 03 level Non ACM

34 Pipe insulation, old steam lines, 03 level 03 at Flues GOOD 2

HM# 2010 HM’s Identified Status/ Location(s) Condition Rank

40 Fiberglass sealant, black Non ACM

41 Window sill material, gray Non ACM

42 12” Black w/white tile and adhesive Non ACM

43 9” Brown w/red tile and adhesive NE office area GOOD 3

44 9” Beige tile and adhesive NE office area GOOD 3

45 Misc. floor covering (4th layer) NE office area GOOD 3

46 9” Black floor tile and mastic East Kitchen GOOD 3

47 Vapor barrier material Non ACM

48 Interior caulking, white Non ACM

49 Fiberglass sealant, gray Non ACM

50 Lab counter material, black Non ACM

51 Gasket material, white Mixed throughout GOOD 3

52 Transite panel material, gray North center office GOOD 3

53 12” Beige w/brown tile and adhesive Non ACM

54 Beige tile (under HM53) North Cntr office GOOD 3

55 12” Acoustical tile, wall and ceiling Non ACM

56 12” Acoustical tile, wall patch

57 Gasket material, gray Mixed througout GOOD 3

58 Fibrous debris, welding blanket Non ACM

59 Silver sealant, furnace brick Non ACM

60 Misc. sealant, white, furnace brick Non ACM

61 Roof sealant, gray (main roof) Non ACM

62 Asphalt rolled roofing Non ACM

63 Roof sealant, gray (upper roof) Non ACM

64 Exterior caulking, gray Non ACM

SUMMARY

Building 152 is the Cherry Point main steam plant. Originally constructed as a coal burning facility, transition to natural gas has occurred. Due to the date of construction, the building contained large quantities of insulated piping and systems, many containing asbestos. Although some systems are no longer used, they have been abandoned in place.

Many lines are marked as “DANGER ACM”. However, there is the possibility of ACM lines without demarcation. Therefore, any disturbance of insulating materials in this structure should consist of sampling and analysis. Various inspections have taken place but without the chain of custody and reports of analysis, the most significant one with an estimated 500 samples is not verifiable.

Various other ACM is also present, including multiple layers of ACM flooring, plaster ceiling material, and gaskets which may also be present throughout. Transite panel material is also present as siding for a control booth on the North first floor.

In general, special protocols should be in place to prevent disturbance of ACM for this building.

PHOTOS

UNKNOWN LOCATIONS

[HM04] Black textured coating, ACM [HM05] Plaster material, ceiling, ACM

[HM14] Furnace insulation, ACM REMOVED [HM15] Cloth lagging, ACM

[HM19] Sink Undercoating, ACM [HM22] Pipe insulation, ACM

[HM28/30] Mudded fittings, ACM [HM28/30] Mudded fittings, ACM

[HM43-46] Flooring, ACM [HM52] Transite panel material, ACM

[HM54] 12” Beige tile, ACM [HM57] Gasket material (sample 57-50), ACM

N

U P

C A

U T

I O

N

D I S

T U

R B

A N

C E

O

F

I N

S U

L A

T I O

N

I

S

T E

A M

P

L A

S

T

I N

C L

U D

E

S

A M

P L

I N

G

F

R

B

E S

T O

S

U

N L

E S

S

I N

S U

L A

T I O

N

C L

E A

R L

Y

I D

E N

T I F

I E

D

A

S

A

O N

A

C M

E

X A

C T

L O

C A

T I O

T

E S

T E

D

A

S U

L A

T I O

N

N

H O

W N

L E

G E

N D

MCAS, CHERRY POINT, NC

152-01

APPROVEDDATEDESCRIPTION

REVISIONS

REV

C H

E C

K E

D

B

Y

D

D

D R

A W

N

B

Y

B

H

S C

A L

A C

E

S H

E

F

D A

T

J

N

T R

N

O

D E

L I V

E R

Y

N

W

D

ASBESTOS BUILDING RE-INSPECTION 2022

ARMY CORPS OF ENGINEERS, MOBILE

S A

M P

D

E N

T I F

I C

A T

I O

N

P O

S I T

I V

E

N

E G

A T

I V

E

O

R

T

R A

C E

T

R

F

E

S E

N C

E

O

F

A

S B

E S

T O

S

S A

M P

G

E N

D

I D

H O

M O

G E

N O

T

E R

I A

L

DATE

O P

E R

A T

I O

N S

C E

N T

E R

F I R

S T

M

A

O

O R

K N

O W

N

A

S U

L A

T I O

N

A

R E

A

H

M

F L

O O

R

T

I

S

T

M

T R

A N

S I T

E

P

A N

T

E R

I A

L

H

M

C

M

I D

E N

T I F

I E

D

B L A

K

A

T I N

G

O

N

S

U P

P O

A

M S

P

L A

S T

C

O U

S T

I C

A L

C

I E

L I N

G

F

L U

E

F

U R

N A

S U

L A

T I O

N

G A

S K

T

E R

I A

L

A

V

R

I O

P

E

I N

S U

L A

T I O

N

R

U N

S

MCAS, CHERRY POINT, NC

152-02

APPROVEDDATEDESCRIPTION

REVISIONS

REV

C H

E C

K E

D

B

Y

D

D

D R

A W

N

B

H

S C

A L

A C

E

S H

E

F

D A

T

N

T R

N

O

D E

L I V

E R

Y

N

D

ASBESTOS BUILDING RE-INSPECTION 2022

ARMY CORPS OF ENGINEERS, MOBILE

S A

M P

E N

T I F

I C

A T

I O

N

P O

S I T

I V

E

N

E G

A T

I V

E

O

R

T

R A

C E

T

R

F

E

S E

N C

E

O

F

A

S B

E S

T O

S

S A

M P

G E

H O

M O

G E

N O

T

E R

I A

L

DATE

V A

L U

E

U

N I T

P I P

E

I N

S U

L A

T I O

N

H

M

M U

D D

T

T I N

G

M

L E

G E

N D

S E

C O

O

O R

I N

S U

L A

T E

D

P

I P

S

E R

S

C A

U T

I O

N

D I S

T U

R B

A N

I N

S U

L A

T I O

N

E

A

S

T

I N

C L U

M

P L I N

G

F

B

E S

T O

S

U

N L E

S U

L A

T I O

N

C L E

A R

E N

T I F

I E

D

A

S

A

O N

A

C M

E

X A

C T

L O

C A

T I O

T

E S

T E

D

A

S U

L A

T I O

N

N

O

W

C

M

I D

E N

T I F

I E

D

B L A

A

T I N

G

O

N

S

U P

P O

A

M S

P

L A

S T

C

O U

S T

I C

A L

C

I E

L I N

G

F

L U

E

F

U R

N A

S U

L A

T I O

N

G A

S K

T

E R

I A

L

A

R

I O

P

E

I N

S U

L A

T I O

N

R

U N

S

MCAS, CHERRY POINT, NC

152-03

APPROVEDDATEDESCRIPTION

REVISIONS

REV

C H

E C

K E

D

B

Y

D

D

D R

A W

N

B

H

S C

A L

A C

E

S H

E

F

D A

T

N

T R

N

O

D E

L I V

E R

Y

N

D

ASBESTOS BUILDING RE-INSPECTION 2022

ARMY CORPS OF ENGINEERS, MOBILE

S A

M P

E N

T I F

I C

A T

I O

N

P O

S I T

I V

E

N

E G

A T

I V

E

O

R

T

R A

C E

T

R

F

E

S E

N C

E

O

F

A

S B

E S

T O

S

S A

M P

G E

H O

M O

G E

N O

T

E R

I A

L

DATE

B R

E E

C H

I N

G B

R E

E C

H I N

G

P I P

E

I N

S U

L A

T I O

N

H

M

M U

D D

T

T I N

M

L E

G E

N D

T H

I R

D

F

L O

O R

C A

U T

I O

N

D I S

T U

R B

A N

I N

S U

L A

T I O

N

E

A

S

T

I N

C L U

M

P L I N

G

F

B

E S

T O

S

U

N L E

S U

L A

T I O

N

C L E

A R

E N

T I F

I E

D

A

S

A

O N

A

C M

E

X A

C T

L O

C A

T I O

T

E S

T E

D

A

S U

L A

T I O

N

N

O

W

C

M

I D

E N

T I F

I E

D

B L A

A

T I N

G

O

N

S

U P

P O

A

M S

P

L A

S T

C

O U

S T

I C

A L

C

I E

L I N

G

F

L U

E

F

U R

N A

S U

L A

T I O

N

G A

S K

T

E R

I A

L

A

R

I O

P

E

I N

S U

L A

T I O

N

R

U N

S

MCAS, CHERRY POINT, NC

152-04

APPROVEDDATEDESCRIPTION

REVISIONS

REV

C H

E C

K E

D

B

Y

D

D

D R

A W

N

B

H

S C

A L

A C

E

S H

E

F

D A

T

N

T R

N

O

D E

L I V

E R

Y

N

D

ASBESTOS BUILDING RE-INSPECTION 2022

ARMY CORPS OF ENGINEERS, MOBILE

S A

M P

E N

T I F

I C

A T

I O

N

P O

S I T

I V

E

N

E G

A T

I V

E

O

R

T

R A

C E

T

R

F

E

S E

N C

E

O

F

A

S B

E S

T O

S

S A

M P

G E

H O

M O

G E

N O

T

E R

I A

L

DATE

WATER TANK

P I P

E

I N

S U

L A

T I O

N

H

M

M U

D D

T

T I N

M

L E

G E

N D

F O

U T

H

F

L O

O R

C A

U T

I O

N

D I S

T U

R B

A N

I N

S U

L A

T I O

N

E

A

S

T

I N

C L U

M

P L I N

G

F

B

E S

T O

S

U

N L E

S U

L A

T I O

N

C L E

A R

E N

T I F

I E

D

A

S

A

O N

A

C M

E

X A

C T

L O

C A

T I O

T

E S

T E

D

A

S U

L A

T I O

N

N

O

W

MCAS, CHERRY POINT, NC

152-RF

APPROVEDDATEDESCRIPTION

REVISIONS

REV

C H

E C

K E

D

B

Y

D

D

D R

A W

N

B

H

S C

A L

A C

E

S H

E

F

D A

T

N

T R

N

O

D E

L I V

E R

Y

N

D

ASBESTOS BUILDING RE-INSPECTION 2022

ARMY CORPS OF ENGINEERS, MOBILE

S A

M P

E N

T I F

I C

A T

I O

N

P O

S I T

I V

E

N

E G

A T

I V

E

O

R

T

R A

C E

T

R

F

E

S E

N C

E

O

F

A

S B

E S

T O

S

S A

M P

G E

H O

M O

G E

N O

T

E R

I A

L

DATE

M A

O

F

M

V E

L

R O

O F

U P

P E

R

L E

V E

L

R O

O F

M A

O

F

L O

W E

R

R

O O

F

P I P

E

I N

S U

L A

T I O

N

H

M

M U

D D

T

T I N

M

L E

G E

N D

R O

O

O R

C A

U T

I O

N

D I S

T U

R B

A N

I N

S U

L A

T I O

N

E

A

S

T

I N

C L U

M

P L I N

G

F

B

E S

T O

S

U

N L E

S U

L A

T I O

N

C L E

A R

E N

T I F

I E

D

A

S

A

O N

A

C M

E

X A

C T

L O

C A

T I O

T

E S

T E

D

A

S U

L A

T I O

N

N

O

W

File details come from the government source that posted it. Updated .