Amendment 0001.pdf

PDF 133 KB Posted

Attached to
EPDM Roof - Building 113 Federal contract opportunity
Solicitation number
N4008520B3320
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This amendment modifies a solicitation for an EPDM and standing seam metal roof replacement project. The solicitation, issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy, extends the response deadline from April 13, 2020 at 2:00 PM to April 17, 2020 at 2:00 PM. The project scope involves installing a new EPDM and insulated standing seam metal roofing system at Building 113 of the NUWC Division in Newport, Rhode Island. Work includes replacement of the existing EPDM roofing membrane, insulation, coverboard and other components, as well as repair of concrete roof deck overhangs. The solicitation is set aside 100% for small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to EPDM Roof - Building 113, newest first.
File Type Posted
Amendment 0004.pdf PDF
Amendment 0002.pdf PDF
Amendment 0003.pdf PDF
IMG_7232.JPG JPG image
20170804_091400.jpg JPG image
20170804_091344.jpg JPG image
20170804_115709.jpg JPG image
Main Roof 1.jpg JPG image
20170804_115638.jpg JPG image
20170808_154409.jpg JPG image
IMG_7209.JPG JPG image
IMG_7223.JPG JPG image
IMG_7221.JPG JPG image
IMG_7216.JPG JPG image
IMG_7229.JPG JPG image
IMG_7222.JPG JPG image
IMG_7198.JPG JPG image
IMG_7206.JPG JPG image
IMG_7197.JPG JPG image
20170804_092356.jpg JPG image
20170804_115652.jpg JPG image
IMG_7234.JPG JPG image
IMG_7208.JPG JPG image
IMG_7193.JPG JPG image
IMG_7220.JPG JPG image
IMG_7210.JPG JPG image
IMG_7225.JPG JPG image
IMG_7196.JPG JPG image
IMG_7213.JPG JPG image
IMG_7219.JPG JPG image
IMG_7199.JPG JPG image
IMG_7195.JPG JPG image
B113 Roof 2.jpg JPG image
20170804_115659.jpg JPG image
20170804_091849.jpg JPG image
IMG_7215.JPG JPG image
IMG_7202.JPG JPG image
20170808_154400.jpg JPG image
IMG_7233.JPG JPG image
IMG_7214.JPG JPG image
20170804_115712.jpg JPG image
IMG_7224.JPG JPG image
IMG_7227.JPG JPG image
IMG_7204.JPG JPG image
IMG_7212.JPG JPG image
Drawings-EPDM.pdf PDF
Specifications-EPDM.pdf PDF
Visitor Request Info Needed 01_2019.pdf PDF
Acceptable Identification Documents.pdf PDF
Solicitation N4008520B3320.pdf PDF
Show all 50

EPDM Roof - Building 113 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

prepared by: sterling, angella

This amendment changes the bid due date from 13 April 2020 at 2:00 PM, EST to 17 April 2020.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Mar-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520B3320

X 9B. DATED (SEE ITEM 11)

13-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Mar-2020

CODE

NAVFAC MID ATLANTIC

PWD NEWPORT

BLDG 1 SIMONPIETRI DRIVE

NAVAL STATION NEWPORT

NEWPORT RI 02841-1712

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008520B3320

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 13-Apr-2020 02:00 PM to 17-Apr-2020 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .