FINAL2020_1581200_RM16-1185_Const_Sq_and_Brdg1-B163.pdf

PDF 15 MB Posted

Attached to
Repair Water Main to B163
Solicitation number
N4008519B3619
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

G001WS-19-261

KITTERY, ME

PORTSMOUTH NAVAL SHIPYARD

PWD-MAINE

IN HOUSE DESIGN

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

PUBLIC WORKS DEPARTMENT - MAINE

AutoCAD SHX Text

NAVAL SHIPYARD - PORTSMOUTH, NH

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

FEAD/PM&E

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

FY20 MM UEM RM REPAIR WATER MAIN TO BLDG 163 & IN CONSTITUTION SQ. RM16-1185

AutoCAD SHX Text

LIST OF DRAWINGS

AutoCAD SHX Text SHEET PWD-ME NAVFAC DRAWING PWD-ME NAVFAC DRAWING NAVFAC DRAWING DRAWING SHEET NO. NO. DWG. NO. TITLE NO. NO. DWG. NO. TITLE NO. DWG. NO. TITLE DWG. NO. TITLE TITLE 1 OF 38 G001 WS-19-261 12786605 TITLE SHEET G001 WS-19-261 12786605 TITLE SHEET WS-19-261 12786605 TITLE SHEET 12786605 TITLE SHEET TITLE SHEET 2 OF 38 G002 WS-19-262 12786606 GENERAL NOTES G002 WS-19-262 12786606 GENERAL NOTES WS-19-262 12786606 GENERAL NOTES 12786606 GENERAL NOTES GENERAL NOTES 3 OF 38 CG001 WS-19-263 12786607 GENERAL EROSION CONTROL NOTES CG001 WS-19-263 12786607 GENERAL EROSION CONTROL NOTES WS-19-263 12786607 GENERAL EROSION CONTROL NOTES 12786607 GENERAL EROSION CONTROL NOTES GENERAL EROSION CONTROL NOTES 4 OF 38 C001 WS-19-264 12786608 OVERALL PHASING SITE PLAN C001 WS-19-264 12786608 OVERALL PHASING SITE PLAN WS-19-264 12786608 OVERALL PHASING SITE PLAN 12786608 OVERALL PHASING SITE PLAN OVERALL PHASING SITE PLAN 5 OF 38 C002 WS-19-265 12786609 OVERALL WORK LOCATION SITE PLAN C002 WS-19-265 12786609 OVERALL WORK LOCATION SITE PLAN WS-19-265 12786609 OVERALL WORK LOCATION SITE PLAN 12786609 OVERALL WORK LOCATION SITE PLAN OVERALL WORK LOCATION SITE PLAN 6 OF 38 C003 WS-19-266 12786610 OVERALL RAIL DETAIL LOCATION PLAN C003 WS-19-266 12786610 OVERALL RAIL DETAIL LOCATION PLAN WS-19-266 12786610 OVERALL RAIL DETAIL LOCATION PLAN 12786610 OVERALL RAIL DETAIL LOCATION PLAN OVERALL RAIL DETAIL LOCATION PLAN 7 OF 38 C101 WS-19-267 12786611 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1A C101 WS-19-267 12786611 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1A WS-19-267 12786611 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1A 12786611 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1A TRAFFIC CONTROL AND PHASING PLAN - PHASE 1A 8 OF 38 C102 WS-19-268 12786612 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1B C102 WS-19-268 12786612 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1B WS-19-268 12786612 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1B 12786612 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1B TRAFFIC CONTROL AND PHASING PLAN - PHASE 1B 9 OF 38 C103 WS-19-269 12786613 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1C C103 WS-19-269 12786613 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1C WS-19-269 12786613 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1C 12786613 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1C TRAFFIC CONTROL AND PHASING PLAN - PHASE 1C 10 OF 38 C104 WS-19-270 12786614 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1D C104 WS-19-270 12786614 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1D WS-19-270 12786614 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1D 12786614 TRAFFIC CONTROL AND PHASING PLAN - PHASE 1D TRAFFIC CONTROL AND PHASING PLAN - PHASE 1D 11 OF 38 C105 WS-19-271 12786615 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2A C105 WS-19-271 12786615 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2A WS-19-271 12786615 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2A 12786615 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2A TRAFFIC CONTROL AND PHASING PLAN - PHASE 2A 12 OF 38 C106 WS-19-272 12786616 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2B C106 WS-19-272 12786616 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2B WS-19-272 12786616 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2B 12786616 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2B TRAFFIC CONTROL AND PHASING PLAN - PHASE 2B 13 OF 38 C107 WS-19-273 12786617 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2C C107 WS-19-273 12786617 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2C WS-19-273 12786617 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2C 12786617 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2C TRAFFIC CONTROL AND PHASING PLAN - PHASE 2C 14 OF 38 C108 WS-19-274 12786618 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2D C108 WS-19-274 12786618 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2D WS-19-274 12786618 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2D 12786618 TRAFFIC CONTROL AND PHASING PLAN - PHASE 2D TRAFFIC CONTROL AND PHASING PLAN - PHASE 2D 15 OF 38 C109 WS-19-275 12786619 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3A C109 WS-19-275 12786619 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3A WS-19-275 12786619 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3A 12786619 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3A TRAFFIC CONTROL AND PHASING PLAN - PHASE 3A 16 OF 38 C110 WS-19-276 12786620 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3B C110 WS-19-276 12786620 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3B WS-19-276 12786620 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3B 12786620 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3B TRAFFIC CONTROL AND PHASING PLAN - PHASE 3B 17 OF 38 C111 WS-19-277 12786621 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3C C111 WS-19-277 12786621 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3C WS-19-277 12786621 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3C 12786621 TRAFFIC CONTROL AND PHASING PLAN - PHASE 3C TRAFFIC CONTROL AND PHASING PLAN - PHASE 3C 18 OF 38 C112 WS-19-278 12786622 TRAFFIC CONTROL AND PHASING PLAN - PHASE 4A C112 WS-19-278 12786622 TRAFFIC CONTROL AND PHASING PLAN - PHASE 4A WS-19-278 12786622 TRAFFIC CONTROL AND PHASING PLAN - PHASE 4A 12786622 TRAFFIC CONTROL AND PHASING PLAN - PHASE 4A TRAFFIC CONTROL AND PHASING PLAN - PHASE 4A 19 OF 38 C113 WS-19-279 12786623 TRAFFIC CONTROL AND PHASING PLAN STAGING AREA PHASE 4B C113 WS-19-279 12786623 TRAFFIC CONTROL AND PHASING PLAN STAGING AREA PHASE 4B WS-19-279 12786623 TRAFFIC CONTROL AND PHASING PLAN STAGING AREA PHASE 4B 12786623 TRAFFIC CONTROL AND PHASING PLAN STAGING AREA PHASE 4B TRAFFIC CONTROL AND PHASING PLAN STAGING AREA PHASE 4B 20 OF 38 C114 WS-19-280 12786624 TRAFFIC CONTROL AND PHASING PLAN - PHASE 4C C114 WS-19-280 12786624 TRAFFIC CONTROL AND PHASING PLAN - PHASE 4C WS-19-280 12786624 TRAFFIC CONTROL AND PHASING PLAN - PHASE 4C 12786624 TRAFFIC CONTROL AND PHASING PLAN - PHASE 4C TRAFFIC CONTROL AND PHASING PLAN - PHASE 4C 21 OF 38 C115 WS-19-281 12786625 TRAFFIC CONTROL AND PHASING PLAN - PHASE 5 C115 WS-19-281 12786625 TRAFFIC CONTROL AND PHASING PLAN - PHASE 5 WS-19-281 12786625 TRAFFIC CONTROL AND PHASING PLAN - PHASE 5 12786625 TRAFFIC CONTROL AND PHASING PLAN - PHASE 5 TRAFFIC CONTROL AND PHASING PLAN - PHASE 5 22 OF 38 C116 WS-19-282 12786626 TRAFFIC CONTROL AND PHASING PLAN - BID OPTION 1 C116 WS-19-282 12786626 TRAFFIC CONTROL AND PHASING PLAN - BID OPTION 1 WS-19-282 12786626 TRAFFIC CONTROL AND PHASING PLAN - BID OPTION 1 12786626 TRAFFIC CONTROL AND PHASING PLAN - BID OPTION 1 TRAFFIC CONTROL AND PHASING PLAN - BID OPTION 1 23 OF 38 C117 WS-19-283 12786627 TRAFFIC CONTROL AND PHASING PLAN - BID OPTION 2 C117 WS-19-283 12786627 TRAFFIC CONTROL AND PHASING PLAN - BID OPTION 2 WS-19-283 12786627 TRAFFIC CONTROL AND PHASING PLAN - BID OPTION 2 12786627 TRAFFIC CONTROL AND PHASING PLAN - BID OPTION 2 TRAFFIC CONTROL AND PHASING PLAN - BID OPTION 2 24 OF 38 C118 WS-19-284 12786628 SITE PLAN - WATERMAIN C118 WS-19-284 12786628 SITE PLAN - WATERMAIN WS-19-284 12786628 SITE PLAN - WATERMAIN 12786628 SITE PLAN - WATERMAIN SITE PLAN - WATERMAIN 25 OF 38 C119 WS-19-285 12786629 SITE PLAN - WATERMAIN C119 WS-19-285 12786629 SITE PLAN - WATERMAIN WS-19-285 12786629 SITE PLAN - WATERMAIN 12786629 SITE PLAN - WATERMAIN SITE PLAN - WATERMAIN 26 OF 38 C120 WS-19-286 12786630 SITE PLAN - WATERMAIN C120 WS-19-286 12786630 SITE PLAN - WATERMAIN WS-19-286 12786630 SITE PLAN - WATERMAIN 12786630 SITE PLAN - WATERMAIN SITE PLAN - WATERMAIN 27 OF 38 C121 WS-19-287 12786631 SITE PLAN - WATERMAIN C121 WS-19-287 12786631 SITE PLAN - WATERMAIN WS-19-287 12786631 SITE PLAN - WATERMAIN 12786631 SITE PLAN - WATERMAIN SITE PLAN - WATERMAIN 28 OF 38 C122 WS-19-288 12786632 SITE PLAN - WATERMAIN BID OPTIONS C122 WS-19-288 12786632 SITE PLAN - WATERMAIN BID OPTIONS WS-19-288 12786632 SITE PLAN - WATERMAIN BID OPTIONS 12786632 SITE PLAN - WATERMAIN BID OPTIONS SITE PLAN - WATERMAIN BID OPTIONS 29 OF 38 C123 WS-19-289 12786633 ENLARGED RAIL PLAN C123 WS-19-289 12786633 ENLARGED RAIL PLAN WS-19-289 12786633 ENLARGED RAIL PLAN 12786633 ENLARGED RAIL PLAN ENLARGED RAIL PLAN 30 OF 38 C124 WS-19-290 12786634 ENLARGED RAIL PLAN C124 WS-19-290 12786634 ENLARGED RAIL PLAN WS-19-290 12786634 ENLARGED RAIL PLAN 12786634 ENLARGED RAIL PLAN ENLARGED RAIL PLAN 31 OF 38 C301 WS-19-291 12786635 WATER PROFILES LOCATION SHEET C301 WS-19-291 12786635 WATER PROFILES LOCATION SHEET WS-19-291 12786635 WATER PROFILES LOCATION SHEET 12786635 WATER PROFILES LOCATION SHEET WATER PROFILES LOCATION SHEET 32 OF 38 C302 WS-19-292 12786636 WATER PROFILES CROSS SECTIONS C302 WS-19-292 12786636 WATER PROFILES CROSS SECTIONS WS-19-292 12786636 WATER PROFILES CROSS SECTIONS 12786636 WATER PROFILES CROSS SECTIONS WATER PROFILES CROSS SECTIONS 33 OF 38 C501 WS-19-293 12786637 WORKING PIT AREA DETAILS C501 WS-19-293 12786637 WORKING PIT AREA DETAILS WS-19-293 12786637 WORKING PIT AREA DETAILS 12786637 WORKING PIT AREA DETAILS WORKING PIT AREA DETAILS 34 OF 38 C502 WS-19-294 12786638 CIVIL DETAILS C502 WS-19-294 12786638 CIVIL DETAILS WS-19-294 12786638 CIVIL DETAILS 12786638 CIVIL DETAILS CIVIL DETAILS 35 OF 38 C503 WS-19-295 12786639 CIVIL DETAILS C503 WS-19-295 12786639 CIVIL DETAILS WS-19-295 12786639 CIVIL DETAILS 12786639 CIVIL DETAILS CIVIL DETAILS 36 OF 38 C504 WS-19-296 12786640 CIVIL DETAILS C504 WS-19-296 12786640 CIVIL DETAILS WS-19-296 12786640 CIVIL DETAILS 12786640 CIVIL DETAILS CIVIL DETAILS 37 OF 38 C505 WS-19-297 12786641 CIVIL DETAILS C505 WS-19-297 12786641 CIVIL DETAILS WS-19-297 12786641 CIVIL DETAILS 12786641 CIVIL DETAILS CIVIL DETAILS 38 OF 38 C506 WS-19-298 12786642 RAIL DETAILSC506 WS-19-298 12786642 RAIL DETAILSWS-19-298 12786642 RAIL DETAILS12786642 RAIL DETAILSRAIL DETAILS

AutoCAD SHX Text

WORK LOCATION

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text 12786605

AutoCAD SHX Text

AutoCAD SHX Text 1581200

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR BID

AutoCAD SHX Text 02/12/2019

AutoCAD SHX Text

RD

AutoCAD SHX Text

LAUNCH RAMP

AutoCAD SHX Text

AREA (CIA) FENCE

AutoCAD SHX Text

CONTROLLED INDUSTRIAL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

PASS

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

PW-MAINE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1B

AutoCAD SHX Text

KITTERY

AutoCAD SHX Text

PORTSMOUTH

AutoCAD SHX Text

U.S.NAVAL

AutoCAD SHX Text

ACTIVITIES

AutoCAD SHX Text

PORTSMOUTH

AutoCAD SHX Text

HARBOR

AutoCAD SHX Text

MAINE

AutoCAD SHX Text

NEW HAMPSHIRE

AutoCAD SHX Text

PISCATAQUA RIVER

AutoCAD SHX Text

RT.1 BYPASS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: YARDS

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MA.

AutoCAD SHX Text

VT.

AutoCAD SHX Text

MAINE

AutoCAD SHX Text

CANADA

AutoCAD SHX Text

CANADA

AutoCAD SHX Text

U.S. NAVAL ACTIVITIES

AutoCAD SHX Text

KITTERY, ME

AutoCAD SHX Text

PORTSMOUTH

AutoCAD SHX Text

AUGUSTA

AutoCAD SHX Text

PORTLAND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: MILES

AutoCAD SHX Text

AREA MAP

AutoCAD SHX Text N.H.

AutoCAD SHX Text

DETAIL IS REFERENCED

AutoCAD SHX Text

SECTION IS REFERENCED

AutoCAD SHX Text

ELEVATION IS REFERENCED

AutoCAD SHX Text

ELEVATION, SECTION OR DETAIL SYMBOLS

AutoCAD SHX Text

DETAIL

AutoCAD SHX Text

SECTION

AutoCAD SHX Text

SHEET NUMBER WHERE

AutoCAD SHX Text

DETAIL LETTER OR NUMBER

AutoCAD SHX Text

REFERENCES

AutoCAD SHX Text

ADDITIONAL SHEET

AutoCAD SHX Text C-102

AutoCAD SHX Text

SHEET NUMBER WHERE

AutoCAD SHX Text

REFERENCES

AutoCAD SHX Text

ADDITIONAL SHEET

AutoCAD SHX Text

INDICATES DIRECTION

AutoCAD SHX Text

OF CUTTING PLANE

AutoCAD SHX Text

ELEVATION LETTER OR NUMBER

AutoCAD SHX Text

REFERENCES

AutoCAD SHX Text

ADDITIONAL SHEET

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

SHEET NUMBER WHERE

AutoCAD SHX Text

SECTION LETTER OR NUMBER

AutoCAD SHX Text

OF CUTTING PLANE

AutoCAD SHX Text

INDICATES DIRECTION

AutoCAD SHX Text C-102

AutoCAD SHX Text C-102

AutoCAD SHX Text A

AutoCAD SHX Text A-000

AutoCAD SHX Text A

AutoCAD SHX Text A-000

AutoCAD SHX Text A

AutoCAD SHX Text A-000

AutoCAD SHX Text

DRAWFORM REVISION: 10 OCTOBER 2014

AutoCAD SHX Text

PORTSMOUTH NAVAL SHIPYARD

AutoCAD SHX Text

KITTERY, MAINE

AutoCAD SHX Text

RM16 1185 CONST. SQ. & BRDG1 B163

AutoCAD SHX Text

BLDG 163 & IN CONSTITUTION SQ. RM16-1185

AutoCAD SHX Text

AutoCAD SHX Text

DAVID HICKMAN

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

XXX

AutoCAD SHX Text

AMIN BAHROUR

AutoCAD SHX Text

JEFF HOYT

AutoCAD SHX Text

RICK DOLCE

AutoCAD SHX Text

ROGER ROY

AutoCAD SHX Text

RICK DOLCE

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

CONTRACT NO. N48005-XX-X-XXXX

AutoCAD SHX Text

SEAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

G002WS-19-262

PWD-MAINE

IN HOUSE DESIGN

GENERAL NOTES

TRAFFIC NOTES:

CONSTRUCTION DEWATERING NOTE

UTILITY NOTES:

AS BUILT NOTES

DEMOLITION NOTES:

CONSTRUCTION NOTES:

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

DRAWFORM REVISION: 10 OCTOBER 2014

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

PUBLIC WORKS DEPARTMENT - MAINE

AutoCAD SHX Text

NAVAL SHIPYARD - PORTSMOUTH, NH

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

FEAD/PM&E

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text 12786606

AutoCAD SHX Text

AutoCAD SHX Text 1581200

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

AutoCAD SHX Text

PORTSMOUTH NAVAL SHIPYARD

AutoCAD SHX Text

KITTERY, MAINE

AutoCAD SHX Text

RM16 1185 CONST. SQ. & BRDG1 B163

AutoCAD SHX Text

AutoCAD SHX Text

DAVID HICKMAN

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

XXX

AutoCAD SHX Text

AMIN BAHROUR

AutoCAD SHX Text

JEFF HOYT

AutoCAD SHX Text

RICK DOLCE

AutoCAD SHX Text

ROGER ROY

AutoCAD SHX Text

RICK DOLCE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

1. PLANS HAVE BEEN COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD PLANS HAVE BEEN COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD HAVE BEEN COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD HAVE BEEN COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD BEEN COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD BEEN COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD FROM EXISTING RECORD PLANS, ON-SITE FIELD FROM EXISTING RECORD PLANS, ON-SITE FIELD EXISTING RECORD PLANS, ON-SITE FIELD EXISTING RECORD PLANS, ON-SITE FIELD RECORD PLANS, ON-SITE FIELD RECORD PLANS, ON-SITE FIELD PLANS, ON-SITE FIELD PLANS, ON-SITE FIELD ON-SITE FIELD ON-SITE FIELD FIELD FIELD SURVEY OF SURFACE FEATURES AND LIMITED ACCESS TO SUBSURFACE OF SURFACE FEATURES AND LIMITED ACCESS TO SUBSURFACE OF SURFACE FEATURES AND LIMITED ACCESS TO SUBSURFACE SURFACE FEATURES AND LIMITED ACCESS TO SUBSURFACE SURFACE FEATURES AND LIMITED ACCESS TO SUBSURFACE FEATURES AND LIMITED ACCESS TO SUBSURFACE FEATURES AND LIMITED ACCESS TO SUBSURFACE AND LIMITED ACCESS TO SUBSURFACE AND LIMITED ACCESS TO SUBSURFACE LIMITED ACCESS TO SUBSURFACE LIMITED ACCESS TO SUBSURFACE ACCESS TO SUBSURFACE ACCESS TO SUBSURFACE TO SUBSURFACE TO SUBSURFACE SUBSURFACE SUBSURFACE LOCATIONS AND VISUAL OBSERVATION. 2. HORIZONTAL DATUM: MAINE STATE COORDINATES. WEST ZONE NAD 83. HORIZONTAL DATUM: MAINE STATE COORDINATES. WEST ZONE NAD 83. DATUM: MAINE STATE COORDINATES. WEST ZONE NAD 83. DATUM: MAINE STATE COORDINATES. WEST ZONE NAD 83. MAINE STATE COORDINATES. WEST ZONE NAD 83. MAINE STATE COORDINATES. WEST ZONE NAD 83. STATE COORDINATES. WEST ZONE NAD 83. STATE COORDINATES. WEST ZONE NAD 83. COORDINATES. WEST ZONE NAD 83. COORDINATES. WEST ZONE NAD 83. WEST ZONE NAD 83. WEST ZONE NAD 83. ZONE NAD 83. ZONE NAD 83. NAD 83. NAD 83. 83. 83. VERTICAL DATUM: NAVD 88. 3. PROTECT AND MAINTAIN PNSY CONTROL POINTS AND TEMPORARY BENCH PROTECT AND MAINTAIN PNSY CONTROL POINTS AND TEMPORARY BENCH AND MAINTAIN PNSY CONTROL POINTS AND TEMPORARY BENCH AND MAINTAIN PNSY CONTROL POINTS AND TEMPORARY BENCH MAINTAIN PNSY CONTROL POINTS AND TEMPORARY BENCH MAINTAIN PNSY CONTROL POINTS AND TEMPORARY BENCH PNSY CONTROL POINTS AND TEMPORARY BENCH PNSY CONTROL POINTS AND TEMPORARY BENCH CONTROL POINTS AND TEMPORARY BENCH CONTROL POINTS AND TEMPORARY BENCH POINTS AND TEMPORARY BENCH POINTS AND TEMPORARY BENCH AND TEMPORARY BENCH AND TEMPORARY BENCH TEMPORARY BENCH TEMPORARY BENCH BENCH BENCH MARKS. IF IMPACTED BY WORK, RETAIN AND PAY FOR A MAIN PROFESSIONAL IF IMPACTED BY WORK, RETAIN AND PAY FOR A MAIN PROFESSIONAL IF IMPACTED BY WORK, RETAIN AND PAY FOR A MAIN PROFESSIONAL IMPACTED BY WORK, RETAIN AND PAY FOR A MAIN PROFESSIONAL IMPACTED BY WORK, RETAIN AND PAY FOR A MAIN PROFESSIONAL BY WORK, RETAIN AND PAY FOR A MAIN PROFESSIONAL BY WORK, RETAIN AND PAY FOR A MAIN PROFESSIONAL WORK, RETAIN AND PAY FOR A MAIN PROFESSIONAL WORK, RETAIN AND PAY FOR A MAIN PROFESSIONAL RETAIN AND PAY FOR A MAIN PROFESSIONAL RETAIN AND PAY FOR A MAIN PROFESSIONAL AND PAY FOR A MAIN PROFESSIONAL AND PAY FOR A MAIN PROFESSIONAL PAY FOR A MAIN PROFESSIONAL PAY FOR A MAIN PROFESSIONAL FOR A MAIN PROFESSIONAL FOR A MAIN PROFESSIONAL A MAIN PROFESSIONAL A MAIN PROFESSIONAL MAIN PROFESSIONAL MAIN PROFESSIONAL PROFESSIONAL PROFESSIONAL LAND SURVEYOR TO REPLACE AND DOCUMENT. 4. PORTSMOUTH NAVAL SHIPYARD GROUND CONTROL ESTABLISHED BY DOUCET PORTSMOUTH NAVAL SHIPYARD GROUND CONTROL ESTABLISHED BY DOUCET NAVAL SHIPYARD GROUND CONTROL ESTABLISHED BY DOUCET NAVAL SHIPYARD GROUND CONTROL ESTABLISHED BY DOUCET SHIPYARD GROUND CONTROL ESTABLISHED BY DOUCET SHIPYARD GROUND CONTROL ESTABLISHED BY DOUCET GROUND CONTROL ESTABLISHED BY DOUCET GROUND CONTROL ESTABLISHED BY DOUCET CONTROL ESTABLISHED BY DOUCET CONTROL ESTABLISHED BY DOUCET ESTABLISHED BY DOUCET ESTABLISHED BY DOUCET BY DOUCET BY DOUCET DOUCET DOUCET SURVEY, NEWMARKET, NH DECEMBER 2018. 5. ALL FINISHED GRADES WILL PROVIDE POSITIVE DRAINAGE FOR ALL ALL FINISHED GRADES WILL PROVIDE POSITIVE DRAINAGE FOR ALL FINISHED GRADES WILL PROVIDE POSITIVE DRAINAGE FOR ALL FINISHED GRADES WILL PROVIDE POSITIVE DRAINAGE FOR ALL GRADES WILL PROVIDE POSITIVE DRAINAGE FOR ALL GRADES WILL PROVIDE POSITIVE DRAINAGE FOR ALL WILL PROVIDE POSITIVE DRAINAGE FOR ALL WILL PROVIDE POSITIVE DRAINAGE FOR ALL PROVIDE POSITIVE DRAINAGE FOR ALL PROVIDE POSITIVE DRAINAGE FOR ALL POSITIVE DRAINAGE FOR ALL POSITIVE DRAINAGE FOR ALL DRAINAGE FOR ALL DRAINAGE FOR ALL FOR ALL FOR ALL ALL ALL RECONSTRUCTED AREAS. 6. UNLESS OTHERWISE NOTED, ALL EXISTING FEATURES DESIGNATED ON THE UNLESS OTHERWISE NOTED, ALL EXISTING FEATURES DESIGNATED ON THE OTHERWISE NOTED, ALL EXISTING FEATURES DESIGNATED ON THE OTHERWISE NOTED, ALL EXISTING FEATURES DESIGNATED ON THE NOTED, ALL EXISTING FEATURES DESIGNATED ON THE NOTED, ALL EXISTING FEATURES DESIGNATED ON THE ALL EXISTING FEATURES DESIGNATED ON THE ALL EXISTING FEATURES DESIGNATED ON THE EXISTING FEATURES DESIGNATED ON THE EXISTING FEATURES DESIGNATED ON THE FEATURES DESIGNATED ON THE FEATURES DESIGNATED ON THE DESIGNATED ON THE DESIGNATED ON THE ON THE ON THE THE THE PLANS TO REMAIN INCLUDING, BUT NOT LIMITED TO, TREES, SIGNS, SIGN TO REMAIN INCLUDING, BUT NOT LIMITED TO, TREES, SIGNS, SIGN TO REMAIN INCLUDING, BUT NOT LIMITED TO, TREES, SIGNS, SIGN REMAIN INCLUDING, BUT NOT LIMITED TO, TREES, SIGNS, SIGN REMAIN INCLUDING, BUT NOT LIMITED TO, TREES, SIGNS, SIGN INCLUDING, BUT NOT LIMITED TO, TREES, SIGNS, SIGN INCLUDING, BUT NOT LIMITED TO, TREES, SIGNS, SIGN BUT NOT LIMITED TO, TREES, SIGNS, SIGN BUT NOT LIMITED TO, TREES, SIGNS, SIGN NOT LIMITED TO, TREES, SIGNS, SIGN NOT LIMITED TO, TREES, SIGNS, SIGN LIMITED TO, TREES, SIGNS, SIGN LIMITED TO, TREES, SIGNS, SIGN TO, TREES, SIGNS, SIGN TO, TREES, SIGNS, SIGN TREES, SIGNS, SIGN TREES, SIGNS, SIGN SIGNS, SIGN SIGNS, SIGN SIGN SIGN POSTS, CURBS, SIDEWALKS AND BACK OF SIDEWALK FEATURES WILL BE CURBS, SIDEWALKS AND BACK OF SIDEWALK FEATURES WILL BE CURBS, SIDEWALKS AND BACK OF SIDEWALK FEATURES WILL BE SIDEWALKS AND BACK OF SIDEWALK FEATURES WILL BE SIDEWALKS AND BACK OF SIDEWALK FEATURES WILL BE AND BACK OF SIDEWALK FEATURES WILL BE AND BACK OF SIDEWALK FEATURES WILL BE BACK OF SIDEWALK FEATURES WILL BE BACK OF SIDEWALK FEATURES WILL BE OF SIDEWALK FEATURES WILL BE OF SIDEWALK FEATURES WILL BE SIDEWALK FEATURES WILL BE SIDEWALK FEATURES WILL BE FEATURES WILL BE FEATURES WILL BE WILL BE WILL BE BE BE VERIFIED, LOCATED, AND PROTECTED DURING ALL PHASES OF CONSTRUCTION. 7. SURVEY CONTROL BOUNDS AND STREET LINE MONUMENTATION SHALL NOT BE SURVEY CONTROL BOUNDS AND STREET LINE MONUMENTATION SHALL NOT BE CONTROL BOUNDS AND STREET LINE MONUMENTATION SHALL NOT BE CONTROL BOUNDS AND STREET LINE MONUMENTATION SHALL NOT BE BOUNDS AND STREET LINE MONUMENTATION SHALL NOT BE BOUNDS AND STREET LINE MONUMENTATION SHALL NOT BE AND STREET LINE MONUMENTATION SHALL NOT BE AND STREET LINE MONUMENTATION SHALL NOT BE STREET LINE MONUMENTATION SHALL NOT BE STREET LINE MONUMENTATION SHALL NOT BE LINE MONUMENTATION SHALL NOT BE LINE MONUMENTATION SHALL NOT BE MONUMENTATION SHALL NOT BE MONUMENTATION SHALL NOT BE SHALL NOT BE SHALL NOT BE NOT BE NOT BE BE BE DISTURBED DURING THE COURSE OF WORK AND SHALL BE PROTECTED. DURING THE COURSE OF WORK AND SHALL BE PROTECTED. DURING THE COURSE OF WORK AND SHALL BE PROTECTED. THE COURSE OF WORK AND SHALL BE PROTECTED. THE COURSE OF WORK AND SHALL BE PROTECTED. COURSE OF WORK AND SHALL BE PROTECTED. COURSE OF WORK AND SHALL BE PROTECTED. OF WORK AND SHALL BE PROTECTED. OF WORK AND SHALL BE PROTECTED. WORK AND SHALL BE PROTECTED. WORK AND SHALL BE PROTECTED. AND SHALL BE PROTECTED. AND SHALL BE PROTECTED. SHALL BE PROTECTED. SHALL BE PROTECTED. BE PROTECTED. BE PROTECTED. PROTECTED. PROTECTED. SHOULD ANY BOUND BE DISTURBED, THE CONTRACTOR WILL BE REQUIRED TO ANY BOUND BE DISTURBED, THE CONTRACTOR WILL BE REQUIRED TO ANY BOUND BE DISTURBED, THE CONTRACTOR WILL BE REQUIRED TO BOUND BE DISTURBED, THE CONTRACTOR WILL BE REQUIRED TO BOUND BE DISTURBED, THE CONTRACTOR WILL BE REQUIRED TO BE DISTURBED, THE CONTRACTOR WILL BE REQUIRED TO BE DISTURBED, THE CONTRACTOR WILL BE REQUIRED TO DISTURBED, THE CONTRACTOR WILL BE REQUIRED TO DISTURBED, THE CONTRACTOR WILL BE REQUIRED TO THE CONTRACTOR WILL BE REQUIRED TO THE CONTRACTOR WILL BE REQUIRED TO CONTRACTOR WILL BE REQUIRED TO CONTRACTOR WILL BE REQUIRED TO WILL BE REQUIRED TO WILL BE REQUIRED TO BE REQUIRED TO BE REQUIRED TO REQUIRED TO REQUIRED TO TO TO HIRE, AT HIS OWN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN AT HIS OWN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN AT HIS OWN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN HIS OWN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN HIS OWN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN OWN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN OWN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN A PROFESSIONAL LAND SURVEYOR LICENSED IN A PROFESSIONAL LAND SURVEYOR LICENSED IN PROFESSIONAL LAND SURVEYOR LICENSED IN PROFESSIONAL LAND SURVEYOR LICENSED IN LAND SURVEYOR LICENSED IN LAND SURVEYOR LICENSED IN SURVEYOR LICENSED IN SURVEYOR LICENSED IN LICENSED IN LICENSED IN IN IN THE STATE OF MAINE TO REPLACE AND / OR RESET THE BOUND TO ITS STATE OF MAINE TO REPLACE AND / OR RESET THE BOUND TO ITS STATE OF MAINE TO REPLACE AND / OR RESET THE BOUND TO ITS OF MAINE TO REPLACE AND / OR RESET THE BOUND TO ITS OF MAINE TO REPLACE AND / OR RESET THE BOUND TO ITS MAINE TO REPLACE AND / OR RESET THE BOUND TO ITS MAINE TO REPLACE AND / OR RESET THE BOUND TO ITS TO REPLACE AND / OR RESET THE BOUND TO ITS TO REPLACE AND / OR RESET THE BOUND TO ITS REPLACE AND / OR RESET THE BOUND TO ITS REPLACE AND / OR RESET THE BOUND TO ITS AND / OR RESET THE BOUND TO ITS AND / OR RESET THE BOUND TO ITS / OR RESET THE BOUND TO ITS / OR RESET THE BOUND TO ITS OR RESET THE BOUND TO ITS OR RESET THE BOUND TO ITS RESET THE BOUND TO ITS RESET THE BOUND TO ITS THE BOUND TO ITS THE BOUND TO ITS BOUND TO ITS BOUND TO ITS TO ITS TO ITS ITS ITS ORIGINAL POSITION. 8. EXCEPT AS NOTED, SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE EXCEPT AS NOTED, SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE AS NOTED, SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE AS NOTED, SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE NOTED, SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE NOTED, SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE ITEMS ARE TO BECOME THE PROPERTY OF THE ITEMS ARE TO BECOME THE PROPERTY OF THE ARE TO BECOME THE PROPERTY OF THE ARE TO BECOME THE PROPERTY OF THE TO BECOME THE PROPERTY OF THE TO BECOME THE PROPERTY OF THE BECOME THE PROPERTY OF THE BECOME THE PROPERTY OF THE THE PROPERTY OF THE THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE OF THE OF THE THE THE GOVERNMENT. 9. FEATURES MAY BE SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT FEATURES MAY BE SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT MAY BE SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT MAY BE SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT BE SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT BE SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT WITHIN THE LIMIT OF WORK THAT ARE NOT WITHIN THE LIMIT OF WORK THAT ARE NOT THE LIMIT OF WORK THAT ARE NOT THE LIMIT OF WORK THAT ARE NOT LIMIT OF WORK THAT ARE NOT LIMIT OF WORK THAT ARE NOT OF WORK THAT ARE NOT OF WORK THAT ARE NOT WORK THAT ARE NOT WORK THAT ARE NOT THAT ARE NOT THAT ARE NOT ARE NOT ARE NOT NOT NOT EXPLICITLY CALLED OUT FOR REMOVAL OR DEMOLITION. DEMOLISH ALL CALLED OUT FOR REMOVAL OR DEMOLITION. DEMOLISH ALL CALLED OUT FOR REMOVAL OR DEMOLITION. DEMOLISH ALL OUT FOR REMOVAL OR DEMOLITION. DEMOLISH ALL OUT FOR REMOVAL OR DEMOLITION. DEMOLISH ALL FOR REMOVAL OR DEMOLITION. DEMOLISH ALL FOR REMOVAL OR DEMOLITION. DEMOLISH ALL REMOVAL OR DEMOLITION. DEMOLISH ALL REMOVAL OR DEMOLITION. DEMOLISH ALL OR DEMOLITION. DEMOLISH ALL OR DEMOLITION. DEMOLISH ALL DEMOLITION. DEMOLISH ALL DEMOLITION. DEMOLISH ALL DEMOLISH ALL DEMOLISH ALL DEMOLISH ALL ALL ALL FEATURES WITHIN THE LIMIT OF WORK REQUIRED TO COMPLETE THE WORK OF WITHIN THE LIMIT OF WORK REQUIRED TO COMPLETE THE WORK OF WITHIN THE LIMIT OF WORK REQUIRED TO COMPLETE THE WORK OF THE LIMIT OF WORK REQUIRED TO COMPLETE THE WORK OF THE LIMIT OF WORK REQUIRED TO COMPLETE THE WORK OF LIMIT OF WORK REQUIRED TO COMPLETE THE WORK OF LIMIT OF WORK REQUIRED TO COMPLETE THE WORK OF OF WORK REQUIRED TO COMPLETE THE WORK OF OF WORK REQUIRED TO COMPLETE THE WORK OF WORK REQUIRED TO COMPLETE THE WORK OF WORK REQUIRED TO COMPLETE THE WORK OF REQUIRED TO COMPLETE THE WORK OF REQUIRED TO COMPLETE THE WORK OF TO COMPLETE THE WORK OF TO COMPLETE THE WORK OF COMPLETE THE WORK OF COMPLETE THE WORK OF THE WORK OF THE WORK OF WORK OF WORK OF OF OF THE PROJECT. 10. PREVENT ANY DISTURBANCE OR DAMAGE TO ADJACENT PROPERTIES. PREVENT ANY DISTURBANCE OR DAMAGE TO ADJACENT PROPERTIES. 11. YELLOW MATERIALS: YELLOW MATERIALS: CONTRACTORS SHALL NOT USE YELLOW OR ORANGE-YELLOW COLORED SHALL NOT USE YELLOW OR ORANGE-YELLOW COLORED SHALL NOT USE YELLOW OR ORANGE-YELLOW COLORED NOT USE YELLOW OR ORANGE-YELLOW COLORED NOT USE YELLOW OR ORANGE-YELLOW COLORED USE YELLOW OR ORANGE-YELLOW COLORED USE YELLOW OR ORANGE-YELLOW COLORED YELLOW OR ORANGE-YELLOW COLORED YELLOW OR ORANGE-YELLOW COLORED OR ORANGE-YELLOW COLORED OR ORANGE-YELLOW COLORED ORANGE-YELLOW COLORED ORANGE-YELLOW COLORED COLORED COLORED MATERIALS FOR THE FOLLOWING PURPOSES: PROTECTIVE CLOTHING, HOODS, FOR THE FOLLOWING PURPOSES: PROTECTIVE CLOTHING, HOODS, FOR THE FOLLOWING PURPOSES: PROTECTIVE CLOTHING, HOODS, THE FOLLOWING PURPOSES: PROTECTIVE CLOTHING, HOODS, THE FOLLOWING PURPOSES: PROTECTIVE CLOTHING, HOODS, FOLLOWING PURPOSES: PROTECTIVE CLOTHING, HOODS, FOLLOWING PURPOSES: PROTECTIVE CLOTHING, HOODS, PURPOSES: PROTECTIVE CLOTHING, HOODS, PURPOSES: PROTECTIVE CLOTHING, HOODS, PROTECTIVE CLOTHING, HOODS, PROTECTIVE CLOTHING, HOODS, CLOTHING, HOODS, CLOTHING, HOODS, HOODS, HOODS, SHEETING, TARPS, POLYETHYLENE BOTTLES OR OTHER CONTAINERS, TAPES, TARPS, POLYETHYLENE BOTTLES OR OTHER CONTAINERS, TAPES, TARPS, POLYETHYLENE BOTTLES OR OTHER CONTAINERS, TAPES, POLYETHYLENE BOTTLES OR OTHER CONTAINERS, TAPES, POLYETHYLENE BOTTLES OR OTHER CONTAINERS, TAPES, BOTTLES OR OTHER CONTAINERS, TAPES, BOTTLES OR OTHER CONTAINERS, TAPES, OR OTHER CONTAINERS, TAPES, OR OTHER CONTAINERS, TAPES, OTHER CONTAINERS, TAPES, OTHER CONTAINERS, TAPES, CONTAINERS, TAPES, CONTAINERS, TAPES, TAPES, TAPES, BAGS, BANDING, IDENTIFICATION MARKS ON TOOLS, BOUNDARY MARKERS, BANDING, IDENTIFICATION MARKS ON TOOLS, BOUNDARY MARKERS, BANDING, IDENTIFICATION MARKS ON TOOLS, BOUNDARY MARKERS, IDENTIFICATION MARKS ON TOOLS, BOUNDARY MARKERS, IDENTIFICATION MARKS ON TOOLS, BOUNDARY MARKERS, MARKS ON TOOLS, BOUNDARY MARKERS, MARKS ON TOOLS, BOUNDARY MARKERS, ON TOOLS, BOUNDARY MARKERS, ON TOOLS, BOUNDARY MARKERS, TOOLS, BOUNDARY MARKERS, TOOLS, BOUNDARY MARKERS, BOUNDARY MARKERS, BOUNDARY MARKERS, MARKERS, MARKERS, RIBBONS, VENT DUCTS, ETC. CONTRACTOR GENERATED YELLOW COLORED VENT DUCTS, ETC. CONTRACTOR GENERATED YELLOW COLORED VENT DUCTS, ETC. CONTRACTOR GENERATED YELLOW COLORED DUCTS, ETC. CONTRACTOR GENERATED YELLOW COLORED DUCTS, ETC. CONTRACTOR GENERATED YELLOW COLORED ETC. CONTRACTOR GENERATED YELLOW COLORED ETC. CONTRACTOR GENERATED YELLOW COLORED CONTRACTOR GENERATED YELLOW COLORED CONTRACTOR GENERATED YELLOW COLORED GENERATED YELLOW COLORED GENERATED YELLOW COLORED YELLOW COLORED YELLOW COLORED COLORED COLORED WASTE SHALL BE DISPOSED OF BY THE CONTRACTOR OFF-YARD. SHIPYARD SHALL BE DISPOSED OF BY THE CONTRACTOR OFF-YARD. SHIPYARD SHALL BE DISPOSED OF BY THE CONTRACTOR OFF-YARD. SHIPYARD BE DISPOSED OF BY THE CONTRACTOR OFF-YARD. SHIPYARD BE DISPOSED OF BY THE CONTRACTOR OFF-YARD. SHIPYARD DISPOSED OF BY THE CONTRACTOR OFF-YARD. SHIPYARD DISPOSED OF BY THE CONTRACTOR OFF-YARD. SHIPYARD OF BY THE CONTRACTOR OFF-YARD. SHIPYARD OF BY THE CONTRACTOR OFF-YARD. SHIPYARD BY THE CONTRACTOR OFF-YARD. SHIPYARD BY THE CONTRACTOR OFF-YARD. SHIPYARD THE CONTRACTOR OFF-YARD. SHIPYARD THE CONTRACTOR OFF-YARD. SHIPYARD CONTRACTOR OFF-YARD. SHIPYARD CONTRACTOR OFF-YARD. SHIPYARD OFF-YARD. SHIPYARD OFF-YARD. SHIPYARD SHIPYARD SHIPYARD REFUSE CONTAINERS SHALL NOT BE USED FOR THE DISPOSAL OF YELLOW CONTAINERS SHALL NOT BE USED FOR THE DISPOSAL OF YELLOW CONTAINERS SHALL NOT BE USED FOR THE DISPOSAL OF YELLOW SHALL NOT BE USED FOR THE DISPOSAL OF YELLOW SHALL NOT BE USED FOR THE DISPOSAL OF YELLOW NOT BE USED FOR THE DISPOSAL OF YELLOW NOT BE USED FOR THE DISPOSAL OF YELLOW BE USED FOR THE DISPOSAL OF YELLOW BE USED FOR THE DISPOSAL OF YELLOW USED FOR THE DISPOSAL OF YELLOW USED FOR THE DISPOSAL OF YELLOW FOR THE DISPOSAL OF YELLOW FOR THE DISPOSAL OF YELLOW THE DISPOSAL OF YELLOW THE DISPOSAL OF YELLOW DISPOSAL OF YELLOW DISPOSAL OF YELLOW OF YELLOW OF YELLOW YELLOW YELLOW COLORED WASTE MATERIALS. YELLOW COLORED ITEMS SUCH AS DESCRIBED WASTE MATERIALS. YELLOW COLORED ITEMS SUCH AS DESCRIBED WASTE MATERIALS. YELLOW COLORED ITEMS SUCH AS DESCRIBED MATERIALS. YELLOW COLORED ITEMS SUCH AS DESCRIBED MATERIALS. YELLOW COLORED ITEMS SUCH AS DESCRIBED YELLOW COLORED ITEMS SUCH AS DESCRIBED YELLOW COLORED ITEMS SUCH AS DESCRIBED COLORED ITEMS SUCH AS DESCRIBED COLORED ITEMS SUCH AS DESCRIBED ITEMS SUCH AS DESCRIBED ITEMS SUCH AS DESCRIBED SUCH AS DESCRIBED SUCH AS DESCRIBED AS DESCRIBED AS DESCRIBED DESCRIBED DESCRIBED ABOVE ARE OF SPECIAL SIGNIFICANCE WITHIN THE SHIPYARD AND ARE ARE OF SPECIAL SIGNIFICANCE WITHIN THE SHIPYARD AND ARE ARE OF SPECIAL SIGNIFICANCE WITHIN THE SHIPYARD AND ARE OF SPECIAL SIGNIFICANCE WITHIN THE SHIPYARD AND ARE OF SPECIAL SIGNIFICANCE WITHIN THE SHIPYARD AND ARE SPECIAL SIGNIFICANCE WITHIN THE SHIPYARD AND ARE SPECIAL SIGNIFICANCE WITHIN THE SHIPYARD AND ARE SIGNIFICANCE WITHIN THE SHIPYARD AND ARE SIGNIFICANCE WITHIN THE SHIPYARD AND ARE WITHIN THE SHIPYARD AND ARE WITHIN THE SHIPYARD AND ARE THE SHIPYARD AND ARE THE SHIPYARD AND ARE SHIPYARD AND ARE SHIPYARD AND ARE AND ARE AND ARE ARE ARE SUBJECT TO STRICT CONTROLS. YELLOW COLORED CONTRACT GENERATED TO STRICT CONTROLS. YELLOW COLORED CONTRACT GENERATED TO STRICT CONTROLS. YELLOW COLORED CONTRACT GENERATED STRICT CONTROLS. YELLOW COLORED CONTRACT GENERATED STRICT CONTROLS. YELLOW COLORED CONTRACT GENERATED CONTROLS. YELLOW COLORED CONTRACT GENERATED CONTROLS. YELLOW COLORED CONTRACT GENERATED YELLOW COLORED CONTRACT GENERATED YELLOW COLORED CONTRACT GENERATED COLORED CONTRACT GENERATED COLORED CONTRACT GENERATED CONTRACT GENERATED CONTRACT GENERATED GENERATED GENERATED DEBRIS SHALL BE BAGGED IN NON-TRANSLUCENT CONTAINERS, AND PROMPTLY SHALL BE BAGGED IN NON-TRANSLUCENT CONTAINERS, AND PROMPTLY SHALL BE BAGGED IN NON-TRANSLUCENT CONTAINERS, AND PROMPTLY BE BAGGED IN NON-TRANSLUCENT CONTAINERS, AND PROMPTLY BE BAGGED IN NON-TRANSLUCENT CONTAINERS, AND PROMPTLY BAGGED IN NON-TRANSLUCENT CONTAINERS, AND PROMPTLY BAGGED IN NON-TRANSLUCENT CONTAINERS, AND PROMPTLY IN NON-TRANSLUCENT CONTAINERS, AND PROMPTLY IN NON-TRANSLUCENT CONTAINERS, AND PROMPTLY NON-TRANSLUCENT CONTAINERS, AND PROMPTLY NON-TRANSLUCENT CONTAINERS, AND PROMPTLY CONTAINERS, AND PROMPTLY CONTAINERS, AND PROMPTLY AND PROMPTLY AND PROMPTLY PROMPTLY PROMPTLY REMOVED FROM PORTSMOUTH NAVAL SHIPYARD. 12. CONTRACTOR SHALL REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER CONTRACTOR SHALL REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER SHALL REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER SHALL REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER ALL SPILLS AND LEAKS OF OIL OR OTHER ALL SPILLS AND LEAKS OF OIL OR OTHER SPILLS AND LEAKS OF OIL OR OTHER SPILLS AND LEAKS OF OIL OR OTHER AND LEAKS OF OIL OR OTHER AND LEAKS OF OIL OR OTHER LEAKS OF OIL OR OTHER LEAKS OF OIL OR OTHER OF OIL OR OTHER OF OIL OR OTHER OIL OR OTHER OIL OR OTHER OR OTHER OR OTHER OTHER OTHER HAZARDOUS SUBSTANCES. (IE OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING SUBSTANCES. (IE OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING SUBSTANCES. (IE OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING (IE OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING (IE OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING ANTIFREEZE, CHEMICALS, ETC.) OCCURRING ANTIFREEZE, CHEMICALS, ETC.) OCCURRING CHEMICALS, ETC.) OCCURRING CHEMICALS, ETC.) OCCURRING ETC.) OCCURRING ETC.) OCCURRING OCCURRING OCCURRING DURING THE PERFORMANCE OF THIS CONTRACT IMMEDIATELY UPON DISCOVERY, THE PERFORMANCE OF THIS CONTRACT IMMEDIATELY UPON DISCOVERY, THE PERFORMANCE OF THIS CONTRACT IMMEDIATELY UPON DISCOVERY, PERFORMANCE OF THIS CONTRACT IMMEDIATELY UPON DISCOVERY, PERFORMANCE OF THIS CONTRACT IMMEDIATELY UPON DISCOVERY, OF THIS CONTRACT IMMEDIATELY UPON DISCOVERY, OF THIS CONTRACT IMMEDIATELY UPON DISCOVERY, THIS CONTRACT IMMEDIATELY UPON DISCOVERY, THIS CONTRACT IMMEDIATELY UPON DISCOVERY, CONTRACT IMMEDIATELY UPON DISCOVERY, CONTRACT IMMEDIATELY UPON DISCOVERY, IMMEDIATELY UPON DISCOVERY, IMMEDIATELY UPON DISCOVERY, UPON DISCOVERY, UPON DISCOVERY, DISCOVERY, DISCOVERY, REGARDLESS OF THE QUANTITY. CALL THE FIRE DEPARTMENT AT EXTENSION OF THE QUANTITY. CALL THE FIRE DEPARTMENT AT EXTENSION OF THE QUANTITY. CALL THE FIRE DEPARTMENT AT EXTENSION THE QUANTITY. CALL THE FIRE DEPARTMENT AT EXTENSION THE QUANTITY. CALL THE FIRE DEPARTMENT AT EXTENSION QUANTITY. CALL THE FIRE DEPARTMENT AT EXTENSION QUANTITY. CALL THE FIRE DEPARTMENT AT EXTENSION CALL THE FIRE DEPARTMENT AT EXTENSION CALL THE FIRE DEPARTMENT AT EXTENSION THE FIRE DEPARTMENT AT EXTENSION THE FIRE DEPARTMENT AT EXTENSION FIRE DEPARTMENT AT EXTENSION FIRE DEPARTMENT AT EXTENSION DEPARTMENT AT EXTENSION DEPARTMENT AT EXTENSION AT EXTENSION AT EXTENSION EXTENSION EXTENSION 2333 TO REPORT THE SPILL. THE GOVERNMENT RESERVES THE RIGHT TO TO REPORT THE SPILL. THE GOVERNMENT RESERVES THE RIGHT TO TO REPORT THE SPILL. THE GOVERNMENT RESERVES THE RIGHT TO REPORT THE SPILL. THE GOVERNMENT RESERVES THE RIGHT TO REPORT THE SPILL. THE GOVERNMENT RESERVES THE RIGHT TO THE SPILL. THE GOVERNMENT RESERVES THE RIGHT TO THE SPILL. THE GOVERNMENT RESERVES THE RIGHT TO SPILL. THE GOVERNMENT RESERVES THE RIGHT TO SPILL. THE GOVERNMENT RESERVES THE RIGHT TO THE GOVERNMENT RESERVES THE RIGHT TO THE GOVERNMENT RESERVES THE RIGHT TO GOVERNMENT RESERVES THE RIGHT TO GOVERNMENT RESERVES THE RIGHT TO RESERVES THE RIGHT TO RESERVES THE RIGHT TO THE RIGHT TO THE RIGHT TO RIGHT TO RIGHT TO TO TO CLEAN UP, PACKAGE AND DISPOSE OF CONTRACTOR SPILLS OCCURRING ON UP, PACKAGE AND DISPOSE OF CONTRACTOR SPILLS OCCURRING ON UP, PACKAGE AND DISPOSE OF CONTRACTOR SPILLS OCCURRING ON PACKAGE AND DISPOSE OF CONTRACTOR SPILLS OCCURRING ON PACKAGE AND DISPOSE OF CONTRACTOR SPILLS OCCURRING ON AND DISPOSE OF CONTRACTOR SPILLS OCCURRING ON AND DISPOSE OF CONTRACTOR SPILLS OCCURRING ON DISPOSE OF CONTRACTOR SPILLS OCCURRING ON DISPOSE OF CONTRACTOR SPILLS OCCURRING ON OF CONTRACTOR SPILLS OCCURRING ON OF CONTRACTOR SPILLS OCCURRING ON CONTRACTOR SPILLS OCCURRING ON CONTRACTOR SPILLS OCCURRING ON SPILLS OCCURRING ON SPILLS OCCURRING ON OCCURRING ON OCCURRING ON ON ON THE SHIPYARD, AND BILL SUCH COSTS TO THE CONTRACTOR. 13. UNFORESEEN HAZARDOUS MATERIAL UNFORESEEN HAZARDOUS MATERIAL IF MATERIALS, NOT INDICATED, THAT MAY BE HAZARDOUS TO HUMAN HEALTH MATERIALS, NOT INDICATED, THAT MAY BE HAZARDOUS TO HUMAN HEALTH MATERIALS, NOT INDICATED, THAT MAY BE HAZARDOUS TO HUMAN HEALTH NOT INDICATED, THAT MAY BE HAZARDOUS TO HUMAN HEALTH NOT INDICATED, THAT MAY BE HAZARDOUS TO HUMAN HEALTH INDICATED, THAT MAY BE HAZARDOUS TO HUMAN HEALTH INDICATED, THAT MAY BE HAZARDOUS TO HUMAN HEALTH THAT MAY BE HAZARDOUS TO HUMAN HEALTH THAT MAY BE HAZARDOUS TO HUMAN HEALTH MAY BE HAZARDOUS TO HUMAN HEALTH MAY BE HAZARDOUS TO HUMAN HEALTH BE HAZARDOUS TO HUMAN HEALTH BE HAZARDOUS TO HUMAN HEALTH HAZARDOUS TO HUMAN HEALTH HAZARDOUS TO HUMAN HEALTH TO HUMAN HEALTH TO HUMAN HEALTH HUMAN HEALTH HUMAN HEALTH HEALTH HEALTH UPON DISTURBANCE DURING CONSTRUCTION OPERATIONS IS ENCOUNTERED, DISTURBANCE DURING CONSTRUCTION OPERATIONS IS ENCOUNTERED, DISTURBANCE DURING CONSTRUCTION OPERATIONS IS ENCOUNTERED, DURING CONSTRUCTION OPERATIONS IS ENCOUNTERED, DURING CONSTRUCTION OPERATIONS IS ENCOUNTERED, CONSTRUCTION OPERATIONS IS ENCOUNTERED, CONSTRUCTION OPERATIONS IS ENCOUNTERED, OPERATIONS IS ENCOUNTERED, OPERATIONS IS ENCOUNTERED, IS ENCOUNTERED, IS ENCOUNTERED, ENCOUNTERED, ENCOUNTERED, STOP THAT PORTION OF WORK AND NOTIFY THE CONTRACTING OFFICER THAT PORTION OF WORK AND NOTIFY THE CONTRACTING OFFICER THAT PORTION OF WORK AND NOTIFY THE CONTRACTING OFFICER PORTION OF WORK AND NOTIFY THE CONTRACTING OFFICER PORTION OF WORK AND NOTIFY THE CONTRACTING OFFICER OF WORK AND NOTIFY THE CONTRACTING OFFICER OF WORK AND NOTIFY THE CONTRACTING OFFICER WORK AND NOTIFY THE CONTRACTING OFFICER WORK AND NOTIFY THE CONTRACTING OFFICER AND NOTIFY THE CONTRACTING OFFICER AND NOTIFY THE CONTRACTING OFFICER NOTIFY THE CONTRACTING OFFICER NOTIFY THE CONTRACTING OFFICER THE CONTRACTING OFFICER THE CONTRACTING OFFICER CONTRACTING OFFICER CONTRACTING OFFICER OFFICER OFFICER IMMEDIATELY. 14. NO WORK, MATERIAL STORAGE OR EQUIPMENT PARKING TO BE ALLOWED NO WORK, MATERIAL STORAGE OR EQUIPMENT PARKING TO BE ALLOWED WORK, MATERIAL STORAGE OR EQUIPMENT PARKING TO BE ALLOWED WORK, MATERIAL STORAGE OR EQUIPMENT PARKING TO BE ALLOWED MATERIAL STORAGE OR EQUIPMENT PARKING TO BE ALLOWED MATERIAL STORAGE OR EQUIPMENT PARKING TO BE ALLOWED STORAGE OR EQUIPMENT PARKING TO BE ALLOWED STORAGE OR EQUIPMENT PARKING TO BE ALLOWED OR EQUIPMENT PARKING TO BE ALLOWED OR EQUIPMENT PARKING TO BE ALLOWED EQUIPMENT PARKING TO BE ALLOWED EQUIPMENT PARKING TO BE ALLOWED PARKING TO BE ALLOWED PARKING TO BE ALLOWED TO BE ALLOWED TO BE ALLOWED BE ALLOWED BE ALLOWED ALLOWED ALLOWED WITHIN TEN (10) FEET OF CIA BOUNDARIES EXCEPT AS NOTED OR TEN (10) FEET OF CIA BOUNDARIES EXCEPT AS NOTED OR TEN (10) FEET OF CIA BOUNDARIES EXCEPT AS NOTED OR (10) FEET OF CIA BOUNDARIES EXCEPT AS NOTED OR (10) FEET OF CIA BOUNDARIES EXCEPT AS NOTED OR FEET OF CIA BOUNDARIES EXCEPT AS NOTED OR FEET OF CIA BOUNDARIES EXCEPT AS NOTED OR OF CIA BOUNDARIES EXCEPT AS NOTED OR OF CIA BOUNDARIES EXCEPT AS NOTED OR CIA BOUNDARIES EXCEPT AS NOTED OR CIA BOUNDARIES EXCEPT AS NOTED OR BOUNDARIES EXCEPT AS NOTED OR BOUNDARIES EXCEPT AS NOTED OR EXCEPT AS NOTED OR EXCEPT AS NOTED OR AS NOTED OR AS NOTED OR NOTED OR NOTED OR OR OR AUTHORIZED BY CONTRACTING OFFICER.

AutoCAD SHX Text

2. WHENEVER CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH WHENEVER CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH SAW CUTTING, OR CORE DRILLING THROUGH SAW CUTTING, OR CORE DRILLING THROUGH CUTTING, OR CORE DRILLING THROUGH CUTTING, OR CORE DRILLING THROUGH OR CORE DRILLING THROUGH OR CORE DRILLING THROUGH CORE DRILLING THROUGH CORE DRILLING THROUGH DRILLING THROUGH DRILLING THROUGH THROUGH THROUGH CONCRETE, BITUMINOUS ASPHALT OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY BITUMINOUS ASPHALT OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY BITUMINOUS ASPHALT OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY ASPHALT OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY ASPHALT OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY OTHER IMPERVIOUS SURFACES, THE THIRD PARTY OTHER IMPERVIOUS SURFACES, THE THIRD PARTY IMPERVIOUS SURFACES, THE THIRD PARTY IMPERVIOUS SURFACES, THE THIRD PARTY SURFACES, THE THIRD PARTY SURFACES, THE THIRD PARTY THE THIRD PARTY THE THIRD PARTY THIRD PARTY THIRD PARTY PARTY PARTY INDEPENDENT, PRIVATE LOCATING COMPANY SHALL LOCATE UTILITY DEPTH BY USE OF GROUND PRIVATE LOCATING COMPANY SHALL LOCATE UTILITY DEPTH BY USE OF GROUND PRIVATE LOCATING COMPANY SHALL LOCATE UTILITY DEPTH BY USE OF GROUND LOCATING COMPANY SHALL LOCATE UTILITY DEPTH BY USE OF GROUND LOCATING COMPANY SHALL LOCATE UTILITY DEPTH BY USE OF GROUND COMPANY SHALL LOCATE UTILITY DEPTH BY USE OF GROUND COMPANY SHALL LOCATE UTILITY DEPTH BY USE OF GROUND SHALL LOCATE UTILITY DEPTH BY USE OF GROUND SHALL LOCATE UTILITY DEPTH BY USE OF GROUND LOCATE UTILITY DEPTH BY USE OF GROUND LOCATE UTILITY DEPTH BY USE OF GROUND UTILITY DEPTH BY USE OF GROUND UTILITY DEPTH BY USE OF GROUND DEPTH BY USE OF GROUND DEPTH BY USE OF GROUND BY USE OF GROUND BY USE OF GROUND USE OF GROUND USE OF GROUND OF GROUND OF GROUND GROUND GROUND PENETRATING RADAR (GPR), X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF RADAR (GPR), X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF RADAR (GPR), X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF (GPR), X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF (GPR), X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF SCOPE, OR ULTRASOUND PRIOR TO THE START OF SCOPE, OR ULTRASOUND PRIOR TO THE START OF OR ULTRASOUND PRIOR TO THE START OF OR ULTRASOUND PRIOR TO THE START OF ULTRASOUND PRIOR TO THE START OF ULTRASOUND PRIOR TO THE START OF PRIOR TO THE START OF PRIOR TO THE START OF TO THE START OF TO THE START OF THE START OF THE START OF START OF START OF OF OF DEMOLITION AND CONSTRUCTION. OUTAGES TO ISOLATE UTILITY SYSTEMS MUST BE USED IN AND CONSTRUCTION. OUTAGES TO ISOLATE UTILITY SYSTEMS MUST BE USED IN AND CONSTRUCTION. OUTAGES TO ISOLATE UTILITY SYSTEMS MUST BE USED IN CONSTRUCTION. OUTAGES TO ISOLATE UTILITY SYSTEMS MUST BE USED IN CONSTRUCTION. OUTAGES TO ISOLATE UTILITY SYSTEMS MUST BE USED IN OUTAGES TO ISOLATE UTILITY SYSTEMS MUST BE USED IN OUTAGES TO ISOLATE UTILITY SYSTEMS MUST BE USED IN TO ISOLATE UTILITY SYSTEMS MUST BE USED IN TO ISOLATE UTILITY SYSTEMS MUST BE USED IN ISOLATE UTILITY SYSTEMS MUST BE USED IN ISOLATE UTILITY SYSTEMS MUST BE USED IN UTILITY SYSTEMS MUST BE USED IN UTILITY SYSTEMS MUST BE USED IN SYSTEMS MUST BE USED IN SYSTEMS MUST BE USED IN MUST BE USED IN MUST BE USED IN BE USED IN BE USED IN USED IN USED IN IN IN CIRCUMSTANCES WHERE UTILITIES ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF WHERE UTILITIES ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF WHERE UTILITIES ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF UTILITIES ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF UTILITIES ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF TO BE POSITIVELY IDENTIFIED. THE USE OF TO BE POSITIVELY IDENTIFIED. THE USE OF BE POSITIVELY IDENTIFIED. THE USE OF BE POSITIVELY IDENTIFIED. THE USE OF POSITIVELY IDENTIFIED. THE USE OF POSITIVELY IDENTIFIED. THE USE OF IDENTIFIED. THE USE OF IDENTIFIED. THE USE OF THE USE OF THE USE OF USE OF USE OF OF OF HISTORICAL DRAWINGS DOES NOT ALLEVIATE THE CONTRACTOR FROM MEETING THIS REQUIREMENT. 3. THE CONTRACTORS SHALL TAKE THE NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES THE CONTRACTORS SHALL TAKE THE NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND ANY DAMAGE TO THE UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S ANY DAMAGE TO THE UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S ANY DAMAGE TO THE UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S DAMAGE TO THE UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S DAMAGE TO THE UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S TO THE UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S TO THE UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S THE UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S THE UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S IMMEDIATELY REPAIRED AT THE CONTRACTOR'S IMMEDIATELY REPAIRED AT THE CONTRACTOR'S REPAIRED AT THE CONTRACTOR'S REPAIRED AT THE CONTRACTOR'S AT THE CONTRACTOR'S AT THE CONTRACTOR'S THE CONTRACTOR'S THE CONTRACTOR'S CONTRACTOR'S CONTRACTOR'S EXPENSE.

This is the start of the file's text. The full file is on GovTribe.