Amendment_0002_N4008518B6101.pdf

PDF 24 KB Posted

Attached to
P1475 Construct MARSOC Cultural Assimilation Facility, MCB Camp Lejeune (Stone Bay), NC
Solicitation number
N4008518B6101
Issued by

About this file

Amendment_0002_N4008518B6101.pdf

View the file

Other files

File Type Posted
Site_Visit_Signup_Sheet_N4008518B6101.pdf PDF
Amendment_0005_N4008518B6101.pdf PDF
Amendment_0004_186101.pdf PDF
Amendment_0003_N4008518B6101.pdf PDF
NAVFAC_Sustainable_Energy_Data_Record_Card.PDF PDF
CS701.pdf PDF
MCB_Camp_Lejeune_REAL_ID.pdf PDF
Site_Visit_Contractor_Access.xls XLS spreadsheet
Amendment_0001_N4008518B6101.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5144525 P1475

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

P1475 Construct Cultural Assimilation Facility, Stone Bay (MARSOC), North Carolina

The time and date for the receipt of proposals are hereby extended to 2:30PM on Wednesday, March 14, 2018.

This amendment should be acknow ledged w hen your bid is submitted. Failure to acknow ledge this amendment may constitute grounds for rejection of the bid.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518B6101

X 9B. DATED (SEE ITEM 11)

07-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Mar-2018

CODE

NAVFAC MID ATLANTIC

ROICC CAMP LEJEUNE

1005 MICHAEL ROAD

CAMP LEJEUNE NC 28547-2521

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518B6101

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

1. Question: Mechanical drawing M-401 (Note 12) shows four 4-inch gas flue lines from the boilers going out of the mechanical room and into the building. There are no other mechanical drawings that show where these four gas flue lines go once outside of the mechanical room. Architectural drawing A-103 seems to show one roof penetration (Note

5) for a gas flue line. This penetration appears to be a good distance from the mechanical room. The boiler manufacturer needs to know the length of flue piping in order to determine if a power ventilator is necessary. Can the government provide drawings showing the desired routing for the four 4-inch gas flue lines leaving the mechanical room in drawing M-401?

Answer: Continuation of the 4 inch flue/combustion air vents can be found on sheet M- 101 and are annotated with note 16. Each set of flue/combustion vents are terminated at a single roof penetration as show on detail A4 on sheet M-502. The longest run is approximately 60 equivalent feet in length taking into account 5 feet for each elbow.

Power ventilation for the scheduled boilers is not required until vent equivalent exceeds 100 feet.

2. Question: Specification 23 52 43.00 20 paragraph 2.3.17 Venting and Combustion Air, says to provide boiler flue and combustion air intake constructed of Category IV stainless steel. Manufacturer’s recommendation allows for the use of PVC/CPVC in these applications. Can the specification be amended to install boiler flue and combustion air intake using manufacturer recommended materials?

Answer: PVC/CPVC is not acceptable because the design water temperatures do not fall below the point of condensing with the boiler operation at 83% efficiency. At that efficiency the flue gases are too high for PVC/CPVC pipe.

3. Question: Was the RR12 option deleted? It still shows on A701 but is not included in the Contract Line Items (CLINs).

Answer: Yes the RR12 option shown on A701 has been deleted.

4. Question: On CD101, Note #4, it states after completion of subgrade work the follow-on construction of the building footings and slabs shall be delayed a minimum of 30-days.

Please confirm that provided the Contractor has provided compaction tests to document that the required compaction requirements have been achieve they will be allowed to immediately proceed with the footings and slab construction.

Answer: No. They must wait the 30 days. As stated in the geotechnical report - “The proposed single story building may be designed using a conventional shallow foundation system. However, there is a potential for intolerable settlement at the southeast corner of the proposed building footprint due to the planned site grade increase on the order of 5 feet at that location. It will be necessary to delay foundation construction for 30 days following placement of site grading fill in order to achieve the desired post-construction differential settlement tolerances.

5. Question: On S001, Note #10, it states that all structural steel shop drawings shall be prepared under the direct supervision of a registered professional engineer. Please confirm the state the professional engineer is to be registered in North Carolina. Also, it states that all structural steel shop drawings shall be prepared under the direct supervision of a registered professional engineer. Please advise if the requirement for a Registered Professional Engineer applies to the preparation of shop drawings for the Pre-Engineered Metal Building.

Answer: Preferably North Carolina, but it is not necessary. This would apply to all structural steel and to the metal building.

6. Question: On S002, Note #12, it states that for cold formed framing designs the Contractor shall utilize a Professional Engineer who must sign and seal the framing design. Please confirm the state the Professional Engineer is to be registered is North Carolina.

Answer: Preferably North Carolina, but it is not necessary.

7. Question: On E-301at Corridor 124 for door location 124 there is no mention of Card

Reader or Balanced Magnetic Switch as is the case at all other Exterior Doors. Is this correct?

Answer: No, provide the rough-in for a Card Reader and Balance Magnetic switch as shown for all other exterior doors and per keynote 10 at the exterior door of corridor 124.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 09-Mar-2018 03:00 PM to 14-Mar-2018 02:30 PM.

(End of Summary of Changes)