N4008020R0011.pdf

PDF 2 MB Posted

Attached to
Notice of Award Federal contract opportunity
Solicitation number
N4008020R0011
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Notice of Award, newest first.
File Type Posted
N4008020R0011 0025.pdf PDF
Copy of J-0200000-10_ELINS_BLANK_ 04.30.20_Amendment 0023.xlsx XLSX spreadsheet
N4008020R0011 0022.docx DOCX document
N4008020R0011 0021.pdf PDF
J-0200000-10_ELINS_BLANK_04.21.20_Amend 0020.xlsx XLSX spreadsheet
C-1503060 Pavement Clearance Snow_04.21.2020 Amend 0020.pdf PDF
N4008020R0011 0019.pdf PDF
C-1503060 Pavement Clearance Snow_04.13.20 Amend 0018.doc DOC document
N4008020R0011 0018.pdf PDF
N4008020R0011 0017.pdf PDF
N4008020R0011 0016.pdf PDF
N4008020R0011 0011.docx DOCX document
N40080-20-R-0011 0010.pdf PDF
Section L Amend 0009 ATT 38.docx DOCX document
RFIS Amend 0009 ATT 37.docx DOCX document
N4008020R0011 0009.pdf PDF
N4008020R0011 0008.pdf PDF
J-1503050-09(a6) MBW_Amendment 0008 (Att 36).pdf PDF
N4008020R0011 0007.pdf PDF
J-1503050-09(a6) MBW Irr_Amend 06 (Att 29).pdf PDF
J-1503050-09(a6.1) MBW_Irr Map_Amend 06 (Att 28).pdf PDF
J-1503060-05(a4) CARD_SNOW_INV 2020_Amend 06 (Att 33).pdf PDF
J-1503050-13(a10) Carderock N Swale Maint Spec 2020_Amend 06 (Att 27).pdf PDF
J-1503050-13(a11) Carderock N Swale Map_Amend 06 (Att 26.pdf PDF
J-1503050-13(g3) JBAB LID 2020_Amend 0006 (Att 23).pdf PDF
J-1503050-08(a4) Carderock 2020 Grounds Inv - Amend 0006 (Att 31).pdf PDF
J-0200000-10_ELINS_BLANK_ 02.13.20_Amend 0006 (Att 22).xlsx XLSX spreadsheet
Written Responses RFI FINAL_Amend 06 (Att 21).docx DOCX document
J-1503050-08(f5) NSAB Grounds Inventory-Amend 07 (Att 34).pdf PDF
N4008020R0011 0006.pdf PDF
J-1503050-08(f) NSAB Grounds Inventory-COL3_Amend 06 (Att 30).pdf PDF
Pre Proposal Sign In Sheet (Att 19).pdf PDF
N4008020R0011 Amendment 0004.pdf PDF
Copy of J-0200000-10_ELINS_BLANK_ 01.30.20_Amendment 0004 (Att 20).xlsx XLSX spreadsheet
J-1503050-08(f) BETH Grounds Inventory-Amendment (Att 17).pdf PDF
Pre Proposal Presentation (Att 18).pdf PDF
Dalecarlia Snow Maps (Att 13).ppt PPT presentation
Copy of J-0200000-10_ELINS_BLANK_ 01.24.20 (Att 15).xlsx XLSX spreadsheet
J-1503060-06(f)_NSA BETH Sweep Map (Att12).pdf PDF
J-1503060-07_NonAirfield Sweeping BETH (Att 11).doc DOC document
BMP Grounds Maintenance Map NSAB (Att 16).pdf PDF
NSA Bethesda Snow Map (Att 9).pdf PDF
N4008020R0011 0003.pdf PDF
NSAB & Dalecarlia Maps 190730 (Att 10).pdf PDF
SCS II AJV LIUNA CBA JBAB 10 1 2019 - Signed.pdf PDF
J-1503060 Second Upload.pdf PDF
N4008020R0011 Corporate Experience Form.docx DOCX document
N4008020R0011 Past Performance Questionnaire.docx DOCX document
J-10503050 Documents, Exhibits and Other Attachments.pdf PDF
J-0200000-10_ELINS_BLANK_ 12.30.19.xlsx XLSX spreadsheet
Show all 50

Notice of Award has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

N4008020R0011 31-Dec-2019

b. TELEPHONE NUMBER

(202) 685-0017

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 10 Feb 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

N400809. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

PETER KHO

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

NAVAL FACILITIES ENG COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: (202) 685-3192

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

X 8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF152

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Regional 8(a) Grounds Maintenance Services

National Capital Region, Washington, DC

N40080-20-R-0011

Section A - Solicitation/Contract Form

SECTION A

GENERAL INFORMATION

B.1 Contract Title: Regional Grounds Maintenance for Naval District Washington; Washington, DC

B.2 Type of Contract: This is a performance-based facilities support indefinite-quantity contract that is comprised of both Recurring Work and Non-Recurring Work Items. The Contract Line Item Numbers (CLINs) will be firm-fixed price (FFP)

B.3 PRIOR CONTRACT INFORMATION:

The contract issued as a result of this solicitation will be the follow-on contract to the existing Regional Grounds contract N40080-15 –D-0312 awarded to SCS II AJV., estimated total was approximately $49.5 million. This information is provided for informational purposes only. Prospective offers are cautioned that they should not rely on this information to determine workload as there is no assurance that workload and volume of future effort and costs will replicate past experience.

B.4 MAXIMUM NOT TO EXCEED (NTE) AND MINIMUM GUARANTEE

The maximum or NTE value of an ordering period is the total of all the CLINs in that ordering period. The maximum for any ordering period shall not be exceeded except as may be provided for by formal modification to the contract. Circumstances may change after award such that the Government may need to issue orders which exceed the estimated quantity set forth for any particular CLIN during an ordering period, but will not exceed the maximum value for that ordering period. In this case, the Contractor may agree by signing the task order or starting performance.

Concurrently with the award of the basic contract, the Government intends to issue a task order to obligate the contract minimum guarantee which is the recurring work for the base year.

CLIN 0001 Base Period Recurring Work;

Minimum guarantees do not apply Year 1 through Year 4. The Minimum Guarantee only applies to the base year recurring work..

B.5 Competition Requirements/Set Aside: This procurement is being solicited as a 8(a) Small Business Set

Aside. In order to be eligible for award, Offerors must be a certified 8(a) Small Business Under NAICS Code

561730 at the time of award.

B.6 NAICS CODE: The NAICS Code assigned to this procurement is 561730 with a small business size standard of $7.5 million. Refer to Section K, On-Line Representations and Certifications Applications (ORCA) via https://www.sam.gov/portal/public/SAM) (FAR 52.219-1 Small Business Program Representation (May 2004)).

B.7 WAGE DETERMINATION: Service Contract Labor Standards (formerly referred to as Service Contract Act) wage determination. Refer to Section Attachment, J-0200000-02.

https://www.sam.gov/portal/public/SAM

N40080-20-R-0011

B. 8 CONTRACT TERM: This contract contains provision for one Base Period of twelve (12) months with four one-year extensions, not to exceed a total of 60 months. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clause, 5252.217-9301, Option to Extend the Term of Contract-

Services. In the option periods, the Government

B.9 Bid Guarantees: NOT REQUIRED for this procurement.

B.10 Period of Performance:

Base Period 1 October 2020 through 30 September 2021

Option Year 1 1 October 2021 through 30 September 2022

Option Year 2 1 October 2022 through 30 September 2023

Option Year 3 1 October 2023 through 30 September 2024

Option Year 4 1 October 2024 through 30 September 2025

B.11 EVALUATION OF PROPOSALS: Please refer to Sections L & M.

B.12 CONTRACT LINE ITEMS (CLINS): Description of the basic contract line items (CLINs), and option

CLINs:

CLIN START Description

CLIN 0001 Base Period Recurring Work

CLIN 1001 Option Year 1 Recurring Work

CLIN 2001 Option Year 2 Recurring Work

CLIN 3001 Option Year 3 Recurring Work

CLIN 4001 Option Year 4 Recurring Work

CLIN 0002 Base Year Non Recurring Work

CLIN 1002 Option Year 1 Non Recurring Work

CLIN 2002 Option Year 2 Non Recurring Work

CLIN 3002 Option Year 3 Non Recurring Work

CLIN 4002 Option Year 4 Non Recurring Work

B.13 CONTRACT LINE ITEMS, CONTRACT EXHIBIT LINE ITEMS AND SUBCLINS

a. Offerors shall enter unit prices for Exhibit Line Items Number (ELINs) for the Base Year

Recurring Work and Base Year Non-Recurring Work. Offerors may also enter a proposed inflation rate for out year pricing *Inflation shall be submitted as a decimal (e.g. 1.01 inflation rate would indicate a 1% increase year to year), whereas 0.99 = 1% decrease year to year). This inflation rate will be utilized for all modifications throughout the contract period unless another rate is agreed upon both parties for any future

ELIN items.

b. Offerors shall enter unit prices and amounts for Contract Line Items (CLINs) and Exhibit line items (ELINs) as indicated in the schedules and accompanying exhibits. All pricing should be rounded to two (2) decimal places only. If an Offeror does not round ELIN unit prices to two (2) decimal places then the Government will round the prices and the rounded prices will be used for evaluation purposes.

c. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended offer and the total of the CLIN and ELIN will be recomputed accordingly. If the Offeror provides a total amount for an ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price. In the event there is a discrepancy between the ELIN pricing and the Section B CLIN price, the Section J ELIN will be held to be the intended offer.

d. The Schedule of Recurring Work Price (CLIN 0001 through 4001) and the Schedule of Non-

Recurring Work (CLIN 0002 through 4002) will be used as the basis for deductions in accordance with the

"CONSEQUENCES OF CONTRACTOR'S FAILURE TO PERFORM REQUIRED SERVICES" clause, Section E.

e. Informational SubCLINs will be incorporated at the time of award with appropriate funding/lines of accounting by customer. These SubCLINS represent funding for each CLIN by customer. The contractor shall not submit totals for SubCLINs

B.14 NON-RECURRING WORK CONTRACT LINE ITEM QUANTITIES:

Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.

B.15 FULLY LOADED PRICING

Prices provided shall be fully loaded and no other allocations, fees, overheads, G&A, insurance, taxes, profits or any other markups shall be applied when an option is exercised or work is ordered for pre-priced work.

Costs for technical specifications 0100000 (Annex 1) and 0200000 (Annex 2) shall be considered overhead;

therefore, their costs shall be allocated and included throughout the prices quoted for all other technical specifications.

B.16 PERIOD OF PERFORMANCE – LESS THAN ONE YEAR:

Offers shall be submitted for the performance of work for a period of one year. The contractor is cautioned to recognize that the initial term of the contract may be for a period of less than one year. In the event that the period of performance is less than one year, the Government will reduce the individual line item quantities to reflect work remaining in the contract term and no other adjustments to the pro-rated contract price will be made.

B.17 GOVERNMENT PURCHASE CARD

Non-Recurring Work may be ordered at the prices offered in one of two ways:

1. by the issuing activity using a DD Form 1155 “Order for Supplies and Services,” or

2. by an authorized Government user via a Government Purchase Card (GPC through the DoD EMALL.

When receiving DoD EMALL orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.

B.18 CONTRACTOR SUPPORT OF ELECTRONIC FACILITIES SUPPORT CONTRACTING (e-FSC)

This procurement allows for and the Government fully intends to use DoD EMALL for issuing orders. Refer to

Section H, Special Contract Requirements.

B.19 UNIT PRICE ADJUSTMENTS IN OPTION PERIODS

This solicitation incorporates the Service Contract Labor Standards (formerly Service Contract Act of 1965) Wage

Determination. The Wages are incorporated for the Base Period of performance only. If the Option Year is exercised, the most current Service Contract Labor Standards Wage Determination for that option year will be incorporated into the contract and the CLIN/ELIN prices will be adjusted in accordance with FAR Clause 52.222-

43, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option

Contracts) (May 2014) for the Service Contract Labor Standards Wage Determinations. The contractor warrants, by submission of his proposal that the price does not include any contingency for future wage increases.

B.20 INCORPORATION OF TECHNICAL PROPOSAL (AKA NON-PRICE PROPOSAL):

The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the technical proposal.

In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.

B.21 REQUEST FOR PROPOSAL (RFP) FILES:

Solicitation and RFP files are posted to the Fedeal Biussines Opportunities website

(https://FBOhome.sam..Gov/) as mandated by our agency. By necessity, these files are protected to prevent unauthorized editing.

It is the sole responsibility of the offeror to obtain the RFP files, along with any amendments, from this website.

Unprotected editable file copies of the RFP documents including: Word, Excel and/or PDF files (Adobe Acrobat

Files) will not be provided. Please plan accordingly.

B.22 SOLICITATION

This solicitation incorporates by reference a Performance Work Statement (PWS) developed by using

NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2 and 15. The contractor will be required to meet the specification in those Annexes as if they were set forth in Section C.

B.23 SITE VISIT

A Preaward Site Visit will be held. Refer to Section L for information.

B.24 PHASE-IN AND PHASE-OUT:

https://fbohome.sam..gov/

Pricing shall include applicable Phase-In and Phase-Out costs. There is no separately priced CLIN for

Phase-In and Phase-Out and such costs can be distributed however the Offeror chooses. The Government recognizes that offerors may choose to front load these costs into the base year.

B.25 PROPOSAL DELIVERY:

a. NOTICE TO ALL OFFERORS

Due to increased security at all military installations, Offerors who do not currently have a valid Contractor’s ID and

Vehicle Decal issued by the Department of Defense (DoD), must allow sufficient time to obtain a one-day pass to permit entry to the base. In accordance with Washington Navy Yard security regulations, all prospective visitors and contractor personnel are hereby notified that in order to obtain a one-day visitor’s pass the person must present their driver’s license and vehicle registration and/or rental car contract. Personnel and vehicle one-day passes must be obtained at the Visitor’s Office located at 11th St. & O St. SE, Washington, DC 20374.

It is imperative that all potential offerors adhere to this notice in order to avoid delay in submitting your proposal.

Also, be advised by this notice that the level of security at Washington Navy Yard may change at any time. As the level of security heightens, the amount of time required to gain access to the Washington Navy Yard also increases.

b. SUBMITTING YOUR PROPOSAL

All proposal deliveries (hand-carried or mailed) must be received prior to the proposal due date and time provided in

Block 8 of the Standard Form 1449. Proposals shall be submitted to:

NAVFAC Washington

ATTN: Peter Kho

1314 Harwood St. SE, Bldg. 212

1st Floor Mailroom

Washington Navy Yard, DC 20374

Please allow sufficient time for your proposal to be received prior to the proposed closing time. Technical and Price proposals shall be submitted in sealed envelopes/boxes marked in the bottom right corner “Solicitation N40080-20-

R-0011, DO NOT OPEN IN MAILROOM”.

c. Proposals not received at the above address on or before the hour and date set forth for receipt of proposals shall be subject to the provisions of FAR 52.215-1(c), “Submission, modification, revision and withdrawal of proposals.”

d. Offerors shall submit complete and accurate information. The Government may elect not to request additional information to perform the evaluation.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Recurring Work Base Year

FFP

1 October 2020 to 30 September 2021

FOB: Destination

NET AMT

Base Year Non Recurring Work

FFP

1 October 2021 to 30 September 2022

OPTION OY 1 Recurring Work

FFP

OPTION OY 1 Non Recurring Work

FFP

OPTION OY 2 Recurring Work

FFP

1 October 2022 to 30 September 2023

OPTION OY 2 Non Recurring Work

FFP

1 October 2022 to 30 September 2023

OPTION OY 3 Recurring work

FFP

1 October 2023 to 30 September 2024

OPTION OY3 Non Recurring Work

FFP

1 October 2023 to 30 September 2024

OPTION OY 4 Recurring Work

FFP

1 October 2024 to 30 September 2025

OPTION OY 4 Non Recurring Work

FFP

1 October 2024 to 30 September 2025

Section C - Descriptions and Specifications

SOW C-0100000 GENERAL INFOR

0100000 – General Information

Spec Item Title

1 General Information

1.1 Outline of Services

1.2 Project Location

1.3 Acquisition of Additional Work

1.4 Background Information

1.5 Verification of Workload and Conditions

1.6 Climate Patterns

1.7 Related Information

1.8 Navy Approach to Service Contracting

1.8.1 Partnering Philosophy

1.8.2 Contractor's Knowledge

1.8.3 Industry Best Practices

1.9 Standard Template

1.10 Navy PBSA Approach

1.11 Technical Proposal Certification

Spec Item Title Description

1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work

Statement (PWS) at throughout Naval District Washington. A combination Recurring Work and Non-Recurring work is anticipated.

The PWS is organized into annexes. Annex 1 is "General Information".

Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.

The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information

Annex 2 Management and Administration

Annex 3 Command and Staff N/A

Annex 4 Public Safety N/A

Annex 5 Air Operations N/A

Annex 6 Port Operations N/A

Annex 7 Ordnance N/A

Annex 8 Range Operations N/A

Annex 9 Health Care Support N/A

Annex 10 Supply N/A

Annex 11 Personnel Support N/A

Annex 12 Morale, Welfare and Recreation Support N/A

Annex 13 Galley N/A

Annex 14 Housing N/A

Annex 15 Facilities Support

Sub-annex 1503050 Grounds Maintenance

Sub-annex 1503060 Snow Removal

Annex 16 Utilities N/A

Annex 17 Base Support Vehicles and Equipment N/A

Annex 18 Environmental N/A

1.2 Project Location The work shall be performed at the following locations throughout Naval

District Washington and could vary from location to location.

(a) Public Works Department Washington (PWD Washington)

(1) Washington Navy Yard, Washington, DC

(2) Naval Support Facility Arlington, VA (Arlington Service Center)

(3) Naval Support Facility Naval Research Laboratory, Washington, DC (NRL)

(4) Naval Support Facility Carderock, West Bethesda, MD

(5) Naval Support Facility Naval Observatory, Washington, DC

(6) Quarters A

(7) Marine Barracks Washington

(b) Public Works Department South Potomac

(1) Naval Support Facility, Dahlgren, VA (Naval Surface Warfare

Center) (Reserved)

(2) Naval Support Facility, Indian Head, MD (Naval Surface Warfare

Center)

(c) Public Works Department Patuxent River (Reserved)

(d) Public Works Department Annapolis (Reserved)

(e) Resident Officer In Charge of Construction, Quantico, VA (ROICC

Quantico)

(1) Marine Corps Systems Command (MCSC)

(2) Civilian Manpower Management

(3) MCNOS

(4) NMCL (Medical/Dental)

(5) Veterinary Clinic

(6) MCIA

(f) Public Works Department Bethesda

(1) Walter Reed National Military Medical Center (WRNMMC)

(2) Armed Forces Radiobiological Research Institute (AFRI)

(3) Naval Support Activity Bethesda

(4) Dalecarlia

(5) NiCOE

(g) Joint Base Anacostia Bolling (Naval Station Anacostia and Bolling

Air Force Base)

Those locations that state “Reserved” have no requirements but may be modified after award for services to be performed.

Refer to the map drawings referenced in J-0200000-07 for a general layout of each location.

Non-recurring services may be ordered for any Federal Government facilities within 100 miles of the Washington Navy Yard.

1.3 Acquisition of

Additional Work

The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in

Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background Information The Naval District Washington (NDW) Navy Region consists of all Naval installations in the National Capital Region under a single regional command structure. NAVFAC Washington, through its Navy Public

Works Departments, provides facility operations support services to NDW sites. The intent of this contract is to obtain grounds services within the

NDW Region for supported commands. The contractor shall provide on-site, RECURRING WORK, and NON-RECURRING WORK services as needed, at Federal Installations located within a 100-mile radius of the

National Capital Region (centered in Washington, DC). Security, safety, and quality of performance within diverse cultural communities in the geographic area are important factors for potential offerors to consider.

The high level nature of operations and clients should also be taken into consideration for proposal submissions.

1.5 Verification of

Workload and

Conditions

Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided.

As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.6 Climate Patterns Refer to National Weather Service, National Oceanic and Atmospheric

Administration (NOAA) website for specific climate information at:

www.noaa.gov

1.7 Related Information There are four types of Related Information that can be found in the

Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked

“Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in

"Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting

The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services

(OBOS). The Head of the Contracting Activity (HCA) of the Naval

Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.

The Navy also supports the following principles:

1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.

Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The

Navy's use of performance-based objectives evidences this principle.

Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to http://www.noaa.gov/ exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. To that end, the

Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.

Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes

3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the management and administrative requirements. Specification

Item 3 will always contain the Recurring Work requirements.

Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item

3 standards apply to all recurring work specification items. Specification

Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 must be priced and their price must be allocated across the Exhibit Line

Items.

1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

C-0200000 MANAGEMENT & ADMIIN

0200000 – Management and Administration

Spec Item Title

2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment

2.3.3 Partnering

2.3.3.1 Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Government Information Technology (IT) System

2.3.8 Directives, Instructions, and References

2.3.9 Invoicing Procedures

2.3.10 Forms

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Facilities (GFF)

2.4.2 Government-Furnished Utilities

2.4.3 Government-Furnished Materials (GFM)

2.4.4 Government-Furnished Equipment (GFE)

2.4.5 Government-Furnished Services (GFS)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

2.6.3 Work Schedule

2.6.4 Deliverables

2.6.5 Service Interruptions

2.6.6 Not used

2.6.7 Quality Management System (QMS)

2.6.7.1 Quality Management (QM) Plan

2.6.7.2 Quality Inspection and Surveillance

2.6.7.3 Quality Inspection and Surveillance Report

2.6.8 Property Management Plan

2.6.9 System and Equipment Replacement

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.1.4 Environmental/Energy Manager

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDS Program

2.8.4.2 DBIDS Credentials

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.7.1 U.S. Naval Observatory (USNO)

2.8.7.2 Naval Research Laboratory (NRL)

2.8.7.3 Vehicle Searches

2.8.7.4 Photographs

2.8.8 Access to Sensitive Unclassified Information

2.8.9 Access to Navy Marine Corps Intranet (NMCI)

2.8.10 Employee Status

2.9 Contractor Safety Program

2.9.1 Accident Prevention Plan (APP)

2.9.2 Activity Hazard Analysis (AHA)

2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.3.1 Alcohol and Drug Abuse Prevention Plan

2.9.3.2 Chemical Hazard Communication Program

2.9.3.3 Confined Space Program

2.9.3.4 Critical Lift Plan

2.9.3.5 Fall Prevention and Protection Plan

2.9.4 Crane Operations

2.9.4.1 Crane Inspections

2.9.4.2 Rigging Gear

2.9.4.3 Crane Operators

2.9.5 Accident and Damage Reporting

2.9.5.1 Accident Reporting and Notification Criteria

2.9.6 Fire Protection

2.9.7 Monthly On-Site Labor Report

2.9.8 OSHA Citations and Violations

2.9.9 Safety Inspections and Monitoring

2.9.10 Safety Certification

2.9.11 Safety Apparel on Jobsites

2.9.12 Emergency Medical Treatment

2.9.13 Excavations

2.10 Environmental Management and Sustainability

2.10.1 Energy Management Program

2.10.1.1 Water Conservation Plan

2.10.1.2 Energy Efficient Products

2.10.2 Environmental Protection

2.10.2.1 Sampling, Testing and Laboratory Services

2.10.2.2 ODS Requirements for Refrigerant Recycling

2.10.2.3 Solid Waste Management and Recycling

2.10.2.4 Non-Regulated Waste Disposal

2.10.2.5 Regulated Waste Disposal

2.10.2.6 Universal Waste

2.10.2.7 Spill Prevention, Containment, and Clean-up

2.10.2.8 Hazardous Material Management

2.10.2.9 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.2.10 Noise Control

2.10.2.11 Salvage

2.10.2.12 Asbestos Containing Material (ACM)

2.10.2.13 Clean Air Act (CAA)

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Biobased Products

2.11 Disaster Preparedness

2.12 Technical Library

2.13 Warranty Management

2.14 Recurring Work Procedures

2.14.1 Notification to the Government for Work Above the Recurring Work Limitations

2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)

2.14.3 Common Output Level Standards (COLS) Options

2.14.3.1 Optional COLS CLINs for Region Funded Facility Services

2.15 Non-Recurring Work

2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.15.1.1 Acceptance and Performance

2.15.1.2 Invoicing and Receiving Payment

2.15.2 Unit Priced Labor (UPL)Work (Negotiated)

2.15.2.1 Non-recurring Preparation of Proposals

2.15.2.1.1 Labor Requirements

2.15.2.1.2 Material and Equipment Requirements

2.15.2.2 Issuance of Final Task Order

2.15.3 Non-Recurring Work ELINS

0200000 - Management and Administration

2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General

Information

2.2.1 Government

Regular Working

Hours

The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this

PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the

Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin

Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence

Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and

Christmas Day.

2.2.1.2 Restriction to

Contractor

Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written

Request to Work Outside Government’s Regular Working Hours per Section

F. Excludes work to be performed during specified hours.

2.2.2 Wage

Determinations

Wage Determinations are included in J-0200000-02.

2.2.3 Requirements

Hierarchy

Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier

(i.e., spec item 3.1) based on the composite work requirements.

2.3 General

Administrative

Requirements

2.3.1 Required

Conferences and

Meetings

The Contractor may be required to attend administrative and coordination meetings, pre-performance conferences, performance assessment board meetings, partnering sessions, etc., as scheduled by the KO. For Contractor sponsored meetings, the Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments.

Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence. Historically, after contract award, there have been approximately four meetings per year on site at the Washington Navy Yard.

2.3.2 Training for

Maintenance and

Operation of New and Replacement

Systems and

Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Partnering To increase the likelihood of successful performance of this contract, the

Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.

The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

Partnering should accomplish three goals:

- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.

2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and

Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by

Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2 Contract Partnering

Administration

Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The

Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.

Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract Partnering

Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager

* Quality Manager

* Site Safety and Health Officer

2.3.4 Permits and

Licenses

The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable

Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause

52.228-5, INSURANCE – WORK ON A GOVERNMENT

INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.5.2 Minimum

Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law

2.3.6 Protection of

Government

Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.7 Government

Information

Technology (IT)

System

Additional information about NMCI may be obtained at http://www.eds.com/nmci

2.3.8 Directives, Instructions, and

References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of

Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.9 Invoicing

Procedures

Refer to Section G for invoicing instructions.

2.3.10 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05.

2.4 Government-

Furnished

Property, Materials and Services

In accordance with Section H, paragraph H.10 Govt-Furnished Property and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities utilities, materials, equipment and services for use in connection with this contract as stated below.

A list of Government Furnished Property, Materials, and Services is provided in J-0200000-06.

2.4.1 Government-

Furnished Facilities

The Government shall make available to the Contractor the facilities as identified in J-0200000-06.

http://www.eds.com/nmci

(GFF)

2.4.2 Government-

Furnished Utilities

The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the

Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

2.4.3 Government-

Furnished

Materials (GFM)

The Government will not provide any materials to the Contractor.

2.4.4 Government-

Furnished

Equipment (GFE)

The Government will not provide any equipment to the Contractor.

2.4.5 Government-

Furnished Services

(GFS)

The Government will not provide any services to the Contractor.

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.

Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data

Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours. The Contractor's management shall have a local or toll free telephone number and a fax machine. The Project Manager shall have a local emergency number and a pager. The Contractor shall maintain at least one e-mail address at their place of business and have the ability to read

". pdf" type files as well as WORD and EXCEL files.

2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

2.6.3 Work Schedule In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The

Contractor shall notify the KO of any difficulty in scheduling work due to

Government controls.

2.6.4 Deliverables Records and reports are specified in Sections C, F, H, I, J, and within the

Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The

Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government.

Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format.

Deliverables shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and

ELIN/Sub-ELIN or clause. All formulas shall be traceable.

Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The

Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website. Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.

2.6.5 Service

Interruptions

If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers within 14 calendar days in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.

2.6.6 Not used

2.6.7 Quality

Management

System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The

Contractor's QMS program shall address:

Accurate documentation of work processes, procedures, and output measures.

A systematic procedure for assessing compliance with performance objectives and standards.

Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

Assessment-d…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .