This amendment modifies a solicitation for the renovation of Building 8 at Marine Barracks Washington. The work includes clarification of scheduling restrictions for parade preparations between April and August as well as projected rehearsal periods from March to June. Contractors must ensure the arcade and speakers in Building 8 remain clear and operational during restricted times for rehearsals and parades. The proposal due date remains unchanged, and the amendment incorporates a revised price schedule and responses to requests for information. The solicitation is issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy for renovation of the specified building located at the Marine Barracks in Washington, DC.
AMENDMENT_0004_BLDG_8.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BLDG_8_AMENDMENT_0005.pdf | ||
| Price_Schedule_Bldg_8_July_31.docx | DOCX document | |
| BLDG_8_AMENDMENT_0003.pdf | ||
| AMENDMENT_0002_BLDG_8.pdf | ||
| Site_visit_sheet.pdf | ||
| ATTACHMENT_C_Bldg_8.docx | DOCX document | |
| Price_Schedule_Bldg_8.pdf | ||
| ATTACHMENT_D_BLDG_8.docx | DOCX document | |
| Amendment_0001_Bldg_8.pdf | ||
| BLDG_8_SOLICITATION.pdf | ||
| RFI_FORM.docx | DOCX document | |
| N4008018R2234_Pre-Solicitation.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5282234
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40080-18-R-2234-RENOVATION BUILDING 8, MARINE BARRACKS WASHINGTON 8TH & I STREETS, SE, WASHINGTON, DC
As an amendment to the solicitation the follow ing is hereby incorporated:
Proposal due date and time remains unchanged.
Incorporated revised Price Schedule.
Incorporated RFI response.
SF 1442 Block 12B is corrected from 90 days to 15 days; Block 13D is hereby corrected from 120 calendar days to 90 days.
CONTINUED ON PAGE 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R2234
X 9B. DATED (SEE ITEM 11)
14-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Jul-2019
CODE
NAVAL FACILITIES ENG COMMAND WASHINGTON
1314 HARWOOD ST.
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008018R2234
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
1. Under Division 01, Section 01 14 00, Subsection 1.2 Special Scheduling requirements, request clarification on the following items and restrictions described under 1.2.e.1 and 1.2.e.2. 1.2.e.1 Describes the restrictions (times and dates) for parade preparations during the summer months (defined as occurring between the period of April 15‐August 30); it also references rehearsal periods occurring starting in March and assuming a completion dated of 14 April. What are the restrictions, if any, during the rehearsal period, regarding specific dates, specific days and/or specific times of day? Would like to understand any potential scheduling implications. 1.2.e.2 Describes physical restrictions as they refer to preparation and performance of the parades, Clarification for the aforementioned as they pertain to rehearsal periods. Are the same physical areas restricted as defined under 1.2.e.2? Would it be possible to provide a list of projected “blackout/work restricted days?
GOVERNMENT RESPONSE: *REHEARSAL PERIOD:
1 MARCH ‐ 7 JUNE. DURING THIS PERIOD, REHEARSALS WILL OCCUR FROM
0700‐0930 ON MONDAY, TUESDAY, THURSDAY, AND FRIDAY. DURING THESE HOURS, THE
ARCADE MUST BE CLEAR. ALTHOUGH THE ENTIRE POST PARKING AREA DOES NOT HAVE
TO BE CLEAR, THE MARCHERS WILL NEED TO HAVE A PATH FROM WHERE THEY EXIT THE
PARADE DECK AND RE‐ENTER THE ARCADE. DURING REHEARSALS, SAFE ACCESS TO THE ROOF OF THE RAMPART
AND SOUND ROOM
ARE REQUIRED. SPEAKERS LOCATED ON THE SECOND FLOOR OF BUILDING 8 MUST REMAIN
OPERATIONAL. ANY OUTAGE OR INTERRUPTION MUST BE COORDINATED (7) WORKING
DAYS PRIOR. IF AN EXTENDED OUTAGE IS EXPECTED, A GENERATOR MUST BE AVAILABLE
TO CONTINUE TO PROVIDE POWER.
* PARADE SEASON (FRIDAYS): 15 APRIL ‐ 30 AUGUST. NO EQUIPMENT, DUMPSTERS,
OR ANY OTHER CONTRACTOR ITEMS ON POST PARKING; ARCADE MUST BE COMPLETELY CLEAR; AND ALL WORK COMPLETE AND CLEARED OUT BY 1400 IS THE DEFINED RESTRICTION FOR WORK ON FRIDAYS
DURING THE PARADE SEASON.
NO, IT IS NOT POSSIBLE TO PROVIDE A LIST OF PROJECTED "BLACKOUT/WORK RESTRICTED DAYS?”.
CONTRACTOR SHOULD PLAN PER SPECIFICATION 01 14 00 1.2.E(2). IF ADDITIONAL UNFORESEEN DAYS ARE NEEDED BY MBW, IT WILL CONSTITUTE A CHANGE ORDER AND MBW WILL PROVIDE 21 DAY NOTICE FOR
ADDITIONAL WORK‐RESTRICTED DAYS OUTSIDE
OF PARADE SEASON EVENTS OR THE 3 UNSCHEDULED DAYS DEFINED IN THE SPECIFICATIONS.
END OF AMENDMENT 0004