Amendment_0001_Bldg_8.pdf

PDF 211 KB Posted

Attached to
BUILDING 8 RENOVATION, MARINE BARRACKS WASHINGTON Federal contract opportunity
Solicitation number
N4008018R2234
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is an amendment to a solicitation for building renovation services. The Naval Facilities Engineering Command seeks to renovate Building 8 at the Marine Barracks in Washington, D.C. The scope of work includes repairing and renovating the existing building, as well as new construction of a basement slab. Offerors must provide fixed prices for the base bid renovation and new construction portions. The solicitation also includes an option for furniture, fixtures, and equipment procurement and installation post-award. Offerors are required to demonstrate relevant construction experience through past project examples and evaluations. The evaluation criteria cover experience with historic building renovations, sustainable construction features, and performance on similar size and scope projects. The period of performance for base bid work is 570 calendar days from notice to proceed. The amendment incorporates revised evaluation factors and a project wage determination.

Amendment_0001_Bldg_8.pdf

View the file

Other files for this federal contract opportunity

Other files attached to BUILDING 8 RENOVATION, MARINE BARRACKS WASHINGTON, newest first.
File Type Posted
BLDG_8_AMENDMENT_0005.pdf PDF
Price_Schedule_Bldg_8_July_31.docx DOCX document
AMENDMENT_0004_BLDG_8.pdf PDF
BLDG_8_AMENDMENT_0003.pdf PDF
AMENDMENT_0002_BLDG_8.pdf PDF
Site_visit_sheet.pdf PDF
ATTACHMENT_C_Bldg_8.docx DOCX document
Price_Schedule_Bldg_8.pdf PDF
ATTACHMENT_D_BLDG_8.docx DOCX document
BLDG_8_SOLICITATION.pdf PDF
RFI_FORM.docx DOCX document
N4008018R2234_Pre-Solicitation.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5282234

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N40080-18-R-2234-BUILDING 8 RENOVATION, MARINE BARRACKS WASHINGTON, WASHINGTON, DC

As an amendment to the solicitation, the follow ing are incorporated:

Incorporated are the Revised Factors 1 & 4.

Incorporated Price Schedule.

Incorporated Specification Section Divisions 11-23 & 25-33.

Incorporated current General Wage Determination Second and final Site Visit 10 July 2019 @ 10:00.

Incorporated Site Visit Sign in Sheet 26 June.

Incorporated Attachments C, D, F, E,& G.

CONTINUED ON PAGE 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R2234

X 9B. DATED (SEE ITEM 11)

14-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jul-2019

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST.

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008018R2234

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

WAGE RATE/PRICE SCHEDULE

"General Decision Number: DC20190002 06/28/2019

Superseded General Decision Number: DC20180002

State: District of Columbia

Construction Type: Building

County: District of Columbia Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 01/11/2019 2 02/08/2019 3 03/22/2019 4 04/05/2019 5 05/03/2019 6 05/10/2019 7 05/24/2019 8 06/14/2019 9 06/28/2019

* ASBE0024-007 04/01/2019

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 36.53 16.42+a

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

ASBE0024-008 10/01/2017

Rates Fringes

ASBESTOS WORKER: HAZARDOUS

MATERIAL HANDLER.................$ 22.81 7.34+a

Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

ASBE0024-014 10/01/2017

Rates Fringes

FIRESTOPPER......................$ 28.01 7.78+a

Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BRDC0001-002 04/28/2019

Rates Fringes

BRICKLAYER.......................$ 32.00 11.57

CARP0197-011 05/01/2019

Rates Fringes

CARPENTER, Includes Drywall Hanging, Form Work, and Soft Floor Laying-Carpet..............$ 29.00 12.71

CARP0219-001 05/01/2019

Rates Fringes

MILLWRIGHT.......................$ 35.99 11.23

CARP0441-001 05/01/2018

Rates Fringes

PILEDRIVERMAN....................$ 30.94 11.45

ELEC0026-016 11/05/2018

Rates Fringes

ELECTRICIAN, Includes Installation of HVAC/Temperature Controls........$ 45.75 18.27

ELEC0026-017 09/03/2018

Rates Fringes

ELECTRICAL INSTALLER (Sound & Communication Systems).........$ 28.05 10.91

SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).

WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.

ELEV0010-001 01/01/2019

Rates Fringes

ELEVATOR MECHANIC................$ 45.53 33.705+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas

Day and the Friday after Thanksgiving.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

IRON0005-011 06/01/2017

Rates Fringes

IRONWORKER.......................$ 31.15 20.63

LABO0011-009 06/01/2018

Rates Fringes

LABORER: Skilled................$ 24.22 8.32

FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer (excluding roofing), open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper,demolition.

MARB0002-004 04/28/2019

Rates Fringes

MARBLE/STONE MASON...............$ 38.81 18.29

INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement (restoration work)

MARB0003-006 04/28/2019

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 29.12 12.27

MARB0003-007 04/28/2019

Rates Fringes

TERRAZZO FINISHER................$ 24.10 11.24

MARB0003-008 04/28/2019

Rates Fringes

TILE SETTER......................$ 29.12 12.27

MARB0003-009 04/28/2019

Rates Fringes

TILE FINISHER....................$ 24.10 11.24

PAIN0051-014 06/01/2018

Rates Fringes

GLAZIER

Glazing Contracts $2 million and under...........$ 26.07 12.15 Glazing Contracts over $2 million.....................$ 30.31 12.15

PAIN0051-015 06/01/2018

Rates Fringes

PAINTER

Brush, Roller, Spray and Drywall Finisher............$ 25.06 9.76

PLAS0891-005 07/01/2018

Rates Fringes

PLASTERER........................$ 29.53 6.80

PLAS0891-006 02/01/2019

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.45 11.28

PLAS0891-007 08/01/2016

Rates Fringes

FIREPROOFER

Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89

Spraying of all Fireproofing materials. Hand application of Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.

PLUM0005-010 08/01/2018

Rates Fringes

PLUMBER..........................$ 42.92 18.15+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.

PLUM0602-008 08/01/2018

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation................$ 41.64 21.57+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

ROOF0030-016 07/01/2018

Rates Fringes

ROOFER...........................$ 29.75 12.74

SFDC0669-002 04/01/2018

Rates Fringes SPRINKLER FITTER (Fire Sprinklers)......................$ 35.60 20.24

SHEE0100-015 07/01/2018

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 40.27 20.34+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

SUDC2009-003 05/19/2009

Rates Fringes

LABORER: Common or General......$ 13.04 2.80

LABORER: Mason Tender - Cement/Concrete..................$ 15.40 2.85

LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

PRICE SCHEDULE

N40080-18-R-2234

Building 8 Renovation Marine Barracks, Washington, D.C.

ITEM DESCRIPTION PRICE

0001 BASE BID: Basis of Bid for Item 0001 shall be the entire work comprised as REPAIR complete in accordance with the specifications and drawings with the exception of NEW construction defined in Item 0002 below.

Price for Item 0001 $___________

0002 BASE BID: Basis of Bid for Item 0002 shall be the NEW construction to complete the new basement slab between Columns 27-32 in accordance with the specifications and drawings.

Price for Item 0002 $___ ______

TOTAL PRICE FOR ITEMS 0001 & 0002 $______________

OPTION

0003 OPTION: FF&E HANDLING &

ADMINISTRATIVE RATE (HAR)

(1) Basis of the Bid for 0003 shall be establishment of a HAR for any possible future work associated with FF&E / Collateral Equipment. (See FF&E notes below).

$928,848 (BUDGET ONLY)

(2) HANDLING & ADMINISTRATIVE RATE (HAR)

(NTE 5%) X $928,848

(3) TOTAL FF&E AMOUNT: (1) + (2) = (3)

Price for Item 0003 $___ ______

GENERAL NOTES:

1. Offeror shall provide a price for all items on the Price Schedule. The Government will evaluate offers based on the total evaluated price of Items 0001 and 0002.

2. A firm fixed price is required for each item and no provision will be made for economic price adjustments.

3. In accordance with FAR 52.215-1, The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

4. The Offeror’s price is valid for 90 days from the receipt of proposals.

5. The total Contract duration for Base Bid is 570 calendar days from Notice to Proceed

(NTP).

6. Evaluation of the Options will not obligate the Government to execute any or all of the Options

7. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options

8. OPTION ITEM 0003: Will be awarded no later than 90 days.

FF&E NOTES:

1. 0003 Option Item: The total estimated budget amount for FF&E has been identified, to provide offerors with the projected magnitude of effort for FF&E. The FF&E Budget Amount is only an estimated amount. The contractor shall determine the final budget amount for the FF&E, during the post-award phase of the FF&E.

2. Offerors shall propose a Handling and Administration Rate (HAR) for the FF&E not to exceed (NTE) 5%. The HAR fee should account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract/task order award and will not be adjusted regardless of fluctuations from the estimated budget amount for FF&E. The proposed HAR is a fixed rate. The dollar amount of the HAR will change based on the actual, final amount for the FF&E determined during the post-award design phase of the FF&E.

3. If awarded, line item (1) under 0003 option item will be funded separately after completion of the FF&E design review by the Government, acceptance of FF&E package by the Government, and receipt of appropriate funding by the Government.

The design effort and the development of the FF&E packages are performed by the Contractor under the Base Bid. See Administrative Specifications 01 30 00, including (but not limited to) FF&E Basis of Design for requirements and details.

4. The Government is not obligated to award the FF&E Option. Should the

Government choose to award the FF&E, the Option will be awarded as a negotiated Modification to the contract/task order. The contractor’s proposed HAR will be applied to all vendor/supplier costs for the FF&E.

5. It is the contractor responsibility to purchase, deliver, and install the FF&E without impacting the overall completion date of the project. The contractor’s schedule should assume the award of the FF&E as a modification. No schedule extensions will be granted.

Name and Address of Firm Submitting Offer:

Name and Title of Person Authorized to Sign Offer (Type or Print):

Print Name and Title

Signature Date

ACKNOWLEDGEMENT OF AMENDMENT(S)__________________________

2ND AND FINAL SITE VISIT

10 July 2019 @ 10:00 meeting in front of Main Gate at the Marine Barracks Washington 8th & I Streets, SE, Washington, DC

The following information is required from each attendee to have access to the Marine Barracks by 1400 on 8 July 2019. If you have DBIDS, you only need to submit your name, if you do NOT have DBIDS you are required to submit the below information for MBW to conduct backgroud screenings.

Last Name, First Name MI

DOB

SSN

The information above shall be provided via email (encrypted) or by phone. If by phone please contact Chris Baker and Dennis Martin at:

Chris Baker Email: christopher.i.baker@usmc.mil Office: 202-433-2920

Dennis Martin Email: dennis.b.martin@usmc.mil OfficerL 202-433-0777

Installation parking will not be provided. There is public/street parking in the area of the Marine Barracks Washington

REVISED FACTORS 1 & 4

Factor 1 – Experience:

(a) Solicitation Submittal Requirements:

The Offeror shall submit the following information:

1. Submit a minimum of three (3) and a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as a project similar to the size, scope, and complexity characteristics set forth below. The overall relevancy will be determined by considering all three characteristics.

Size: Minimum 24,000 Square Feet and a minimum $10,000,000 construction cost

Scope: New construction and/or renovation of an administrative facility (e.g. private offices, open office workstations, meeting/conference rooms) and other supporting building functions such as operation and maintenance spaces) and/or public works facility which include utility shops (e.g. woodworking shops and paint shops).

Complexity: At least one of the projects submitted to demonstrate the Scope above must include the renovation of buildings that are registered as historic by State Historical Preservation Offices or Federal Organizations or other equivalent historic certifying agencies and include one or more of the following:

- Installation of blast resistant windows and door assemblies in an existing masonry façade.

- Construction of an additional floor within an existing building open space.

Proposal may be strengthened if the submitted projects possess:

1. Experience strengthening existing structures using a fiber reinforced epoxy composite system.

2. Experience with a relevant project which required minimum 20,000 Square Feet of building renovation.

3. Experience working in a constrained space and laydown area.

4. Relevant projects that demonstrate experience with sustainable features (e.g. energy efficient, environmentally friendly materials, and water conservation) may be considered more favorably than those that do not demonstrate experience with sustainable features.

All projects submitted for the Offeror, under this factor, shall be completed within the past five

(5) years of the date of issuance of this RFP. Projects that have not attained beneficial occupancy will not be considered.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided 8.5” x 11” page (or two (2) single-sided 8.5” x 11” pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features.

Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

All example projects provided must have been performed by the Offeror as the prime contractor or as a member of a Joint Venture, as opposed to performance as a subcontractor under another firm’s contract. Corporate experience presented for any other entity (e.g. team subcontractor or a prime that did not provide field staffing and direct field work oversight, but only provided general management) will not be evaluated.

If the Offeror is a Joint Venture (JV), at least one of the relevant projects should be submitted for the JV entity. If the JV does not have shared relevant experience, at least one project shall be submitted for each JV partner; however, JV entities with no shared relevant experience may be considered less favorably. If a project was performed by a JV, and not all partners from that JV are on the JV proposed for this contract, the offeror shall clearly demonstrate what portion of the work was performed by the JV partner offering on this contract and shall not include work performed by the JV as a whole. The JV member proposed for this contract shall specifically address field work performed by that JV member including field staffing and direct field work oversight. The JV member proposed for this contract shall also address home office management performed by that JV member including the number/percent of employees provided for the overall contract by the JV member as well as the overall percentage of work performed by the JV member. This same information shall also be provided for the task orders listed under IDIQ contracts on Attachment C. If the Offeror does not specifically address what portion of the work under the submitted project was performed by the JV member offering on this contract, the project will not be evaluated. Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract in order for the past performance information of the affiliate/subsidiary/parent/LLC/LTD member companies to be considered. The proposal shall state specific commitments of technical resources (e.g. personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in performance of the contract. Any projects submitted in excess of the five (5) will not be considered.

The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offer must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract. More weight may be given to the Offeror’s projects than to those submitted for subcontractors.

(ii) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. A minimum of three (3) construction projects must be submitted, but the Government will only review a maximum of five (5) construction projects. Any projects submitted in excess of the five

(5) will not be considered.

Factor 4 – Past Performance:

(a) Solicitation Submittal Requirements:

IF A COMPLETED CONTRACTOR PERFORMANCE ASSESSMENT REPORTING

SYSTEM (CPARS) EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH

THE PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, then submit Past Performance Questionnaire (Attachment D) for each project the offeror includes in it proposal for Factor 1 for Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).

The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Cynthia Crowder, Contracting Officer , cyndi.crowder@navy.mil.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors may also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided 8.5” x 11” pages (or four (4) single-sided 8.5” x 11” pages) in total.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

(ii) Basis of Evaluation:

This evaluation will consider on how well the Offeror performed on the relevant projects submitted under Factor 1 – Experience and may also consider past performance on other projects currently documented in known sources.

The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.

The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.

Recency is projects completed within the past ten (10) years of the date of issuance of this RFP. Relevancy is as follows:

Size: $5,000,000 construction cost

Offerors lacking relevant past performance history will receive a NEUTRAL Confidence rating.

In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown past performance.

(End of Summary of Changes)