01_30_00_05_20_revised.pdf
PDF 18 KB Posted
- Attached to
- P130: Mechanical and Electrical Improvements Federal contract opportunity
- Solicitation number
- N40080-14-R-0151
About this file
Project Manager
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amendment_0009.pdf | ||
| 01_35_26_05_20_Revised.pdf | ||
| amendment_0008.pdf | ||
| 01_14_00_05_20_revised.pdf | ||
| 01_45_00_05_20_revised.pdf | ||
| N40080-14-R-0151_P-130_AMENDMENT_07.pdf | ||
| N40080-14-R-0151_Amendment_06.doc | DOC document | |
| N40080-14-R-0151_AMMEND_05.pdf | ||
| P-130_sign_in_sheet.pdf | ||
| Phase_2_RFP.pdf | ||
| P-130_Ammendment_4.pdf | ||
| Phase_2_Technical.pdf | ||
| P130_Amendment_0003.pdf | ||
| P130_Amendment_0002_1-30-14.pdf | ||
| P130_Amendment_0001.pdf | ||
| N40080-14-R-0151_P130_Solicitation.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P130 Mechanical and Electrical Improvements 1171717 WRNMMC Bethesda, Maryland
SECTION 01 30 00.05 20
ADMINISTRATIVE REQUIREMENTS FOR DESIGN-BUILD
03/13
PART 1 GENERAL
1.1 SUBMITTALS
The use of a "G" following a submittal indicates that a Government approval action is required. Submit the following in accordance with Section 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES and Section 01 33 00.05 20
CONSTRUCTION SUBMITTAL PROCEDURES.
SD-01 Preconstruction Submittals
Insurance; G
1.2 MINIMUM INSURANCE REQUIREMENTS
Procure and maintain during the entire period of performance under this contract the following minimum insurance coverage:
a. Comprehensive general liability: $500,000 per occurrence
b. Automobile liability: $200,000 per person, $500,000 per occurrence for bodily injury, $20,000 per occurrence for property damage
c. Workmen's compensation as required by Federal and State workers' compensation and occupational disease laws.
d. Employer's liability coverage of $100,000, except in States where workers compensation may not be written by private carriers,
e. Others as required by the State.
1.3 CONTRACTOR PERSONNEL REQUIREMENTS
1.3.1 Subcontractor Special Requirements
1.3.1.1 Asbestos Containing Material
All contract requirements of PART 4, F20 SELECTIVE BUILDING DEMOLITION, assigned to the Private Qualified Person (PQP) shall be accomplished directly by a first tier subcontractor.
1.3.1.2 Qualified Testing Organization
All contract requirements of work required to be performed by a Qualified Testing Organization in PART 4, D50 ELECTRICAL and G40 SITE ELECTRICAL UTILITIES, shall be accomplished directly by a first tier subcontractor.
No work to be performed by a Qualified Testing Organization, required by PART 4, D50 and G40 shall be accomplished by a second tier subcontractor.
1.4 SUPERVISION
Provide at least one qualified on-site Project Manager and one on-site
SECTION 01 30 00.05 20 Page 1
Project Superintendent assigned only to this project and capable of reading, writing and conversing fluently in English. The Project Manager shall be a Full-time position and cannot hold the position of Project Superintendent, Site Safety and Health Officer (SSHO) or QC Manager. The Project Manager must have a minimum of 10 years' experience as a Project Manager or Superintendent on projects similar in size and complexity to the one under this Contract. In addition to the above experience requirements, the Project Manager and on-site Project Superintendent shall complete the course titled "Construction Quality Management for Contractors" prior to the start to construction.
Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, the Quality Control (QC) representative shall also have fluent English communication skills.
1.5 AVAILABILITY OF CADD DRAWING FILES
After award and upon request, the electronic "Computer-Aided Drafting and Design (CADD)" drawing files will be made available to the Contractor for use in preparation of construction drawings and data related to the referenced contract subject to the following terms and conditions:
a. Data contained on these electronic files shall not be used for any purpose other than as a convenience in the preparation of construction drawings and data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor shall, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
b. These electronic CADD drawing files are not construction documents.
Differences may exist between the CADD files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic CADD files, nor does it make representation to the compatibility of these files with the Contractors hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished CADD files, the signed and sealed construction documents shall govern. The Contractor is responsible for determining if any conflict exists. Use of these CADD files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project.
c. If the Contractor uses, duplicates and/or modifies these electronic CADD files for use in producing construction drawings and data related to this contract, all previous indicia of ownership (seals, logos, signatures, initials and dates) shall be removed.
d. Drawings provided are for information only. Contractor is responsible for confirmation of as-builts (record drawings) and subsequent
SECTION 01 30 00.05 20 Page 2 modifications as accurate. Government is not responsible for additional cost resulting from conflicts between documents and existing conditions.
1.6 CLEANUP
Leave premises "broom clean." Clean interior and exterior glass surfaces exposed to view; remove temporary labels, stains and foreign substances;
polish transparent and glossy surfaces; vacuum carpeted and soft surfaces.
Clean equipment and fixtures to a sanitary condition. Clean debris from roofs, gutters, downspouts and drainage systems. Sweep paved areas and rake clean landscaped areas. Remove waste and surplus materials, rubbish and construction facilities from the site.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 30 00.05 20 Page 3
| 01 30 00.05 20 - ADMINISTRATIVE REQUIREMENTS FOR DESIGN-BUILD |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 MINIMUM INSURANCE REQUIREMENTS |
| 1.3 CONTRACTOR PERSONNEL REQUIREMENTS |
| 1.3.1 Subcontractor Special Requirements |
| 1.3.1.1 Asbestos Containing Material |
| 1.3.1.2 Qualified Testing Organization |
| 1.4 SUPERVISION |
| 1.5 AVAILABILITY OF CADD DRAWING FILES |
| 1.6 CLEANUP |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |