N4002718R0010PR
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
NECC SMALL BOATS (089-18) AMENDMENT 3
SEE PAGE TWO FOR SF30 BLOCK 14 CONTINUATION
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4002718R0010
X 9B. DATED (SEE ITEM 11)
18-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Aug-2018
CODE
COMMANDER SOUTHEAST REGIONAL MAINTENANCE
CTR P.O. BOX 280057, MAYPORT NAVAL STATION
JACKSONVILLE FL 32228-0057
N40027 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4002718R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 03
QUESTION 3:
Work Item 042-11-001 Accountability of Manhour and Material Reservation; accomplish paragraph 4.5 states “A tracking log is provided as Attachment B”.
Attachment B is not attached.
Will the Government provide Attachment B
ANSWER 3 :
Yes, both Attachment A and Attachment B for Work Specification 042-11-001 are included in Amendment 03 as attachment J-7 and J-8.
QUESTION 4:
Item number 000-00-001, Title: Admin Will the Government confirm that the work package is to cover both 34’ patrol boats and quantities are to be doubled? As well as each work item is to be accomplished for both hulls?
ANSWER 4 :
Yes, The work scope defined in each work item of the work package shall be performed on each 34’ Patrol Boat hull (both the 405 and 408 boats).
QUESTION 5:
Item number 000-00-001, Title: Admin
The contractor requested drawings from SERMC Technical Library on 19 July, 2018 the requested references were not provided to contractor until 31 July 2018.
Contractor is requesting a 13-day extension to the bid due date, question response date and ship check dates. This will allow the contractor adequate time to review the references and obtain quotes.
ANSWER 5 :
The Government cannot extend the due date. The proposal due date remains 1400 (SERMC Local Time) 17 August
SECTION I - CONTRACT CLAUSES
N4002718R0010
The following have been modified:
ADDITIONAL CLAUSES
LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
(a) Any job order awarded as a result of this solicitation shall consist of the following sections of this solicitation.
Part I – The Schedule (Sections A through H)
Part II – Contract Clauses (Section I)
Part III – List of Documents, Exhibits and Other Attachments (Section J)
J-1 Specification Package SSP SERM-063-18,51 pages
J-2 Request for Specification Clarification, 1 page
J-3 Reserved
J-4 Cost Data Break Down, 1 page
J-5 Exhibits “A” and “B” Contract Data Requirements List (CDRL) DD Form 1423, J-6 Past Performance Questionnaire, 5 pages
J-7 Work item 042-11-001 Attachment A
J-8 Work item 042-11-001 Attachment B
Part IV – Representations and Instructions
Part IV of the solicitation will not be physically incorporated into the resulting contract. However, Section K, “Representations, Certifications and Other Statements of Offerors” will be retained in the contract file, and acceptance of a proposal under this solicitation incorporates Section K by reference into the resultant contract.
(FAR 15.406-2(a)(1))
(End of Summary of Changes)