17-T-0138_Attachment_2.pdf

PDF 1 MB Posted

Attached to
Diesel Generator Maintenance Federal contract opportunity
Solicitation number
N39040-17-T-0138
Issued by
Department of the Navy Naval Sea Systems Command

About this file

RFQ Attachment 2

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 2

Appendix 2 - Page 1 of 4

LOAD HOUSE DIESEL GENERATOR INVENTORY:

Manufacturer Model# Serial Number KW Location

Cummings DMT300C 380461 300 Dry Dock #1

Caterpillar SR-4 6BA01975 300 Dry Dock #2

Cummings DMT300C 860462 300 Dry Dock #3

Detroit 71237000 J2185/2 250 Conex Box

A-1. PREVENTIVE MAINTENANCE (PM) (Scheduled).

Perform maintenance on the above generators per the criteria listen below. PMs will be performed each calendar quarter (eg. 1st quarter: 1 Jan – 31 Mar) as scheduled by the contract POC. Four PMs will be performed during the year (three Minor PMs and 1 Major PM). Complete appropriate minor or major preventative maintenance checklist the day that the work is performed and provide checklist and any other relevant documentation to Shipyard POC.

The minor (quarterly) checks shall consist of checking the diesel generator as noted below.

1. Service/clean air filters

2. Perform air inlet restriction test

3. Check coolant level

4. Check ground connection

5. Check/adjust engine oil level

6. Check block heater operation

7. Check/adjust governor linkage/controls

8. Check/correct anti-freeze concentration

9. Check radiator for air restriction and dirt

10. Check engine gauges and metering for proper operation

11. Inspect exhaust system for leakage and deterioration

12. Inspect/adjust all accessible hoses, belts, and linkages

13. Inspect accessible fuel lines for leakage or deterioration

14. Check battery electrolyte levels and specific gravity

15. Clean battery terminals and check tightness of cables

16. Ensure battery charger is operating properly and record battery charging voltage

17. Adjust output voltage (450VAC) and frequency (60Hz) if required

18. Operate the diesel generator under load (200 kW) for a minimum of 30 minutes and check for proper operation. Running the diesel loaded must be coordinated with the Shipyard POC for the load bank. Shipyard will provide and operate the load bank. Check for fuel or coolant leaks, check and record voltage and frequency output, engine oil pressure, engine operating temperature, and check for unusual engine vibration.

christina.ellis Typewritten Text N39040-17-T-0138 Attachment 2

Appendix 2 - Page 2 of 4

The major (yearly) checks shall consist of checking the diesel generator as noted below.

1. Clean engine

2. Clean crankcase breather

3. Change air filter

4. Change fuel filters

5. Change engine oil and oil filter

6. Perform air inlet restriction test

7. Perform coolant system pressure test

8. Perform back pressure reading on exhaust system

9. Inspect main generator windings

10. Inspect fan hub, drive pulley and water pump

11. Inspect exhaust system for leakage and deterioration

12. Inspect/adjust all accessible hoses, belts, and linkages

13. Inspect accessible fuel lines for leakage or deterioration

14. Check and adjust valves

15. Check ground connection

16. Check block heater operation

17. Check/adjust governor linkage/controls

18. Check radiator for air restriction and dirt

19. Check engine gauges and metering for proper operation

20. Check tightness of mounting bolts and vibration isolators

21. Check engine and generator shutdown and alarm systems for proper operation

22. Flush cooling system

23. Grease main generator bearing

24. Remove, clean, and adjust magnetic pickup

25. Test fuel for water and algae/bacteria growth

26. Measure and record generator winding resistance

27. Vacuum/blow dust out of main generator (30psi max.)

28. Adjust output voltage (450VAC) and frequency (60Hz) if required

29. Change batteries (every 2 years—next replacement in 2018)

30. Check battery electrolyte levels and specific gravity

31. Clean battery terminals and check tightness of cables

32. Ensure battery charger is operating properly and record battery charging voltage

33. Operate the diesel generator under load (200 kW) for a minimum of 30 minutes and check for proper operation. Running the diesel loaded must be coordinated with the Shipyard POC for the load bank. Shipyard will provide and operate the load bank. Check for fuel or coolant leaks, check and record voltage and frequency output, engine oil pressure, engine operating temperature, and check for unusual engine vibration

(Check One)

Generator Hours (Pre-Start)

Generator Hours (Completion)

Date

CUMMINS DMT300C 300KW S/N: 380461 (DRY DOCK #1)

CATERPILLAR SP-4 300KW S/N: 6840197B (DRY DOCK #2)

CUMMINS DMT300C 300KW S/N: 860462 (DRY DOCK #3)

DETROIT 71237000 250KW S/N: J2185/2 (CONEX BOX)

Appendix 2 - Page 3 of 4

DIESEL GENERATOR MINOR PREVENTATIVE MAINTENANCE CHECKLIST (QUARTERLY)

MAINTENANCE SAT UNSAT

Operate the Generator Under Load (200kW) for a Minimum of 30 Minutes and Check for Proper Operation as follows:

SAT UNSAT

Service/clean air filters Check for Coolant or Fuel Leaks

Perform air inlet restriction test Output voltage ______VAC

Check coolant level Output Frequency ________Hz

Check ground connection Engine Oil Pressure ________PSI

Check/adjust engine oil level Engine Operating Temperature _______ F

Check block heater operation Check for Unusual Vibration or Noise

Check/adjust governor linkage/controls Comments:

Check/correct anti-freeze concentration

Check radiator for air restriction and dirt

Check engine gauges and metering for proper operation

Inspect exhaust system for leakage and deterioration

Inspect/adjust all accessible hoses, belts, and linkages

Inspect accessible fuel lines for leakage or deterioration

Check battery electrolyte levels and specific gravity

Clean battery terminals and check tightness of cables

Ensure battery charger is operating properly and record battery charging voltage

Voltage: ________________

Adjust output voltage (450VAC) and frequency (60Hz) if required

(Check One)

Generator Hours (Pre-Start)

Generator Hours (Completion)

Date

CUMMINS DMT300C 300KW S/N: 380461 (DRY DOCK #1)

CATERPILLAR SP-4 300KW S/N: 6840197B (DRY DOCK #2)

CUMMINS DMT300C 300KW S/N: 860462 (DRY DOCK #3)

DETROIT 71237000 250KW S/N: J2185/2 (CONEX BOX)

Appendix 2 - Page 4 of 4

DIESEL GENERATOR MAJOR PREVENTATIVE MAINTENANCE CHECKLIST (YEARLY)

MAINTENANCE ITEMS SAT UNSAT MAINTENANCE ITEMS SAT UNSAT

Clean engine Check/adjust governor linkage/controls

Clean crankcase breather Check radiator for air restriction and dirt

Change air filter Check engine gauges and metering for proper operation

Change fuel filters Check tightness of mounting bolts and vibration isolators

Change engine oil and oil filter Check engine and generator shutdown and alarm systems for proper operation

Perform air inlet restriction test Flush cooling system

Perform coolant system pressure test Grease main generator bearing

Perform back pressure reading on exhaust system Remove, clean, and adjust magnetic pickup

Inspect main generator windings Test fuel for water and algae/bacteria growth

Inspect fan hub, drive pulley and water pump Vacuum/blow dust out of main generator (30psi max.)

Inspect exhaust system for leakage and deterioration Adjust output voltage (450VAC) and frequency (60Hz) if required

Inspect/adjust all accessible hoses, belts, and linkages Change batteries (every 2 years)

Inspect accessible fuel lines for leakage or deterioration Check battery electrolyte levels and specific gravity

Check and adjust valves Clean battery terminals and check tightness of cables

Check ground connection Ensure battery charger is operating properly and record battery charging voltage Voltage: _______________

Check block heater operation Measure and record the generator winding resistance

Winding Resistance:

Operate the Generator Under Load (200kW) for a Minimum of 30 Minutes and Check for Proper Operation as follows: SAT UNSAT

Check for Coolant or Fuel Leaks

Output voltage ______VAC

Output Frequency ________Hz

Engine Oil Pressure ________PSI

Engine Operating Temperature _______ F

Check for Unusual Vibration or Noise

Comments: