N39040-16-T-0116-0003.pdf

PDF 207 KB Posted

Attached to
Non Destructive Test Inspector Services Federal contract opportunity
Solicitation number
N39040-16-T-0116
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to Non Destructive Test Inspector Services, newest first.
File Type Posted
N39040-16-T-0116-0002.pdf PDF
N39040-16-T-0116-0001.pdf PDF
Attachment_4_-_DD254.pdf PDF
N39040-16-T-0116.pdf PDF
Attachment_3_QASP_Matrix_-_NDT.pdf PDF
Attachment_1_NAVSHIPYD_PTSMH_INST_5090.30PNSYI_4110.1.pdf PDF
Attachment_6_Past_Performance_Questionnaire_Form.doc DOC document
Attachment_7_PAST_PERFORMANCE_INFORMATION_FORM.doc DOC document
Attachment_2_QASP_-_NDT.pdf PDF
WD_05-2241_(Rev.-18).txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the security requirements section of the statement of w ork and the period of performance. This

Amendment also extends the due date for quotations to 06 September 2016 at 1500 Eastern time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N39040-16-T-0116

X 9B. DATED (SEE ITEM 11)

04-Mar-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Aug-2016

CODE

PORTSMOUTH NAVAL SHIPYARD

CONTRACTING DIVISION, CODE 410

BLDG 153, 6TH FLOOR

KITTERY ME 03904

N39040 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N39040-16-T-0116

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC

POP 14-JUL-2016 TO

13-JUL-2017

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

FOB: Destination

N39040

To:

POP 01-NOV-2016 TO

31-OCT-2017

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 000101 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 000102 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 000103 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 000104 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for CLIN 0002 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for CLIN 1001 has been changed from:

POP 14-JUL-2017 TO

13-JUL-2018

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

POP 01-NOV-2017 TO

31-OCT-2018

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 100101 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 100102 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 100103 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 100104 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for CLIN 1002 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for CLIN 2001 has been changed from:

POP 14-JUL-2018 TO

13-JUL-2019

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

POP 01-NOV-2018 TO

31-OCT-2019

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 200101 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 200102 has been changed from:

14-JUL-2019

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 200103 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for SUBCLIN 200104 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following Delivery Schedule item for CLIN 2002 has been changed from:

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

The following have been modified:

SECTION C - STATEMENT OF WORK

Statement of Work (SOW) for

General Non-Destructive Testing (NDT) Services

1. REFERENCES. The following documents shall form a part of the technical requirements for work under this contract:

a. NSTP T9074-AS-GIB-010/271, Original Issue, ACN-1, Requirements for Nondestructive Testing Methods of 30 Apr 1997

b. ASNT SNT-TC-1A Non-Destructive Testing of 2006

c. MIL-STD-2035A, Nondestructive Testing Acceptance Criteria of 15 May 1995

d. NAVSHIPYD PTSMH INST 5090.30/PNSYI 4110.1, see attch 1.

2. PLACE OF PERFORMANCE: Portsmouth Naval Shipyard, Kittery, Maine.

3. OVERALL SCOPE. In connection with the performance of the work on this contract, the Contractor is to provide Non-Destructive Test (NDT) Metals Inspectors capable of performing Visual (VT), Liquid

Penetrant (PT), and Magnetic Particle (MT), for acceptance with specified requirements.

4. PERIOD OF PERFORMANCE: PNSY anticipates a need of 9 personnel from 11/01/16 through

10/31/17 with two one year options.

Hours of Work: The Contractor shall observe the same holidays as the Government (i.e, Memorial Day).

It is anticipated the task hours assigned will be worked during a five-day workweek (Monday – Friday) on an eight (8) hour day, supporting Day Shift from 7:00 a.m. – 3:30 p.m. Saturday or Sunday work is not guaranteed and will be project approved, with a Thursday notification and/or 24 hour notice, not to exceed

8 hours of work.

Notes:

1. Federal Holidays during notional performance period:

Monday May 30, 2016 Memorial Day

Monday July 4, 2016 Fourth of July

Monday September 5, 2016 Labor Day

Monday October 10, 2016 Columbus Day

Friday November 11, 2016 Veterans Day

Thursday November 24-25, 2016 Thanksgiving

Monday December 26, 2016 (work day off) Christmas

Monday January 16, 2017 Martin Luther King Jr Day

Monday February 20, 2017 Presidents Day

2. Ten hour shifts are authorized on this task/delivery order but not guaranteed and will be project approved.

TASK HOURS

16,064

(8 People x 8 hrs/day x 251 days)

(8 People x 8 hrs/day x 90 days)

(1 Person x 8 hrs/day x 251 days)

(1 Person x 8 hrs/day x 90 days)

TASK HOURS

16,000

(8 People x 8 hrs/day x 250 days)

(8 People x 8 hrs/day x90 days)

(1 Person x 8 hrs/day x 250 days)

(1 Person x 8 hrs/day x 90 days)

TASK HOURS

16,000

(8 People x 8 hrs/day x 250 days)

(8 People x 8 hrs/day x90 days)

(1 Person x 8 hrs/day x 250 days)

(1 Person x 8 hrs/day x 90 days)

NDT Metals Inspector Supervisor - straight time

NDT Metals Inspector Supervisor - PNS discretionary Saturday or Sunday overtime

NDT Metals Inspector Supervisor - PNS discretionary Saturday or Sunday overtime

NDT Metals Inspector Supervisor - PNS discretionary Saturday or Sunday overtime

NDT Metals Inspectors – VT/PT/MT/ (8) – straight time

NDT Metals Inspectors – VT/PT/MT/ (8) – PNSY discretionary overtime

NDT Metals Inspector Supervisor - straight time

TOTAL ESTIMATED HOURS OPTION 2

NDT Metals Inspectors – VT/PT/MT/ (8) – straight time

NDT Metals Inspectors – VT/PT/MT/ (8) – PNSY discretionary overtime

NDT Metals Inspectors – VT/PT/MT (8) – straight time

NDT Metals Inspectors – VT/PT/MT (8) – PNSY discretionary Saturday or

Sunday overtime

NDT Metals Inspector Supervisor - straight time

TOTAL ESTIMATED HOURS OPTION 1

3. 252 workdays during the performance period.

4. 42 Saturdays during the performance period.

5. 42 Sundays during the performance period.

5. SECURITY AND ACCESS REQUIREMENTS.

Performance of contract work will require access to classified information, material, and/or work areas up to and including the level of Confidential - Restricted Data.

Contractor facility must possess a minimum of a Confidential Facility Security Clearance (FCL); and all contractor employees performing work under this contract must possess, at a minimum, a U.S.

Department of Defense final-adjudicated Confidential Personal Security Clearance (PCL) prior to being assigned classified work at Portsmouth Naval Shipyard (PNSY).

If an adequately-cleared contractor is not available at time of award, the Government Contracting Agency may elect to sponsor a contractor for a FCL. Sponsorship does not guarantee the contractor will be granted a FCL, and failure to obtain a FCL will result in the termination of the contract.

The contractor is responsible for providing documentation of U.S. citizenship and security clearance verification for all employees prior to being assigned work at PNSY. The contractor shall submit visit requests via the Joint Personnel Adjudication System (JPAS) to SMO 39040. Visit requests submitted by other means will not be accepted without Facility Security Officer signed verification as to the level of security clearance granted to each employee on the visit request.

Contractors must have RapidGate credentials for access to Portsmouth Naval Shipyard.

6. WORK SPECIFICATION. Technical services required on this contract shall be completed using best NDT industry practices as well as requirements and information provided by Non-Destructive Testing Contract references (a) through (c). Questions, issues and problems regarding the technical requirements of this contract shall be resolved by the Portsmouth Naval Shipyard’s (PNS) Technical Lead (TL) and the Contracting Officer’s Representative

(COR).

a. Regarding specific contract supervision the contractor shall:

(1) Provide overall management, oversight and supervision of contract personnel to ensure proper execution to effectively manage the work of this contract.

(2) Maintain accurate account of charging.

(3) Ensure contract labor hours are reported daily by submitting a job sheet that tracks the amount of contract man-hours expended, date completed, and the signature of the contract supervisor upon completion. The job sheet(s) shall be provided to the contract COR.

(4) Contractor Supervisor will be required to interact with PNS NDT Division for workload planning and PNS

NDT Division. Contractor NDT Metals Inspection Supervisor shall work directly with PNS NDT Division for work assignment.

(5) Contractor shall maintain a logbook of all of the NDT performed. At a minimum, it shall contain the item inspected, Technical Work Document (TWD), method performed, inspector who performed the inspection, results of the inspection, and the date of the inspection.

(6) The contractor shall submit monthly technical and financial progress reports in accordance with requirements of the contract. Please ensure one electronic copy is sent to C/1260 business office representative.

(7) Once assigned the Contractor shall not change out inspection personnel without written approval by the PNS TL and COR.

b. Work Environment: The contractor will be assigned to work areas aboard a submarine. Assignments may require working extended shifts as well as weekends to support production efforts. Work may include assignments to areas where certain potentially harmful physical and chemical agents are present. These agents may include, but are not limited to; fumes, dust, noise, heat, chemicals, etc

c. Procedure Qualification and Approval: Nondestructive Testing (NDT) methods shall be performed in accordance with Portsmouth Naval Shipyard (PNS) written NDT procedures and Written Practice.

Prepared and approved in accordance with references (a) through (c).

d. NDT Inspector Certification: The contractor shall provide inspection personnel that are certified to the contractor’s Written Practice, as required by reference (c), which will include (but not limited to) work time experience, initial training certification testing and oversight, using reference (a) as guidance. Although they are called “guidelines” in reference (a), the contractor shall follow them as “requirements” in this contract. A copy of the Contractors Written Practice, NDT course outlines and inspection personnel certification records shall be provided to the PNS Test Examiner. Additional NDT personnel certification is as follows:

(1) PNS is responsible for the adequacy of the NDT program to be used at PNS and is responsible for the certification of all levels of nondestructive test personnel in accordance with the requirements of reference (a).

Contractor personnel shall be trained by PNS NDT Training Branch on local procedures and practices and tested/certified by the NDT Test Examiner.

(2) All NDT test personnel shall have to pass a vision test in accordance with reference (a).

(3) PNS will provide local written procedures to contractor ahead of arrival at PNS for familiarization prior to testing

(4) After Code 138.1 NDT Examiner Branch review of written certification paperwork, the contracted inspector shall perform a PNS written specification exam and an operational exam. Upon successful exam results the contracted inspector will be certified to perform inspections of that method for which he/she is tested. Inspectors that are unable to satisfactorily complete this certification within three days after training on local procedures will be released, after discussion with owning organization.

e. General Task Skill/Qualification Requirements

(1) On company letterhead, at a minimum, verification that personnel have been trained by the contractor) in asbestos awareness, Occupational Safety & Health (OSH), lockout/tag-out energy control, Electrical

Safety, hearing conservation, eye safety awareness, qualified lead/cadmium awareness, sexual harassment, proper use of personal protective equipment, and hazardous communications and fall protection.

(2) Proof of qualifications required by this SOW. Qualifications shall be current through the performance period and verifiable by Portsmouth Naval Shipyard.

NOTE: The contractor’s proposal shall include certification on company letterhead that each employee, by name, meets the requirements of the above paragraph e. (1) and (2) for review and approval prior to commencing work.

f. Contractor Orientation Briefing: Before accomplishing any work on board Navy ships, PNS will provide an

Orientation brief to contractor employees to address the below requirements as necessary:

(1) Pre-Shift briefings: Hazmat (HM) requirements, environmental compliance.

(2) Task Group Instruction Usage (Technical Work Documents)

(3) Basic Computer Training (New Account IA New User Training Certificate, SAAR-N- OPNAV Form 5239.14, NNPI Certificate & User agreement)

(4) Basic computer programs used by Inspection Division (supervisor as applicable).

(5) NDT Division Expectations.

g. Specific Task Skill/Qualification Requirements: PNS requires contactor workers to have training and experience to journeyman level in the support of NDT Metals Inspector. Contractor employees shall:

(1) Have sufficient knowledge of the common and most typical operations of NDT inspection in accordance with references (a) through (d) in Section 1 of this document

(2) Shall have the ability to read and interpret blueprints, sketches, written technical instructions and manuals.

h. Equipment: PNS shall provide the applicable NDT equipment and materials to perform inspections. This includes but is not limited to:

(1) Visual: scales, gages, etc.

(2) Liquid Penetrant: dye, alcohol, etc.

(3) Magnetic Particle: Alternating current MT yokes and direct current prod machines, consumable to include but not limited to magnetic particles and associated application equipment.

i Inspection Records. The contractor shall complete inspection records in accordance with shipyard Technical

Work Documents (TWD).

j. Restricted Work Areas: The contractor shall not provide NDT services in a radiation area (any areas where

TLDs are required) or nuclear cognizant inspections. Work will not be in posted radiation areas, and contractors will not handle radioactive materials or wear radiation measuring dosimetry.

k. Workforce safety shall include, but is not limited to:

(1) The contractor is responsible for workforce safety

(1) The contractor shall supply all Personal Protective Equipment (PPE) in accordance with the appropriate

Occupational Safety and Health Administration (OSHA) Standard. The following list provides examples of typical equipment used: steel-toed shoes, safety glasses, hard hats, earplugs, fall protection, flashlights, and respiratory equipment.

(2) Injury reporting for contractor personnel shall be the responsibility of contractor management.

NAVSHIPYD PTSMH managers must be informed of any injuries within 24 hours of occurrence. The contractor shall cooperate with any safety investigations.

(3) Contractor personnel are not authorized to use Government tools or equipment other than those directly related to the performance of the contract.

(4) The contractor shall be responsible to comply with all environmental and safety requirements and designate a POC for these issues.

(5) The contractor personnel shall have been trained (by the contractor) in asbestos awareness, OSH lockout/tagout energy control, fall protection, hearing conservation, eye safety awareness, lead work, and general respiratory training prior to task performance at NAVSHIPYD PTSMH.

(6) Hazardous Materials shall be handled and disposed of per reference (d).

7. GOVERNMENT FURNISHED PROPERTY (GFP). The Contractor shall be given access to references (a) through (d) in time to support drafting a proposal and while on site at PNS. In addition the Government will provide:

a. Workplaces for contractor personnel assigned to this contract.

b. All work package information to accomplish the inspection.

c. All orientation/training necessary to successfully integrate with the Shipyard’s processes to accomplish work.

8. QUALITY ASSURANCE: To ensure that the Government’s standards continue to be met after task award the

Shipyard has assigned personnel to evaluate the Contractors performance. These personnel are authorized to perform quality audits at any time in order to evaluate performance and conformance to specifications. Any discrepancies will be reported to the COR and Government Inspector immediately for remedial action.

(End of Summary of Changes)