Attachment_7_QASP_Matrix_.pdf
PDF 168 KB Posted
- Attached to
- Touch Labor - Multiple Trades Federal contract opportunity
- Solicitation number
- N39040-16-T-0031
About this file
Attachment 7 - QASP Matrix
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N39040-16-T-0031-0001.pdf | ||
| Attachment_2_DD_254.pdf | ||
| Attachment_5_Past_Performance_Information_Form.pdf | ||
| N39040-16-T-0031.pdf | ||
| Attachment_4_Past_Performance_Report_Form.pdf | ||
| Attachment_1_Manning_Tables.pdf | ||
| Attachment_6_Quality_Assurance_Surveillance_Plan.pdf | ||
| Attachment_3_Status_Report_Requirements_REV_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN, (MATRIX)
Touch Labor – Multiple Trades
IN SUPPORT OF US NAVY’S SUBMARINE MAINTENANCE PROGRAM
688 CLASS SUBMARINES
Deliverable or Service
Requirement
Measurement/
Metric
Performance Standards Maximum Error Rate
Method of Surveillance
Procedures to be taken when performance standards are met/not met
Workforce Training
/ Qualifications
Quality
Timeliness
Responsiveness
Contractor shall ensure all personnel are fully qualified, meet or exceed training and skill requirements and possess adequate experience as stated in 2.1& 2.2 of the Performance Work Statement
(PWS)
Contractor shall provide all training records and documented trade/work experience certifying the personnel have met the requirements under paragraph 2.1 of the PWS to the
Portsmouth Naval Shipyard (PNS) training department at least one week prior to travel date as identified in Paragraph 2.4.2 of the
PWS
Contractor’s ability to respond to any training/qualification issues with workforce personnel as well as the approach used to resolve problems.
0%
100% verification of all training/qualification records by PNS
Positive performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance.
Negative performance by the Contractor will
All positive and negative findings will be reported in the Contractor Performance
Appraisal Rating System (CPARS).
Touch Labor – Multiple Trades
Requirement
Measurement/
Metric
Performance Standards Maximum Error Rate
Method of Surveillance
Procedures to be taken when performance standards are met/not met
Workforce
Performance
Contractor workforce shall perform tasks as identified in 2.1of the
PWS
Contractor shall provide the appropriate number of personnel
/hours per shift as identified in
Attachment A Manning Table
Contractor shall maintain a stable work force with minimum turnover of personnel.
The contractor will be rated on their ability to provide required services in accordance with the project schedules. Project Schedules will be defined by PNS throughout execution of the contract.
Contractor’s ability to respond to performance/quality and scheduling concerns and approach used to resolve problems.
5% error rate of hours per month
10% turnover of personnel per life of contract
Customer Feedback
Unannounced inspections by the COR and/or technical point of contact
100% review of all monthly reports
Weekly/bi-weekly meetings between PNS Contracting
Department, contractor, and appropriate PNS personnel
100% verification of time and attendance records via
SUPDESK
Touch Labor – Multiple Trades
Requirement
Measurement/
Metric
Performance Standards Maximum Error Rate
Method of Surveillance
Procedures to be taken when performance standards are met/not met
Management
Performance
Contractor management shall assign work, provide oversight, resolve conflict, discipline and reward, manage travel, and maintain a safe environment as detailed in
Paragraph 2.4 of the PWS.
Contractor management shall report all injuries as identified in
Paragraph 2.4.5 of the PWS.
Contractor management shall provide weekly status reports as identified in Paragraph 4.4 of the
PWS and shall contain the elements identified in Attachment C of the contract.
Contractor shall present weekly status reports for review at weekly status meetings
Contractor management’s ability to respond to safety and discipline concerns and approach used to resolve problems.
Customer Feedback
Unannounced inspections by the COR and/or technical point of contact
100% review of all monthly reports
Weekly/bi-weekly meetings between PNS Contracting
Department, contractor, and appropriate PNS personnel