AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 8

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

28-Jul-2020

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY CODE N33191 7. ADMINISTERED BY (If other than item 6) CODE

NAVY PUBLIC WORKS DEPARTMENT, DJIBOUTI

(N-4) BLDG 211

CAMP LEMONNIER, DJIBOUTI

PSC 831 BOX 0043

FPO AE 09363-0043

See Item 6

8. NAME AND ADDRESS OF CONT RACT OR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

N33191-20-R-0664

X 9B. DATED (SEE ITEM 11)

18-Jun-2020

10A. MOD. OF CONT RACT /ORDER NO.

10B. DAT ED (SEE ITEM 13)

CODE FACILIT Y CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT

TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.

IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SOLICITATION N3319120R0664- REPLACE ROWPU STORAGE TANKS, CAMP LEMMONIER, DJIBOUTI

The closing date for this solicitation has been extended until 17 AUG 2020. All proposals must be received by 17 AUG 2020 @ 1400 Eastern Africa Time.

SEE CONTINUATION SHEETS

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONT RACT OR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNIT ED ST AT ES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

14-Aug-2020

EXCEPTION TO SF 30

30-105-04

ST ANDARD FORM 30 (Rev. 10-83) APPROVED BY OIRM 11-84 Prescribed by GSA

FAR (48 CFR) 53.243

N33191-20-R-0664

The following have been added by full text:

AMENDMENT 0002

SOLICITATION N33191-20-R-1748 - REPLACE SWITCHGEAR PP2-B, CAMP LEMMONIER, DJIBOUTI

1. The purpose of the amendment is to

a. Revise the Request for Proposal with changes noted

i. Remove Option 01, page 2 of the RFP

ii. Revise the Basis of Award on page 2 of the RFP

iii. Remove Clause 52.217-4 from the RFP

iv. Remove Clause 52.217-5 from the RFP

v. Remove Clause 52.217-7 from the RFP

vi. Revise the Price Proposal Form

vii. Remove Proposal Note (6) on the last page of the RFP

b. Incorporate Pre-Proposal Inquiries and Government Responses received in response to this solicitation (PPI Log – 1 below)

PPI Log-1 28 JUL 2020

Question 1

Giving the complexity of this solicitation for which we must prepare a concept design to be able to properly evaluate the costs, we ask that the solicitation due date be extended by 2 weeks. In fact, to be able to provide a more precise cost estimate of the new water storage tanks and for the systems that require minimum sizing, as well as a structural analysis, several days to analyze the situation are needed.

Answer 1

Per issuance of this amendment, the proposal due date has been extended

Question 2

Considering that a design phase must be completed over a 10-month time period, approximately 6 months are required for fabricating and delivering the Storage Tanks from USA to Djibouti, additional months are needed to remove and install the tanks and then subsequent testing and commissioning activities must be executed, 392 days is not considered to be a sufficient amount of time to properly execute this contract. Therefore, it is requested that the current POP be extended to 24 months for a total of 720 days.

Answer 2

The period of performance remains unchanged

Question 3

On provided layout (see below), point no. 4 of NEW WORK KEYNOTES, it is mentioned the Provision of new VALVES, FITTINGS & APPURTENANCES.

To our consideration is not clear the scope of provision as we cannot understand what to provide in means of equipment (type, size, quantities, etc.)

Please provide a detailed breakdown of the equipment mentioned under point no.4

Answer 3

This is a design build project. The contractor (KTR) is responsible for the investigation and verification of pipe size, length, material type, valves, fittings, and other appurtenances. The KTR must conduct a site visit and investigation prior to submitting a bid proposal in order to assess the site, existing conditions, extend of work involved, and associated complexities.

Question 4

Under NEW WORK KEYNOTES is mentioned to be provided from the Contractor: “PROVIDE TESTING AND

COMMISSIONING TO THE COMPLETE WATER DITRIBUTION SYSTEM”. Please make clear the battery limits of the equipment to be TESTED & COMMISSIONED. “COMPLETE” means all the new equipment? or in conjunction with the existing one? and up to which level?

Answer 4

The Author of the RFP implies testing and commissioning to all provided equipment/tanks, pipes, valves, and fittings.

Test and commission in accordance with ANSI/AWWA D103-97 and UFC 3-230-01 Water Storage, Distribution, and

Transmission; whichever is more stringent.

Question 5

On page 2 paragraph 2.1 it is mentioned: “Provide two new and complete water storage tanks from a qualified manufacturer with a minimum of five years in manufacturing experience of steel storage tanks” Please clarify which references has the manufacturer to have.

Answer 5

Refer to ANSI/AWWA D103-97 and UFC 3-230-01 Water Storage, Distribution, and Transmission, whichever is more stringent.

Question 6

Is an Internal Cathodic Protection required for the two new tanks? If yes please provide us the related specs describing exactly the type of the system required.

Answer 6

The Author of the RFP required to design in accordance with ANSI/AWWA D103-97 and UFC 3-230-01 Water

Storage, Distribution, and Transmission, whichever is more stringent. Kindly refer the design base on these standards and guidelines.

Question 7

Is lightning Protection required for the two new tanks? If yes please provide us the related specs describing exactly the type of the system required.

Answer 7

No lightning protection required.

Question 8

Is Obstruction Lighting required for the two new tanks? If yes please provide us the related specs.

Answer 8

No obstruction lighting is required.

Question 9

Is remote level indication required for the new two tanks? If yes please specify if also cabling is required to be terminated to an existing (or not) marshalling cabinet with existing (or not) I/O Cards and if existing (or not) SCADA has to be updated.

Answer 9

Each existing tank has a mechanical level gauge visible externally and a pressure transducer that can send a 4-20 milliamp signal used to verify mechanical reading.

Question 10

Is an Impressed Cathodic Protection required for the two new tanks (rectifier, buried anodes, etc.)? If yes please provide us the related specs describing exactly the type of the system required.

Answer 10

Refer to ANSI/AWWA D103-97 or UFC 3-230-01 Water Storage, Distribution, and Transmission

Question 11

Is any U/G piping network involved to this project. If yes please provide details of the Scope of Work

Answer 11

No U/G piping network involved.

Question 12

Is any Water metering device involved to this project? If yes please provide details of the Scope of Work

Answer 12

There is a mechanical water level gauge on each tank. No metering device.

Question 13

Is any backflow prevention system involved to this project? If yes please provide details of the Scope of Work

Answer 13

No backflow prevention system involved.

Question 14

Is any fire Hydrants system involved to this project? If yes please provide details of the Scope of Work

Answer 14

No fire hydrant systems involved.

Question 15

Is the paragraph G3020 applicable within the Scope of Work of this Project? Please clarify which parts of this paragraph are involved to this project.

Answer 15

No. The Author of the RFP included the G3020 SANITARY SEWER in part 4 as part of the minimum materials, engineering and construction requirements only. Shall the scope in part 3 does not require any items concerning

G3020, the KTR shall disregard such reference.

Question 16

Is the paragraph G3030 applicable within the Scope of Work of this Project? Please clarify which parts of this paragraph are involved to this project.

Answer 16

Yes, please see G3030 STORM SEWER on part 3 Statement of Work/Project Program. KTR to verify location of overflow piping and connection and its tapping point on site.

Question 17

For Contract CLIN002 Option 1 work is mentioned: “Price for all work including labor, materials, supplies and supervision, associated with replacement of deteriorated stainless-steel pipe and rerouting of reverse osmosis membrane pipe to UV device / equipment”. From the Technical information sent to us we are able only to understand that only discharge pipes for RO No4 & RO No2 are corroded plus the portion of header pipe connected to U/V

Treatment device (see below marked drawing).

The queries raised are the following:

Is it required the complete replacement of discharge pipes for RO No1,2,3 and 4, plus the header pipe connected to U/V treatment device?

If yes please provide distances between the RO Equipment and U/V treatment device as without Site Survey it is impossible to define the exact materials and welds needed to accommodate this scope of work.

Is required to supply new bracing supports? If yes how many of those?

What is the size of the piping to be replaced?

Answer 17

By way of this amendment, CLIN 0002 Option1 is hereby removed.

Question 18

Laydown Area: Is it known where the designated 50x50 meters laydown area will be located and the distance from the laydown area to the project site?

Answer 18

Several areas are appropriate; however, none adjacent to the project site

Question 19

Haul route: Is there any planned route or restrictions for heavy trucks driving from designated laydown area to the project site?

Answer 19

Routes are all paved. There are sidewalks and underground lines in the area.

Question 20

Per 01 31 19.05 20 POST AWARD MEETINGS, the DQC Manager and the DOR are to attend the PAK. Will this be required to attend in person or virtual?

Answer 20

Whatever method that can most effectively meet the intent of the referenced section is acceptable

Question 21

Please indicate if virtual attendance for the design engineering team is acceptable for the Post Award Kick-Off meeting, Design review meetings, Pre-Construction Conference, Coordination meetings and similar

Answer 21

Whatever method that can most effectively meet the intent of the referenced section is acceptable

Question 22

For Option 1 Bid - Replacement of Deteriorated Stainless Steel Pipe and Rerouting of RO

Membrane Pipe to UV Device/Equipment - the contractor shall be responsible for the investigation and verification of the piping size, length, materials type, location, and routing of the existing set-up of the RO train. Is this re-routing within the same ROWPU building? Can the Government provide the existing as-built drawings? This information is needed to evaluate the level of effort for the design and construction of Option 1.

Answer 22

Question 23

Section G3030 (PDF page 42) refers to overflow piping and connection to the existing storm sewer collection system at the point indicated on the drawings in Part 6 of the RFP. Connection point is not found in Part 6. Please clarify.

Answer 23

The intent of the RFP is to connect the overflow piping to existing storm water conveyance system manhole. The nearest connection point is located on Third Street north of the tanks.

Question 24

RFP Section A10 FOUNDATION indicate that the Importance Factor must be based on Risk Category III and IV (Part

3 Statement of Work, Page 6). The difference is essentially if this system is required, or not, to maintain water pressure for a fire suppression system. Per the elements provided, this information is not clear. Please clarify.

Answer 24

The system will be required to maintain water pressure for fire suppression.

Question 25

According to UFC 3-230-01, paragraph 4-2.2 level controls are required for water storage facilities, including low and high level sensors/alarms and interaction with existing pump control system. Please confirm that these level sensors/alarms are required and that the existing pump control system is prepared to receive signal from the sensors.

Answer 25

All level sensors and alarms are located in the pump house, off of main header. Not on the tanks.

Question 26

Please clarify if an Automatic Tank Gauge system is required for remote monitoring of water level on each tank.

Answer 26

Not at this time. Suggest adding automated valves and automatic tank gauges at time of new SCADA install.

Question 27

In order to provide the best possible proposal, please consider a time extension of 3 weeks after clarifications for the submission of the bid. This will allow the development of the design solution and determination of precise constructions costs.

Answer 27

Per issuance of this amendment, the proposal due date has been extended

Question 28

Need details like Length, die, path for Deteriorated Stainless Steel Pipe and Reverse Osmosis Membrane Pipe

Answer 28

Question 29

Which Leakage tests are have to perform

Answer 29

Leak test and disinfect in accordance with ANSI/AWWA D103-97 and UFC 3-230-01 Water Storage, Distribution, and

Transmission; whichever is more stringent. Leak testing, disinfection & flushing, bacteriological test procedure shall be performed to all provided tanks and pipelines for this project.

Question 30

Need the side utilities details of the existing tank that have to demolish "Replace the corroded 3” (80 mm) stainless steel pipe connected to the pneumatic actuator valve from RO membrane to prevent further damage on the water production of the ROWPU system.

Answer 30

Dia. 38', Ht. 24', Design spec. AWWA D103-97, NSF Columbian TecTank, Nom. Capacity 211908

Question 31

What is the distance from UV Treatment device to each reverse osmosis device?

Answer 31

Question 32

What is the existing pipe material and pipe size (Specifications) from the UV Treatment device to each reverse osmosis device?

Answer 32

Question 33

What is the distance from UV Treatment device to High pressure pump?

Answer 33

Question 34

What is the existing pipe material and pipe size (Specifications) from the UV Treatment device to High pressure pump?

Answer 34

Question 35

What is the distance from longest Purifier tank to High pressure pump?

Answer 35

Question 36

What is the existing pipe material and pipe size (Specifications) from the Purifier tank to High pressure pump?

Answer 36

Question 37

Please confirm if pipe from the RO membrane to High pressure pump need to be replaced? If yes, please let us know the existing pipe specs and distance

Answer 37

No, the line from high pressure pump to RO membrane will not be replaced. Kindly refer to Drawing M-101 Existing

Pipe Schematic of Reverse Osmosis Train Demolition Layout and M-102 New Pipe Schematic Layout of Reverse

Osmosis Train to verify which pipe lines are needed to replace.

Question 38

What is the distance from UV Treatment device to water reticulation tank?

Answer 38

Question 39

What is the existing pipe material and pipe size (Specifications) from the UV Treatment device to water reticulation tank?

Answer 39

(End of Summary of Changes)