J - 7 MSC Ship Repair Facility Survey.doc

DOC document 104 KB Posted

Attached to
Midterm Availability (MTA) on the USNS ROBERT E. PEARY (T-AKE 9) Federal contract opportunity
Solicitation number
N3220522R4035
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains a federal contract opportunity synopsis and a related ship repair facility survey form. The synopsis announces a forthcoming solicitation for a midterm availability period on the USNS ROBERT E. PEARY beginning August 9, 2022, with a performance period of 46 days. Interested offerors should monitor the Federal Business Opportunities website for solicitation number N3220522R4035 releasing on or around February 23, 2022. The solicitation will require ship repair services during the availability period from August 9 to September 23, 2022. Questions may be directed to the points of contact listed. The ship repair facility survey form requests facility information from potential repair yards, including drydocks, cranes, shops, equipment, and certifications.

View the file

Other files for this federal contract opportunity

Other files attached to Midterm Availability (MTA) on the USNS ROBERT E. PEARY (T-AKE 9), newest first.
File Type Posted
J-3 USNS ROBERT E PEARY TAKE 5 MTA 2022_01.25.2022.xlsx XLSX spreadsheet
Amendment 0002.docx DOCX document
Amendment 0001.docx DOCX document
J-2 Category A Items PEARY MTA 2022 - REV 1.29.2022.xlsx XLSX spreadsheet
J-2 Category A Items PEARY MTA.xls XLS spreadsheet
J - 10 Interport Differential (002).docx DOCX document
J-4 ROBERT E PEARY AUG MTA 2022 GFM REPORT 07 JAN 2022.xlsx XLSX spreadsheet
J - 14 Technical Data Non-Disclosure PEARY.docx DOCX document
Copy of J-2 Category A Items PEARY.xls XLS spreadsheet
J - 12 Past Performance Data.doc DOC document
J-3 USNS ROBERT E PEARY TAKE 5 MTA 2022_12.09.2021.xlsx XLSX spreadsheet
J - 13 PAST PERFORMANCE QUESTIONNAIRE PEARY ROH DD.docx DOCX document
JA REP ship repair ROBERT E. PEARY MTA.docx DOCX document
J - 8 Request for Spec Clarification.doc DOC document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
N3220522R4035 PD2 Solicitation.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET 1 OF 5

SHEET 5 OF 5

MSC SHIP REPAIR FACILITY SURVEY

NOTE: If survey form has been previously submitted, then enter changes only.

DATE:

SHIPYARD AND ADDRESS

Commander (Code N10)

Military Sealift Command

Norfolk, VA 23511

SHIPYARD DATA

Telephone No:

Telex No:

Date Found:

BUILDING WAYS (M. I. W.)

NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE

OF (check one) (ton 2,240 lbs)

WAY

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

DEPTH OF WATER

CRANES SERVING WAY

CERTIFICATION DATE &

CERTIFIED BY WHOM

LIFT CAPACITY

(std. tons)

TYPE

NO.

AT DROP

OFF

OVER

WAY END

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.

TIDAL RANGE (DIFF. OF M.L. M.H)

IS SNUBBING NECESSARY?

YES NO

IS FIRE PROTECTION AVAILABLE

ON BUILDING WAY?

YES NO

DOCK

MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

LENGTH

at coping (GD), at keel blocks

OVERALL on cradle (MR), on PONTOON

(FD)

CLEAR WIDTH

at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height

DEPTH/DRAFT

OVER OVER OVER

SILL FLOOR KEEL

(GD) BLOCKS

LIFTING CAPACITY

(ton 2,240)

DATE CERTIFIED, CERTIFIED BY WHOM, &

DATE CERTIFICATION EXPIRES

DRY DOCKS (continued)

MATERIAL TYPE

Floating--(FD)

Graving--(GD) Marine Railway (MR)

SERVICES AVAILABLE

(use abbreviation of service below)

USE

REPAIR/

OUTFIT-

ING

HEIGHT

OF

(M.L.W.)

OUT-

BOARD

IN-

BOARD

TYPE

LENGTH

(actual & usable)

ACT:

USE:

WATER DEPTH

(M. L. W.)

BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) DRY DOCKS (means high water)

MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:

LEGEND (abbreviation of services)

Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO

MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:

BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

MAX REACH HEIGHT OF HOOK

NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM &

(STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES

DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT

RAILROAD CONNECTION (identify)

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)

MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)

SHIPYARD:

MSC SHIP FACILITY SURVEY (continued)

STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)

PRINCIPAL SHOPS AND BUILDINGS

ALL OTHER SHOPS

(LIST NAMES AND DIMENSIONS)

LARGEST EXIT

WIDTH HEIGHT

DIMENSIONS OF

SHOP OR BUILDING

NAME OF SHOP

OR BUILDING

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY

RIGGER

RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________

WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________

ACREAGE LEGALLY CONTROLLED

IN USE DEVELOPED TOTAL

LIST TYPES OF WORK NORMALLY SUBCONTRACTED

SHIPYARD:

MSC SHIP REPAIR FACILITY SURVEY (continued)

LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT

3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND

EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND

DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN

ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP

REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN

LIST EACH FACILITY AND ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM

(NAME/TITLE/PHONE NUMBER).

NORMAL

SHIFTS

NORMAL

MAXIMUM

POTENTIAL MAXIMUM

CURRENT

CURRENT

EMPLOYMENT

MANAGEMENT, ADMINISTRATION

PROFESSIONAL ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED

ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO

PAGE

ATTACHMENT J - 7

MSC Form 4330/26

File details come from the government source that posted it. Updated .