J-2 Category A Items PEARY MTA.xls
XLS spreadsheet 103 KB Posted
- Attached to
- Midterm Availability (MTA) on the USNS ROBERT E. PEARY (T-AKE 9) Federal contract opportunity
- Solicitation number
- N3220522R4035
About this file
This document provides details for a federal contract opportunity to perform a midterm availability on the USNS ROBERT E. PEARY. The solicitation number N3220522R4035 will be released on or about February 23, 2022 for shipyard services on the USNS ROBERT E. PEARY from August 9 to September 23, 2022. Interested contractors should monitor the Federal Business Opportunities website for the solicitation and submit a Technical Data Nondisclosure form to receive additional details. Questions may be directed to the named contracting officers. The selected contractor will perform a 46-day midterm availability on the USNS ROBERT E. PEARY at an estimated dollar amount and award date to be determined. The applicable NAICS code is 336611 and the opportunity is open to Gulf and East Coast contractors.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | Intent, Scope, General Conditions and Definitions | - 0 | $ - 0 | $0 | ||||||||
| 002 | Technical and Manufacturer's Representative | - 0 | $ - 0 | $0 | ||||||||
| 003 | Approach, Berth, and Mooring Requirements | - 0 | $ - 0 | $0 | ||||||||
| 004 | Testing and Quality Assurance | - 0 | $ - 0 | $0 | ||||||||
| 005 | Electrical Safety Procedure Requirements | - 0 | $ - 0 | $0 | ||||||||
| 006 | Heavy Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 007 | Cold Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 011 | GENERAL SERVICES FOR SHIP REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 014 | WEIGHT AND MOMENT REPORT REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 015 | ILS GFM REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 016 | FIRE PROTECTION AND SHIPS SAFETY PROGRAM REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 020 | GAS FREE CERTIFICATES REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 021 | CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACES - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 022 | MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEA TRIALS REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 090 | LEVEL I DAILY COVID-19 PREVENTION AND CONTROL SERVICES REV - 02APR2021 | - 0 | $ - 0 | $0 | ||||||||
| 100 | HULL AND STRUCTURAL | |||||||||||
| 101 | 02 Louver Repairs REV - | - 0 | $ - 0 | $0 | ||||||||
| 102 | Stack Cracking at 08 Level (T-ALT 400) | - 0 | $ - 0 | $0 | ||||||||
| 110 | Handrails and Guardrail Replacement | - 0 | $ - 0 | $0 | ||||||||
| 111 | Exterior Ladder Mounting Tab Replacement | - 0 | $ - 0 | $0 | ||||||||
| 112 | Kick pipe Replacement | - 0 | $ - 0 | $0 | ||||||||
| 200 | PROPULSION MACHINERY | |||||||||||
| 209A | TAKE_CSI_MAIN ENGINE 8 CYLINDER SERVICE (24K HRS) MDG 1 | - 0 | $ - 0 | $0 | ||||||||
| 251 | TAKE_CCSI_WOODWARD GOVERNORS (24K HRS) MDG 1 | - 0 | $ - 0 | $0 | ||||||||
| 252 | TAKE_CSI_VULKAN COUPLING INSPECTIONS (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 253 | TAKE_CSI_AUTOMATION AND PROPULSION CONTROL INSPECTION AND TEST (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 254 | TAKE_CSI_MDE CONTROL SAFETY INSPECTION AND TEST (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 302 | TAKE_CCSI_THERMOGRAPHIC SURVEY (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 305 | TAKE_CSI_PLC SURVEY (2 YR) | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAVIGATION | |||||||||||
| 401 | Amplify 1JV Circuit in EOS and Wheelhouse (T-ALT 334) | - 0 | $ - 0 | $0 | ||||||||
| 402 | Aft Steering Rudder Angle Indicator Installation (T-ALT 502) | - 0 | $ - 0 | $0 | ||||||||
| 403 | 1JV Sound Powered Phone Relocation on Ship Control Console (SCC) (T-ALT 514) | - 0 | $ - 0 | $0 | ||||||||
| 404 | Bridge Optics Refurbish | - 0 | $ - 0 | $0 | ||||||||
| 413 | T1 line repair | - 0 | $ - 0 | $0 | ||||||||
| 414 | TAKE_CCSI_ANNUAL INSPECTION OF MANUALLY OPERATED ALARMS | - 0 | $ - 0 | $0 | ||||||||
| 415 | TAKE_CCSI_ANNUAL GYRO SYSTEM | - 0 | $ - 0 | $0 | ||||||||
| 416 | TAKE_CCSI_ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 417 | TAKE_CCSI_ANNUAL VDR RECERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 418 | TAKE_CCSI_ANNUAL RADAR SERVICE | - 0 | $ - 0 | $0 | ||||||||
| 419 | TAKE_CCSI_ANNUAL ECDIS SERVICE (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | Incinerator Sludge Tank Heater Install (T-ALT 218) | - 0 | $ - 0 | $0 | ||||||||
| 502 | JP-5 System Fuel Flow Meter Installation (T-ALT 322) | - 0 | $ - 0 | $0 | ||||||||
| 503 | Cargo and AC Plant Insp and Groom | - 0 | $ - 0 | $0 | ||||||||
| 504 | Anchor Windlass Inspection Annuals | - 0 | $ - 0 | $0 | ||||||||
| 505 | LT Chilled Water Pumps No 3 and 4 Overhauls (VR21-0001) REV - | - 0 | $ - 0 | $0 | ||||||||
| 506 | Unclog containments and weather deck drains | - 0 | $ - 0 | $0 | ||||||||
| 508 | Alarm Tower Mn Eng Workshop (T-ALT 396) REV-A | - 0 | $ - 0 | $0 | ||||||||
| 510 | OWS ANNUALS | - 0 | $ - 0 | $0 | ||||||||
| 511 | Machinery and Cargo OWS Repairs | - 0 | $ - 0 | $0 | ||||||||
| 514 | ODME Removal (T-ALT 526) | - 0 | $ - 0 | $0 | ||||||||
| 515 | CMWD Sys Piping Replacement - PM6 Zone 1 (T-ALT 420) | - 0 | $ - 0 | $0 | ||||||||
| 531 | Downcomer drain pipe repairs REV - A | - 0 | $ - 0 | $0 | ||||||||
| 570 | BERGAN TLI SYSTEM Groom | - 0 | $ - 0 | $0 | ||||||||
| 571 | TAKE_CCSI_SCBA COMPRESSOR AND FILLING STATION INSPECTION & MAINTENANCE (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 572 | TAKE_CCSI_PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 573 | TAKE_CCSI_FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 574 | TAKE_CCSI_FIRE HOSES (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 575 | TAKE_CSI_CARGO CRANE INSPECTION (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 576 | TAKE_CSI_EMERGENCY DIESEL GENERATOR -ANNUAL TESTING AND INSPECTION (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 577 | TAKE_CCSI_FIRE AND SMOKE DAMPER SERVICE (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 578 | TAKE_CCSI_DEEP FAT FRYER AND RANGE FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 579 | TAKE_CCSI_FIRE DOORS AND SHUTTERS (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 580 | TAKE_CCSI_FIRE AND SMOKE DETECTION ALARM SYSTEM (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 582 | TAKE_CSI_MAGAZINE SPRINKLER GAUGE SPRINKLER CALIBRATION (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 583 | TAKE_CCSI_INSPECT TEST AND CERTIFY NON-CARGO LIFTING GEAR (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 584 | TAKE_CCSI_FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 585 | TAKE_CCSI_SCBA ANNUAL INSPECTION AND (T-ALT 578) | - 0 | $ - 0 | $0 | ||||||||
| 586 | TAKE_CCSI_GAUGE CALIBRATION (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 600 | HABITABILITY OUTFITTING AND FURNISHINGS | |||||||||||
| 601 | Machinery HVAC Room Decks and Airlift renewal | - 0 | $ - 0 | $0 | ||||||||
| 602 | Exam Room Decking Replacement REV - | - 0 | $ - 0 | $0 | ||||||||
| 655 | TAKE_CCSI_IMMERSION SUIT SERVICE (3 YR) | - 0 | $ - 0 | $0 | ||||||||
| 663 | Renew Non-Slip Deck Covering Rev - | - 0 | $ - 0 | $0 | ||||||||
| 665 | TAKE_CSI_JETTISON READY SERVICE LOCKERS - CLEAN AND PAINT (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 666 | TAKE_CCSI_ANNUAL RESCUE BOAT AND DAVIT INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 667 | TAKE_CCSI_ACCOMMODATION LADDER INSPECTION (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 668 | TAKE_CCSI_DEEP FAT FRYER INSPECTION (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 670 | TAKE_CCSI_ANNUAL LIFEBOAT AND DAVIT INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 671 | TAKE_CCSI_ANNUAL LIFE RAFT CERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 800 | HVAC | |||||||||||
| 801 | EOS AC Unit Installation (T-ALT 360) | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRYDOCKING | |||||||||||
| 958 | TAKE_CCSI_PROPELLER CLEAN AND POLISH - IN WATER (0.25 YR) | - 0 | $ - 0 | $0 | ||||||||
| 000 | UNDERWAY REPLENISHMENT EQUIPMENT | |||||||||||
| 001 | SWMS Removal (T-ALT 236) | - 0 | $ - 0 | $0 | ||||||||
| 002 | FAS FAIRLEAD BLOCK REMOTELY FED GREASE LINES | - 0 | $ - 0 | $0 | ||||||||
| 003 | ARC refurbishment | - 0 | $ - 0 | $0 | ||||||||
| 004 | PEARY Xfer head refurbishment | - 0 | $ - 0 | $0 | ||||||||
| 005 | PEARY Sliding block jaw clutch assemblies | - 0 | $ - 0 | $0 | ||||||||
| 661 | Carpet Replacement (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 851 | Annual Galley Ventilation and Gaylord Hood Cleaning (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 852 | Annual Laundry Vent Cleaning (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | Dry Docking and Undocking Vessel | - 0 | $ - 0 | $0 | ||||||||
| 902 | Sea suction and Discharge Waster Piping (2.5 YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 903 | Propulsion Shafting Inspection and Removal (5 YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 904 | Zinc Renewal (5 YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 905 | Speed Log Maintenance (5 YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 906 | Intrasonic Tsting | - 0 | $ - 0 | $0 | ||||||||
| 907 | Replace Port and Starboard Rudder Stock Bearings | - 0 | $ - 0 | $0 | ||||||||
| 908 | Bilge Keel Examination | - 0 | $ - 0 | $0 | ||||||||
| 909 | Rudder and Stern Frame Examination | - 0 | $ - 0 | $0 | ||||||||
| 953 | Anchors, Chains and Lockers (5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 955 | Stern Tube Seal Assembly (5 Yr) (SCSI) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 956 | Overhauling Sea Valves (5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 957 | Propeller Clean and Polish - On Dock (2.5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 959 | Underwater Hull Cleaning and Painting - Near White Blast (10YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 961 | Freeboar Preservation (5YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 962 | Cathodic Protection (5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 963 | Sea Chest and Marine Growth Protection (2.5 YR) ( CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 966 | Shaft Alignment and Bearing Reaction Checks (Set 1 and 2) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 967 | Shaft Alignment and Bearing Reaction (Sets 3 and 4) (5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 968 | Shaft Alignment and Bearing Reaction (Post Sea Trail) ( CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 000 | UNDERWAY REPLENISHMENT EQUIPMENT | |||||||||||
| 001 | SWMS Removal (T-ALT 236) | - 0 | $ - 0 | $0 | ||||||||
| 002 | FAS FAIRLEAD BLOCK REMOTELY FED GREASE LINES | - 0 | $ - 0 | $0 | ||||||||
| 003 | ARC refurbishment | - 0 | $ - 0 | $0 | ||||||||
| 004 | PEARY Xfer head refurbishment | - 0 | $ - 0 | $0 | ||||||||
| 005 | PEARY Sliding block jaw clutch assemblies | - 0 | $ - 0 | $0 | ||||||||
| TOTAL | - 0 | $ - 0 | $0 |
&LUSNS ARCTIC (T-AOE 8)&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-19-R-6012
&CATTACHMENT J-2
File details come from the government source that posted it. Updated .