This document outlines modifications to the delivery schedule for a federal contract solicitation for regular overhaul and dry-docking services for the USNS JOHN LENTHALL (T-AO 189).
The solicitation, number N3220520R4006, requires general services including hull steel replacement, tank painting, stability testing, degaussing conduit removal from tanks and inserting bulkheads, diesel engine repair, and structural steel gauging surveys. Flight deck non-skid coating, safety net inspection, and weight testing are also required along with UN-station steel replacement and UN-REP systems repairs. The period of performance is approximately 90 calendar days beginning around March 9, 2020.
The modifications change the delivery dates for all contract line items from February 7 to May 6, 2020 to March 9 to June 6, 2020. The Military Sealift Command is the contracting agency and the requirement is designated as a 100% small business set-aside.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3220520R4006-0004.docx | DOCX document | |
| N3220520R4006-0002.docx | DOCX document | |
| N3220520R4006A0001.docx | DOCX document | |
| USNS_LENTHALL_2020_ROH_JA_Signed_Redacted.pdf | ||
| J-7_MSC_Ship_Repair_Facility_Survey.doc | DOC document | |
| J-2_Cat-A.xlsx | XLSX spreadsheet | |
| J-3_Cat-B.xlsx | XLSX spreadsheet | |
| J-12_Past_Perf_Data.docx | DOCX document | |
| CDRLS.zip | ZIP file | |
| J-9_Disclsr_Lobbying_Activities_SF-LLL.doc | DOC document | |
| N3220520R4006.docx | DOCX document | |
| JOHN_LENTHALL_2020_ROH_J-4.pdf | ||
| J-11_MSC_Dry-Dock_Evaluation_Form.docx | DOCX document | |
| J-8_RFC.doc | DOC document | |
| J-13,_Past_Perf_Questionaire.docx | DOCX document | |
| J-14,_NDA_.docx | DOCX document | |
| J-10_Interport_Differential.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220520R4006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION F - DELIVERY AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 07-FEB-2020 TO
06-MAY-2020
| N/A |
| N/A |
FOB: Destination
To:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 09-MAR-2020 TO
06-JUN-2020
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0002 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 07-FEB-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 09-MAR-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0003 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 07-FEB-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 09-MAR-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0004 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 07-FEB-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 09-MAR-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0005 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 07-FEB-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 09-MAR-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0006 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 07-FEB-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 09-MAR-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0007 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 07-FEB-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 09-MAR-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0008 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 07-FEB-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 09-MAR-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0009 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 07-FEB-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 09-MAR-2020 TO
| N/A |
| N/A |
The following have been modified:
F-1 SHIP AVAILABILITY PERIOD
It is anticipated the ship will arrive at contractor’s yard on or about 09 March 2020. All work shall be completed in no more than 90 calendar days from actual start date designated by the Government at time of contract award.
(End of Summary of Changes) image1.wmf