N3220520R4006-0003.docx

DOCX document 32 KB Posted

Attached to
USNS JOHN LENTHALL (T-AO 189) ROH/DD
Solicitation number
N3220520R4006
Issued by

About this file

This document outlines modifications to the delivery schedule for a federal contract solicitation for regular overhaul and dry-docking services for the USNS JOHN LENTHALL (T-AO 189).

The solicitation, number N3220520R4006, requires general services including hull steel replacement, tank painting, stability testing, degaussing conduit removal from tanks and inserting bulkheads, diesel engine repair, and structural steel gauging surveys. Flight deck non-skid coating, safety net inspection, and weight testing are also required along with UN-station steel replacement and UN-REP systems repairs. The period of performance is approximately 90 calendar days beginning around March 9, 2020.

The modifications change the delivery dates for all contract line items from February 7 to May 6, 2020 to March 9 to June 6, 2020. The Military Sealift Command is the contracting agency and the requirement is designated as a 100% small business set-aside.

View the file

Other files

File Type Posted
N3220520R4006-0004.docx DOCX document
N3220520R4006-0002.docx DOCX document
N3220520R4006A0001.docx DOCX document
USNS_LENTHALL_2020_ROH_JA_Signed_Redacted.pdf PDF
J-7_MSC_Ship_Repair_Facility_Survey.doc DOC document
J-2_Cat-A.xlsx XLSX spreadsheet
J-3_Cat-B.xlsx XLSX spreadsheet
J-12_Past_Perf_Data.docx DOCX document
CDRLS.zip ZIP file
J-9_Disclsr_Lobbying_Activities_SF-LLL.doc DOC document
N3220520R4006.docx DOCX document
JOHN_LENTHALL_2020_ROH_J-4.pdf PDF
J-11_MSC_Dry-Dock_Evaluation_Form.docx DOCX document
J-8_RFC.doc DOC document
J-13,_Past_Perf_Questionaire.docx DOCX document
J-14,_NDA_.docx DOCX document
J-10_Interport_Differential.doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220520R4006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION F - DELIVERY AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 07-FEB-2020 TO

06-MAY-2020

N/A
N/A

FOB: Destination

To:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 09-MAR-2020 TO

06-JUN-2020

N/A
N/A

The following Delivery Schedule item for CLIN 0002 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 07-FEB-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 09-MAR-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 07-FEB-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 09-MAR-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0004 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 07-FEB-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 09-MAR-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0005 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 07-FEB-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 09-MAR-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0006 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 07-FEB-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 09-MAR-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0007 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 07-FEB-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 09-MAR-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0008 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 07-FEB-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 09-MAR-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0009 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 07-FEB-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 09-MAR-2020 TO

N/A
N/A

The following have been modified:

F-1 SHIP AVAILABILITY PERIOD

It is anticipated the ship will arrive at contractor’s yard on or about 09 March 2020. All work shall be completed in no more than 90 calendar days from actual start date designated by the Government at time of contract award.

(End of Summary of Changes) image1.wmf