J-3_Cat-B.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- USNS JOHN LENTHALL (T-AO 189) ROH/DD
- Solicitation number
- N3220520R4006
About this file
This document contains a pre-solicitation notice and description for the upcoming Regular Overhaul/Dry-Docking (ROH/DD) of the USNS JOHN LENTHALL (T-AO 189) under Solicitation Number N3220520R4006. The Military Sealift Command requires general services, hull steel replacement, tank painting, stability testing, degaussing conduit removal and bulkhead insertion, diesel engine repair, structural steel gauging surveys, flight deck non-skid and safety net inspection and testing, and UN-Station steel replacement and UN-REP systems repairs for the vessel. The period of performance is expected to begin on or about February 21, 2020 and last 60 calendar days. The estimated solicitation issue date is October 3, 2019. The solicitation and supporting documentation will be posted on FBO.gov. This requirement will be set aside for small businesses. The NAICS code is 336611 and questions should be directed to the point of contact listed.
J-3 Contractor Price Breakdown - Category B Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3220520R4006-0004.docx | DOCX document | |
| N3220520R4006-0003.docx | DOCX document | |
| N3220520R4006-0002.docx | DOCX document | |
| N3220520R4006A0001.docx | DOCX document | |
| USNS_LENTHALL_2020_ROH_JA_Signed_Redacted.pdf | ||
| J-7_MSC_Ship_Repair_Facility_Survey.doc | DOC document | |
| J-2_Cat-A.xlsx | XLSX spreadsheet | |
| J-12_Past_Perf_Data.docx | DOCX document | |
| CDRLS.zip | ZIP file | |
| J-9_Disclsr_Lobbying_Activities_SF-LLL.doc | DOC document | |
| N3220520R4006.docx | DOCX document | |
| JOHN_LENTHALL_2020_ROH_J-4.pdf | ||
| J-11_MSC_Dry-Dock_Evaluation_Form.docx | DOCX document | |
| J-8_RFC.doc | DOC document | |
| J-13,_Past_Perf_Questionaire.docx | DOCX document | |
| J-14,_NDA_.docx | DOCX document | |
| J-10_Interport_Differential.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | ||||||||||||||
| 1.3 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 1 | DAY | ||||||||||||
| 1.3 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 1 | DAY | ||||||||||||
| 1.3 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 1 | DAY | ||||||||||||
| 1.3 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 1 | DAY | ||||||||||||
| Sub-Total | |||||||||||||||
| 030 | CONTINUATION OF SERVICES | QTY | UI | Unit Price | Total | TOTAL PRICE | |||||||||
| 7.1 | Overhaul Management Team | 90 | DAYS | ||||||||||||
| 7.2 | General Services For The Ship | 90 | DAYS | ||||||||||||
| 7.3 | Telephone Services | 90 | DAYS | ||||||||||||
| 7.4 | Project Planning and Monitoring | 90 | DAYS | ||||||||||||
| 7.5 | Fire Protection and Ship's Safety | 90 | DAYS | ||||||||||||
| 7.6 | Shipboard Access and Security | 90 | DAYS | ||||||||||||
| 7.7 | Gas Free Certificates | 90 | DAYS | ||||||||||||
| Sub-Total | |||||||||||||||
| 106 | ULTRASONIC THICKNESS GAUGING | QTY | UI | Unit Price | Total | TOTAL PRICE | |||||||||
| 7.1 | Ultrasonice Thickness Gauging Reading | 7,500 | ea | ||||||||||||
| Sub-Total | |||||||||||||||
| 107 | STRUCTURAL STEEL REPAIRS | QTY | UI | Unit Price | Total | TOTAL PRICE | |||||||||
| 7.1.1 | STEEL PLATE REPLACEMENT | 10,000 | LB | ||||||||||||
| 7.1.2 | ROLLED STEEL STRUCTUAL SHAPES | 5,000 | LB | ||||||||||||
| 7.2.1 | VEE OUT & RE-WELD ONE(1) 6" LONG OR LESS CRACKED FILLET WELD | 50 | EA | ||||||||||||
| 7.2.2 | VEE OUT & RE-WELD ONE(1) 7"-12" LONG CRACKED FILLET WELD | 50 | EA | ||||||||||||
| 7.3.1 | REPLACE ONE SOUNDING TUBE STRIKER PLATE | 25 | EA | ||||||||||||
| 7.4.1 | CLAD WELD ONE (1) 2" x 2" AREA OF DECK OR BOTTOM PLATING | 50 | EA | ||||||||||||
| 7.4.2 | CLAD WELD ONE (1) 4" x 4" AREA OF DECK OR BOTTOM PLATING | 50 | EA | ||||||||||||
| 7.4.3 | CLAD WELD ONE(1)6"x6" AREA OF DECK OR BOTTOM PLATING | 50 | EA | ||||||||||||
| Sub-Total | |||||||||||||||
| 902 | DRY DOCKING AND UNDOCKING | QTY | UI | Unit Price | Total | TOTAL PRICE | |||||||||
| 7.1 | ADDITIONAL DAYS | 30 | DAYS | ||||||||||||
| Sub-Total | |||||||||||||||
| 904 | ZINC ANODE REPLACEMENT | QTY | UI | Unit Price | Total | TOTAL PRICE | |||||||||
| 7.2 | TYPE ZSS-12 ZINC ANODE | 200 | EA | ||||||||||||
| 7.2 | TYPE ZHC-23 ZINC ANODE | 100 | EA | ||||||||||||
| 7.2 | TYPE ZHC-47 ZINC ANODE | 200 | EA | ||||||||||||
| 7.2 | TYPE ZEP STYLE B ZINC ANODE | 100 | EA | ||||||||||||
| Sub-Total | |||||||||||||||
| 965 | STEEL RENEWAL | QTY | UI | Unit Price | Total | TOTAL PRICE | |||||||||
| FLAT SHELL PLATING | 10,000 | LBS. | |||||||||||||
| SHAPED SHELL PLATING | 5,000 | LBS. | |||||||||||||
| TANK BULK HEAD | 5,000 | LBS. | |||||||||||||
| TANK INTERNAL STRUCTURE | 5,000 | LBS. | |||||||||||||
| MISCELLANEOUS BULKHEADS AND DECKS | 10,000 | LBS. | |||||||||||||
| CLAD WELDING | 50 | EA | |||||||||||||
| DRY-DOCK BLOCK REMOVAL | 150 | EA | |||||||||||||
| Sub-Total | |||||||||||||||
| TOTAL |
&"Times New Roman,Regular"&10USNS JOHN LENTHALL (T-AO 189)
| &"Times New Roman,Bold"&14 | |
| CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N3220520R4006 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .