Text version
Sheet1
| Paragraph/section | Contractor Question/Comment | Government Response |
| PWS 14.3 | The Program Manager key personnel requirements are very specific and potentially restrictive. The previous MSC material management solicitation had much lower requirements for a project manager. What is the difference? | The position has been upgraded from a project manager to a program manager due to the required oversight over a global contract and both ashore and afloat pieces. Due to complexity of the scope of work, the minimum requirements were increased and are consistent with industry standards. |
| PWS 9 | Please provide a list of labor categories for each location expected to travel | It will be the contractor's responsibility to manage which employees travel for successful performance. |
| PWS 7.1 | Will the contractor be provided the results of a 100% inventory audit upon contract award that’s not older than 30 days? | The government is certifying that the inventory is above the 98% accuracy level per PWS 3.7.3 |
| PWS 7.1 | Where are the KSD files currently being stored? | At each warehouse site as well as electronically. |
| PWS 3.12 | Will the government be attending the production meetings? What information will the government require as a deliverable? | The Production meeting will be between the contractor and Government. Information discussed will be metrics associated with the PWS and the management of the contract, status of property, process improvements, milestones, challenges, etc. The contractor should provide charts, trends and graphs where applicable. |
| PWS 3.8.1, 3.8.2, 3.9 | What additional information is required on the report besides part nomenclature, part number, serial number, location, quantity and cost per unit? | This is the minimum required on the report. |
| PWS 3.8.1 | Will the government provide full access to all past inventory audits? Is there a certain percentage of inventory to be audited daily? | The awardee will have access to MSC systems which will have all past inventory and audit information. The government will conduct random audits to on the contractor inventories. |
| PWS 3.6 | Will a current, 100 % inventory of all RRAM material be provided upon contract award? | The RRAM inventory resides in the Navy ERP system. |
| PWS 11.2 | What are the material and HAZMAT/HAZWASTE disposal requirements for overseas locations? Are there any special permits required? |
| MSC warehouses will not receive HAZMAT to be disposed of other than what is generated by the warehouse operation. Permits requirements will vary by location. | ||
| PWS 14 | Recommend identifying additional personnel to do shipboard inventories as over and above. | Other additional will be required to complete shipboard inventories, but they are not key personnel. |
| PWS 14.3 | What is the level of effort for the key personnel | It is anticipated that key personnel will work full time under this potential contract; however, potential offerors have the flexibility to create a staffing plan that will be evaluated per subfactor A. It is the vendor's responsibility to create a staffing plan that meets the technical requirements. |
| PWS 11.1.2 | This PWS paragraph shows 200 discrepancies on 250 requisitions. Please confirm this location receives a high percentage of discrepancies and what is the driver for such a high level. | This is material normally removed from ships with little or no documentation. |
| PWS 12.1 | The Maintenance Technicians working on-site at MSC facilities MUST have a minimum active SECRET security clearance or an interim SECRET security clearance prior to the start of performance. Does this mean ONLY the Maintenance Techs require clearances, or will others on contract also require them? | Personnel accessing the DoD computer system will require a secret clearance. It is not anticipated at this time that laborors without a need to log into the DoD computer systems will require a secret clearance. |
| PWS 15.1 and 15.2 | Please clarify the PM assigned in PWS 15.1 & 15.2 Attachments A & B. We understand the "PM" stands for Program, but how does that relate to this effort and/or location? | MSC's organization structure includes dfferent Program Management Offices that manage the different vessels and their missions. This is just informational. |
| PWS 15.1 and 15.2 | For the Attachments A & B, please assign the size of ship applicable to this representational inventories. | The physical size of the ship is not the major factor in determining the level of effort to complete the inventory, the total number of line items is what is important to focus on. Paragraph 11.3 of the PWS breaks down what is considered large, medium, and small vessels. |
| PWS 1.1 | Is the Government expecting a need for overtime to meet PWS 1.1 Requirement? | Paragraph 11.3 of the PWS provides the average number of days to complete the inventory. It is up to the awardee to determine the right labor mix. |
| PWS 11.3 | Please clarify for each class of ship if the table presented in PWS 11.3 is for SRI, DMP or both? | Paragraph 11.3 states, "If a ship requires both an SRI and DMP inventory it will count as two ships" |
| PWS 11.3 | Table in PWS 11.3 displays "average range". Can the Government please clarify what this number is (i.e. items, lines, etc.) | These are line item counts. |
| PWS 3 | The PWS states, "The contractor shall perform all aspects of this task with qualified personnel and have the capability of surging for short periods without reduced support." There is no CLIN for "Over and Above/Surge Support" it is assumed this will be expected to be covered in monthly FFP rates. Please provide historical monthly workload data for surge for industry to analysis and determine proper minimum staff complement. | No historical data exists. In the past the contractors have put their existing personnel on flex shifts to cover any surge support required. A person or persons would work Saturday and be given off on Monday. Work consisted of only required functions to support the ships, such as receiving and issuing parts. |
| PWS 3.8 | Please provide historical frequency of afloat inventories relating to TDY missions and historical number of personnel required to complete these inventories. | The Government anticipates a minimum of one to two afloat inventories per month depending on availabilities of the ships and requests from the Command. Contractors personnel requirements vary depending on the amount of property to be inventoried and type of ship. 11.3 and 15.1 provide an example of the amounts of property to be inventoried. All data entry will be performed aboard the ship in ShipCLIP. |
| PWS | PWS refers to requisitions. Does 1 requisition mean 1 item or |
multiple? Can Government clarify so that we can propose an appropriate number of personnel?
| A spread sheet with piece count thruput will be provided. | ||
| PWS 3.5 | Does the Government need any specific qualifications for personnel handling medical kits? | |
| No special qualifications are required. The contractors personnel must follow the guidelines listed in the references section of the PWS. | ||
| PWS 3.8.1 | In accordance with PWS 3.8.1, request the Government provide historical SRI workload data per ship class at each location to aid industry in proposing a competitive offeror. | This data is from MSC Shipboard systems. Because of the variety of storeroom ranges and depths even within the same class the government elected to provide an average number |
| PWS 3.8 | Do all ships have both an independent (not shared with any other ship) SRI and DMP? Does every ship have both a SRI and DMP? | Each ship has it's own SRI. Only contract operated ships have both SRI and DMP as spelled out in Table 15.2 |
| PWS 3.8 | Please provide all ship classes associated with this contract, identify for each ship whether it has an associated SRI, DMP, and/or both, Location of these SRI and DMP sites, and average monthly inventory amounts/workload (specified in items or line of items) | Table 15.1 and 15.2 have this information. |
| PWS 11.3 | Request the government provide historical data on how many inventories conducted in CENTCOM locations | That information is unavailable as this is a new requirement to cover the entire MSC fleet. The inventory will be conducted wherever the ship is operating or located. |
| PWS 11 | The provided workload data appears inconsistent. For example, in many cases, the number of causative research on warehouse discrepancies appears to be over the 2% threshold associated with inventory accuracy rates. Request the government confirm the accuracy of the workload data, provide updates as required. | Workload is valid. Discrepancies are the result of material that is returned from shipyard availablities or not in the MSC systems as it has been ordered outside of N4 processing. |
| PWS 14.3 | The minimum requirements for the Program Manager appear to be written for a specific individual not what is available in the labor market. As the proponent for this requirement Navy wide, the Navy Supply Corps does not require anything close to the minimum requirements in this RFP. The Navy successfully assigns Supply Corps Officers in the grade of O-5 and O-6 to run similar or larger operations world wide with much lesser requirements. Based on the RFP requirements, the vast majority of the Navy Supply Corps Officers are not qualified to run this program. USAJobs.Gov is the source for Government employment, similar positions for Department of the Navy open positions running similar operations do not require all of the minimum requirements in this RFP. Additionally, in almost every position posted on USAJobs.Gov the Government allows trade offs between education and experience and vice versa. Senior Navy Supply Corps Officers who successfully performed this managerial duty while on active serive with the highest Fitness Report are not qualified as the PM under this RFP. Will the Government consider properly aligning the positions to the Navy's corresponding active duty/reserve requirements to fill the position and the requirements set forth by the Department of the Navy in USAJobs.Gov? | The current requirement is less restrictive than previous solicitations. The resume is not drafted for a particular person but based on past experience is the minimum requirements that the government feel is necessary for a successful applicant. The government has reviewed past solicitations and there has been no shortage of personnel who have met past more stringent qualifications. The government agrees that Supply Corps officers are good candidates that meet or exceed the minimum requirements, however program management qualification and certification is internationally recognized as an ISO standard qualification and MSC is an ISO organization and continues to expand its ISO certifications. |
| PWS 3.2.4 | References D, E, F, and G are cited with regard to management of hazardous materials. Respectfully request the Government confirm that these are the desired governing references. | Yes the references are correct. |
| SHIP AND BASE ACCES Clause | Following the instructions provided within the RFP for website http://www.msc.navy.mil, there are only two forms available to choose from. Is the awarded contractor to use the "One Day Pass Request" for both Base/Repair Facility Access Request and Vehicle Access Request? | Any contractor that does not possess a CAC card will be required to obtain a one day pass and vehicle access. Requirements may vary by location. |
| PWS 14.3.10 | This specifies the requirement for Key Personnel, Senior Supply Management Analyst, but does not specify location(s). Will the Government provide that information? | It is anticipated that one key personnel will manage the majority of the Afloat (SRI/DMP) inventories. The location will not be specific as they will travel to the ship location. |
| PWS 12.4 | Specific Key Personnel have locations outside of CONUS, for non-US states and territories do these individual and other employees (FTE/PTE) fall under a SOFA Agreement or Defense Accord? Paragraph 12.4 All personnel performing work on-site at GOV locations shall be United States citizens, does the US Government sponsor these individuals? If not these positions maybe subject to local labor laws and could possibly make the position open to only local nationals who are both citizens and residents; generally local nationals will not qualify for a clearance. Please clarify. | Yes, they are all covered under SOFA agreements. |
| PWS 11 | PWS Section 11.0 provides detailed workload for each location, and asks the Contractor to determine the hours required. However the workload also depends on the type of material – weight, size and shape. Can Government provide additional clarity into the type of material received/ shipped | The material is not homogenious like a DLA stock point. It ranges from small boxes to large crates with shipboard equipment to be installed. As much as possible the material is shipped via triwalls. |
| PWS 14.2 | PWS Section 14.2 Position Requirements indicates Key personnel and their qualifications. However the positions listed as Key are different from PWS Section 14.3. Can the Government clarify which positions it considers as Key? How many resumes per category is the Government looking for? | There are multiple key personnel listed in PWS 14.3 that fall under the minimum qualifications in PWS 14.2 e.g. there are multiple material management supervisors at the different locations and a resume would be expected for each location |
| PWS 11.3 | In order for the Contractor to provide a reasonable cost estimate, can the Government provide the location(s) of where these inventories take place and clarify what the workload is if there is more than one location? | The locations are unknown, which is why travel is reimburseable under this contract. The workload estimates and average time to complete is assumed to be enough information in order for the contractor to provide a firm fixed price. |
| PWS 1.2 | The PWS dictates surging during emergencies or contingencies to include phase 2 operations per DFAR 252.237-7024. Can the gov’t provide historical data on the number of times in the past five years that this requirement was invoked? | This requirement has not been invoked in the past five years |
| PWS 3.2.4 | Will the gov’t pay for necessary HAZMAT training? | The contractor should provide all training to the standards and requirements listed in the references of the PWS. |
| PWS 15.1 | In Attachment A, what is meant by Range and Depth? | The range is the number of line items, and the depth is total quantity or eaches. |
| PWS 11 | Can the Government clarify what they mean by a Requisition, does each requisition consist of multiple items/pieces or just one item/piece, and if multiple what is the average number? | A requisition could constitute 1 line item or multiple line items of various sizes and weights. |
| PWS 3.3.4 | Is the contractor required to provide vehicles for local pick-up and delivery? If so, what type/number of vehicles are required in each location? Will this be considered an authorized ODC expense? | Yes, The contractor will determine what is appropriate to the workload and the mission. |
| PWS 4 | This paragraph states "The contractor is responsible for providing all material and vehicle support under these tasks." Will the Government specify what material and vehicle support is required at each location as without this information, it places a contractor at great risk? | Based on the workload estimates and other information, it is assumed that a contractor with warehouse management experience will have knowledge of material and vehicle support to complete the scope of work. |
| PWS 3.7.3 | Will the gov’t agree to a statistical sampling of inventory accuracy during the transition period to confirm gov’t assertion of 98% inventory accuracy | Statistical sampling would be at the discretion of the awardee and at their cost. Per the PWS the government assumes the risk until the awardee touches it or receives and stows new material. |
| PWS Scope (background section) | As this is a firm fixed price contract as to provide accurate pricing, will the government clarify the number and types of material handling equipment by location that will be required by the vendor to provide? And will this be an authorized ODC? | MHE is provided by the government. |
| PWS 1.1.9 | Will the government estimate clarify for accurate pricing how much temporary support is required to Jacksonville, FL area? | Historically, support to Jacksonville was infrequent with the contractor located in Charleston able to shift locations temporarily to handle any requirement. |
| PWS 1.2 | what constitutes phase 2 operations, and are there predefined COOP locations for operations or are they anticipated to surge within the existing buildings/locations? | Phase 2 operations would be part of a national emergency and require relocation of material to more secure sites and require a second shift or 24 hour operation at some sites. |
| PWS 14.3 | For overseas locations, several have 1 or 2 personnel at these locations, is this a requirement at these locations? If so, will travel funding be authorized as an approved ODC to bring personnel from another geographic location to cover these costs? | Key positions are listed in the PWS under 14.3 by location and labor category and are required to be staffed at these minimum levels. Travel is authorized for the contractors personnel to travel to their place of performance under this contract. |
| PWS 5 and FAR 52.212-1 Addendum | Paragraph 5 specifies a requirement for a phase-in within 7 days of award and a phase-out 90 days prior to end of contract, however, Paragraph 2b requires a transition plan starting at contract award and a transition to a follow-on contractor. Can the Government clarify this apparent inconsistancy? | The transition plan is a technical subfactor, which is due with the offerors proposal and will allow the Government to evaluate the plan in making their award selection. It is assumed that the majority of this document will become the phase-in plan deliverable. |
| PWS 11 and FAR 52.212-1 Addendum | The Government furnished information/workload leaves gaps in real support; Instructions for Volume I - Technical requires industry to address full-time and part-time personnel as well as FTE counts per location. The only competitor holding this information is the incumbent which makes fair competition very difficult. Request more comprehensive workload data to include historical monthly workload per location instead of annual. | The workload per location was provided as an annual estimate and the estimated monthly workload could be obtained by dividing the annual numbers by 12. |
| FAR 52.212-1 Addendum | "The Offeror shall provide resumes for all Key Personnel listed in Section 12 of the PWS (resumes are not included in the page limitation of the Technical Offer)." Section 12 is 12. Security Requirements. Does the Government mean Paragraph 14. KEY PERSONNEL? | Yes, this has been updated in the RFP |
| FAR 52.212-1 Addendum | "The Offeror shall provide resumes for all Key Personnel listed in Section 12 of the PWS. Requiring resumes and Letters of Intent from the Key Personnel list in 14.3" Specific Key Personnel (Page 61) requires 18 individuals. We believe this is excessive and places a significant burden on all bidders except the incumbent contractor (Professional Analysis, Inc.) providing them an unfair advantage. Request the Government delete this requirement or limit it to only the PM. | Based on past experience, having the proper key personnel in place is one of the key necessities for successful performance of the contract. Further, each warehouse functions independent (to an extent)of the other warehouses, hence the requirement for all the key personnel |
| FAR 52.212-1 Addendum | Request the Government delete the requirement for Letters of Intent for all key personnel except the PM. Unless the Government provides all bidders with a list of the incumbent personnel and contact information, Key Personnel who are currently on the contract and have institutional knowledge will not be offered contingent employment by anyone except the incumbent. It would be unethical and possibly illegal to make an employment offer, have a signed letter of intent from an individual then revoke it upon contract award to hire the incumbent work force. Leaving this requirement in the RFP will cause the Government to loose all institutional knowledge across the contract. Is it the Government's intent to replace all key personnel and loose all institutional knowledge across the contract? | Yes, the Government is willing to lose all institutional knowledge if a potential offeror proposes that. This is a typical process amongst service contracts and a risk the Government accepts. This is also why we requested resumes for all key personnel as a mitigation factor. |
| FAR 52.212-1 Addendum | According to instructions, industry is to provide a, "[transition] plan for obtaining all resources required (e.g., personnel, equipment)…" According to the PWS, there is no reference to contractor furnished equipment and/or mention of coordinating equipment for transition. Please clarify what equipment this instruction is referring too and to which PWS sections it applies. | Equipment is meaning any vehicles or material the contractor may need for successful performance |
| FAR 52.212-1 Addendum | Paragrpah 2a 1) states, "The Offeror shall provide a brief and precise narrative that describes/explains their staffing approach. This approach shall include proposed labor categories and estimated hours/FTE for each specific, high level task in section 3 of the PWS (e.g. 3.1 Material Receipt, 3.2 Material Stowage)." Can the Government specify which of the 12 tasks are considered 'high level" and if it includes such tasks as Material Transportation, provide the workload at each location? | 3.1 - 3.12 are considered the high level tasks. Please note, the Government is not seeking to have it broken down by the sub paragraphs (e.g. 3.1.1). |
| FAR 52.212-1 Addendum | This paragraph states "A price is requested for estimated travel costs". Is this not included in the CLIN for Reimbursable Travel of $1M as specified in Attachment 4? | As this is an option, the travel price for these is not included in the $1M travel estimate. |
| FAR 52.212-1 Addendum | Does the Government really want "A labor market analysis of the place of performance and the surrounding area and how it impacts the staffing approach." and if yes, does this include OCONUS given that the workforce is all US citizens? | Yes, this is required. If a vendor is sourcing all labor from the U.S. for OCONUS locations, the offeror should document how they plan on filling those positions. |
| FAR 52.212-1 Addendum | Does relevant only mean Navy contracts and supply functions or are similar supply functions for accountability, inventory, receipts, store/issue/receive, stocking and such deemed generic tasks and considered relevant if performed in other agencies, departments and commercial contracts? | Per the instructions to offerors, “Relevant” is defined as a contract or multiple simultaneous contracts cumulatively combined that is of similar scope, magnitude, and complexity to the requirements as set forth in this solicitation. Further, under the definition of "recency" it says, If the offeror has not had three (3) Government contracts within the last three (3) years, information on recent and relevant subcontracts and/or commercial contracts may be submitted |
| FAR 52.212-1 Addendum | Proposal Preparation Instructions: Volume II - Technical Proposal: Subfactor A - Staffing and Key Personnel. The Government is requesting a Labor Market Analysis of the place of performance. Can Government clarify what is the extent of detail the Government requires in this analysis? A brief list of topics to be covered in the Labor Market Analysis would be helpful for contractors to make efficient use of the limited page restrictions. | The Government is not dictating any additional requirements for the labor market analysis in order to allow offerors the flexibility of managing their page count and meeting the intent of the instructions to offerors. |
| FAR 52.212-1 Addendum | Does MSC expect a written plan for continuation of essential contractor services (DFAR 252.237-7024) to be submitted in Volume 1? | Yes, Per FAR 52.212-1 Addendum, paragraph B. "The contractor shall provide, as part of their proposal, the information requested in clause 252.237-7024 NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES" |
| Clauses | The Solicitation states that FAR 52.222-17 applies, and therefore the incumbent service employees would be offered the first right of refusal. Why is the Government requesting Resumes and Letters of Intent? | The key personnel as definined in the PWS fall under the exemption in FAR 52.222-17 for adminstrative or professional personnel. |
| Clauses | As FAR 52.222-17 applies, the new vendor must offer any qualified individual the opportunity for first right of refusal. Since this is a Firm Fixed Price contract, in order to price this accurately the vendor needs to know the labor categories and location of existing employees on the existing contract. Would the government please provide the FTE requirement by labor category and by location? | Per FAR 52.222-17 (b)(1), The Contractor and its subcontractors shall determine the number of service employees necessary for efficient performance of this contract and may elect to employ fewer employees than the predecessor Contractor employed in connection with performance of the work. As such, all potential offerors have the ability to determine the labor categories and FTE's they believe meets the requirements of this contract and still comply with FAR 52.222-17 |
| Clauses | The Solicitation states that FAR 52.222-42, Statement of Equivalent Rates for Federal Hires applies. Can the Government provide the equivalent rates for Federal Hires | GS Equilivents do not exist on this contract. 14.2 of the PWS lists the minimum requirements for key personnel and labor categories only. |
| Attachment 3 | Attachment 3: Past Performance Questionnaire - The PPQ provided by the Government has a response deadline of 10 March 2017. Can the Government provide a corrected copy with the desired date | The corrected due date is the closing date of the solicitation. Attachment 3 has been updated |
| Attachments/Exhibits | This paragraph references an Exhibit A. Will the Government provide this exhibit? | Yes, Exhibit A has been uploaded |
| Attachment 5 | Request the Government verify if all employees are required to have secret clearance and where will the access to classified be | Personnel accessing the DoD computer system will require a secret clearance. Acess will be on a DoD facility or ship. |
| Attachment 4 | Is it safe to assume the labor category rates to be inserted in Attachment 4 are composite rates since the rate for each labor category is likely to vary geographically? Or is it the desire of the government to have the vendor provide rates for each labor category at each location? | Yes, a composite rate is acceptable. |
| All | Who is the incumbent contractor? | This requirement was previously fulfilled under N62387-15-D-6507 by Future Technologies, Inc. Since 1 November 2017, the requirement has temporarily been fulfilled under N62387-14-D-6505 by Professional Analysis, Inc. This requirement expires 31 January 2017. |
| All | Based on the lack of detailed workload data provided, please provide the historical staffing FTE count for each location. | The Government will not be providing an FTE count per location. |
| All | Due to tolls in the Hampton Roads area, and elsewhere, will the government provide or reimburse the costs of an EZ pass for all vehicles used for delivery of material? | No, the government will not provide reimbursement for tolls or EZ pass on contractor owned vehicles. |
| All | Who is the incumbent contractor? Can the Government provide Incumbent Contractor name, contract number, contract award amount, and period of performance? | See row 2 above |
| All | Are all positions on the current contract currently filled? | The Government has not mandated a specific number of FTE's besides those key personnel. All Key Personnel positions are currently filled |
| All | The requirements of this Solicitation, especially requisitions and inventory sections makes it very specific to MSC. Only a contractor with previous MSC experience will have an understanding of the intricate details. Can the Government explain if they have preference for contractors with prior MSC experience? | |
| MSC N044 requires a competent contractor with a strong afloat and ashore logistics and management background. There is no preference for a contractor with prior Navy or MSC experence. | ||
| All | The RFP requires the contractor to provide rental vehicles and consumable supplies (boxes, cleaning supplies, etc.). How should these be priced in the proposal? A separate line item or included in the afloat/ashore management CLINs? | The Afloat and Ashore CLINs should be priced as a firm fixed price to complete all requirements for the applicable PWS paragraphs. |
| All | Is it possible to add a labor category for lower level workers where total logistics experience is a minimum of four years? | The minimum personnel requirements listed in PWS 14.2 are only for key personnel. There are no requirements for other personnel that would be employed under this contract. |
| All | Is this requirement covered under any Collective Bargaining Agreement? | Negative |
| All | Given the requirements of the solicitation including resumes to be provided, and the short time frame available, Can the Government extend the deadline for proposal submission? | |
| An extension has been granted to 10AM on 2 Jan 2018 |