Q&A_3_-_answered.docx

DOCX document 2 MB Posted

Attached to
USNS GRASP (T-ARS 51) Mid-Term Availability
Solicitation number
N32205-17-R-4402
Issued by

About this file

Q&A #3

View the file

Other files

File Type Posted
Q&A_5_-_answered.docx DOCX document
SF30.docx DOCX document
Q&A_7_-_answered.docx DOCX document
Q&A_6_-_answered.docx DOCX document
J-3_Category_B_Items.xlsx XLSX spreadsheet
N32205-17-R-4402-0002.docx DOCX document
J-4_Consolidated_GFP.pdf PDF
J-6_CDRLs.zip ZIP file
Q&A_4_-_answered.docx DOCX document
SF30.docx DOCX document
Q&A_2_-_answered.docx DOCX document
Q&A_1_-_answered.docx DOCX document
17-R-4402.docx DOCX document
JA__(N32205-17-C-4402)_REV_3_Signed_Redacted.pdf PDF
N32205-17-R-4402.docx DOCX document
J_attachments.zip ZIP file
J-6_CDRLs.zip ZIP file
SYNOPSIS_N32205-17-R-4402.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-17-R-4402

USNS GRASP (T-ARS 51)

REQUEST FOR SPECIFICATION CLARIFICATION

SPECIFICATION ITEM NO.:506

PARAGRAPH / SECTION NO: 2.1 & 7.3.4

TITLE: Air Conditioning Plan Groom

QUESTION:

Please confirm the references are correct.

Reference 2.1 35 Ton Capacity Air Conditioning Plant, S6230-BP-MMM-010 -This is a York Plant and the compressor referenced is a Carrier Model 5H60-C109.

Can you provide the manufacturer name and part number for the skid resilient mounts in paragraph 7.3.4?

ANSWER:

The specification references are correct as written. The Plant was manufactured by York but a Carrier Model 5H60-C109 compressor and Marathon Motor (Model: DVA326TSTFPA4036CBL) was installed into the plant during a previous availability. The entire carrier condensing unit is referred to as a Carrier Transicold 90YH-060DP6 and the tech manual is referenced in section 2.2.

Currently the manufacturer and part number is not available in material history. Please see attached pictures of four (4) resilient mounts installed on the A/C Plant.

ATTACHMENT J - 8

image1.jpeg image2.jpeg image3.jpeg image4.jpeg

File details come from the government source that posted it. Updated .