N3220517R4013-0002.docx
DOCX document 38 KB Posted
- Attached to
- USNS LARAMIE Mid-Term Availability Federal contract opportunity
- Solicitation number
- N32205-17-R-4013
About this file
N32205-17-R-4013-0002
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220517R4013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Work Items included for this solicitation:
000 GENERAL REQUIREMENTS
001 INTENT, SCOPE, GENERAL REQUIREMENTS DEFINITIONS NSP
002 TECHNICAL AND MANUFACTURER'S REPRESENTATIVE NSP
003 APPROACH, BERTH, AND MOORING REQUIREMENTS NSP
004 TESTING AND QUALITY ASSURANCE NSP
005 ELECTRICAL SAFETY PROCEDURES REQUIREMENTS NSP
006 HEAVY WEATHER PLAN NSP
007 COLD WEATHER PLAN NSP
010 FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM A
011 FURNISH GENERAL SERVICES A
012 TELEPHONE SERVICES A
013 PROJECT PLANNING & PRODUCTION STATUS MONITORING REPORTS A
014 PREPARATION OF WEIGHT AND MOMENT REPORT A
015 INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS A
016 FIRE PROTECTION AND SHIP'S SAFETY PROGRAM A
017 HANDLING SHIP'S STORES A
018 DELIVERY AND REDELIVERY OF THE VESSEL A
019 SHIPBOARD ACCESS AND SECURITY A
020 GAS FREE CERTIFICATES A
021 CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES A
022 DOCK TRIALS AND SEA TRIALS A
023 HAZARDOUS WASTE DISPOSAL A
024 PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY NSP
025 PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY B
030 CONTINUATION OF SERVICES B
100 HULL STRUCTURE
101 NON-SKID RECOAT A
102 SUPERSTRUCTURE BLAST AND PAINT A
103 CARGO BAY TARP PERIMETER RAIL A
104 FAN ROOM DRAIN TROUGH STEEL REPAIRS A
105 TANK DECK OVERHEAD PRESERVATION A
106 MAIN DECK LP AIR PIPING REPLACEMENT A
107 FIXED PORT LIGHT REPAIRS A
108 INTERIOR JOINER DOOR REPLACEMENT A
109 FABRICATE STERN FUEL HOSE RACK A
110 BALANCED FAIRLEAD RECONDITION A
111 FLIGHT DECK NON-SKID RENEWAL A
112 HELO DECK SAFETY NET FURBISHMENT & WEIGHT TEST A
200 MAIN PROPULSION
201 MAIN ENGINE 12,000 HOUR OVERHAUL A
202 FUEL INJECTOR OVERHAUL A
203 OIL MIST DETECTOR CALIBRATION AND SERVICE A
204 MAIN ENGINE CLUTCH-COUPLING OVERHAUL-PORT A
205 PTO CLUTCH OPEN-INSPECT A
300 ELECTRICAL
301 THERMOGRAPHIC SURVEY OF MOTOR CONTROL CENTERS A
302 PTO GENERATOR GROOM A
303 ANNUAL GENERATOR INSPECTION A
304 AIR BREAKER MAINTENANCE A
305 PTO CLUTCH AIR CONTROL PANEL REPLACEMENT A
306 ENGINE ROOM FIRE PUMP MOTOR RECONDITION A
400 COMMUNIC ATION & NAV AIDS
401 GMDSS RECERTIFICATION ANNUAL A
402 MAGNETIC COMPASS ANNUAL MAINTENANCE A
403 NAVIGAT X GYRO SYSTEM MAINTENANCE A
| 404 | RADAR AND ECDIS PREVENTIVE MAINTENANCE | A |
| 405 | SVDR REPLACEMENT WITH JRC JCY 1950 | A |
| 406 | OE-82 UHF SATCOM ANTENNA OVERHAUL | A |
407 TV-DTS SYSTEM GROOM A
408 UHF SATCOM AND LOS TRANSCEIVER GROOM A
409 OE-82 UHF SATCOM ANTENNA RF CABLE REPLACEMENT A
410 URT-23 AND URR-2368 HF SET GROOM A
411 REPLACE BRIDGE ELECTRICAL SAFETY MATTING A
500 AUXILIARY MACHINERY
501 SCBA COMPRESSOR/REFILL STATION ANNUAL SERVICING A
502 AUXILIARY BOILER MAINTENANCE, INSPECTINO AND TEST A
503 #1 SW PUMP OVERHAUL A
505 OVERHAUL SSDG #4 (BERGEN 50,000 HOUR) A
507 CARGO OIL CONTENT MONITOR CALIBRATION AND REPAIR A
508 OVERHUAL ENGINE ROOM FIRE PUMP A
511 WESTFALIA OILY WATER SEPERATOR SERVICE AND CALIBRATION A
600 HABITABILITY
601 ANNUAL OVERHAUL OF FIRE FIGHTING EQUIPMENT A
602 INSPECTION OF FIRE HOSES A
603 INSPECTION OF AFFF HOSES A
604 SCBA EQUIPMENT ANNUAL SERVICING A
605 STATEROOM CARPET SHOWER BULKHEAD AND TERRAZZO A
606 ANNUAL ELEVATOR SERVICE AND MANITENANCE A
607 LIFEBOAT RECERTIFICATION A
608 RECERTIFY LIFEBOAT WINCHES AND DAVITS A
609 RESCUE BOAT RECERTIFICATION A
610 STBD RESCUE BOAT WINCH AND DAVIT INSPECTION A
611 ANNUAL PORT RHIB DAVIT AND WINCH INSPECTION A
612 ANNUAL LIFERAFT RECERTIFICATION A
613 STACK ISOLATION VALVE REPLACEMENT A
614 HALON BOTTLE HYDROSTAIC TEST AND RECHARGE A
800 HEATING, VENTILATION, AND AIR CONDITIONING
801 GALLEY VENTILATION SYSTEM CLEANING A
802 VENTILATION STEAM COIL REPLACEMENT A
803 SPLIT A/C SYSTEM INSTALLATION A
1000 UNREP EQUIPMENT
1001 REFURBISHMENT SADDLE WINCH FOUNDATION A
1002 ANTI SLACK DEVICE (ASD) FRAME AND FOUNDATION A
1003 SLIDING BLOCK BUMPER REFURBISHMENT A
1004 TRANSMISSION REPLENISHMENT PUMP ELECTRIC MOTOR A
1007 SLIDING BLOCK JAW CLUTCH REFURBISHMENT A
1008 ASD BLOWER MOTOR OVERHAUL A