CDRL,_SWI-0015.pdf
PDF 204 KB Posted
- Attached to
- USNS LARAMIE Mid-Term Availability Federal contract opportunity
- Solicitation number
- N32205-17-R-4013
About this file
CDRL SWI 0015
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| data_item: A015 |
| title: ILS/GFM Support Requirements |
| sub: |
| auth: |
| ref: MSC WI 015 |
| req_ofc: PM1CM1/N10 |
| dd250: LT |
| appcode: N/A |
| dist: See Blk 16 |
| freq: ASREQ |
| asof: N/A |
| firstsub: ASREQ |
| subsub: ASREQ |
| addressee1: ACO |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: PPE |
| draft2: |
| reg2: 1 |
| repro2: |
| addressee3: MSC Tech Library |
| draft3: |
| reg3: 1 |
| repro3: |
| addressee4: Onsite Gov't ILS Rep |
| draft4: |
| reg4: 2 |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_reg: 5 |
| total_repro: 0 |
| remarks: Abstract: |
7.1.1 Technical Manual Requirements: Equipment procured under this contract shall be delivered with 3 hard copy and 1 electronic copy of the supporting technical manual. All data will be provided in hard-copy and electronic copy in PDF or Excel formats.
7.1.2 Technical Support Data (TSD): A bill of materials/list of all repair parts, assemblies and subassemblies, special tools and test equipment required to maintain, repair or overhaul the equipment/components as specified by an illustrated parts breakdown. Alternate Submission of TSD: The Contractor may substitute the requirements of TSD documentation with an equipment technical manual as required in paragraph 7.1.1. Statement of Prior Submission (SPS): The contractor may submit SPS documentation in lieu of the requirement in paragraph 7.1.2, as applicable. PDF or Excel formats apply.
7.1.5 Repair Parts Support: The Contractor is required to provide the MSCREP a pre-priced recommended list of spare parts with delivery of equipment. Listing should be in electronic (Excel) format.
7.1.6 Purchase Orders: The contractor shall provide hard copies of all purchase orders for all work items where contractor-furnished materials and equipment were procured.
7.1.7 Provisioning Guidance Conference (PGC) Minutes: The contractor shall take the minutes of the meeting and provide a copy (PDF) to each attendee.
7.2 DRAWINGS: The contractor shall provide specific drawings as called out in the individual work item. Drawings shall be per MSC GTR No.5 (AUTOCAD).
(Continue next page)
| group: |
| total_price: |
| prep_name: |
| line_item: |
| exhibit: |
| xtdp: Off |
| xtm: Off |
| othercat: X |
| system: |
| ctr_no: |
| contr: |
| remarksb: Abstract: |
7.3.1 Receiving Report: The Contractor shall prepare a receiving report for all GFM/GFE and shipboard spares/repair parts delivered to the Contractor. The report shall describe the condition of equipment and shall list parts missing or in need of repair. When the equipment is not in serviceable condition as described in the report, the report shall be signed by the MSC Port Engineer indicating joint survey. At the direction of the MSCREP, the contractor shall provide necessary parts and repairs on a reimbursable basis; otherwise, the contractor shall assume all liability for corrective action required to repair the damage. The receiving report (Excel) shall note all data with respect to the GFM/GFE and spares/repair parts (i.e., quantity, number, description, where stored, protection used, and similar data).
7.3.4 Handling Material and Equipment Inventory designated for turnover to the Government: In addition to copies affixed in suitable weather resistant Packing Envelopes to crate/containers, two (2) additional hard or electronic (Excel) copies shall be provided to the government onsite ILS Representative.
7.3.5 REPORTS:
GFM/CFM Summary List - The contractor shall prepare (Excel) and update weekly a summary list of GFM and CFM received at commencement of the contract until contract completion.
Damage Report - Any damage to the GFM, while in the custody of the contractor, shall be reported immediately to the MSCREP so that arrangements for joint survey can be made. The contractor shall prepare (Excel) and provide electronic damage report outlining the damage, conditions that led to the damage, and proposed method of repair.
Scrap Report – Material and equipment permanently removed from the vessel as a result of work accomplished in this work package shall be documented (Excel) and provided to the MSCREP.
Residual Asset Report – The contractor shall provide to the MSCREP a list (Excel) of government furnished material (GFM) and contractor furnished material (CFM) that are residual assets at completion of the availability.
Technical Document Mailing Address:
MSC Technical Library - USNS KANAWHA 9276 3rd Ave., Bldg LP-26 Norfolk, VA 23511 Tel: (757) 443-2595
| Page2: 2 |
| Reset: |
| prep_date: |
| app_by: |
| app_date: |
| Page: 1 |
| of_pages: 3 |
| app: Adobe Professional 8.0 |
File details come from the government source that posted it. Updated .