Revised_J_-_2_Attachment_-_15-R-4012_TRENTON_PSA-DD.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
USNS TRENTON PSA/DD
Solicitation number
N32205-15-R-4012
Issued by

View the file

Other files

File Type Posted
N32205-15-R-4012_0002.doc DOC document
RFP-RFQ_Q_and_A_3.docx DOCX document
N32205-15-R-4012_00001.doc DOC document
RFP-RFQ_Q_and_A_2.docx DOCX document
RFP-RFQ_Q_and_A_1.docx DOCX document
Revised_J_-_3_Category_B_Items__-_15-R-4012_TRENTON.xls XLS spreadsheet
15-R-4012 TRENTON PSA-DD Corrected Solicitation.doc DOC document
15-R-4012_TRENTON_PSA-DD_SWI_CDRLS.zip ZIP file
N104-15-R-4012_J A_-_Redacted_(2).pdf PDF
15-R-4012_USNS_TRENTON_PSA-DD_Solicitaiton_and_J-Attachments.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAT A Items

ITEM NO.GENERAL REQUIREMENTPRIME ContractorSUB ContractorGovt Mandated Tech Rep / SubOTHER COSTSTOTAL LABOR HOURSTOTAL MATERIALTOTAL PRICE
TITLE CAT A ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICEPrice
000GENERAL REQUIREMENTS
001Intent, Scope, General Requirements Definitions-NSP$0
002Technical and Manufacturer's Representative-NSP$0
003Approach, Berth, and Mooring Requirements-NSP$0
004Testing and Quality Assurance-NSP$0
005Electrical Safety Procedures Requirements-NSP$0
006Heavy Weather Plan-NSP$0
007Clod Weather PlanNSP$0
010Furnish Office for Overhaul Management Team-$ - 0$ - 0
011Furnish General Services-$ - 0$ - 0
012Telephone Services-$ - 0$ - 0
013Project Planning and Production Status Monitoring Reports-$ - 0$ - 0
014Preparation of Weight and Moment Report-$ - 0$ - 0
015Integrated Logistics and GFM Support Requirements-$ - 0$ - 0
016Fire Protection and Ship's Safety Program-$ - 0$ - 0
017Handling Ship's Stores-$ - 0$ - 0
018Delivery and Redelivery of the Vessel-$ - 0$ - 0
019Shipboard Access and Security-$ - 0$ - 0
020Gas Free Certificates-$ - 0$ - 0
021Clean and Gas Free Tanks, Voids, Cofferdams and Spaces-$ - 0$ - 0
022Dock Trials and Sea Trials-$ - 0$ - 0
023Hazardous Waste Disposal at a Contractor's Facility-$ - 0$ - 0
024Physical Security at Private Contractor’s Facility
Subtotal 000 - 099- 0$ -$ - 0- 0$ - 0$ - 0$ - 0$ - 0-$ - 0$ - 0
100HULL STRUCTURE
101Replace AMR Hatch with Schuttle (TALT-33)-$ - 0$ - 0
102RE-Heater Fan Foundation Reinforcement-$ - 0$ - 0
103Access to Main Mast and NAV Lights-$ - 0$ - 0
106Hull Level Access Catwalk-$ - 0$ - 0
108Install Flight Deck Ground Points-$ - 0$ - 0
111Install Non-Skid on Aft Main Deck-$ - 0$ - 0
113Deadweight Survey-$ - 0$ - 0
Subtotal 101 - 113- 0$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
200MACHINERY, PROPULSION
202Modify Fuel Service System-$ - 0$ - 0
203Heat Exchanger Cleaning-$ - 0$ - 0
204Reduction Gears Maintenance-$ - 0$ - 0
Subtotal 201 - 204- 0$ - 0$ - 0- 0$ - 0$ - 0$ - 0$ - 0-$ - 0$ - 0
300ELECTRICAL
301Install Night OPS Lighting in Mission Bay-$ - 0$ - 0
302Additional Electrical Outlets-$ - 0$ - 0
303Clean Ship Service Switchboard and Load Center-$ - 0$ - 0
Subtotal 301 -303- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
400COMMUNICATION & NAVIGATION
401Renew NAVIBS/Radio Safety Survey-$ - 0$ - 0
402Install Ship Security Alert System (SSAS)-$ - 0$ - 0
Subtotal 401 - 402- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
500MACHINERY, AUXILIARY SYSTEM
501Perform Annual Stern Ramp Maintenance-$ - 0$ - 0
502Inspect Ride Control System Bearing-$ - 0$ - 0
503Perform Annual Stores Crane Maintenance-$ - 0$ - 0
504A/C Heat Exchanger Condenser Cleaning and HVAC Maintenance-$ - 0$ - 0
505Support Store Crane Modification-$ - 0$ - 0
506Modify OWS LID to Facilitate Removal for Maintenance-$ - 0$ - 0
507Install Fuel Sensors and Transmitters-$ - 0$ - 0
508Firemain Isolation Valve-$ - 0$ - 0
509Install Vinyl Floor on 03 Level Walkway-$ - 0$ - 0
510Waterjet Shaft Seal Flow Indicators-$ - 0$ - 0
511Fuel Bunkering Piping Mod-$ - 0$ - 0
512Annual Sewage Plant Maintenance-$ - 0$ - 0
513Annual MSD Units Maintenance-$ - 0$ - 0
514Install Fireman Cooling Water Cross-Over-$ - 0$ - 0
515Install SSDG Sea Water Strainers-$ - 0$ - 0
516Replace Firemain Check Valves-$ - 0$ - 0
Subtotal 501 - 516- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
600OUTFIT, FURNISHING AND HABITABILITY
601Provide Support foor HAB and Galley Mods (TALT-13)-$ - 0$ - 0
602Rescue Boat Davit Brackets Installation-$ - 0$ - 0
603Marine Evacuation System Annual Certification-$ - 0$ - 0
604Rescue Boat and Davit Annual Inspeciton-$ - 0$ - 0
605SCBA Annual Cetification-$ - 0$ - 0
606Firefighting System Certification-$ - 0$ - 0
607Battle Helmet Rack-$ - 0$ - 0
608MOGAS Jettison Racks-$ - 0$ - 0
Subtotal 601 - 608- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
800HEATING, VENTILATION and AIR CONDITIONING
801Clean Galley Exhaust Ducts-$ - 0$ - 0
802Clean Laundry Exhaust Ducts-$ - 0$ - 0
807HVAC Sea Water Strainer Replacement-$ - 0$ - 0
Subtotal 801-803- 0$ - 0$ - 0- 0$ - 0$ - 0$ - 0$ - 0-$ - 0$ - 0
900DRYDOCKING
901Dry Docking and Undocking Vessel-$ - 0$ - 0
902Renew Anodes-$ - 0$ - 0
903Inspect Sea Valves and Sea Chests-$ - 0$ - 0
904Cathodic Monitoring System Insection/Maintenance-$ - 0$ - 0
905Hull Markings to Support UWILD Certification (TALT-2)-$ - 0$ - 0
906Remove and Inspect Waterjet-$ - 0$ - 0
910UWH Blast and Re-Coat-$ - 0$ - 0
Subtotal 901-910- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1000UNREP
1001Replace FAS Hardware-$ - 0$ - 0
1002Weight Test Flight Deck Nets
Subtotal 1001 - 1002- 0$ - 0$ - 0- 0$ - 0$ - 0$ - 0$ - 0-$ - 0$ - 0

TOTAL CAT "A" - 0 $ - 0 $ - 0 - 0 $ - 0 $ - 0 $ - 0 $ - 0 - $ - 0 $ - 0

PRIME/SUB Breakdown%
PRIME Percentage-
SUB Percentage-
USNS TRENTON (JHSV-5)CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMSN32205-15-R-4012

CATEGORY "A" ITEMS ONLY J-2 Attachment

File details come from the government source that posted it. Updated .