15-R-4012 TRENTON PSA-DD Corrected Solicitation.doc

DOC document 558 KB Posted

Attached to
USNS TRENTON PSA/DD Federal contract opportunity
Solicitation number
N32205-15-R-4012
Issued by
Department of the Navy Military Sealift Command

About this file

Corrected Solicitation with Draft watermark removed

View the file

Other files for this federal contract opportunity

Other files attached to USNS TRENTON PSA/DD, newest first.
File Type Posted
N32205-15-R-4012_0002.doc DOC document
RFP-RFQ_Q_and_A_3.docx DOCX document
N32205-15-R-4012_00001.doc DOC document
RFP-RFQ_Q_and_A_2.docx DOCX document
Revised_J_-_2_Attachment_-_15-R-4012_TRENTON_PSA-DD.xlsx XLSX spreadsheet
RFP-RFQ_Q_and_A_1.docx DOCX document
Revised_J_-_3_Category_B_Items__-_15-R-4012_TRENTON.xls XLS spreadsheet
15-R-4012_USNS_TRENTON_PSA-DD_Solicitaiton_and_J-Attachments.zip ZIP file
N104-15-R-4012_J A_-_Redacted_(2).pdf PDF
15-R-4012_TRENTON_PSA-DD_SWI_CDRLS.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

USNS TRENTON (JHSV-5) CAT "A" WIs

FFP

Prepare for and accomplish the Post Shakedown Availabilty/Dry-docking of USNS TRENTON (JHSV-5)

Total Category "A" Items

Proposed unit price per KWh $_____ in accordance with Work Item 011, 7.1.1.5

Proposed unit price per gallon of potable water $______ in accordance with Work Item 011, 7.1.3.2

Proposed unit price per gallon of distilled water $______ in accordance with Work Item 011, 7.1.4.2

Proposed unit price per gallon of bilge water removal $______ in accordance with Work Item 011, 7.1.18.3

Proposed unit price per crane usage $______ in accordance with Work Item 11, 7.9.1

Proposed Hazardous Waste handling fee rate in accordance with Work Item 023, 7.4.3 ______%

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0001AA

Dollars, U.S.

USNS TRENTON (JHSV-5) MSC CAT "A" WIs

USNS TRENTON (JHSV-5) PSA/DD MSC FUNDED CAT A WIs

CAT A WORK ITEMS. 010, 011, 012, 013, 015, 016, 017, 018, 019, 020, 021, 022, 023, 024, 101,103, 104, 106, 110, 113, 201,202, 203, 204, 301,302,303, 401, 402,501,502, 503, 504, 505, 506, 507, 508, 509, 510, 511, 512, 513, 514, 515, 516, 601, 602, 603, 604, 605, 606, 801, 802, 807, 901, 902, 903, 904, 905, 906, 910, 911, 912, 913, 914, 915, 1002

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0001AB

Dollars, U.S.

USNS TRENTON (JHSV-5) NAVSEA CAT "A" WI

USNS TRENTON (JHSV-5) PSA/DD NAVSEA FUNDED CAT A WIs

CAT A WORK ITEMS. 022, 102, 108,111, 607, 608, 1001

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

USNS TRENTON (JHSV-5) PSA/DD AGR

USNS TRENTON (JHSV-5) PSA/DD Additional Government Requirements (AGR) - 10,000 man-hours @ $________ per man-hour = $____________

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

USNS TRENTON (JHSV-5) PSA/DD - ODC

USNS TRENTON (JHSV-5) PSA/DD Other Direct Costs (ODC) Base $480,000.00____

Proposed G&A Rate _______________%

Subtotal:

Proposed Profit Rate _______________%

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 025

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT "B" WI 025 - PHYSCIAL SECURITY AT PRIIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITIONS BRAVO - DELTA

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 030

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT "B" WI 030 - CONTINUATION OF SERVICES

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 104

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT "B" WI104 - STRUCTURAL INSPECTION

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 110

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT "B" WI 110 – WELD MISC. ALUMINUM STRUCTURE

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 803

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT "B" WI 803 - ADDITIONAL INSULATION AND LAGGING

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 804

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT "B" WI 804 – INSTALL 02-03 LEVEL INSULATION

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 805

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT"B" WI 805 – TOP SIDE DECK COATING

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 911

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT"B" WI 911 – PAINT WATER JET INLET TUNNELS

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 912

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT "B" WI 912 - REPLACE SEA CHEST VALVE FLANGES

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 913

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT "B" WI 913 – HULL SURFACE PREPERATION

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 914

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT "B" WI 914 – SEA VALVE REPLACEMENT

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

OPTION
USNS TRENTON(JHSV-5) PSA/DD CAT B WI 915

FFP

USNS TRENTON (JHSV-5) PSA/DD CAT "B" WI 915 – REMOVE AND INSPECT WATER JETS AND SEAT RINGS

The Contracting Officer will notify the Contractor in writing when Category B items are required to be accomplished as part of this contract. Those items that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

USNS TRENTON (JHSV-5) PSA/DD NAVSEA AGR

USNS TRENTON (JHSV-5) PSA/DD NAVSEA Additional Government Requirements (AGR)

400 man-hours @ $________ per man-hour =

$_____________ CAT A WORK ITEMS. 022, 102, 108,111, 607, 608, 1001

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Dollars, U.S.

USNS TRENTON (JHSV-5) PSA/DD NAVSEA ODC

USNS TRENTON (JHSV-5) PSA/DD NAVSEA Other Direct Costs (ODC)

Base $20,000.00____

Proposed G&A Rate _______________%

Proposed Profit Rate _______________%

CAT A WORK ITEMS. 022, 102, 108,111, 607, 608, 1001

NET AMT

CLAUSES INCORPORATED BY FULL TEXT

TOTAL PROPOSED PRICE

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0017 $______________

Offeror shall fill-in the total proposed price, above, by calculating the summation of each CLIN Amount.

CLAUSES INCORPORATED BY FULL TEXT

Section B - Supplies or Services and Prices

PART I - THE SCHEDULE

The offeror shall follow the instructions stated below when completing section B:

CLIN 0001 – The offeror shall complete CLIN 0001 NET AMT, each of the fill-in items stated in the extended description, and complete Attachment J-2

CLIN 0002: AGR - The Offeror shall indicate the fully loaded man-hour Labor rate (including profit, QA, supervision, support functions). This rate will be used in evaluating the offeror's proposal and shall be the rate for pricing changes negotiated under the "Additional Government Requirements" clause, H-3, up to the maximum number of man-hours specified herein. The contractor agrees that the number of manhours included in its price proposal for such AGR shall include only direct production manhours. For these purposes, direct production manhours are for skilled labor at the journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blasting

Tank cleaning

Welding

Machinists (inside and outside)

Burning

Brazing

Carpentry

Electrical Work

Electronic Work

Shipfitting

Lagging

Painting

Boilermaking

Pipefitting

Sheetmetal Work

Engineering

Rigging

Staging/scaffolding

General Labor

Fire Watch

Direct production manhours will not include those functions (whether charged directly or indirectly by the offeror's accounting system) which are herein defined as support for production functions. Necessary support functions shall be considered to be included in the offeror's fully burdened rate for direct production manhours. Examples of support functions include:

Testing

Quality Assurance

Planning

Cleaning (except tank cleaning)

Material handling & Warehousing

Security

Surveying

Administration

Transportation

Purchasing staff

Lofting

Other indirect support

Supervision

CLIN 0003 - Other Direct Cost: The rates proposed for profit and G&A on CLIN 0004 above shall be the same rates used by the Contractor in its responses to RFPs issued under the contract. The Contracting Officer will apply these rates to the ODCs for each RFP when it is negotiated and / or settled.

The base cost does not include the profit or G&A rates. Include the final figure that results when proposed G&A and profit rates are applied to the base price in your total price for offer evaluation purposes. (This does not include any material cost for Category “A” items. The material cost for Category “A” should be included under CLIN 0001).

CLINs 0004 through 0017 – The offeror shall complete CLIN 0004 through 0017 NET AMT, each of the fill-in items, and complete Attachment J-3.

Section C - Descriptions and Specifications

CLAUSES INCORPORATED BY FULL TEXT

C-1

GENERAL

The Contractor shall prepare for and accomplish the voyage repairs, overhaul, or alterations of the USNS TRENTON (JHSV-5) as specified herein and in accordance with the Work Package as provided in Attachment J-1. Unless otherwise specified, all work shall be performed at the Contractor’s shipyard.

2.

In performing the work items specified, the Contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the work items take precedence over the following terms and conditions):

(a) Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

(b) Ensuring the timely procurement of Contractor Furnished Material/Contractor Furnished Property (CFM/CFP) and the timely receipt, storage, and installation of Government Furnished Material/Government Furnished Property (GFM/GFP) (In accordance with FAR Clause 52.245-1 and DFARs Clauses 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004).

(c) Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials in accordance with the Contract Data Requirements List and the Contractor's own Technical Proposal, and the Work Item Package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

(d) Using management procedures and systems to identify behind schedule conditions and unfavorable schedule variance based on the time phased sequencing network (TPSN) submitted with the Contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

(e) Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 013 must be submitted to and approved by the Contracting Officer. A performance milestone schedule and critical path chart shall be developed and submitted in accordance with the Work Item Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 013.

(f) Using approved quality control procedures as required by this contract and the work item package to ensure procured material and performed production work conforms to the required quality standards.

(g) Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

(h) Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

(i) Providing for staging and storing of Material (Both Government furnished and Contractor furnished) and Long Lead Time Material (LLTM) for use in the availabilities from the date of award.

(j) Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the contractor.

(k) Employing good judgment and sound engineering practice and principles, particularly when Work Items do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below. Evaluation of eligibility is conducted in accordance with Section M in the solicitation.

(a) Eligible contractors must be capable of performing the full scope of the solicitation within their own facilities, utilizing their own shops and work force or be capable of subcontracting for these elements beyond their managerial, technical, or physical capability or capacity. Contractors must assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

(b) Eligible contractors must be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/off ship production and component/system testing and trials. The contractor shall provide industry certifications such as, MSRA, ABR, or ISO Certifications that would further emphasize the contractor's ability to perform the work. To be determined responsible, a prospective contractor must submit acceptable evidence to demonstrate the prospective contractor's ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award. The contractors' proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award: To be determined responsible, a prospective contractor must possess a Master Ship Repair Agreement (MSRA), Agreement for Boat Repair (ABR) or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate the prospective contractor’s ability to obtain required resources.

This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award.

The contractors’ proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm’s eligibility for contract award:

a. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control and subcontractor control.

b. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

c. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

d. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. They shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package

e. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

g. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards

h. Safety/security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

i. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage and disposal. Appropriate state/federal agency issued hazardous waste generator number. Disposal records which indicate type of material, date and place of disposal.

j. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place in which the CLASS size ship can access and be berthed at

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

(c) The government reserves the right to perform site survey for verification of policies, procedures, capabilities and facilities prior to award.

C – 2 List of Standard Work Items included for this solicitation:

USNS TRENTON

(JHSV-5)

WORK ITEM INDEX

SECTION 000

GENERAL REQUIREMENTS

NOT SEPERATELY PRICED (NSP) REQUIREMENTS

Category

INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS

NSP

TECHNICAL AND MANUFACTURER’S REPRESENTATIVES

NSP

APPROACH, BERTH, AND MOORING REQUIREMENTS

NSP

TESTING AND QUALITY ASSURANCE

NSP

ELECTRICAL SAFETY PROCEDURE REQUIREMENTS

NSP

HEAVY WEATHER PLAN

NSP

COLD WEATHER PLAN

NSP

PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY (NSP)

NSP

CATEGORY “A” WORK ITEMS

FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT)

A

FURNISH GENERAL SERVICES

A

TELEPHONE SERVICES

A

PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS

A

PREPARATION OF WEIGHT AND MOMENT REPORT

A

INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS

A

FIRE PROTECTION AND SHIP’S SAFETY PROGRAM

A

HANDLING SHIP’S STORES

A

DELIVERY AND REDELIVERY OF THE VESSEL

A

SHIPBOARD ACCESS AND SECURITY

A

GAS FREE CERTIFICATES

A

CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES

A

DOCK TRIALS AND SEA TRIAL

A

HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR’S FACILITY

A

CATEGORY “B” WORK ITEMS

PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY (B)

B

CONTINUATION OF SERVICES (B)

B

SECTION 100

HULL STRUCTURE

CATEGORY “A” WORK ITEMS

T-ALT

Category

REPLACE AMR HATCH WITH SCUTTLE

A

REHEATER FAN FOUNDATION REINFORCEMENT

N/A A

ACCESS TO MAIN MAST AND NAV LIGHTS

A

HULL LEVEL ACCESS CATWALK

A

INSTALL FLIGHT DECK GROUNDING POINTS

N/A A

INSTALL NONSKID ON AFT MAIN DECK

N/A A

DEADWEIGHT SURVEY

N/A A

CATEGORY “B” WORK ITEMS

STRUCTURAL INSPECTION

N/A B

WELD MISC ALUMINUM STRUCTURE

N/A B

SECTION 200 MACHINERY, PROPULSION

CATEGORY “A” WORK ITEMS

T-ALT

Category

MODIFY FUEL SERVICE SYSTEM Rev 3 A

HEAT EXCHANGE CLEANING

N/A A

REDUCTION GEARS MAINTENANCE

SECTION 300

ELECTRICAL

CATEGORY “A” WORK ITEMS

T-ALT

Category

INSTALL NIGHT OPS LIGHTING IN MISSION BAY

A

ADDITIONAL ELECTRICAL OUTLETS

CLEAN SHIP’S SVC SWITCHBOADS AND LOAD CENTERS

N/A A

SECTION 400

COMMUNICATION AND NAVIGATIONAL AIDS

CATEGORY “A” WORK ITEMS

T-ALT

Category

RENEW NAVIBS RADIO SAFETY SURVEY

N/A A

INSTALL SSAS

SECTION 500

MACHINERY, AUXILIARY SYSTEMS

CATEGORY “A” WORK ITEMS

T-ALT

Category

PERFORM ANNUAL STERN RAMP MAINTENANCE

N/A A

RIDE CONTROL SYSTEM BEARING INSPECTION

N/A A

PERFORM ANNUAL STORES CRANE MAINTENANCE

N/A A

PERFORM HVAC AND REEFER SYSTEM MAINTENANCE

N/A A

505 SUPPORT STORE CRANE MODIFICATION

A

MODIFY OWS LID PIPING TO FACILITATE MAINT

N/A A

INSTALLATION OF FUEL SENSORS AND TRANSMITTERS

010R A

FIREMAIN MANUAL ISOLATION VALVE

005R A

INSTALL RUBBER FLOORING ON 03 LEVEL WALKWAY

N/A A

WATERJET SHAFT SEAL FLOW INDICATORS

A

FUEL BUNKERING PIPING MOD

N/A A

ANNUAL SEWAGE PLANT MAINTENANCE

N/A A

ANNUAL MSD UNITS MAINTENANCE

N/A A

INSTALL FIREMAIN COOLING WATER CROSS-OVER

066R A

INSTALL SSDG SEA WATER STRAINERS

076R A

REPLACE FIREMAIN CHECK VALVES

077R

SECTION 600 OUTFIT, FURNISHINGS and HABITABILITY

CATEGORY “A” WORK ITEMS

T-ALT

Category

PROVIDE SUPPORT FOR HAB AND GALLEY MODS

013R A

RESCUEBOAT DAVIT BRACKETS INSTALLATION

N/A A

M.E.S. & LIFE RAFT CERTIFICATION

N/A A

RESCUE BOAT AND DAVIT ANNUAL INSPECTION

N/A A

SCBA ANNUAL CERTIFICATION

N/A A

FIREFIGHTING SYSTEM CERTIFICATION

N/A A

BATTLE HELMET RACK

N/A A

MOGAS JETTISON RACKS

A

SECTION 800 HVAC

CATEGORY “A” WORK ITEMS

T-ALT

Category

CLEAN GALLEY EXHAUST DUCTS

N/A A

CLEAN LAUNDRY EXHAUST DUCTS

N/A A

HVAC SEA WATER STRAINER REPLACEMENT

N/A A

CATEGORY “B” WORK ITEMS

ADDITIONAL INSULATION AND LAGGING

N/A B

INSTALL 02-03 LEVEL INSULATION

N/A B

TOPSIDE DECK COATING

N/A B

SECTION 900 DRYDOCK

CATEGORY “A” WORK ITEMS

T-ALT

Category

DRYDOCKING AND UNDOCKING VESSEL

N/A A

RENEW ZINC ANODES

N/A A

INSPECT SEA VALVES AND SEA CHEST

N/A A

CATHODIC MONITORING SYSTEM INSPECTION AND MAINT

N/A A

HULL MARKINGS TO SUPPORT UWILD CERTIFICATION

002R A

REMOVE AND INSPECT WATER JET

N/A A

UWH BLAS AND RE-COAT

N/A A

CATEGORY “B” WORK ITEMS

PAINT WATER JET INLET TUNNELS

N/A B

REPLACE SEA CHEST VALVE FLANGES

N/A B

UWH SURFACE PREPERATION

N/A B

SEA VALVE REPLACEMENT

N/A B

WATERJETS AND SEAT RINGS INSPECTION

B

SECTION 1000 MISSION

CATEGORY “A” WORK ITEMS

T-ALT

Category

REPLACE FAS STATION HARDWARE

N/A A

WEIGHT TEST FLIGHT DECK NETS

N/A A

Section D - Packaging and Marking

CLAUSES INCORPORATED BY FULL TEXT

WOOD PACKAGING MATERIAL (WPM) - ADDITIONAL DELIVERY INSTRUCTIONS

In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved "DUNNAGE" stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Origin
Government
Origin
Government
0001AA
Origin
Government
Origin
Government
0001AB
Origin
Government
Origin
Government
0002
Origin
Government
Origin
Government
0003
Origin
Government
Origin
Government
0004
Origin
Government
Origin
Government
0005
Origin
Government
Origin
Government
0006
Origin
Government
Origin
Government
0007
Origin
Government
Origin
Government
0008
Origin
Government
Origin
Government
0009
Origin
Government
Origin
Government
0010
Origin
Government
Origin
Government
0011
Origin
Government
Origin
Government
0012
Origin
Government
Origin
Government
0013
Origin
Government
Origin
Government
0014
Origin
Government
Origin
Government
0015
Origin
Government
Origin
Government
0016
Origin
Government
Origin
Government
0017
Origin
Government
Origin
Government

CLAUSES INCORPORATED BY REFERENCE

252.217-7005
Inspection and Manner of Doing Work
JUL 2009
252.217-7006
Title
DEC 1991
252.217-7013
Guarantees
DEC 1991

Section F - Delivery and Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0001AA
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0001AB
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0002
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0003
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0004
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0005
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0006
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0007
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0008
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0009
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0010
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0011
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0012
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0013
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0014
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0015
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0016
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A
0017
POP 04-JAN-2016 TO

04-MAR-2016

N/A
N/A

CLAUSES INCORPORATED BY REFERENCE

52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
252.217-7009
Default
DEC 1991

52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $50,334.00 per calendar day of delay.

(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.

(End of clause)

F-1

SHIP AVAILABILITY PERIOD

It is anticipated that ship will arrive at Contractor’s yard on or about 04 January 2016. All work shall be completed in no more than 60 calendar days from actual start date designated by the Government at time of contract award.

F-2 PLACE OF PERFORMANCE

The place of performance for this contract shall be the contractor’s shipyard.

Section G - Contract Administration data

CLAUSES INCORPORATED BY REFERENCE

252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7006
Wide Area WorkFlow Payment Instructions
MAY 2013
CLIN #
Contract Price Through Mod P0000x
% Complete
Contract Completed ($)
Less Retainage ($)
Less Prev Payments ($)
Amount due this Invoice ($)
Total Invoiced to Date ($)
0001
TBD
0002
TBD
0003
TBD
0004
Option
0005
Option
0006
Option
0007
Option
0008
Option
0009
Option
0010
Option
0011
Option
0012
Option
0013
Option
0014
Option
0015
Option
0016
Option
0017
Option

Military Sealift Command

Administering Contracting Officer

Military Sealift Command

Ship Yard Representative

Port Engineer

MSC SPECIFIC WIDE AREA WORKFLOW (WAWF) INSTRUCTIONS (AUG 2012)

The information contained in this instruction is supplemental to DFARS 252.232-7006.

The information contained in the table in DFARS 252.232-7006 is for WAWF purposes only. Information included in DFARS 252.232-7006 and this WAWF instruction apply only to WAWF Invoicing and WAWF Receiving Reports. Contradictory information elsewhere in this contract, e.g. Ship to DoDAAC, shall be followed per the terms and conditions of the contract.

When entering the invoice into WAWF, the Contractor shall fill in the DoDAAC fields or DoDAAC extensions exactly as shown in the table in DFARS 252.232-7006. Fields that should not be filled in when entering the invoice into WAWF will be indicated with the direction, “Leave Blank.”

In some situations the WAWF system will pre-populate the “Pay DoDAAC,” “Admin By DoDAAC” and “Issue By DoDAAC.” The Contractor shall verify that those DoDAACs automatically entered by the WAWF system match the information in the table in DFARS 252.232-7006. If these DoDAACs do not match, then the Contractor shall correct the field(s).

If Receiving Reports are required, ensure that the “Inspection” and “Acceptance” defaults of “destination” for both fields are not changed in the WAWF online interface.

The CLINs on the WAWF invoice shall be entered exactly as set forth in the contract document including CLIN number (e.g. 0001), Quantity (may be adjusted for actual quantity or dollar value delivered and invoiced), and Unit Price (e.g. $1.00). The dollar amounts on each CLIN or SubCLIN on the WAWF invoice shall reflect final performance values, but in no instance can the dollar amount for each CLIN or SubCLIN exceed what is specified in the contract document. The Contractor shall bill to the lowest level, e.g., the SubCLIN level. The Quantity and Unit of Measure fields must be filled out exactly as indicated in the CLINs and SubCLINs to reduce the possibility of the invoice being delayed or rejected during processing.

Before closing out of an invoice session in WAWF, but after submitting the document or documents, the Contractor will be given the option to send additional email notifications by clicking on the “Send More Email Notifications” link that appears on the page. The Contractor shall click on this link and add the Technical Point of Contact’s (TPOC) or Contracting Officer’s Representative’s (COR) email address in the first email address block and add any other additional email addresses desired in the following blocks. This additional notification to the Government is important to ensure the acceptor/receiver is aware that the invoice documents have been submitted into the WAWF system.

(End of instructions) Section H - Special Contract Requirements

CLAUSES INCORPORATED BY FULL TEXT

H-1

OPTION FOR INCREASED QUANTITIES

The Government may require the delivery of the numbered line items identified in Section B as option items in any amount up to the unit quantities and at the unit prices stated in the Contractor Price Breakdown. The Contracting Officer may exercise the options by giving the Contractor written notification or via standard modification (SF30). Delivery of option items shall be within the performance period identified in Section F unless the parties otherwise agree.

CLAUSES INCORPORATED BY FULL TEXT

H-2

PREVENTION OF THE DISCHARGE OF OIL AND HAZARDOUS SUBSTANCES

(a) POLICY. In compliance with Executive Order Number 11752 (38 F.R. 34793), the policy of the Department of the Navy is to conform to the provisions of the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 et seq), and the Oil Pollution Act of 1990, as amended (33 U.S.C. 2701 et seq), insofar as these Acts prohibit the discharge of oil, oily mixtures, and hazardous substances, and regardless of whether or not these Acts pertain specifically to the Naval vessel and shore activities. The provisions of this clause are intended to implement that policy with respect to the vessel(s) being constructed or undergoing repair and overhaul under this contract.

(b) Definitions. For the purpose of this clause, the terms "oil," "oily mixtures," "hazardous substance," and "discharge" shall have the meanings as defined in the Acts referred to in Paragraph (a) of this clause and other environmental statutes.

(c) Trials. Prior to commencement of any dock or sea trials hereunder, the Contractor shall assure the COR by demonstrations, completed test memoranda, or other means reasonably acceptable to the COR that all equipment, the function of which is to prevent the accidental discharge of oil, oily mixtures, or hazardous substances from the vessel, that the Contractor is required by the specifications to install, are fully operable.

(d) Reports. The contractor shall, as soon as he has knowledge of any discharge of oil, oily substance, or hazardous substance from the vessel, immediately notify the COR thereof and shall immediately take all reasonable steps to prevent further discharge. Within 24 hours thereafter, the Contractor shall file with the COR the "Oil or Hazardous Substance Discharge Report" set out in the DD Form 1423 herein.

(e) Liability. The Contractor shall not be liable for the costs incurred by the Government for the removal of such oil, oily mixture, or hazardous substance, except that the Contractor shall be liable to the Government for all such costs of removal where such discharge was the result of willful negligence or willful misconduct within the privity and knowledge of the Contractor.

CLAUSES INCORPORATED BY FULL TEXT

H-3

ADDITIONAL GOVERNMENT REQUIREMENTS CLIN 0002

(a) The contractor agrees that CLIN 0002 AGR man-hours (including supplemental, emergent and new work), if ordered, shall be performed concurrently with CLIN 0001 and any or all Cat B CLINS exercised, during the contract period of performance, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned work items, to any other Government Contract, or to any other work in progress for the Government.

(b) Whenever the Government orders AGR pursuant to this clause, the contractor shall submit a price proposal for such work. This proposal shall be submitted within 3 days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the Contracting Officer. The contractor's failure to submit its proposal within the 3 days, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the AGR and will permit the Contracting Officer to take any of the three options set forth in subparagraph (c) below. AGR proposals shall be priced using the fully loaded rate set forth in Section B, CLIN 0002. The Contractor shall indicate the fully loaded man-hour labor rate (including profit, G&A, QA, supervision, support functions, and all indirect charges). This rate will be used in evaluating the Contractor's proposal and also will be used for negotiating changes as required by this clause.

(c) Upon receipt of the Contractor's price proposal for the AGR the Contractor and the Contracting Officer shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the Contractor and the Contracting Officer, the Contracting Officer reserves the right to:

(1) Have the work performed by the Government;

(2) Issue a unilateral modification

(3) Cancel the requirement.

(d) The Contractor knowingly and voluntarily waives all claims against the Government and/or other third party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the AGR at this contractor's facility. Furthermore, in cases described in sub-paragraphs (c)(1) and (2) above, the Contractor waives any right to claims of interference under the Clause entitled "Access to Vessels".

(e) The Contractor warrants and hereby certifies that its price for the firm fixed portion of this Contract (CLIN

0001) does not include any amount for the "Additional Government Requirements" (CLIN 0002). Settlement of

“Additional Government Requirements” (CLIN 0002) will be for the purpose of providing funding. In the event the

Government requires additional work, authorization to proceed shall be made by only the Contracting Officer. A

Technical Direction Letter (TDL) may authorize individual or multiple Additional Requirements. Upon receipt of a

TDL the Contractor may invoice the work authorized therein, provided sufficient funding remains on each applicable CLIN. Each TDL shall contain, at a minimum, a serial number for reference purposes, the work to be performed, the agreed price, the applicable CLINs and the amount that may be invoiced to each, and the total authorized value for all issued TDLs. The Contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED in a TDL. All funding remaining on CLINs 0001 through 00XX at Contract completion shall be de-obligated.

(f) AGR does not include work performed pursuant to the clause of this Contract entitled "Inspection of and Manner of doing work," "Guarantees," or other contract provisions relating to the corrections of defects.

CLAUSES INCORPORATED BY FULL TEXT

H-4

EMPLOYMENT OF NAVY PERSONNEL RESTRICTED

In performing this contract, the contractor will not use as a consultant or employ (on either a full or part-time basis) any active duty Navy personnel (civilian or military) without the prior approval of the contracting officer. Such approval may be given only in circumstances where it is clear that no laws and no DOD or Navy instructions, regulations, or policies are contravened and no appearance of a conflict of interest will result.

H-5

ASBESTOS REMOVAL REQUIREMENTS

(a) During the performance of this Contract the contractor and any subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos containing products. This clause applies to each instance of asbestos removal or disturbance.

(b) The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, State, and Local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the Contracting Officer immediately upon issuance or receipt.

(c) The latest change to the Federal, State and Local Regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the Contractor and Naval personnel from exposure to asbestos fibers in excess of the Occupational Safety and Health Administration (OSHA) Action level airborne concentration (currently 0.1 fibers per cubic centimeter (f/cc) of air).

(d) During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.

(e) After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.

(f) In all respects, the performance of air sampling and analysis shall be performed in accordance with the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:

(1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four hours.

(2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.

(3) Air sampling shall be performed by a person competent in sampling procedures and overseen by an industrial hygienist certified for comprehensive practice (CIH) by the American Board of Industrial Hygiene.

(4) Laboratory analysis of samples shall be performed by a participant in the American Industrial Hygiene Association (AIHA) Proficiency in Analytical Testing (PAT) Program rated proficient for asbestos and air.

(g) Personal sampling shall be conducted using breathing zone air samples, which are representative of the 8-hour Time-Weighted Average (TWA) exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).

(h) The contractor agrees to indemnify MSC for any fines assessed by Federal, State or Local Agencies, for the contractor's failure to properly follow applicable Regulations.

(i) The contractor shall insert this clause in all subcontracts entered into under this contract.

H-6

SUBCONTRACTOR SUBSTITUTION

Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the Contracting Officer and official approval is obtained. The post-award substitution OR insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and will require specific approval by the Contracting Officer.

H-7

SUBSTITUTION OF KEY PERSONNEL

(a) General Provision. The Contractor agrees to assign to this contract those persons identified as key personnel whose resumes were submitted with the proposal and who are necessary to fulfill the requirements of this contract. No substitution of key personnel shall be made except in accordance with this clause.

(b) Guidance on Substitutions. During the first thirty (30) days of the contract performance period no personnel substitutions by the Contractor will be made unless substitutions are necessitated by an individual’s sudden illness, death, or termination of employment. In any of these events, the Contractor shall promptly notify the Contracting Officer and provide the information required by paragraph (c) below. After the initial thirty (30) day period, all proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions) to the Contracting officer and provide information required by paragraph (c) below.

(c) Request for Substitution. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the Contracting Officer. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The Contracting Officer or their authorized representative will evaluate such requests and promptly notify the Contractor of the approval or disapproval thereof.

H – 8

WAIVER OF CLAIMS

All requests for equitable adjustment to the contract price and any other claims whatsoever for monies due under this contract must be submitted to the Contracting officer pursuant to the clause entitled “Disputes” within six (6) months of the redelivery of the vessel. All requests for equitable adjustment that are not submitted within the six (6) month limit shall be deemed to have been waived by the contractor.

H – 9

UTILIZATION OF TRAVEL AND PERDIEM IN CONDUCTING CHANGE ORDERS

The Contractor shall demonstrate due diligence in the assessment, evaluation, and determination resulting in the proposed utilization of other than local specialized labor resources.

Only with Contracting Officer approval to proceed will a contractor, technical representative, or subcontractor be reimbursed for reasonable per diem costs (transportation, travel expenses, lodging, meals, and incidental expenses) required in connection with the associated change order. Per Diem costs are considered reasonable, allowable and reimbursable only to the extent that they do not exceed the allowed per diem rate in effect at the time of travel as set forth in the Federal Travel Regulations, Joint Travel Regulations, or Standardized Regulations as set forth in FAR 31.205-46.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1
Definitions
NOV 2013
52.203-3
Gratuities
APR 1984
52.203-6
Restrictions On Subcontractor Sales To The Government
SEP 2006
52.203-7
Anti-Kickback Procedures
MAY 2014
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.203-13
Contractor Code of Business Ethics and Conduct
APR 2010
52.203-17
Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
APR 2014
52.204-1
Approval of Contract
DEC 1989
52.204-4
Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-13
System for Award Management Maintenance
JUL 2013
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
AUG 2013
52.210-1
Market Research
APR 2011
52.211-5
Material Requirements
AUG 2000
52.215-2
Audit and Records--Negotiation
OCT 2010
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.215-11
Price Reduction for Defective Certified Cost or Pricing Data--Modifications
AUG 2011
52.215-13
Subcontractor Certified Cost or Pricing Data--Modifications
OCT 2010
52.215-14
Integrity of Unit Prices
OCT 2010
52.215-17
Waiver of Facilities Capital Cost of Money
OCT 1997
52.215-20
Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data
OCT 2010
52.215-21
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications
OCT 2010
52.219-6
Notice Of Total Small Business Set-Aside
NOV 2011
52.219-9 Alt II
Small Business Subcontracting Plan (OCT 2014) Alternate II
OCT 2001
52.219-16
Liquidated Damages-Subcontracting Plan
JAN 1999
52.222-1
Notice To The Government Of Labor Disputes
FEB 1997
52.223-3
Hazardous Material Identification And Material Safety Data
JAN 1997
52.223-5
Pollution Prevention and Right-to-Know Information
MAY 2011
52.223-6
Drug-Free Workplace
MAY 2001
52.223-12
Refrigeration Equipment and Air Conditioners
MAY 1995
52.223-18
Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-8
Duty-Free Entry
OCT 2010
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.225-25
Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.
DEC 2012
52.226-1
Utilization Of Indian Organizations And Indian-Owned Economic Enterprises
JUN 2000
52.227-1
Authorization and Consent
DEC 2007
52.227-2
Notice And Assistance Regarding Patent And Copyright Infringement
DEC 2007
52.227-3
Patent Indemnity
APR 1984
52.232-8
Discounts For Prompt Payment
FEB 2002
52.232-9
Limitation On Withholding Of Payments
APR 1984
52.232-11
Extras
APR 1984
52.232-18
Availability Of Funds
APR 1984
52.232-23 Alt I
Assignment of Claims (May 2014) - Alternate I
APR 1984
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-1 Alt I
Disputes (May 2014) - Alternate I
DEC 1991
52.233-3
Protest After Award
AUG 1996
52.233-3
Protest After Award
AUG 1996
52.233-4