Input Sheet
| ITEM | VALUE |
| A. Contract Line Item Number | 16 |
| B. Exhibit | A |
| D. System/Item | C4 Operational Maintenance & Engineering Training (COMET) |
| E. Contract/PR No. | TBD |
| F. Contractor | TBD |
| G. Prepared By | L. Davis |
| I. Approved By: | N. Downs |
| 6. Requiring Office | NAWCAD 4.11.3.4 |
| H. Date Prepared | 5/31/16 |
| J. Date Approved | 5/31/16 |
| Total Number of Pages | 24 |
| Block 6 | NAWCAD 4.11.3.4 |
| Block 14a | 4.11.3.4 |
| Notes: | |
| Renumbering of CDRLs | Just rename the Tabs and the CDRL numbers will adjust. |
| You may also have to change the number of pages above. |
A001
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (MISC) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A001 | Technical Report – Study/Services | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MISC-80508B | | | SOW Paras 4.1.1, 4.1.1.1, 4.1.1.2, 4.1.1.3, 4.1.3.1, 4.1.4.3, 4.2.1, 4.2.2, 4.2.3, 4.2.6.1, 4.3.1, 4.3.2, 4.3.3, 4.3.4, 4.3.5, 4.4.2, 4.4.11, 5.4 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-MISC-80508B are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Blocks 10, 12, and 13: Final due 10 days after receipt of Government comments on draft submission. Government has 30 days to |
| comment. If the Government does not reply within 30 days, the CDRL is considered accepted. Submit IAW SOW Paras. |
Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the Government.
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | 15. Total | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 6/1/15 | | |
| DD Form 1423-1, JUN 91 | Previous editions are obsolete | Page | 1 | of | 24 |
| 1007/183 | | | | | |
A002
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (IPSC) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A002 | Software Requirements Specification (SRS) | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-IPSC-81433A | | | SOW Para 4.1.3 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-IPSC-81433A are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Blocks 10, 12, and 13: Final due 10 days after receipt of Government comments on draft submission. Government has 30 days to |
| comment. If the Government does not reply within 30 days, the CDRL is considered accepted. Submit IAW SOW Para. |
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with Office |
| 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 2 | of | 24 |
| 1007/183 | | | | | |
A003
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (IPSC) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A003 | Software Design Description | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-IPSC-81435A | | | SOW Paras 4.1.3.1, 4.2.4.1, 4.2.4.2, 4.2.4.3, 4.2.4.3.2, 4.2.4.3.3, 4.2.4.3.4, 4.2.5 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | N/A | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 0 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-IPSC-81435A are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
Blocks 10, 12, and 13: Submit IAW SOW Paras.
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with Office |
| 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 0 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 3 | of | 24 |
| 1007/183 | | | | | |
A004
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (IPSC) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A004 | Database Design Description | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-IPSC-81437 | | | SOW Para 4.1.3.1, 4.2.4.1 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-IPSC-81437 are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Blocks 10, 12, and 13: Final due 10 days after receipt of Government comments on draft submission. Government has 30 days to |
| comment. If the Government does not reply within 30 days, the CDRL is considered accepted. Submit IAW SOW Para. |
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with |
| Office 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 4 | of | 24 |
| 1007/183 | | | | | |
A005
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (IPSC) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A005 | Software Test Plan (STP) | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-IPSC-81438A | | | SOW Paras 4.1.3.1, 4.2.7.2, 4.5.1.3, 4.5.2.3 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-IPSC-81438A are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Blocks 10, 12, and 13: Final due 10 days after receipt of Government comments on draft submission. Government has 30 days to |
| comment. If the Government does not reply within 30 days, the CDRL is considered accepted. Submit IAW SOW Paras. |
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with Office |
| 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 5 | of | 24 |
| 1007/183 | | | | | |
A006
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP________ | TM ________ | Other X (IPSC) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A006 | Software Test Report (STR) | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-IPSC-81440A | | | SOW Paras 4.1.3.1, 4.2.7.3 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | N/A | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 0 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-IPSC-81440A are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
Blocks 10, 12, and 13: Submit IAW SOW Paras.
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with |
| Office 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 0 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 6 | of | 24 |
| 1007/183 | | | | | |
A007
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (IPSC) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A007 | Software User Manual (SUM) | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-IPSC-81443A | | | SOW Para 4.1.3.1, 4.2.8.6 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-IPSC-81443A are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Blocks 10, 12, and 13: Final due 10 days after receipt of Government comments on draft submission. Government has 30 days to |
| comment. If the Government does not reply within 30 days, the CDRL is considered accepted. Submit IAW SOW Para. |
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with Office |
| 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 7 | of | 24 |
| 1007/183 | | | | | |
A008
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (MCCR) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A008 | Computer Software Product End Items | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MCCR-80700 | | | SOW Paras 4.1.2, 4.2.6.2, 4.2.6.3, 4.2.6.5, 4.2.6.6, 4.2.8.1, 4.2.8.4, 4.2.8.5, 4.5, 4.5.1.4, 4.5.2.4 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | See Blk 16 | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | See Blk 16 | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-MCCR-80700 are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Blocks 10, 12, and 13: Final due 10 days after receipt of Government comments on draft submission. Government has 30 days to |
| comment. If the Government does not reply within 30 days, the CDRL is considered accepted. |
| Submit IAW SOW Paras. |
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with Office |
| 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 8 | of | 24 |
| 1007/183 | | | | | |
A009
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (ADMN) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A009 | Presentation Materials | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-ADMN-81373 | | | SOW Para 4.4.4 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-ADMN-81373 are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Blocks 10, 12, and 13: Final due 10 days after receipt of Government comments on draft submission. Government has 30 days to |
| comment. If the Government does not reply within 30 days, the CDRL is considered accepted. Submit IAW SOW Para. |
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with |
| Office 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 9 | of | 24 |
| 1007/183 | | | | | |
A010
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (MISC) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A010 | Technical Report – Study/Services | | | | | Information Assurance Documentation | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MISC-80508B | | | SOW Para 4.1.5, 4.2.6.1 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-MISC-80508B are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Blocks 10, 12, and 13: Final due 10 days after receipt of Government comments on draft submission. Government has 30 days to |
| comment. If the Government does not reply within 30 days, the CDRL is considered accepted. Submit IAW SOW Para. |
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with Office |
| 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 10 | of | 24 |
| 1007/183 | | | | | |
A011
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (MGMT) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A011 | Contractor’s Progress, Status and Management Report | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MGMT-80227, and See Blk 16 | | | SOW Paras 4.4.3, 4.4.7 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | MTHLY | | See Blk 16 | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | See Blk 16 | | See Blk 16 | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 0 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-MGMT-80227 are met. | | | | | | | | | | |
| Report shall include: Cover sheet, major milestone summary, overdue deliverables, identification of new problem areas, status of |
| previously identified and open problem areas, justification for cost increases/schedule slippages, monthly and cumulative labor hours |
| bid and expended per contract labor category (names of employees charged to each contract labor category, and total labor cost per |
| CLIN), performance based evaluation roll-up, and financial progress. The contractor shall provide a cumulative self-evaluated |
| depiction displaying how they are performing. |
| Reports will be submitted both in electronic and hardcopy formats. Both the electronic and hardcopy formats will be contractor |
| proposed and Government approved and shall include valid and current data through the most recent pay period closing date. The |
| contractor and Government will agree on an electronic and hardcopy format within 30 days after contract award. To reduce the |
| administrative burden presented by creating a unique reporting requirement and to allow these reports to piggyback on the |
| contractor’s timesheet/payroll system, the actual periodicity of these reports will be determined by the contractor’s existing |
| accounting system. |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Block 11 and 12: NLT 15 days after the close of the contractor's accounting month, following the first full month of performance. |
| Block 13: Reports are due 15 days after the close of the contractor's fiscal month. |
| Submit IAW SOW Paras. |
| Block 14: Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 0 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 11 | of | 24 |
| 1007/183 | | | | | |
A012
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (ADMN) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A012 | Report, Record of Meeting/Minutes | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI -ADMN-81505 | | | SOW Paras 4.1.4.2, 4.4.2, 11.6 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | See Blk 16 | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | N/A | | See Blk 16 | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 0 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI -ADMN-81505 are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| (See Contract Section J Attachments ). |
Blocks 10, 12, and 13: Final due 10 days after meeting. Submit IAW SOW Paras.
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with Office |
| 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 0 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 12 | of | 24 |
| 1007/183 | | | | | |
A013
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (MGMT) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A013 | Integrated Program Management Report | | | | | Integrated Master Schedule | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MGMT-81861 and See Blk 16 | | | SOW Paras 4.4.3, 4.4.6 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ | | See Blk 16 | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | See Blk 16 | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-MGMT-81861 are met. | | | | | | | | | | |
| The Integrated Master Schedule is a top-level schedule of key tasks/activities at the summary level of the Work | | | | | | | | | | |
| Breakdown Structure (WBS). It will be an integrated roll-up of the Detailed Project Schedules (CDRL A016). The Integrated | | | | | | | | | | |
| Master Schedule shall include at a minimum the following elements: major tasks/project milestones (to include deliverables) and a | | | | | | | | | | |
| WBS that includes 100% of the work defined by the project scope, task details including dependencies, schedule baseline, lag times, | | | | | | | | | | |
| supporting project critical path identification, and resource loading with assignments. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Blocks 12, and 13: First report dues 15 days after notification of task order issuance Final due 10 days after receipt of Government |
| comments on draft submissions. Government has 30 days to comment. If the Government does not reply within 30 days, the |
| CDRL is considered accepted. Frequency of subsequent submissions will be identified per specific tasking. Submit in accordance |
| with SOW Paras. |
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with |
| Office 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 13 | of | 24 |
| 1007/183 | | | | | |
A014
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A014 | Detailed Project Schedule | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| See Blk 16 | | | SOW Paras 4.4.3, 4.4.6 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | ASREQ, See Blk 16 | | See Blk 16 | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | See Blk 16 | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable. | | | | | | | | | | |
| Detailed Project Schedules are schedules that include key tasks/milestones at a summary level. They shall include at a | | | | | | | | | | |
| minimum the following elements: major tasks/activities and/or milestones (to include deliverables) and a Work Breakdown | | | | | | | | | | |
| Structure that includes 100% of the work defined by the project scope at a summary task and/or milestone level. A Plan of | | | | | | | | | | |
| Actions and Milestones (POA&M) may also be requested in this format. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Blocks 10, 12, and 13: First report due 15 calendar days after task order issuance. Final due 10 days after receipt of |
| Government comments on draft submissions. Government has 30 days to comment. If the Government does not reply within 30 |
| days, the CDRL is considered accepted. Frequency of subsequent submissions will be identified per specific tasking. Submit IAW |
| SOW Paras. |
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with |
| Office 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 14 | of | 24 |
| 1007/183 | | | | | |
A015
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (MISC) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A015 | Technical Information Report | | | | | Project Close-Out Report | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MISC-80652 and See Blk 16 | | | SOW Para 9.5 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | See Blk 16 | | See Blk 16 | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | N/A | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-MISC-80652 are met. | | | | | | | | | | |
| Contractor format is acceptable. At a minimum, the report is to be provided on each task order issued on this IDIQ | | | | | | | | | | |
| contract, and shall include expenditures data, budgeted versus actual, contract deliverable(s) status, | | | | | | | | | | |
| disposition of contractor furnished materials, a list of Government furnished materials, outside | | | | | | | | | | |
| services employed in completion of the order, and, if a level of effort task, the number of hours delivered vs. the number of hours | | | | | | | | | | |
| required. The closeout report shall be signed by the contractor's program manager. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Block 10 and 12: Within 90 days of completion or project or tasking. Final due 10 days after receipt of Government comments on |
| draft submission. Government has 30 days to comment. If the Government does not reply within 30 days, the CDRL is considered |
| accepted. Submit IAW SOW Para. |
| Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with |
| Office 2010 unless otherwise approved by the Government. |
| Deliver to: | | | | | | |
| Naval Air Warfare Center Aircraft Division Patuxent River (Code 4.11.3), | | | | | | |
| 17149 Communications Lane Bldg 8222, St. Inigoes, MD 20684-0010 | | | | | | |
| Mark for: Contracts Deliverable Manager (insert contract number) | | | | | | |
| | | 15. TOTAL | 1 | 1 | 1 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| L. Davis | 5/31/16 | N. Downs | | 5/31/16 | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 15 | of | 24 |
| 1007/183 | | | | | |
A016
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| 0015 | | A | | TDP_________ | TM ________ | Other X (MGMT) | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| C4 Operational Maintenance & Engineering Training (COMET) | | | TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A016 | Contractor's Risk Management Plan | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MGMT-81808 | | | SOW Para 4.4.8 | | | | NAWCAD 4.11.3.4 | | | |
| 7. DD 250 REQ | 9. DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| See Blk 16 | | | | | | | | | | |
| XX | REQUIRED | See Blk 16 | | See Blk 16 | | | | b. COPIES | | | |
| | D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| A | | N/A | | N/A | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | 4.11.3.4 | 1 | 1 | 1 |
| Block 4: Contractor format is acceptable if the content/intent of DI-MGMT-81808 are met. | | | | | | | | | | |
| Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection |
| form (See Contract Section J Attachments ). |
| Block 10 and 12: Submit within 30 days after award of the first task issuance. Final due 10 days after receipt of Government |
| comments on draft submission. Government has 30 days to comment. If the Government does not reply within 30 days, |
| the CDRL is considered accepted. Frequency of subsequent submissions will be identified per specific tasking. |
| Submit IAW SOW Para. |
This is the start of the file's text. The full file is on GovTribe.