No.
| RFP/Document Page Reference. |
| Document Paragraph Reference |
| Question/Comment/Feedback |
| Government Response |
| 1 |
| Page 18 |
| 5.2.5 |
| Please confirm that the Extended Range Video System (ERVS) will be installed in the Medium Helicopter only. Further, will the ERVS operator be onboard during the recovery of the torpedoes? |
| Revised RFP identifies ERVS will be installed in both the medium and heavy lift helicopters. |
The ERVS operators are not onboard for any launch or recovery operations.
| 2 |
| Page 19 |
| 5.3.5, 5.3.6 |
| Section 5.3.5 states that the heavy helicopter will be required to carry up to 6 passengers plus crew with ICS capability for all passengers. Section 5.3.6 states that the internal capacity of the heavy helicopter shall be as follows: 2,000 pounds capacity (including a minimum of 8 passengers); re-configurable for internal loads. Is the requirement 6 or 8 passengers for the heavy helicopter? |
| Revised paragraph 5.3.5 the heavy lift helicopter will be required to carry 8 passengers plus crew with ICS capability for all passengers. |
| 3 |
| Pages 20-21 |
| 5.5.b, 5.6.b |
| Does the Government currently have access to STCs for certain aircraft types for the installation of GFE that Contractor can utilize to meet contract requirements? If so, please advise what aircraft types are available. |
| No, the Government does not have access to STC’s for certain aircraft types for the installation of GFE. |
| 4 |
| Page 21 |
| 6.0.c |
| Section 6.0.c states that “for aircraft operations to which 14 CFR Part 135 and 133 apply, aircraft shall have an FAA Standard Category airworthiness certificate.” Section 6.0.d references the use of former military aircraft under this contract. Since former military aircraft are operated as “Restricted Category” aircraft, an FAA Standard Category airworthiness requirement as set out in 6.0.c would exclude former military aircraft. Is it the Government’s intent that former military aircraft operated as Restricted Category aircraft are allowed for use under this contract, including for use in movement of passengers and internal cargo? |
| The incumbent flies an H-3 variant. The Government does not intend for the offeror to use a former military aircraft. The offeror may propose their recommended aircraft to fulfill the requirements of this contract. |
| 5 |
| RFP Page 26 |
| 9.0.c |
| Section 9.0.c states “Flight operations may be scheduled for any time, 24 hours a day, seven days a week. The typical schedule for conducting flight operations is Monday through Friday, dawn to dusk, (approximate times are from 0600 to 2000, PMRF Barking Sands local time). The Government shall give 12 hours advance notice (not to include emergent tasking) of a requirement for flying outside the typical operating time. The weekly schedule issued by the SO will identify when operations are required outside of the typical period or are of longer duration than 14 hours per day. Night sustainment flights (if required) shall be coordinated through the weekly scheduling conference.” To achieve a 24/7 level of readiness, the contractor will have to require air crews be scheduled for duty. This will require assignment of two flight crews to each aircraft to accommodate 24/7 availability. Is it the Government’s intention for the contractor to staff two (2) crews per one (1) aircraft to accommodate the 24/7 availability? |
| The offeror shall propose the required crews to support the minimum 2 aircraft requirement. The weekly schedule provided by the Government Scheduling Officer (SO) will identify operations Monday through Friday, dawn to dusk, (approximate times are from 0600 to 2000, PMRF Barking Sands local time). The Government SO will give at least 12 hours advance notice of a requirement for flying outside the typical operating time. |