CONTRACT DATA REQUIREMENTS LIST Form Approved I ( 1 Data Item) OMB No. 0704-0188

I The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate

I (0704-0188). Respondents should be aware that notwithstanding any other provision or law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

I A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

2000 A TOP TM OTHER MGMT

I D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

N00421-15-R-0013 (For Bidding Purposes Only)

I 1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

AOOl Program Financial Summary Monthly Status Report

I

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

I DI-FNCL-8033 lA (See Block 16) SOW Section 5.1.2 NA WC-AD, Code 5.4.3

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

I REQUIRED Monthly See Block16 LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

I "D" SUBMISSION Draft Reg Repro

16. REMARKS COR 1

I

1) Block4: Tailored Content Requirements I

Report shall be consistent with the format in Attachment 4 in accordance with SOW Section I 5.1.2. Monthly Project Financial reports (SOW Section 8.1.3) are to be delivered electronically in the Microsoft Excel format. I

2) Block 12: The initial report shall be submitted within 10 days of the completion of the I first calendar month following task order award. If there are fewer than 8 business days

I between task order award and the end of the first calendar month, the initial report may be deferred until the next calendar month.

I

3) Block 13: Within I 0 days of the completion of the reporting calendar month.

I

4) The Government will have 30 days for review and acceptance/rejection of each

I submission.

I

... 15. TOTAL 0 1 0

G. PREPARED BY ~~ H.DATE I. APPROVED.BY ,.~ ~ J. DATE

Erik Rebeck ) . Mike Sakach //

26-0CT-2016

NA WCAD 5431 j 26-0CT-2016 NA WCAD 543 _/

DD FORM 1423-1, FEB 2001 - PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DAT A REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

2000 IB. EXHIBIT ,C. CATEGORY: MGMT

A TOP __ ™--OTHER -----------------

D. SYSTEM/ITEM

I

E. CONTRACT/PR NO. IF. CONTRACTOR

N00421-15-R-0013 (For Bidding Purposes Only)

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page __ of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010. 12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning, ""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4. 71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

I

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group Ill. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group Ill are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Item 13. Specify when subsequent submittals are required, when Estimated Price - Group IV items should normally be shown applicable. on the DD Form 1423 at no cost.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

DD FORM 1423-1 (BACK), FEB 2001

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

CONTRACT DAT A REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources. gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, irycluding suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704~0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMS control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

2000 A TOP TM OTHER MGMT

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

N00421-15-R-0013 (For Bidding Purposes Only)

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Project Financial Summary Monthly Status Report

4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81864 (See Block 16) SOW Section 5.1.3 NA WC-AD, Code 5.4.3

7. DD 250 REQ 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

Monthly See Blockl6 LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final "D" SUBMISSION Draft

Reg Re pro

16. REMARKS COR 1

Proiect TPOC 1

I) Block 4: Tailored Content Requirements

Report shall be consistent with the format in Attachment 4 in accordance with SOW Section

5.1.3. Monthly Project Financial reports (SOW Section 8.1.3) are to be delivered electronically in the Microsoft Excel format.

2) Block 12: The initial report shall be submitted within 10 days of the completion of the first calendar month following task order award. If there are fewer than 8 business days between task order award and the end of the first calendar month, the initial report may be deferred until the next calendar month.

3) Block 13: Within 10 days of the completion of the reporting calendar month.

4) The Government will have 30 days for review and acceptance/rejection of each submission.

15.TOTAL 0 2 0

G. PREPARED BY

w~

H.DATE

I. APPROVED B~~~ J.DATE

Erik Rebeck Mike Sakach

26-0CT-2016

NAWCAD5431

26-0CT-2016 NAWCAD543

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

17. PRICE GROUP

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

2000 I

B. EXHIBIT IC. CATEGORY: MGMT

A TOP __ ™--OTHER -----------------

D. SYSTEM/ITEM

I

E. CONTRACT/PR NO. IF. CONTRACTOR

N00421-15-R-0013 (For Bidding Purposes Only)

(See DoD 5010. 12-M for detailed instructions.}

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark {X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning, '"'Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory {to be filled in after contract award).

Item F. Self-explanatory {to be filled in after contract award).

Item G. Signature of preparer of CORL.

Item H. Date CORL was prepared.

Item I. Signature of CORL approval authority.

Item J. Date CORL was approved.

Item 1. See DoD FAR Supplement Subpart 4. 71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item {optional entry).

Item 4. Enter Data Item Description {DID) number, military specification number, or military standard number listed in DoD 5010.12-L {AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item {e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data {ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

DD FORM 1423-1 (BACK), FEB 2001

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort {production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group Ill. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

"Estimated Price - Costs to be included under Group Ill are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

The public reporting burden for this collect\ion of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704~0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a colfection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

2000 A TOP TM OTHER MGMT

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F.CONTRACTOR

N00421-15-R-0013 (For Bidding Purposes Only)

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003 Monthly Progress Report

4. AUTHORITY /Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80368 (See Block 16) SOW Section 5.2 NA WC-AD, Code 5.4.3

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION REQUIRED Monthly SeeBLK 16 LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final "D" SUBMISSION Draft SeeBLK 16 Reg Repro

16. REMARKS COR 1

1) Block4: Contractor format is acceptable with prior COR concurrence. The intended purpose of this report is to communicate risks, issues and accomplishments and create a record of the work performed under this task order. Schedule and performance of projects supported by this Task Order are to be reported at the project level. Information shall be organized according to the project/task supported in accordance with SOW Section 5.2.

Data Item Description tailoring:

a. Paragraph 3.2.la - not applicable unless contractor desires to communicate risk or performance issues.

b. Paragraph 3.2.lb- not applicable.

c. Paragraph 3.2.ld - not applicable.

d. Paragraph 3.2.lf - applicable only to Program Management (SOW Section 4.2.1)

e. Paragraph 3.2.3 - not applicable. See CDRL AOOl and A005.

2) Block 12: First submittal within 15 days after the end of the first calendar month the Task Order performance commences. Ifthere are fewer than 8 business days between task order award and the end of the first calendar month, the initial report may be deferred until

' the next calendar month.

3) Block 13: Within 15 days of the completion of the reporting calendar month.

4) The Government will have 30 days for review and acceptance/rejection of each submission.

5) Submissions shall be transmitted electronically (via e-mail) in the Microsoft Word format.

A 15. TOTAL 0 1 0

G. PREPARED BY

B;Jf2&0~

H. DATE I. APPROVED BY~ ~ J.DATE

Erik Rebeck Mike Sakach ').

26-0CT-2016

NAWCAD5431

26-0CT-2016 NAWCAD543

I ~ -DD FORM 1423 1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

17. PRICE GROUP

( 1 Data Item)

A. CONTRACT LINE ITEM NO.

2000 IB. EXHIBIT IC. CATEGORY: MG

A TOP __ TM __ OTHER -'-.--M_T ______________ _

D. SYSTEM/ITEM

I

E. CONTRACT/PR NO. IF. CONTRACTOR

N00421-15-R-0013 (For Bidding Purposes Only)

(See DoD 5010. 12-M for detailed instructions.}

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning, ""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CORL.

Item H. Date CORL was prepared.

Item I. Signature of CORL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4. 71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number list.ed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

DD FORM 1423-1 (BACK), FEB 2001

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group Ill. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item. _

Estimated Price - Costs to be included under Group Ill are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

CONTRACT DATA REQUIREMENTS LIST Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMS control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

2000 A TOP TM OTHER MGMT

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

N00421-15-R-0013 (For Bidding Purposes Only)

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004 Operations Security (OPSEC) Plan

4. AUTHORITY (Data Acquisition Document No.) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80934C (See BLK 16) SOW Section 7.8 NA WC-AD, Code 5.4.3

7. DD 250 REQ 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT

REQUIRED SeeBLK 16 SeeBLK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final "D" SUBMISSION Draft

SeeBLK 16 SeeBLK 16 Reg Re pro

16. REMARKS COR 1 1 0

1) Block 4: Delete References in DI-MGMT-80934C. Instead use the definition of sensitive information given in Public Law 100-235. Use National Security Decision Directive (NSDD) 298 for the concept of Operation Security.

2) Blocks IO, ll, 12, 13: Preliminary draft OPSEC Plan due 30 days after award. Final plan is due 30 days after draft OPSEC plan is approved. (Revisions as required after approval of final plan only to comply with Government Data Protection Policy Documents revision).

3) The Government will have 30 days for review and acceptance/rejection of each submission.

4) The report shall be submitted electronically (via e-mail) in Microsoft Word format.

15. TOT_AL 1 1 0

G. PREPARED BY ~~ H.DATE I. APPROVED BY N ~ J. DATE

Erik Rebeck ~ , c: I 26-0CT-2016 f"l•ck~I 26-0CT-2016

NA WCAD 5431 I <.ak~ Nku~ s.f> DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

Adobe Professional 7.0

I

I

I

17. PRICE GROUP

A. CONTRACT LINE ITEM NO. I B. EXHIBITA I c. CATEGORY:

MGMT 2000 TOP__ TM __ OTHER

D. SYSTEM/ITEM IE. CONTRACT/PR NO. ,F.CONTRACTOR

N00421-15-R-0013 (For Bidding Purposes Only)

16. REMARKS (Continued)

I

DD FORM 1423-1. FEB 2001 Page __ of Pages

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TOP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning, ""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CORL.

Item H. Date CORL was prepared.

Item I. Signature of CORL approval authority.

Item J. Date CORL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Jtem 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

lt!lm 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

DD FORM 1423-1 (BACK), FEB 2001

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group Ill. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal,· preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group Ill are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMS control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

2000 A TOP TM OTHER MGMT

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

N00421-15-R-0013 (For Bidding Purposes Only)

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005 Technical Reports and Documentation

4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-J\.1ISC-80711A (See Block 16) SOW Section 5.3 NA WC-AD, Code 5.4.3

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT

REQUIRED As Required As Required b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final "D" SUBMISSION Draft

As Required As Required Reg Repro

16. REMARKS COR 1

I) Block4: Contractor format is acceptable with prior COR concurrence.

2) The Government will have 30 days for review an acceptance/rejection of each submission.

3) Submissions shall be transmitted electronically in a format to be determined in accordance with program and/or project requirements.

15. TOTAL 0 1 0

G. PREPARED BY s~ 1~ H.DATE I. APPROVED BY~~ J. DATE Erik Rebeck · ' Mike Sakach

26-0CT-2016

NAWCAD543

26-0CT-2016 NAWCAD543

DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0

I

I

I

I

I

I

17. PRICE GROUP

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

2000 I B. EXHIBIT I c. CATEGORY:

A TOP __ ™-- OTHER _M_G_M_T ______________ _

D. SYSTEM/ITEM

IE. CONTRACT/PR NO. IF. CONTRACTOR

N00421-15-R-0013 (For Bidding Purposes Only)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TOP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,"" Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CORL was approved.

Item 1. See DoD FAR Supplement Subpart 4. 71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item . by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

DD FORM 1423-1 (BACK), FEB 2001

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group Ill. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item .

Estimated Price - Costs to be included under Group Ill are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should norrnally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any