Attachment_8_-_QASP_-_Supply.docx

DOCX document 57 KB Posted

Attached to
5. 4. 3 Supply Support
Solicitation number
N00421-15-R-0013
Issued by

About this file

Attachment (8) Quality Assurance Surveillance Plan (QASP

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5.4.3 Supply ContractAttachment 82015-08-18
N00421-15-R-0013QASP

Quality Assurance Surveillance Plan (QASP) For the Simulation Division (5.4.3) Supply Contract

1. Purpose This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to ensure systematic quality assurance methods are used in the administration of the Performance Work Statement (PWS) under the planned contract. The intent is to ensure that the Contractor performs in accordance with the performance metrics identified herein and the Government receives the quality of services called for in the order.

This requirement is for supply procurement and manufacturing support for Simulation Division (NAWCAD 5.4.3) teams, facilities, and supported projects. Supplies to be procured will support the development, modification, upgrade and maintenance of simulation systems, laboratories, and aircraft test and prototype systems. Supply manufacturing support includes fabrication, wiring, installation, quality assurance, deployment and maintenance of systems developed and/or operated by the Simulation Division.

The resulting vehicle will be single award IDIQ Contract. The performance based task order will have Cost-Plus-Fixed-Fee (CPFF) CLINs for labor, cost-reimbursable CLINs for travel and material, and a not separately priced CLIN for data. The task order will consist of a one year base and four one year options. A properly executed QASP will assist the Government in achieving the objectives of this procurement.

2. Authority Authority for issuance of this QASP is provided under Section E – Inspection and Acceptance of the task order, which provides for inspection and acceptance of the services and documentation called for in a Seaport task order, to be executed by the Contracting Officer or a duly authorized representative.

3. Scope To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the Quality Assurance Surveillance Plan. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the order. The QASP is put in place to provide Government surveillance oversight of the Contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the order.

4. Government Resources The following definitions for Government resources are applicable to this plan:

Contracting Officer - A person duly appointed with the authority to enter into contracts (Procuring Contracting Officer -PCO) or administer contracts (Administrative Contracting Officer - ACO) and make related determination and findings on behalf of the Government. The PCO for this contract is:

{PCO Name, AIR 2.5.X.X} The ACO will be designated in the resulting Task Order (TO). Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed by written letter of appointment which will set forth limitations of authority.

5. Responsibilities The following Government resources shall have responsibility for the implementation of this QASP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Report System (CPARS) – The market place for engineering and management support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS rating under this contract. Additionally, an evaluation using the CPARS format will be performed at the midpoint of each period of performance. This evaluation will be one determinant in exercising an option. For this procurement the Government will address the quality of product or service, schedule, cost control, management, and other areas. As this information may affect future source selections throughout DoD, and the continuation of the TO, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.

b. QASP - The below listed methods of surveillance shall be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist provided as Enclosure (4) herein.

7. Surveillance

a. Monthly QA Surveillance Activities The COR will provide monthly quality assurance surveillance of the contract activities culminating with the submission of the Monthly COR Report and Surveillance Activity Checklist within 15 days of the reporting month. Monthly quality assurance surveillance will include the following activities:

1) Financial Review

a. Review of the Contractor’s Monthly Financial Summary (CDRL A001) and Project Financial Summaries (CDRL A002)

i. Compare funding listed with BFM funding report.

ii. Check for and investigate potential out-of-place or unexpected charges.

iii. Review the funding, expenditures, and burn-rate of each CLIN. Investigate unexpected burn rate values. Identify potential funding shortfalls.

iv. Review funding, expenditures and burn-rates for each project/activity supported by the contract. Communicate future funding requirements to project leaders.

v. Investigate any concerns identified by project Technical Points of Contact (TPOC) after they have reviewed their Project Financial Summaries for accuracy.

b. Investigate over-time charges. Ensure all over-time is allowable and reasonable (see contract clause 52.222-2).

c. Download Invoice documents and compare with Monthly Financial Report (CDRL A001). Note: contractor’s invoice period will not coincide exactly with monthly reporting periods, and sub-contractor charges are often delayed.

d. Record and plot historical monthly burn rates for all CLIN’s and for significant projects. Identify and rectify deviations with current spend plans.

2) Review Monthly Progress Report (CDRL A002)

a. Identify and investigate identified program and project concerns and risk areas.

b. Review for work that may be outside the scope of the contract SOW.

c. Review for unexpected and/or unauthorized work.

3) Performance Review

a. Discuss with Project Leaders the perceived quality, schedule and cost of services provided to their projects thru this contract.

b. Discuss with Simulation Division Management the perceived quality, schedule and cost of services provided to the organization thru this contract.

c. Review perceived overall performance with contractor. Discuss performance risks and potential paths for improving performance by the contractor and/or government.

4) Evaluation

a. Complete monthly Surveillance Activity Checklist (see Enclosure 4)

b. Complete and submit Monthly COR Report

b. Yearly Surveillance Activities Yearly Surveillance Activities will include completion of the Contractor Performance Assessment Reports System (CPARS).

Enclosures (1), (2), and (3) sets forth the performance standards, incentives, and surveillance methods for the contractor and COR while Enclosure (4) provides the checklist and means for the COR to document on a monthly basis.

8. Documentation The COR shall submit the Surveillance Activity Checklist, Enclosure 4, with the Monthly COR report electronically by posting them to the CORT Tool within Wide Area Work Flow (WAWF) (https://wawf.eb.mil/), where they will be reviewed and approved by the Contracting Officer. Copies of the COR Monthly Reports, Surveillance Activity Checklists, and CPARS evaluations will be maintained by the COR in a Quality Assurance File. All such records will be maintained for the life of the TO. The COR shall forward these records to the Contracting Officer at termination or completion of the TO.

9. Enclosures Enclosure (1) – Performance Standards Enclosure (2) – Data Performance Standards Enclosure (3) – Incentives Enclosure (4) – Surveillance Activity Checklist

Enclosure (1)

PERFORMANCE STANDARDS

SOW Task Description
Performance Standard / Acceptable Quality Level
Surveillance Method / Measure
Incentives
(All)
Acceptable quality level for all tasks performed on this contract include:

1) Compliance with all applicable Simulation Division (5.4.3) Quality Management System (QMS) standards and Procedures 100% of the time.

2) Compliance with all applicable security standards and procedures 100% of the time.

Inspection by COR, with input from 5.4.3 management.
See Enclosure 3

Program and Project Management Support SOW Section 4.3 Program management acceptable quality level is:

1) Program requirements met 95% of the time.

2) CDRL reports complete and on time in accordance with enclosure 2.

3) Effective and efficient use of all resources 92% of the time.

Supply Procurement SOW Section 4.4.1 Procurement support acceptable quality level is:

1) Orders processed and placed in a timely manner consistent with the level of difficulty of the purchase.

2) Compliance with FAR and DFAR material purchase policies, including price reasonableness documentation and sole-source justification documentation (when required) 100% of the time.

3) Compliance with material purchasing procedures and approval processes, as defined by the contract, 100% of the time.

4) Accurately report on status of purchases 95% of the time.

Inspected by COR, with input from 5.4.3 management and/or team leaders.

Quality Assurance Support SOW Section 4.4.2 For systems requiring QA support the acceptable quality level is:

1) Successful identification of out-of specification (detectable with tools available) mechanical parts 97% of the time.

2) Successful identification of out-of –specification (detectable with tools available) mechanical assemblies

3) Successful identification of mis-wired assembly or cable 99.8% of the time.

4) Successful identification of mis-wired power assemblies, power wires/cables, and other identified critical wiring 100% of the time.

5) Successful identification of other quality issues as defined in the Workmanship and Inspection standards 97% of the time.

6) Prompt communication of issues identified to fabrication and engineering 100% of the time.

Shipping, Receiving and Inventory Support SOW Section 4.4.3 Shipping, receiving and inventory standards are defined in relevant Simulation Division standards. Acceptable quality level is adherence to standards 100% of the time and successful operations 95% of the time.

Fabrication and Wiring Support SOW Section 4.5.1, 4.5.2 Fabrication and Wiring acceptable quality level is:

1) Fabrication and assembly tasks completed in accordance with the supporting design documentation 95% of the time on first submission to QA and 100% thereafter.

2) Wiring tasks completed in accordance with supporting design documentation 97% of the time on first submission to QA and 100% thereafter.

3) Project / task-level targets for cost and schedule that are agreed to by projects and shops are met 85% of the time when not affected by outside factors.

4) Workload prioritized and executed in an order that maximizes stated project and program goals 90% of the time.

5) Safety policies and procedures adhered to 100% of the time.

6) Hazardous materials procedures adhered to 100% of the time.

Deployment Support SOW Section 4.5.3 Deployment support acceptable quality level is:

1) Provide required support to successfully deploy fielded systems in required time-frames 100% of the time.

2) Successfully coordinate with customers and other support companies (shipping, crane operators, etc.) to ensure schedule is met 95% of the time.

3) Safety policies and procedures adhered to 100% of the time.

Enclosure (2)

DATA PERFORMANCE STANDARDS

SOW/CDRL Task Description
Standard
Acceptable Quality Level
Surveillance Method / Measure
Incentives

CDRL A001:

Monthly Financial Summary

Submissions are in accordance with DID cited in the CDRL, format in Attachment 4, and Basic Contract PWS Section 5.1.2.
Acceptable quality level is:

1) Accurate and complete 98% of the time.

2) On time delivery 90% of the time.

3) Delivery is never more than 7 days late.

100% Inspection by COR

Project Financial Reports 100% Inspected by Government Lead and Reported to COR See Enclosure 3

CDRL A002:

Monthly Project Financial Summary

Submissions are in accordance with DID cited in the CDRL, format in Attachment 5, and Basic Contract PWS Section 5.1.3.
Acceptable quality level is:

1) Accurate and complete 98% of the time.

2) On time delivery 90% of the time.

3) Delivery is never more than 7 days late.

Project Financial Reports 100% Inspected by COR and Government TPOC, who will report any concerns to COR

CDRL A002:

Monthly Progress Report

Submission is in accordance with the DID cited in the CDRL and Basic Contract PWS Section 5.2.
Acceptable quality level is:

1) Accurate and complete, providing an overview of the work accomplished during the reporting period.

2) Information is organized in a logical format and presents an appropriate level of detail to communicate Program status and accomplishments.

3) On time delivery 90% of the time.

4) Delivery is never more than 7 days late.

100% Inspection by COR

CDRL A003:

Incurred Cost and Progress Reporting for Services

Submission is in accordance with the DID cited in the CDRL.
Acceptable quality level is:

1) Accurate and complete 100% of the time.

2) Submitted with vouchers 100% of the time.

100% Inspection by COR

CDRL A004:

OPSEC Plan

Submission is in accordance with the DID cited in the CDRL.
Accurate and complete by customer due date 100% of the time.
100% Inspection by COR

CDRL A005:

Additional Reporting

Submission satisfied applicable ASD standards, project requirements, and any applicable project standards.
Accurate and complete by customer due date 90% of the time.
100% By Government TPOC, Reported to COR

Enclosure (3)

INCENTIVES

All incentives are based on CPARS evaluations of the contracted effort. CPARS reports will be submitted for the entirety of the contract effort, and not individually for each Task Order. CPARS evaluations will be performed six months after contract initiation and every 12 months thereafter, with a final CPARS report submitted at the end of the contract period of performance. CPARS evaluations will be based on the monthly and annual surveillance checklists (see Enclosure 4) and contract performance information collected by the COR.

CPARS evaluations asses the performance of a contract using six performance measurement areas:

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events, discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or underrun? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort should be assessed.

Business Relations - Assess the integration and coordination of all activity needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor's history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts.

Management Responsiveness – Assess the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, Engineering Change Proposals (ECPs), or other UCAs), the contractor's history of reasonable and cooperative behavior, effective business relations, and customer satisfaction. Consider the contractor’s responsiveness to the program as it relates to meeting contract requirements during the period covered by the report.

Utilization of Small Business – FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the Small Business Subcontracting Program. Assess whether the contractor provided maximum practicable opportunity for Small Business (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes), Women Owned Small Businesses, HUBZone, Veteran Owned, Service Disabled Veteran Owned Small Business, Historically Black Colleges and Minority Institutions and ANCs and Indian Tribes that are not Small Disadvantaged Businesses or Small Businesses) to participate in contract performance consistent with efficient performance of the contract.

Each CPARS performance measurement area is given one of five standard ratings:

Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory – Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal – Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.

Numeric values have been assigned to the five standard ratings to assist in calculating weighted average ratings of each of the six performance measurement areas based on ratings of several contract requirements.

Standard Rating
Numeric Value
Exceptional
5
Very Good
4
Satisfactory
3
Marginal
2
Unsatisfactory
1

Contract performance incentives are outlined in the following table:

Assessment Period
How Measured
Acceptable Performance Definition
Incentives
CPARS Report 1
CPARS evaluation performed 6 months after IDIQ award covering the first 6 months of contract performance.
All measurement areas rated “Satisfactory” or better.

Reporting meets acceptable quality levels (Enclosure 2).

(+) Meet the acceptable performance definition as a condition for award of additional Task Orders.

(-) Does not meet the acceptable performance definition as a condition for award of additional Task Orders.

CPARS Report 2
CPARS evaluation performed 30 months after IDIQ award covering the previous 12 months (Months 7-18).
All measurement areas rated “Satisfactory” or better.

Four of the six measurement areas rated “Very Good” or better.

Reporting meets acceptable quality levels (Enclosure 2).

(+) Meet the acceptable performance definition as a condition for award of additional Task Orders.

(-) Does not meet the acceptable performance definition as a condition for award of additional Task Orders.

CPARS Report 3
CPARS evaluation performed 30 months after IDIQ award covering the previous 12 months (Months 19-30).
All measurement areas rated “Satisfactory” or better.

Four of the six measurement areas rated “Very Good” or better.

Reporting meets acceptable quality levels (Enclosure 2).

(+) Meet the acceptable performance definition as a condition for award of additional Task Orders.

(-) Does not meet the acceptable performance definition as a condition for award of additional Task Orders.

CPARS Report 4
CPARS evaluation performed 42 months after IDIQ award covering the previous 12 months (Months 31-42).
All measurement areas rated “Satisfactory” or better.

Four of the six measurement areas rated “Very Good” or better.

Reporting meets acceptable quality levels (Enclosure 2).

(+) Meet the acceptable performance definition as a condition for award of additional Task Orders.

(-) Does not meet the acceptable performance definition as a condition for award of additional Task Orders.

CPARS Report 5
CPARS evaluation performed 54 months after IDIQ award covering the previous 12 months (Months 43-54).
All measurement areas rated “Satisfactory” or better.

Four of the six measurement areas rated “Very Good” or better.

Reporting meets acceptable quality levels (Enclosure 2).

(+) Meet the acceptable performance definition as a condition for award of additional Task Orders.

(-) Does not meet the acceptable performance definition as a condition for award of additional Task Orders.

Final CPARS Report
Final CPARS report - inclusive of entire period of performance – performed at the end of the contract period of performance.
All measurement areas rated “Satisfactory” or better.

Four of the six measurement areas rated “Very Good” or better.

Reporting meets acceptable quality levels (Enclosure 2).

Final CPARS evaluation will be used by the Government in evaluating the Contractor’s past performance during the source selection process for future Government contracts.

Enclosure (4)

SURVEILLANCE ACTIVITY CHECKLIST

Monthly Surveillance:

The COR will perform a monthly assessment of the contract performance no later than the 15th day of the following month. The monthly assessment consists evaluating the principal contract support requirements by assigning numeric performance ratings for each of the six CPARS performance measurement areas. A weighted average is then calculated for each of the six performance measurements that will be used in determining the CPARS ratings.

Contract Support Requirement
Quality
Schedule
Cost Control
Mgmt. Responsive-ness
Utilization of Small Business
Business Relations

Program and Project Management Support SOW Section 4.3 n/a

10%
10%
10%
100 %
0%
50%

Procurement Support SOW Section 4.4.1

n/a
n/a
15%
15%
20%
0%
0%
10%

Quality Assurance Support SOW Section 4.4.2

n/a
n/a
5%
5%
5%
0%
0%
5%

Shipping Receiving and Inv.

SOW Section 4.4.3

n/a
n/a
5%
5%
10%
0%
0%
5%

Fabrication and Wiring Support SOW Section 3.5.1, 3.5.2

n/a
n/a
50%
50%
40%
0%
0%
20%

Deployment Support SOW Section 3.5.3

n/a
n/a
10%
10%
10%
0%
0%
10%

Reporting SOW Section 4.0

n/a
n/a
n/a
5%
5%
5%
0%
0%
0%

Summary of Ratings

Weighted Average† n/a

Equivalent CPARS Rating n/a

†Weighted average is calculated by summing up the ratings times weight percentage. Weight percentage indicates the relative importance of the requirement to the overall contract effort.
Weighted Average = (numeric rating) x (percentage weight)

Weighted average values are rounded up or down to determine the CPARS standard rating.

Annual Surveillance:

The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in enclosure 3, and the monthly weighted average ratings.

CPARS Report 1:

Weighted CPARS Rating
Quality
Schedule
Cost Control
Mgmt.
Utilization of Small Business
Business Relations

Month 1 n/a

Month 2 n/a

Month 3 n/a

Month 4 n/a

Month 5 n/a

Month 6 n/a

Average n/a

CPARS Rating n/a

CPARS Report 2:

Description
Quality
Schedule
Cost Control
Mgmt.
Utilization of Small Business
Business Relations

Month 7 n/a

Month 8 n/a

Month 9 n/a

Month 10 n/a

Month 11 n/a

Month 12 n/a

Month 13 n/a

Month 14 n/a

Month 15 n/a

Month 16 n/a

Month 17 n/a

Month 18 n/a

Average n/a

CPARS Rating n/a

CPARS Report 3:

Description
Quality
Schedule
Cost Control
Mgmt.
Utilization of Small Business
Business Relations

Month 19 n/a

Month 20 n/a

Month 21 n/a

Month 22 n/a

Month 23 n/a

Month 24 n/a

Month 25 n/a

Month 26 n/a

Month 27 n/a

Month 28 n/a

Month 29 n/a

Month 30 n/a

Average n/a

CPARS Rating n/a

CPARS Report 4:

Description
Quality
Schedule
Cost Control
Mgmt.
Utilization of Small Business
Business Relations

Month 31 n/a

Month 32 n/a

Month 33 n/a

Month 34 n/a

Month 35 n/a

Month 36 n/a

Month 37 n/a

Month 38 n/a

Month 39 n/a

Month 40 n/a

Month 41 n/a

Month 42 n/a

Average n/a

CPARS Rating n/a

CPARS Report 5:

Description
Quality
Schedule
Cost Control
Mgmt.
Utilization of Small Business
Business Relations

Month 43 n/a

Month 44 n/a

Month 45 n/a

Month 46 n/a

Month 47 n/a

Month 48 n/a

Month 49 n/a

Month 50 n/a

Month 51 n/a

Month 52 n/a

Month 53 n/a

Month 54 n/a

Average n/a

CPARS Rating n/a

Final CPARS Report¥:

Weighted CPARS Rating
Quality
Schedule
Cost Control
Mgmt.
Utilization of Small Business
Business Relations

Month 55 n/a

Month 56 n/a

Month 57 n/a

Month 58 n/a

Month 59 n/a

Month 60 n/a

Average n/a

¥ The Final CPARS report covers the entire contract period of performance. This table collects data for the last six months of contract performance.

SOURCE SELECTION INFORMATION-SEE FAR 2.101 AND 3.104

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .