N00253-14-R-0010 Amendment 0003 to provide answers to vendor questions update a drawing and extend the closing date.

View the file

Other files

File Type Posted
N00253-14-R-0010-0004.pdf PDF
N00253-14-R-0010-0002.pdf PDF
N0025314R0010_0001_10June14.doc DOC document
ATT_3_Past_Performance.docx DOCX document
14R0010_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

Questions and Answers

NOTE: Questions and Answers 1 through 11 were provided under Amendment 0001. Questions and Answers 12 through 15 were provided under Amendment 0002.

Question 16: If you refer to section T-T on sheet 4, W-W on sheet 5 and the 3D model the drawings illustrate a sharp corner where the 3 surfaces come together. Square corners are very difficult and sometimes impossible to machine, not to mention the reduced strength. What size radii can be used in the different corners large enough to accommodate a rotating cutter to machine these surfaces?

Answer 16: Refer to section T-T on page 4 for a max allowable radius. (R=.125 MAX) Question 17: I have not been able to locate the drawing for section Z-Z.

Answer 17: There is no section Z-Z.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 11-Jul-2014 02:00 PM to 16-Jul-2014 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from Manufacture in accordance with Drawing 8290001, review print date 01/23/2014 (5 sheets). Inspection and Acceptance at Destination.Receipt inspection per drawing.Vendor to provide certificate of conformance to all drawing notes and specifications.Mark For: In Support of US Cold Gas Fleet Exercise System (FES) to Manufacture in accordance with Drawing 8290001, review print date 07/07/2014 (5 sheets). Inspection and Acceptance at Destination.Receipt inspection per drawing.Vendor to provide certificate of conformance to all drawing notes and specifications.Mark For: In Support of US Cold Gas Fleet Exercise System (FES).

CLIN 0002

The CLIN extended description has changed from Manufacture in accordance with Drawing 8290001, review print date 01/23/2014 (5 sheets). Inspection and Acceptance at Destination.Receipt inspection per drawing.Vendor to provide certificate of conformance to all drawing notes and specifications. to Manufacture in accordance with Drawing 8290001, review print date 07/07/2014 (5 sheets). Inspection and Acceptance at Destination.Receipt inspection per drawing.Vendor to provide certificate of conformance to all drawing notes and specifications..

CLIN 1001

The CLIN extended description has changed from Manufacture in accordance with Drawing 8290001, review print date 01/23/2014 (5 sheets). Inspection and Acceptance at Destination.Receipt inspection per drawing.Vendor to provide certificate of conformance to all drawing notes and specifications.Delivery will be 90 days after option exercise. to Manufacture in accordance with Drawing 8290001, review print date 07/07/2014 (5 sheets). Inspection and Acceptance at Destination.Receipt inspection per drawing.Vendor to provide certificate of conformance to all drawing notes and specifications.Delivery will be 90 days after option exercise..

CLIN 2001

The CLIN extended description has changed from Manufacture in accordance with Drawing 8290001, review print date 01/23/2014 (5 sheets). Inspection and Acceptance at Destination.Receipt inspection per drawing.Vendor to provide certificate of conformance to all drawing notes and specifications.Delivery will be 90 days after option exercise. to Manufacture in accordance with Drawing 8290001, review print date 07/07/2014 (5 sheets). Inspection and Acceptance at Destination.Receipt inspection per drawing.Vendor to provide certificate of conformance to all drawing notes and specifications.Delivery will be 90 days after option exercise..

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

HQ J-2-0002 CONTRACT LANGUAGE FOR SECTION J PRIVATE

The following document(s), exhibit(s), and other attachment(s) form a part of this contract:

ATTACHMENT 1 – Drawings – Updated 10 June 2014

DRAWING
Nomenclature
REV
8290001
Hull, Cold Gas – Updated 09 July 2014
No Rev
8290007
Manifold, Bottle
No Rev
8290024
Handhold Manifold, Fill
No Rev
8290008
Bracket, Valve
No Rev
8290022
Bag Strap Mount
No Rev
8290014
Range Gear and Battery Bracket
No Rev
8290015
Battery Bracket
No Rev
8290017
Foam, Bottle Mount
No Rev
8290527
Depth Manifold Assembly Cold Gas
No Rev
8290694
Druck Sleeve Cold Gas
No Rev
8290039
Bottle and Electronics Mount Assy
No Rev
8290719
Weight Block 001
No Rev
8290720
Weight Block 002
No Rev
8290721
Weight Block 003
No Rev
5816977
Pin, Alignment Shell
Rev C
8290016
Bottle & Electronics Mounting Plate
No Rev
8290025
Manifold, Depth Switch
No Rev

ATTACHMENT 2: NAVSEA NUWC Division Keyport, OPSEC Guide For Defense Contractors, Rev Oct 2013 (Incorporated by reference. Document can be downloaded from http://www.navsea.navy.mil/nuwc/keyport/default.aspx; click on OPSEC Guide For Defense Contractors on the left-hand side.)

ATTACHMENT 3: Past Performance Worksheet (will not become part of the award document) ATTACHMENT 4: 3D Model Hull, Cold Gas (will not become part of the award document)

(End of Text) (End of Summary of Changes)