J3_DO_1_CDRLs.pdf
PDF 5 MB Posted
- Attached to
- IDS Technical Refresh
- Solicitation number
- N0017818R4017
About this file
This document contains a Contract Data Requirements List (CDRL) for a federal contract opportunity to update and support the Dominance System (IDS) technology through its intended life cycle. The Naval Surface Warfare Center Dahlgren Division will issue a solicitation on March 1, 2018 for a full and open single-award IDIQ contract with cost-plus-fixed-fee and firm-fixed-price CLINs. The contract will provide for updating hardware components of the IDS system including required drivers, firmware, operating system, and native power management associated with the hardware platform. The solicitation number is N0017818R4017 and contract award is anticipated on August 14, 2018. The CDRL includes five data items covering work breakdown structure, integrated master schedule, commercial drawings and design documents, technical reports on hardware device design, and deliverables associated with design reviews.
J3 CDRL
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0017818R4017_REV2.pdf | ||
| J2_ACTION_SHEET_DO_0001_REV1.pdf | ||
| J1_DO1_SOW_Rev2.pdf | ||
| Exhibit_B_IDS_Hardware_Specifications_REV1.xlsx | XLSX spreadsheet | |
| N0017818R4017_REV1.pdf | ||
| J1_DO1_SOW_Rev1.pdf | ||
| J2_ACTION_SHEET_DO_0001.pdf | ||
| J5_SUPPORTING_COST_DATA.pdf | ||
| Exhibit_B_IDS_Hardware_Specifications.xlsx | XLSX spreadsheet | |
| J1_DO1-S.PDF | ||
| J4_COSTS.XLS | XLS spreadsheet | |
| ExhibitA_IDIQ_CDRL.pdf | ||
| J6_StaffingMatrix.xlsx | XLSX spreadsheet | |
| IDS_RFP.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CORL) Form Approved ( 1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A . CONTRACT LINE ITEM NO. IB. ~XHIBIT I c. CATEGORY:
TOP_ TM -- OTHER X-MGMT
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DAT A ITEM 3. SUBTITLE
A001 CONTRACT WORK BREAKDOWN STRUCTURE
4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-MGMT-81334D SOW PARAGRAPH C4.8.3.6,C4.5.31 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED HIME SEE BLK 16 b. COPIES
8. APPCODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
D (SEE BLK 16)
N/A SEE BLK 16
Draft
Reg Re pro
16. REMARKS COR 0 1
BLK 4: TAILORED TO REMOVE SUBMITTAL THROUGH THE CSDR SUBMIT-REVIEW SYSTEM. THE TECHNICAL POC 3 1
CONTRACTOR SHALL SUBMIT TO THE REQUIRING OFFICE DIRECTLY AND NOT THROUGH THE
DCARC WEBSITE. FORMAT SHALL BE IN ACCORDANCE WITH THE IDS PROGRAM WBS PROVIDED SEE BLK 16
ASGFI.
BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM
RECEIPT OF FINAL SUBMISSION TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE
CONTRACTOR HAS 5 DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT
REVISION REQUESTS WITHIN 5 DAYS, THE DELIVERY IS APPROVED.
BLK g: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRA TIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12,13: FIRST DRAFT SUBMISSION DUE 15 DAYS AFTER THE TECHNICAL INTERCHANGE
MEETING #1 (TIM#1) PER DELIVERY ORDER SOW PARAGRAPH C4.4 (AND SUBPARAGRAPHS).
SUBSEQUENT DRAFT SUBMISSIONS DUE 15 DAYS AND AGAIN 1 DAY PRIOR TO THE SCHEDULED
DATE FOR TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW
PARAGRAPH C4.5 (AND SUBPARAGRAPH$). FINAL SUBMISSION DUE 5 DAYS FOLLOWING
RECEIPT OF GOVERNMENT COMMENTS RESULTING FROM TIM#2.
BLK 14: ELECTRONIC MEDIA: THE CWBS SHALL BE SUBMITTED IN MS OFFICE 2010
APPLICATIONS AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN
SECTION G, GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND
RESPONSIBLITIES.
15. TOTAL
3 2 0
G. PREPARED BY H. DATE I. AP
1;VEDBY
J. DATE
MURILLO.CLAIRE.M.12762404 ~~s.~~i!c!1~.:..USI< 11/6/2017 JJ/11r1 43 ~.C.l.AIJILlillJ1W-4l
~ l JJ{A__,l Gow 20Ull.otl400H.OSW
DD FORM 1423-1 FEB 2001 PREVIOUS EDlvfOl'J.MAY BE USW Page 1 of 21 Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
The public reporting burden for this collection of infonnation is estimated to average 110 hours per response, including the time for reviewing instructions, searching exiS1ing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of infonnation. Send comments regarding this burden estimate or any other aspect of this collection of infonnation, including suggestions for reducing the burden, to the Department of Defense, Execu1ive Services Directorate (0704-0188) Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of lnfonnation if rt does not display a currently valid OMB control number. Please do not retum your form to the above organization. Send completed form to the Govemment Issuing Contracting Officer for the Contract/PR No. listed In Block E.
A . CONTRACT LINE ITEM NO. IB. ~XHIBIT I c. CATEGORY:
TOP __ TM -- OTHER X-MGMT
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR) INTEGRATED MASTER SCHEDULE
4. AUTHORITY (0818 Acquisn10n Document No ) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-MGMT-81861A SOW PARAGRAPHS C4.1 3 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED MNTHLY SEE BLK 16 b. COPIES
8.APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
N/A
D (SEE BLK 16)
SEE BLK 16 SEE BLK 16
Draft
Reg Repro
16. REMARKS COR 0 1
BLK 4· TAILORED TO ONLY INCLUDE FORMAT 6 AS RELATED TO INTEGRATED MASTER TPOC 0 1
SCHEDULE (IMS). EXCLUDE ALL REQUIRMENTS NOT REAL TED TO THE IMS AND ALL
INFORMATION SPECIFICALLY RELATED TO EARNED VALUE MANAGEMENT (EVM) REPORTING SEE BLK 16
CRITICAL MILESTONES SHALL BE HIGHLIGHTED FOR THE GOVERNMENT.
9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND US. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD. SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLK 11 : THE REPORTING PERIOD SHALL BE SYNCHRONIZED WITH THE CONTRACTOR'S
MONTHLY INVOICING PERIOD.
BLKS 12, 13: FIRST SUBMISSION IS DUE 10 WORKING DAYS AFTER THE END OF THE FIRST
MONTH OF CONTRACT PERFORMANCE. IF CONTRACT PERFORMANCE IS LESS THAN 10
WORKING DAYS, FIRST SUBMISSION IS DUE AFTER FIRST FULL MONTH OF CONTRACT
PERFORMANCE. SUBSEQUENT SUBMISSIONS ARE DUE 10 WORKING DAYS AFTER THE END OF
THE MONTH THEREAFTER
BLK 14: ELECTRONIC MEDIA: THE IMS SHALL BE SUBMITTED IN MS PROJECT 2010 ATTACHED TO
EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G, GOVERNMENT CONTRACT
ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES
15. TOTAL ___ ._ 0 2 0
G. PREPARED BY H.DATE l.A~DBY './ .
J. DATE
MURILLO.CLAIRE.M.12762 ~"::::'.~":',:;::" 11/6/2017 11)1/11 40443
-VSN.«>.........iOCLNllE.M.11762"'°""l '~~ o.tt201111 .0. HI OIH~OO'
DD FORM 1423 1, FEB 200 - 1 PREVIOUS EDITIO~ MAY BE USED-" Page i of ll Pages
17. PRICE GROUP
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A . CONTRACT LINE ITEM NO. ,B. ~XHIBIT ,C. CATEGORY:
TOP _X_ TM -- OTHER
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N001 78-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 COMMERICAL DRAWINGS/MODELS AND ASSOCIATED
HANDHELD DEVICE AND KIT DESIGN DRAWINGS
LISTS
4. AUTHORITY (0818 Acqwsition Document No) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-SESS-81003E SEE BLK 16 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED 1TIME/R SEE BLK 16 b COPIES
8. APP CODE 11 . AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a ADDRESSEE Final
A
D (SEE BLK 16)
NIA SEE BLK 16
Draft
Reg Repro
16. REMARKS COR 0 1
TPOC 3 1
BLK 4: TAILORED TO DRAWINGS APPROPRIATE FOR A DEVELOPMENTAL LEVEL TOP (LEVEL 2)
WITH A TYPE 3D WITH ASSOCIATED 20 DRAWINGS DESIGNATED BY THE CONTRACTOR AND IN SEE BLK 16
THE CONTRACTOR'S FORMAT.
BLK 5: REFERENCE SOW PARAPGRAPHS C4.2.9, C4.3.8, C4.4.2.1 , C4.8.3.7, C4.5.3.1.
BLK 8: APPROVAL OF TECHNICAL CONTENT. GOVERNMENT HAS 10 DAYS FROM RECEIPT TO
REVIEW, COMMENT AND APPROVE OR DISAPPROVE THE CONTRACTOR HAS 5 DAYS TO
SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS WITHIN 10
DAYS, THE DELIVERY IS APPROVED.
9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157
BLKS 12,13: FIRST DRAFT SUBMISSION DUE 15 DAYS AFTER THE TECH NICAL INTERCHANGE
MEETING #1 (TIM#1) PER DELIVERY ORDER SOW PARAGRAPH C4.4 (AND SUBPARAGRAPHS).
SUBSEQUENT DRAFT SUBMISSIONS DUE 15 DAYS AND AGAIN 1 DAY PRIOR TO THE SCHEDULED
DATE FOR TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW
PARAGRAPH C4 5 (AND SUBPARAGRAPH$). FINAL SUBMISSION DUE 15 DAYS PRIOR TO RECIEPT
OF PROTOTYPE HARDWARE.
BLK 14: ELECTRONIC MEDIA: DRAWINGS SHALL BE SUBMITIED IN ABODE ACROBAT 30 PDF OR
IADOBE PDF AND ATIACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G k;OVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.
15. TOTAL ___ .,. 3 2 0
G. PREPARED BY H. DATE
1.A~;gB;
J . DATE
MURILLO.CLAIRE.M. 12762404 ~~~1~:_~2~!.V!H
11/6/2017 _.) k_ II )7-//1-43 cn-MUlll.LO CLWUol IJnJ~J
0.l*l011110.1• 010 0\'00' r 7
DD FORM 1423-1 FEB 2001 PREVIOUS EDITrON MAY BE USED Page~ of 21 Pages
17. PRICE GROUP
The public reporting burden for this collection of infonnation Is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of infonnation, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of infonnation if rt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. fisted In Block E.
A. CONTRACT LINE ITEM NO. , B. ~XHIBIT I c. CATEGORY:
TOP __ TM -- OTHER X-MISC
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N001 78-18-R-401 7-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 TECHNICAL REPORT - STUDY/SERVICES HANOHELD HARDWARE DEVICE DESIGN
4. AUTHORITY (Data Acquis1t1on Document No) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-MISC-80508B SOW PARAGRAPH C4.4.3 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED HIME SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
0 (SEE BLK 16)
N/A N/A Draft
Reg Repro
16. REMARKS COR 0 1
BLK 4: TAILOR PER SOW PARAGRAPH C4.4.3 TPOC 1 1
BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM SEE BLK 16
RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE THE CONTRACTOR HAS 5
DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS
WITHIN 5 DAYS, THE DELIVERY IS APPROVED.
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 10, 12, 13: FIRST SUBMISSION DUE 15 WORKING DAYS AFTER THE TECHNICAL
INTERCHANGE MEETING #1 PER SOW PARAGRAPH C4 4 (AND SUBPARAGRAPHS).
BLK 14: ELECTRONIC MEDIA: TECHNCIAL REPORTS SHALL BE SUBMITTED IN MS WORD 2010 OR
ADOBE PDF AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION
G, GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES
ALL TABLES SHALL BE IN MS WORD 2010 OR MS EXCEL 2010.
15 TOTAL -II> 1 2 0
G. PREPARED BY H. DATE 1.~7VEDBY y/ J. DATE
MURILLO.CLAIRE.M.127624 ~::::-.1.~=~.1.:..~.!. U~N,
IJ )1//f 0443 m-MUM.l.OCVJJl)f. 111'1~1 11/6/2017 I)._~----' (/-._ .. O.• 201111061•011\ 0\'00'
DD FORM 1423-1 FEB 2001 PREVIOUS EDfflON MAY BE USED V Page i of .il Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST (CORL) Fann Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply wrth a collection of information if ~ does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contractlng Officer for the Contract/PR No. listed in Block E.
A . CONTRACT LINE ITEM NO. IB. ~XHIBIT I c. CATEGORY:
TOP __ TM -- OTHER X-MISC
0 . SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N001 78-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 TECHNICAL REPORT - STUDY/SERVICES HANDHELD HARDWARE DEVICE DESIGN
4. AUTHORITY (Data Acqu1s~10n Document No) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-MISC-805086 SEE BLK 16 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED HIME SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
D (SEE BLK 16)
NIA SEEL BLK 16
Draft
Reg Repro
16 REMARKS COR 0 1
TPOC 2 1
BLK 5: REFERENCE SOW PARAGRPAH C4.5.3 (AND SUBPARAGRAPHS)
SEE BLK 16
BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM
RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5
DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS
WITHIN 5 DAYS, THE DELIVERY IS APPROVED
9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12,13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE SCHEDULED DATE FOR
TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW PARAGRAPH C4.5
(AND SUBPARAGRAPHS). SUBSEQUENT DRAFT SUBMISSION DUE 1 DAY PRIOR TO THE
SCHEDULED DATE FOR TIM#2. FINAL SUBMISSION DUE 5 DAYS FOLLOWING RECEIPT OF
GOVERNMENT COMMENTS RESULTING FROM TIM#2.
BLK 14: ELECTRONIC MEDIA: TECHNCIAL REPORTS SHALL BE SUBMITTED IN MS OFFICE 2010
APPLICATIONS AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN
SECTION G, GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND
RESPONSIBLITIES. ALL TABLES SHALL BE IN MS WORD 2010 OR MS EXCEL 2010.
15. TOTAL ___ ..,. 2 2 0
G. PREPARED BY H. DATE I. APP
~Jlv--
J . DATE
MURILLO.CLAIRE.M.1 276240 ~"::::':=:..."':'=.!..- 11/6/2017 J!/1/11 443
ui-»UllU.0Cl.Allil.MU,.,<60oM J ont :K111116'14.0U,.OSW
- PREVIOUS EDITlt>N MAY BE USED Page ~ of ll Pages
DD FORM 1423 1, FEB 2001
17. PRICE GROUP
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources. gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for faihng to comply wi1h a collection of information if it does not display a currently valid OMB control number Please do not retum your form to the above organlutlon. Send completed form to the Government Issuing Contractlng Officer for the Contract/PR No. listed In Block E.
A. CONTRACT LINE ITEM NO. IB. :XHIBIT I c. CATEGORY:
TOP __ TM -- OTHER X- SESS
0 . SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 PRODUCT BASELINE INDEX (PBLI)
4. AUTHORITY (Data Acquisffion Document No) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
01-SESS-82019 SOW PARAGRAPH C4.8.3.1 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
D (SEE BLK 16) N/A SEE BLK 16
Draft Rag Rapro
16. REMARKS COR 0 1
TPOC 1 1
BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM
RECEIPT TO REVIEW, COMMENT ANO APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5 SEE BLK 16
DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS
W ITHIN 5 DAYS, THE DELIVERY IS APPROVED.
9 DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRAT IVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12, 13: FIRST DRAFT SUBMISSION DUE 3 DAYS PRIOR TO THE SCHEDULED DATE FOR
TECHNCIAL INTERCHANGE MEETING #2 (TIM#2). FINAL SUBMISSION DUE 5 DAYS FOLLOWING
RECEIPT OF GOVERNMENT COMMENTS RESULTING FROM TIM#2. SUBSEQUENT SUBMISSIONS
DUE 5 DAYS FOLLOWING SUBMISSION OF A CHANGE TO ANY ITEM LISTED IN THE PBLI.
BLK 14: ELECTRONIC MEDIA: THE PBLI SHALL BE SUBMITTED IN MS EXCEL 2010 AND ATTACHED
TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G, GOVERNMENT CONTRACT
ADMINISTRATIVE POINTS OF CONTACT A NO RESPONSIBLITIES.
15. TOTAL ___ .,. 1 2 0
G. PREPARED BY H. DATE
l.fK~rliv-
J . DATE
MURILLO.CLAIRE.M.127624044 ::r.:.,"::',":'..!."=.'.'!!;'!..,,. 11/6/2017 JJ)1/FI 3 """Ail..M.LOCl..MllMIJ~_.I 0...JOO l!Otl•O)Jl4f'OO'
DD FORM 1423-1 FEB 2001 PREVIOUS EDITl6N MAY BE USED Page 2 of 2.1 Pages
17. PRICE GROUP
CONTRACT DAT A REQUIREMENTS LIST (CORL) Fonn Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law. no person shall be subject to any penalty for failing to comply wi1h a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organlzaUon. Send completed form to the Government Issuing ContracUng Officer for the Contract/PR No. fisted In Block E.
A . CONTRACT LINE ITEM NO. , B. ~XHIBIT , C. CATEGORY:
TOP _ TM -- OTHER X-IPSC
0 . SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DAT A ITEM 3. SUBTITLE
A008 INTERFACE REQUIREMENTS SPECIFICATION (IRS) HANDHELD HARDWARE IRS
4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-IPSC-81434 SOW PARA. C4.8.3.4, C4.5.3.5 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED HIME SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
0 (SEE BLK 16) NIA SEE BLK 16
Draft Reg Repro
16. REMARKS COR 0 1
BLK 4: TAILORING TO INCLUDE ONLY THOSE INTERFACES RELATED TO THE HANDHELD TPOC 2 1
HARDWARE DEVICE AT THE SYSTEM AND COMPONENT LEVELS
SEE BLK 16
BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM
RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5
DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS
WITHIN 5 DAYS, THE DELIVERY IS APPROVED.
BLK 9: DISTRIBUTION STATEMENT D DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER. DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RO, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12.13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE SCHEDULED DATE FOR
TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW PARAGRAPH C4 5
(AND SUBPARAGRAPHS). SUBSEQUENT DRAFT SUBMISSION DUE 1 DAY PRIOR TO THE
SCHEDULED DATE FOR TIM#2. FINAL SUBMISSION DUE 5 DAYS FOLLOWING RECEIPT OF
GOVERNMENT COMMENTS RESULTING FROM TIM#2.
BLK 14: ELECTRONIC MEDIA: THE IRS SHALL BE SUBMITTED IN MS OFFICE 2010 APPLICATIONS
ANO ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,
GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES
15. TOTAL ___ ... 2 2 0
G. PREPARED BY H. DATE 1.~VEDBY _-/
J . DATE
MURILLO.CLAIRE.M.12762 ~ .... "::;',~":':.':' l I)-::;-I 11 40443 ou-USH. at•MUM.LOQ.AIA[ loll 1116240-Wl 11/6/2017 .,?I-:1__-!_ 7/ ~ D•t.· l017 1 10f1•~l-OS'OO'
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page z of 2.1 Pages
17. PRICE GROUP
CONTRACT DAT A REQUIREMENTS LIST (CORL) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching e)(isting data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden. to the Department of Defense. Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if It does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.
A . CONTRACT LINE ITEM NO. I B. ~XHIBIT IC. CATEGORY:
TOP __ TM -- OTHER X - IPSC
0 . SYSTEMnTEM I E. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-1 8-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009 SYSTEM/SUBSYSTEM SPECIFICATION (SSS)
HARDWARE REQUIREMENTS SPECIFICATION (HRS)
FOR HANDHELD HARDWARE DEVICE
4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-IPSC-81431A SOW PARA. C4.8.3.2, C4.5.3.5 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST ST A TEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED HIME SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
D (SEE BLK 16)
NIA SEE BLK 16
Draft
Reg Repro
16. REMARKS COR 0 1
TPOC 2 1
BLK 4: TAILORING TO INCLUDE THE HANDHELD HARDWARE DEVICE AS THE SYSTEM. THE
SPECIFICATION SHALL INCORPORATE ALL REQUIREMENTS FROM SOW PARAGRAPH C4.2 (AND SEE BLK 16
SUBPARAGRAPHS) AND C4.3 (AND SUBPARAGRAPHS).
BLK 8 APPROVAL OF TECHNICAL CONTENT AND FORMAT GOVERNMENT HAS 5 DAYS FROM
RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5
DAYS TO SUBMIT REVISIONS IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS
WITHIN 5 DAYS, THE DELIVERY IS APPROVED.
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION. CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12, 13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE SCHEDULED DATE FOR
TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW PARAGRAPH C4.5
(AND SUBPARAGRAPH$). SUBSEQUENT DRAFT SUBMISSION DUE 1 DAY PRIOR TO THE
SCHEDULED DATE FOR TIM#2. FINAL SUBMISSION DUE 5 DAYS FOLLOWING RECEIPT OF
GOVERNMENT COMMENTS RE SUL TING FROM TIM#2.
BLK 14: ELECTRONIC MEDIA: THE HRS SHALL BE SUBMITIED IN MS OFFICE 2010 APPLICATIONS
AND A TI ACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,
GOVERNMENT CONTRACT ADMINISTRATNE POINTS OF CONTACT AND RESPONSIBLITIES.
15. TOTAL ---~ 2 2 0
G. PREPARED BY H. DATE
I. APij?; BY ~ J. DATE
MURILLO.CLAIRE.M.127624 ~":'.:'.~~.':'.;::'.!...,., (} #111 0443
(IWIMUlllllLOQ.AIM.M.ll~l 11/6/2017 /~~ OM.- JOH11.0. 14 04J7 -0S'OO
DD FORM 1423 1, FEB - 2001 PREVIOUS EDITl6N MAY BE USED Page .e. of Z1 Pages
17. PRICE GROUP
The public reporting burden for this collection of information is estimated to average 11 o hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.
A . CONTRACT LINE ITEM NO. 1 8.~XHIBIT I c. CATEGORY:
TDP __ TM -- OTHER X - SESS
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS} N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A010 SUPPLIER'S CONFIGURATION MANAGEMENT PLAN
4. AUTHORITY (Data Acquis1t1on Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-SESS-80858 SOW PARAGRAPH C4.8.1,C4.5.3.5 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED HIME SEE BLK 16 b. COPIES
8. APPCODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
D (SEE BLK 16)
NIA SEE BLK 16
Draft
Reg Repro
16 REMARKS COR 0 1
BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM TPOC 2 1
RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5
DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS SEE BLK 16
WITHIN 5 DAYS, THE DELIVERY IS APPROVED.
BLK 9 DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12, 13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE SCHEDULED DATE FOR
TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW PARAGRAPH C4.5
(AND SUBPARAGRAPHS). SUBSEQUENT DRAFT SUBMISSION DUE 1 DAY PRIOR TO THE
SCHEDULED DATE FOR TIM#2. FINAL SUBMISSION DUE 5 DAYS FOLLOWING RECEIPT OF
GOVERNMENT COMMENTS RESULTING FROM TIM#2.
BLK 14 ELECTRONIC MEDIA. THE CMP SHALL BE SUBMITTED IN MS OFFICE 2010 APPLICATIONS
AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,
GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.
15. TOTAL ___ ... 2 2 0
G. PREPARED BY H. DATE 1.ArOVEDBY J . DATE
MURILLO.CLAIRE.M.127624044 =:::::s~-!..~1~.:...U~ J)
~ II )1- /17 3
llft·"""*'UDCl.Mll ,,_11'tJ.0.Wl 11/6/2017 ~l;Ci - ! r-0... JOl,. , .. , •• .,.-ono
- 2 01 DD FORM 1423 1, FEB 0 PREVIOUS EDl"TmN MAY BE us~ Page ~ of 21 Pages
17. PRICE GROUP
The public reporting burden for this collection of information Is estimated to average 11 O hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penatty for fa iling to comply with a collection of Information if tt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.
A. CONTRACT LINE ITEM NO. IB. ~XHIBIT IC. CATEGORY:
TOP _ TM -- OTHER X -SESS
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DAT A ITEM 3. SUBTITLE
A011 NOTICE OF REVISION (NOR)
4. AUTHORITY (Data Acquisition Document No ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-SESS-806420 SOW PARAGRAPH C4.8.1 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE 11 . AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
N/A
D (SEE BLK 16)
N/A SEE BLK 16
Draft
Reg Repro
16. REMARKS COR 0 1
BLK 4: TAILORING TO BE USED TO SUPPORT GOVERNMENT SYSTEM LEVEL ENGINEERING TPOC 0 1
CHANGE PROPOSALS (ECP) AND TO ALLOW DUAL USE TO RECOMMEND/DOCUMENT CHANGES
TO SPECIFICATION DOCUMENTS RELATED TO HARDWARE FOR GOVERNMENT-DIRECTED OR SEE BLK 16
CONTRACTOR RECOMMENDED CHANGES. ALL CONTRACTOR RECOMMENDED CHANGES
REQUIRE GOVERNMENT CONCURRENCE
BLK 9· DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12, 13: FIRST SUBMISSION DUE 5 DAYS AFTER COMPLETION OF ANALYSIS AND AT LEAST 5
DAYS PRIOR TO THE START OF DOCUMENT REVISIONS FOR GOVERNMENT APPROVAL OF
PROPOSED CHANGES. SUBSEQUENT SUBMISSIONS DUE 2 DAYS AFTER RECEIPT OF
COMMENTS
BLK 14: ELECTRONIC MEDIA: THE NOR SHALL BE SUBMITIED IN MS OFFICE 2010 APPLICATIONS
OR ADOBE PDF AND ATIACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN
SECTION G, GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND
RESPONSIBLITIES.
15. TOTAL ---"' 0 2 0
G. PREPARED BY H. DATE I . Ai)/~
J . DATE
MURILLO.CLAIRE.M.127624 ==•~":".:.;'Z::"
11/6/2017 ~ 11/1 /1 7-0443
-U1".(ft.o-"'UM.i.O.QAN.M.11~J o.- ~1111.M1'06:1D.OSW , /
- PREVIOUS EDITlbN MAY BE USEtr" Page 1Q of 2.1 Pages
DD FORM 1423 1, FEB 2001
17. PRICE GROUP
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.
A . CONTRACT LINE ITEM NO. IB. ~HIBIT I c. CATEGORY:
TOP_ TM -- OTHER X-QCIC
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012 QUALITY ASSURANCE PROGRAM PLAN QUALITY ASSURANCE PLAN (OAP) FOR HARDWARE
4. AUTHORITY (Data Acquisition Document No ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-QCIC-81794 SOW PARA. C4.7.3.2, C4.5.3.5 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED 1TIME SEE BLK 16 b. COPIES
8.APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
D (SEE BLK 16)
NIA SEE BLK 16
Draft
Reg Repro
16. REMARKS COR 0 1
TPOC 2 1
BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM
RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5 SEE BLK 16
DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS
WITHIN 5 DAYS, THE DELIVERY IS APPROVED.
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12,13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE SCHEDULED DATE FOR
TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW PARAGRAPH C4.5
(AND SUBPARAGRAPH$). SUBSEQUENT DRAFT SUBMISSION DUE 1 DAY PRIOR TO THE
SCHEDULED DATE FOR TIM#2. FINAL SUBMISSION DUE 5 DAYS FOLLOWING RECEIPT OF
GOVERNMENT COMMENTS RES UL TING FROM TIM#2.
BLK 14: ELECTRONIC MEDIA: THE OAP SHALL BE SUBMITTED IN MS OFFICE 2010 APPLICATIONS
AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,
GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.
15. TOTAL
_.,.. 2 2 0
G. PREPARED BY H. DATE 1.~EDBY J . DATE
MURILLO.CLAIRE.M.127
~ .... .,,.~QAltt.Ml11'624044)
'ifi_ ,, IJ/7/R ONc-US....U.S..~l-0.0.-'ltl. Ji .'ZC ,, ..2 6240443 ou-USH, cno-MUllllUOClAIRE_M 11762.0UJ 11/6/2017 O.te >Ot1l1 061 4:06.50-o$'00' /
DD FORM 1423 1, FEB 2001 - PREVIOUS EDl'tlON MAY BE USEO- Page 11 of ll Pages
17. PRICE GROUP
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.
A . CONTRACT L.INE ITEM NO. I B. i:xHIBIT I c. CATEGORY:
TOP __ TM _x_ OTHER
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DAT A ITEM 3. SUBTITLE
A013 COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND
ASSOCIATED SUPPLEMENTAL DATA
4. AUTHORITY (Data Acquisd10n Document No) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-TMSS-80527 SEE BLK 16 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
D (SEE BLK 16)
N/A SEE BLK 16
Draft
Reg Repro
16. REMARKS COR 0 1
BLK 4: TAILORING TO REMOVE All REQUIREMENTS RELATED TO INTERACTIVE ELECTRONIC TPOC 1 1
TECHNICAL MANUALS (IETM) AND TO REMOVE REQUIREMENT FOR PAPER COPIES.
SEE BLK 16
BLK5. SOW PARAGRAHPS C4.5.3.5, C4.8.3 5, C4.9.2
BLK 8 APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 10 DAYS FROM
RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 15
DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS
WITHIN 10 DAYS, THE DELIVERY IS APPROVED.
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE. OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318. DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12,13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE DELIVERY OF PROTOTYPES
PER DELIVERY ORDER SOW PARAGRAPH C4.7 (AND SUBPARAGRAPHS). FINAL AND
SUBSEQUENT SUBMISSIONS DUE 15 DAYS AFTER RECEIPT OF COMMENTS.
BLK14 ELECTRONIC MEDIA: THE MANUAL INFORMATION SHALL BE SUBMITIED IN MS WORD
2010ANDATIACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,
GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.
15. TOTAL ---"" 1 2 0
G. PREPARED BY H. DATE
I. A l JO) EDBY J . DATE
\1)1/Jt MURILLO.CLAIRE.M.127624 =.'.°::',~':'..;::'' 11/6/2017 ~)~ 0443
........S....t~OOJ,lllLM.1211l2..a.MJ ·~ o.i: ... 201r11ot1•-01•s~oo
- PREVIOUS EDITIO'°N MAY BE USED- Page ll of il Pages
DD FORM 1423 1, FEB 2001
17. PRICE GROUP
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwtthstanding any other provision of law, no person shall be subject to any penatty for failing to comply wtth a collection of information if tt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.
A . CONTRACT LINE ITEM NO. 18. ~XHIBIT IC. CATEGORY:
TOP _ TM -- OTHER X -IPSC
0 , SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A014 SYSTEM/SUBSYSTEM DESIGN DESCRIPTION (SSDD)
HARDWARE DESIGN DESCRIPTION (HOO) FOR
HANDHELO HARDWARE DEVICE
4. AUTHORITY (Data Acquistlion Document No ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Ol-IPSC-81432A SOW PARA. C4 8 3.3, C4.5.3.5 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED HIME SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
D (SEE BLK 16)
N/A SEE BLK 16
Draft
Reg Repro
16. REMARKS COR 0 1
TPOC 2 1
BLK 4: TAILORING TO INCLUDE THE HANOHELO HARDWARE DEVICE AS THE SYSTEM. THE
SPECIFICATION SHALL INCORPORATE ALL REQUIREMENTS FROM SOW PARAGRAPH C4.2 (AND SEE BLK 16
SUBPARAGRAPHS) AND C4.3 (AND SUBPARAGRAPHS).
BLK 8 APPROVAL OF TECHNICAL CONTENT AND FORMAT GOVERNMENT HAS 5 DAYS FROM
RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5
DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS
WITHIN 5 DAYS, THE DELIVERY IS APPROVED.
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12, 13: FIRST DRAFT SUBMISSION DUE 15 DAYS AFTER THE TECHNICAL INTERCHANGE
MEETING #1 (TIM#1 ) PER DELIVERY ORDER SOW PARAGRAPH C4.4 (AND SUBPARAGRAPHS).
SUBSEQUENT DRAFT SUBMISSIONS DUE 15 DAYS AND AGAIN 1 DAY PRIOR TO THE SCHEDULED
DATE FOR TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW
PARAGRAPH C4.5 (AND SUBPARAGRAPHS). FINAL SUBMISSION DUE 15 DAYS PRIOR TO RECIEPT
OF PROTOTYPE HARDWARE.
BLK 14: ELECTRONIC MEDIA: THE HOD SHALL BE SUBMITTED IN MS OFFICE 2010 APPLICATIONS
AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,
GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.
15. TOTAL ---"' 2 2 0
G. PREPARED BY H. OATE
1.AP;p~~~
J . DATE
MURILLO.CLAIRE.M .127624 =.-::,=:.,,":'=' IJ )1/r+ 0443 .....u\H,<,_.,,,._..0.QMMM 1l7t240oWJ
11/6/2017 O.t• 10111 1.o6 14:0t:M .OSW
DD FORM 1423 1, FEB 200 - 1 PREVIOUS EDITION MAY BE USED Page ll of 21 Pages
17. PRICE GROUP
The public reporting burden for this collection of infonnation is estimated to average 110 hours per response, including the lime for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0166). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information If tt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contractlng Officer for the Contract/PR No. listed In Block E.
A . CONTRACT LINE ITEM NO. ,B. ~XHIBIT ,C. CATEGORY:
TOP _ TM _x_ OTHER
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-401 7-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A01 6 OPERA TING, SUPPORT, HEAL TH, AND SAFETY (OSH&S) HANDHELD HARDWARE DEVICE SYSTEMS HAZARD
HAZARD ANALYSIS REPORT ANALYSIS (SHA)
4. AUTHORITY (Data Acqu1s1tion Document No ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-SAFT-81841 SOW PARAGRAPH C4.9.1 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ONE/R SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
A
D (SEE BLK 16)
NIA SEE BLK 16
Draft
Reg Repro
16. REMARKS COR 0 1
BLK 4: TAILORING TO COMPLY WITH MIL-STD-882E TASKS AS SPECIFIED IN THE SOW
TPOC 1 1
REFERENCE IN BLK 5.
SEE BLK 16
BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 10 DAYS FROM
RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 10
DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS
WITHIN 10 DAYS, THE DELIVERY IS APPROVED.
BLK g: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE
AND US DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RO, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLKS 12, 13: FIRST SUBMISSION DUE CONCURRENTLY WITH DELIVERY OF PROTOTYPE
HARDWARE. SUBSEQUENT SUBMISSIONS DUE 10 DAYS AFTER RECEIPT OF COMMENTS.
BLK 14 ELECTRONIC MEDIA: THE REPORT SHALL BE SUBMITIED IN MS WORD 2010 AND
ATIACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G, GOVERNMENT
CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.
15. TOTAL ---~ 1 2 0
G. PREPARED BY H. DATE
I.~;; ~
J . DATE
MURILLO.CLAIRE.M. 12762
0.,.W,16gned~Ml..ll&J.0~12~) 11/ '1/ FI ON c-US.o-4.J.S.~-000.°"-l'IG, UJ.-..__ 40443 ~~~OCLAIMMl2762.0UJ 11/6/2017 0...1017110l1•11U OUG'
DD FORM 1423-1 , FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of ll Pages
17. PRICE GROUP
The public reporting burden for this collection of information is estimate<! to average 110 hours per response, Including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penatty for failing to comply with a collection of information if tt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.
A. CONTRACT LINE ITEM NO. I B. ~XHIBIT I c. CATEGORY:
TOP __ TM -- OTHER X-QCIC
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A017 ACCEPTANCE TEST REPORT
4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-QCIC-81891 SOW PARAGRAPH C4.7.3.3 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASGEN SEE BLK 16 b. COPIES
8. APPCODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a ADDRESSEE Final
NIA
D (SEE BLK 16)
NIA N/A
Draft
Reg Rep<o
16. REMARKS COR 0 1
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE TPOC 0 1
AND U.S. DOD CONTRACTORS ONLY ADMINSTRA TIVE OR OPERATIONAL USE, OCTOBER 2017.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE SEE BLK 16
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157
BLK 12: FIRST SUBMISSION DUE CONCURRENTLY WITH HARDWARE PRODUCTS DELIVERED TO
THE GOVERNMENT
BLK 14: ELECTRONIC MEDIA: THE REPORT SHALL BE SUBMITTED IN MS OFFICE 2010
APPLICATIONS OR ADOBE PDF AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES
LISTED IN SECTION G, GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND
RESPONSIBLITIES.
15. TOTAL ---II> 0 2 0
G. PREPARED BY H. DATE
l .A~d~
J . DATE
MURILLO.CLAIRE.M.1276240 ~-::::",....:::..":'=:..,.._ 11)1/11 443
~O.ClAlllMIJHl-40A<IJ 11/6/2017 D.Ml>01111.0.1•·1Ul6 ~'00'
DD FORM 1423 1, FEB 200 . 1 PREVIOUS EDITroN MAY BE USED Page ~ of 21 Pages
17. PRICE GROUP
The public reporting burden for this collection of infonnation is estimated to average 110 hours per response. including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information. including suggestions for reducing the burden. to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law. no person shall be subject to any penalty for failing to comply with a collection of infonnation if tt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contractina Officer for the Contract/PR No. listed In Block E.
A . CONTRACT LINE ITEM NO. I B. ~XHIBIT I C. CATEGORY:
TOP __ TM - - OTHER X - SESS
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A020
CONFIGURATION STATUS ACCOUNTING (CSA)
INFORMATION
4. AUTHORITY (Data Acqws1tion Document No ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-SESS-81253C SOW PARAGRAPH C4.8.7 NSWC DAHLGREN, H10
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASGEN SEE BLK 16 b. COPIES
8. APP CODE 11 . AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final
NIA
0 (SEE BLK 16)
N/A NIA
Draft Reg Repro
16. REMARKS COR 0 1
BLK g: DISTRIBUTION STATEMENT 0 : DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE TPOC 0 1
AND US. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE. OCTOBER 2017
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE SEE 8LK 16
CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,
VIRGINIA 22448-5157.
BLK 12 FIRST SUBMISSION DUE CONCURRENTLY WITH HARDWARE PRODUCTS DELIVERED TO
THE GOVERNMENT
BLK 14 ELECTRONIC MEDIA. THE DATA SHALL BE SUBMITTED IN MS OFFICE 2010
APPLICATIONS AND ATTACHED TO EMAIL NOTIFICATION TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .