This document contains a Contract Data Requirements List (CDRL) for a federal contract opportunity to update and support the Dominance System (IDS) technology through its intended life cycle. The Naval Surface Warfare Center Dahlgren Division will issue a solicitation on March 1, 2018 for a full and open single-award IDIQ contract with cost-plus-fixed-fee and firm-fixed-price CLINs. The contract will provide for updating hardware components of the IDS system including required drivers, firmware, operating system, and native power management associated with the hardware platform. The solicitation number is N0017818R4017 and contract award is anticipated on August 14, 2018. The CDRL includes five data items covering work breakdown structure, integrated master schedule, commercial drawings and design documents, technical reports on hardware device design, and deliverables associated with design reviews.

J3 CDRL

View the file

Other files

File Type Posted
N0017818R4017_REV2.pdf PDF
J2_ACTION_SHEET_DO_0001_REV1.pdf PDF
J1_DO1_SOW_Rev2.pdf PDF
Exhibit_B_IDS_Hardware_Specifications_REV1.xlsx XLSX spreadsheet
N0017818R4017_REV1.pdf PDF
J1_DO1_SOW_Rev1.pdf PDF
J2_ACTION_SHEET_DO_0001.pdf PDF
J5_SUPPORTING_COST_DATA.pdf PDF
Exhibit_B_IDS_Hardware_Specifications.xlsx XLSX spreadsheet
J1_DO1-S.PDF PDF
J4_COSTS.XLS XLS spreadsheet
ExhibitA_IDIQ_CDRL.pdf PDF
J6_StaffingMatrix.xlsx XLSX spreadsheet
IDS_RFP.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CORL) Form Approved ( 1 Data Item) OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A . CONTRACT LINE ITEM NO. IB. ~XHIBIT I c. CATEGORY:

TOP_ TM -- OTHER X-MGMT

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DAT A ITEM 3. SUBTITLE

A001 CONTRACT WORK BREAKDOWN STRUCTURE

4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-MGMT-81334D SOW PARAGRAPH C4.8.3.6,C4.5.31 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED HIME SEE BLK 16 b. COPIES

8. APPCODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

D (SEE BLK 16)

N/A SEE BLK 16

Draft

Reg Re pro

16. REMARKS COR 0 1

BLK 4: TAILORED TO REMOVE SUBMITTAL THROUGH THE CSDR SUBMIT-REVIEW SYSTEM. THE TECHNICAL POC 3 1

CONTRACTOR SHALL SUBMIT TO THE REQUIRING OFFICE DIRECTLY AND NOT THROUGH THE

DCARC WEBSITE. FORMAT SHALL BE IN ACCORDANCE WITH THE IDS PROGRAM WBS PROVIDED SEE BLK 16

ASGFI.

BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM

RECEIPT OF FINAL SUBMISSION TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE

CONTRACTOR HAS 5 DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT

REVISION REQUESTS WITHIN 5 DAYS, THE DELIVERY IS APPROVED.

BLK g: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRA TIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12,13: FIRST DRAFT SUBMISSION DUE 15 DAYS AFTER THE TECHNICAL INTERCHANGE

MEETING #1 (TIM#1) PER DELIVERY ORDER SOW PARAGRAPH C4.4 (AND SUBPARAGRAPHS).

SUBSEQUENT DRAFT SUBMISSIONS DUE 15 DAYS AND AGAIN 1 DAY PRIOR TO THE SCHEDULED

DATE FOR TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW

PARAGRAPH C4.5 (AND SUBPARAGRAPH$). FINAL SUBMISSION DUE 5 DAYS FOLLOWING

RECEIPT OF GOVERNMENT COMMENTS RESULTING FROM TIM#2.

BLK 14: ELECTRONIC MEDIA: THE CWBS SHALL BE SUBMITTED IN MS OFFICE 2010

APPLICATIONS AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN

SECTION G, GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND

RESPONSIBLITIES.

15. TOTAL

3 2 0

G. PREPARED BY H. DATE I. AP

1;VEDBY

J. DATE

MURILLO.CLAIRE.M.12762404 ~~s.~~i!c!1~.:..USI< 11/6/2017 JJ/11r1 43 ~.C.l.AIJILlillJ1W-4l

~ l JJ{A__,l Gow 20Ull.otl400H.OSW

DD FORM 1423-1 FEB 2001 PREVIOUS EDlvfOl'J.MAY BE USW Page 1 of 21 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

The public reporting burden for this collection of infonnation is estimated to average 110 hours per response, including the time for reviewing instructions, searching exiS1ing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of infonnation. Send comments regarding this burden estimate or any other aspect of this collection of infonnation, including suggestions for reducing the burden, to the Department of Defense, Execu1ive Services Directorate (0704-0188) Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of lnfonnation if rt does not display a currently valid OMB control number. Please do not retum your form to the above organization. Send completed form to the Govemment Issuing Contracting Officer for the Contract/PR No. listed In Block E.

A . CONTRACT LINE ITEM NO. IB. ~XHIBIT I c. CATEGORY:

TOP __ TM -- OTHER X-MGMT

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR) INTEGRATED MASTER SCHEDULE

4. AUTHORITY (0818 Acquisn10n Document No ) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-MGMT-81861A SOW PARAGRAPHS C4.1 3 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MNTHLY SEE BLK 16 b. COPIES

8.APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

N/A

D (SEE BLK 16)

SEE BLK 16 SEE BLK 16

Draft

Reg Repro

16. REMARKS COR 0 1

BLK 4· TAILORED TO ONLY INCLUDE FORMAT 6 AS RELATED TO INTEGRATED MASTER TPOC 0 1

SCHEDULE (IMS). EXCLUDE ALL REQUIRMENTS NOT REAL TED TO THE IMS AND ALL

INFORMATION SPECIFICALLY RELATED TO EARNED VALUE MANAGEMENT (EVM) REPORTING SEE BLK 16

CRITICAL MILESTONES SHALL BE HIGHLIGHTED FOR THE GOVERNMENT.

9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND US. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD. SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLK 11 : THE REPORTING PERIOD SHALL BE SYNCHRONIZED WITH THE CONTRACTOR'S

MONTHLY INVOICING PERIOD.

BLKS 12, 13: FIRST SUBMISSION IS DUE 10 WORKING DAYS AFTER THE END OF THE FIRST

MONTH OF CONTRACT PERFORMANCE. IF CONTRACT PERFORMANCE IS LESS THAN 10

WORKING DAYS, FIRST SUBMISSION IS DUE AFTER FIRST FULL MONTH OF CONTRACT

PERFORMANCE. SUBSEQUENT SUBMISSIONS ARE DUE 10 WORKING DAYS AFTER THE END OF

THE MONTH THEREAFTER

BLK 14: ELECTRONIC MEDIA: THE IMS SHALL BE SUBMITTED IN MS PROJECT 2010 ATTACHED TO

EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G, GOVERNMENT CONTRACT

ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES

15. TOTAL ___ ._ 0 2 0

G. PREPARED BY H.DATE l.A~DBY './ .

J. DATE

MURILLO.CLAIRE.M.12762 ~"::::'.~":',:;::" 11/6/2017 11)1/11 40443

-VSN.«>.........iOCLNllE.M.11762"'°""l '~~ o.tt201111 .0. HI OIH~OO'

DD FORM 1423 1, FEB 200 - 1 PREVIOUS EDITIO~ MAY BE USED-" Page i of ll Pages

17. PRICE GROUP

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A . CONTRACT LINE ITEM NO. ,B. ~XHIBIT ,C. CATEGORY:

TOP _X_ TM -- OTHER

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N001 78-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003 COMMERICAL DRAWINGS/MODELS AND ASSOCIATED

HANDHELD DEVICE AND KIT DESIGN DRAWINGS

LISTS

4. AUTHORITY (0818 Acqwsition Document No) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-SESS-81003E SEE BLK 16 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED 1TIME/R SEE BLK 16 b COPIES

8. APP CODE 11 . AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a ADDRESSEE Final

A

D (SEE BLK 16)

NIA SEE BLK 16

Draft

Reg Repro

16. REMARKS COR 0 1

TPOC 3 1

BLK 4: TAILORED TO DRAWINGS APPROPRIATE FOR A DEVELOPMENTAL LEVEL TOP (LEVEL 2)

WITH A TYPE 3D WITH ASSOCIATED 20 DRAWINGS DESIGNATED BY THE CONTRACTOR AND IN SEE BLK 16

THE CONTRACTOR'S FORMAT.

BLK 5: REFERENCE SOW PARAPGRAPHS C4.2.9, C4.3.8, C4.4.2.1 , C4.8.3.7, C4.5.3.1.

BLK 8: APPROVAL OF TECHNICAL CONTENT. GOVERNMENT HAS 10 DAYS FROM RECEIPT TO

REVIEW, COMMENT AND APPROVE OR DISAPPROVE THE CONTRACTOR HAS 5 DAYS TO

SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS WITHIN 10

DAYS, THE DELIVERY IS APPROVED.

9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157

BLKS 12,13: FIRST DRAFT SUBMISSION DUE 15 DAYS AFTER THE TECH NICAL INTERCHANGE

MEETING #1 (TIM#1) PER DELIVERY ORDER SOW PARAGRAPH C4.4 (AND SUBPARAGRAPHS).

SUBSEQUENT DRAFT SUBMISSIONS DUE 15 DAYS AND AGAIN 1 DAY PRIOR TO THE SCHEDULED

DATE FOR TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW

PARAGRAPH C4 5 (AND SUBPARAGRAPH$). FINAL SUBMISSION DUE 15 DAYS PRIOR TO RECIEPT

OF PROTOTYPE HARDWARE.

BLK 14: ELECTRONIC MEDIA: DRAWINGS SHALL BE SUBMITIED IN ABODE ACROBAT 30 PDF OR

IADOBE PDF AND ATIACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G k;OVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.

15. TOTAL ___ .,. 3 2 0

G. PREPARED BY H. DATE

1.A~;gB;

J . DATE

MURILLO.CLAIRE.M. 12762404 ~~~1~:_~2~!.V!H

11/6/2017 _.) k_ II )7-//1-43 cn-MUlll.LO CLWUol IJnJ~J

0.l*l011110.1• 010 0\'00' r 7

DD FORM 1423-1 FEB 2001 PREVIOUS EDITrON MAY BE USED Page~ of 21 Pages

17. PRICE GROUP

The public reporting burden for this collection of infonnation Is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of infonnation, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of infonnation if rt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. fisted In Block E.

A. CONTRACT LINE ITEM NO. , B. ~XHIBIT I c. CATEGORY:

TOP __ TM -- OTHER X-MISC

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N001 78-18-R-401 7-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004 TECHNICAL REPORT - STUDY/SERVICES HANOHELD HARDWARE DEVICE DESIGN

4. AUTHORITY (Data Acquis1t1on Document No) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-MISC-80508B SOW PARAGRAPH C4.4.3 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED HIME SEE BLK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

0 (SEE BLK 16)

N/A N/A Draft

Reg Repro

16. REMARKS COR 0 1

BLK 4: TAILOR PER SOW PARAGRAPH C4.4.3 TPOC 1 1

BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM SEE BLK 16

RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE THE CONTRACTOR HAS 5

DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS

WITHIN 5 DAYS, THE DELIVERY IS APPROVED.

BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 10, 12, 13: FIRST SUBMISSION DUE 15 WORKING DAYS AFTER THE TECHNICAL

INTERCHANGE MEETING #1 PER SOW PARAGRAPH C4 4 (AND SUBPARAGRAPHS).

BLK 14: ELECTRONIC MEDIA: TECHNCIAL REPORTS SHALL BE SUBMITTED IN MS WORD 2010 OR

ADOBE PDF AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION

G, GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES

ALL TABLES SHALL BE IN MS WORD 2010 OR MS EXCEL 2010.

15 TOTAL -II> 1 2 0

G. PREPARED BY H. DATE 1.~7VEDBY y/ J. DATE

MURILLO.CLAIRE.M.127624 ~::::-.1.~=~.1.:..~.!. U~N,

IJ )1//f 0443 m-MUM.l.OCVJJl)f. 111'1~1 11/6/2017 I)._~----' (/-._ .. O.• 201111061•011\ 0\'00'

DD FORM 1423-1 FEB 2001 PREVIOUS EDfflON MAY BE USED V Page i of .il Pages

17. PRICE GROUP

CONTRACT DATA REQUIREMENTS LIST (CORL) Fann Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply wrth a collection of information if ~ does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contractlng Officer for the Contract/PR No. listed in Block E.

A . CONTRACT LINE ITEM NO. IB. ~XHIBIT I c. CATEGORY:

TOP __ TM -- OTHER X-MISC

0 . SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N001 78-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005 TECHNICAL REPORT - STUDY/SERVICES HANDHELD HARDWARE DEVICE DESIGN

4. AUTHORITY (Data Acqu1s~10n Document No) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-MISC-805086 SEE BLK 16 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED HIME SEE BLK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

D (SEE BLK 16)

NIA SEEL BLK 16

Draft

Reg Repro

16 REMARKS COR 0 1

TPOC 2 1

BLK 5: REFERENCE SOW PARAGRPAH C4.5.3 (AND SUBPARAGRAPHS)

SEE BLK 16

BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM

RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5

DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS

WITHIN 5 DAYS, THE DELIVERY IS APPROVED

9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12,13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE SCHEDULED DATE FOR

TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW PARAGRAPH C4.5

(AND SUBPARAGRAPHS). SUBSEQUENT DRAFT SUBMISSION DUE 1 DAY PRIOR TO THE

SCHEDULED DATE FOR TIM#2. FINAL SUBMISSION DUE 5 DAYS FOLLOWING RECEIPT OF

GOVERNMENT COMMENTS RESULTING FROM TIM#2.

BLK 14: ELECTRONIC MEDIA: TECHNCIAL REPORTS SHALL BE SUBMITTED IN MS OFFICE 2010

APPLICATIONS AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN

SECTION G, GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND

RESPONSIBLITIES. ALL TABLES SHALL BE IN MS WORD 2010 OR MS EXCEL 2010.

15. TOTAL ___ ..,. 2 2 0

G. PREPARED BY H. DATE I. APP

~Jlv--

J . DATE

MURILLO.CLAIRE.M.1 276240 ~"::::':=:..."':'=.!..- 11/6/2017 J!/1/11 443

ui-»UllU.0Cl.Allil.MU,.,<60oM J ont :K111116'14.0U,.OSW

- PREVIOUS EDITlt>N MAY BE USED Page ~ of ll Pages

DD FORM 1423 1, FEB 2001

17. PRICE GROUP

The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources. gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for faihng to comply wi1h a collection of information if it does not display a currently valid OMB control number Please do not retum your form to the above organlutlon. Send completed form to the Government Issuing Contractlng Officer for the Contract/PR No. listed In Block E.

A. CONTRACT LINE ITEM NO. IB. :XHIBIT I c. CATEGORY:

TOP __ TM -- OTHER X- SESS

0 . SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A007 PRODUCT BASELINE INDEX (PBLI)

4. AUTHORITY (Data Acquisffion Document No) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

01-SESS-82019 SOW PARAGRAPH C4.8.3.1 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

D (SEE BLK 16) N/A SEE BLK 16

Draft Rag Rapro

16. REMARKS COR 0 1

TPOC 1 1

BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM

RECEIPT TO REVIEW, COMMENT ANO APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5 SEE BLK 16

DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS

W ITHIN 5 DAYS, THE DELIVERY IS APPROVED.

9 DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRAT IVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12, 13: FIRST DRAFT SUBMISSION DUE 3 DAYS PRIOR TO THE SCHEDULED DATE FOR

TECHNCIAL INTERCHANGE MEETING #2 (TIM#2). FINAL SUBMISSION DUE 5 DAYS FOLLOWING

RECEIPT OF GOVERNMENT COMMENTS RESULTING FROM TIM#2. SUBSEQUENT SUBMISSIONS

DUE 5 DAYS FOLLOWING SUBMISSION OF A CHANGE TO ANY ITEM LISTED IN THE PBLI.

BLK 14: ELECTRONIC MEDIA: THE PBLI SHALL BE SUBMITTED IN MS EXCEL 2010 AND ATTACHED

TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G, GOVERNMENT CONTRACT

ADMINISTRATIVE POINTS OF CONTACT A NO RESPONSIBLITIES.

15. TOTAL ___ .,. 1 2 0

G. PREPARED BY H. DATE

l.fK~rliv-

J . DATE

MURILLO.CLAIRE.M.127624044 ::r.:.,"::',":'..!."=.'.'!!;'!..,,. 11/6/2017 JJ)1/FI 3 """Ail..M.LOCl..MllMIJ~_.I 0...JOO l!Otl•O)Jl4f'OO'

DD FORM 1423-1 FEB 2001 PREVIOUS EDITl6N MAY BE USED Page 2 of 2.1 Pages

17. PRICE GROUP

CONTRACT DAT A REQUIREMENTS LIST (CORL) Fonn Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law. no person shall be subject to any penalty for failing to comply wi1h a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organlzaUon. Send completed form to the Government Issuing ContracUng Officer for the Contract/PR No. fisted In Block E.

A . CONTRACT LINE ITEM NO. , B. ~XHIBIT , C. CATEGORY:

TOP _ TM -- OTHER X-IPSC

0 . SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DAT A ITEM 3. SUBTITLE

A008 INTERFACE REQUIREMENTS SPECIFICATION (IRS) HANDHELD HARDWARE IRS

4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-IPSC-81434 SOW PARA. C4.8.3.4, C4.5.3.5 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED HIME SEE BLK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

0 (SEE BLK 16) NIA SEE BLK 16

Draft Reg Repro

16. REMARKS COR 0 1

BLK 4: TAILORING TO INCLUDE ONLY THOSE INTERFACES RELATED TO THE HANDHELD TPOC 2 1

HARDWARE DEVICE AT THE SYSTEM AND COMPONENT LEVELS

SEE BLK 16

BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM

RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5

DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS

WITHIN 5 DAYS, THE DELIVERY IS APPROVED.

BLK 9: DISTRIBUTION STATEMENT D DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER. DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RO, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12.13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE SCHEDULED DATE FOR

TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW PARAGRAPH C4 5

(AND SUBPARAGRAPHS). SUBSEQUENT DRAFT SUBMISSION DUE 1 DAY PRIOR TO THE

SCHEDULED DATE FOR TIM#2. FINAL SUBMISSION DUE 5 DAYS FOLLOWING RECEIPT OF

GOVERNMENT COMMENTS RESULTING FROM TIM#2.

BLK 14: ELECTRONIC MEDIA: THE IRS SHALL BE SUBMITTED IN MS OFFICE 2010 APPLICATIONS

ANO ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,

GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES

15. TOTAL ___ ... 2 2 0

G. PREPARED BY H. DATE 1.~VEDBY _-/

J . DATE

MURILLO.CLAIRE.M.12762 ~ .... "::;',~":':.':' l I)-::;-I 11 40443 ou-USH. at•MUM.LOQ.AIA[ loll 1116240-Wl 11/6/2017 .,?I-:1__-!_ 7/ ~ D•t.· l017 1 10f1•~l-OS'OO'

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page z of 2.1 Pages

17. PRICE GROUP

CONTRACT DAT A REQUIREMENTS LIST (CORL) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching e)(isting data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden. to the Department of Defense. Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if It does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.

A . CONTRACT LINE ITEM NO. I B. ~XHIBIT IC. CATEGORY:

TOP __ TM -- OTHER X - IPSC

0 . SYSTEMnTEM I E. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-1 8-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A009 SYSTEM/SUBSYSTEM SPECIFICATION (SSS)

HARDWARE REQUIREMENTS SPECIFICATION (HRS)

FOR HANDHELD HARDWARE DEVICE

4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-IPSC-81431A SOW PARA. C4.8.3.2, C4.5.3.5 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST ST A TEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED HIME SEE BLK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

D (SEE BLK 16)

NIA SEE BLK 16

Draft

Reg Repro

16. REMARKS COR 0 1

TPOC 2 1

BLK 4: TAILORING TO INCLUDE THE HANDHELD HARDWARE DEVICE AS THE SYSTEM. THE

SPECIFICATION SHALL INCORPORATE ALL REQUIREMENTS FROM SOW PARAGRAPH C4.2 (AND SEE BLK 16

SUBPARAGRAPHS) AND C4.3 (AND SUBPARAGRAPHS).

BLK 8 APPROVAL OF TECHNICAL CONTENT AND FORMAT GOVERNMENT HAS 5 DAYS FROM

RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5

DAYS TO SUBMIT REVISIONS IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS

WITHIN 5 DAYS, THE DELIVERY IS APPROVED.

BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION. CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12, 13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE SCHEDULED DATE FOR

TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW PARAGRAPH C4.5

(AND SUBPARAGRAPH$). SUBSEQUENT DRAFT SUBMISSION DUE 1 DAY PRIOR TO THE

SCHEDULED DATE FOR TIM#2. FINAL SUBMISSION DUE 5 DAYS FOLLOWING RECEIPT OF

GOVERNMENT COMMENTS RE SUL TING FROM TIM#2.

BLK 14: ELECTRONIC MEDIA: THE HRS SHALL BE SUBMITIED IN MS OFFICE 2010 APPLICATIONS

AND A TI ACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,

GOVERNMENT CONTRACT ADMINISTRATNE POINTS OF CONTACT AND RESPONSIBLITIES.

15. TOTAL ---~ 2 2 0

G. PREPARED BY H. DATE

I. APij?; BY ~ J. DATE

MURILLO.CLAIRE.M.127624 ~":'.:'.~~.':'.;::'.!...,., (} #111 0443

(IWIMUlllllLOQ.AIM.M.ll~l 11/6/2017 /~~ OM.- JOH11.0. 14 04J7 -0S'OO

DD FORM 1423 1, FEB - 2001 PREVIOUS EDITl6N MAY BE USED Page .e. of Z1 Pages

17. PRICE GROUP

The public reporting burden for this collection of information is estimated to average 11 o hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.

A . CONTRACT LINE ITEM NO. 1 8.~XHIBIT I c. CATEGORY:

TDP __ TM -- OTHER X - SESS

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS} N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A010 SUPPLIER'S CONFIGURATION MANAGEMENT PLAN

4. AUTHORITY (Data Acquis1t1on Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-SESS-80858 SOW PARAGRAPH C4.8.1,C4.5.3.5 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED HIME SEE BLK 16 b. COPIES

8. APPCODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

D (SEE BLK 16)

NIA SEE BLK 16

Draft

Reg Repro

16 REMARKS COR 0 1

BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM TPOC 2 1

RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5

DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS SEE BLK 16

WITHIN 5 DAYS, THE DELIVERY IS APPROVED.

BLK 9 DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12, 13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE SCHEDULED DATE FOR

TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW PARAGRAPH C4.5

(AND SUBPARAGRAPHS). SUBSEQUENT DRAFT SUBMISSION DUE 1 DAY PRIOR TO THE

SCHEDULED DATE FOR TIM#2. FINAL SUBMISSION DUE 5 DAYS FOLLOWING RECEIPT OF

GOVERNMENT COMMENTS RESULTING FROM TIM#2.

BLK 14 ELECTRONIC MEDIA. THE CMP SHALL BE SUBMITTED IN MS OFFICE 2010 APPLICATIONS

AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,

GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.

15. TOTAL ___ ... 2 2 0

G. PREPARED BY H. DATE 1.ArOVEDBY J . DATE

MURILLO.CLAIRE.M.127624044 =:::::s~-!..~1~.:...U~ J)

~ II )1- /17 3

llft·"""*'UDCl.Mll ,,_11'tJ.0.Wl 11/6/2017 ~l;Ci - ! r-0... JOl,. , .. , •• .,.-ono

- 2 01 DD FORM 1423 1, FEB 0 PREVIOUS EDl"TmN MAY BE us~ Page ~ of 21 Pages

17. PRICE GROUP

The public reporting burden for this collection of information Is estimated to average 11 O hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penatty for fa iling to comply with a collection of Information if tt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.

A. CONTRACT LINE ITEM NO. IB. ~XHIBIT IC. CATEGORY:

TOP _ TM -- OTHER X -SESS

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DAT A ITEM 3. SUBTITLE

A011 NOTICE OF REVISION (NOR)

4. AUTHORITY (Data Acquisition Document No ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-SESS-806420 SOW PARAGRAPH C4.8.1 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES

8. APP CODE 11 . AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

N/A

D (SEE BLK 16)

N/A SEE BLK 16

Draft

Reg Repro

16. REMARKS COR 0 1

BLK 4: TAILORING TO BE USED TO SUPPORT GOVERNMENT SYSTEM LEVEL ENGINEERING TPOC 0 1

CHANGE PROPOSALS (ECP) AND TO ALLOW DUAL USE TO RECOMMEND/DOCUMENT CHANGES

TO SPECIFICATION DOCUMENTS RELATED TO HARDWARE FOR GOVERNMENT-DIRECTED OR SEE BLK 16

CONTRACTOR RECOMMENDED CHANGES. ALL CONTRACTOR RECOMMENDED CHANGES

REQUIRE GOVERNMENT CONCURRENCE

BLK 9· DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12, 13: FIRST SUBMISSION DUE 5 DAYS AFTER COMPLETION OF ANALYSIS AND AT LEAST 5

DAYS PRIOR TO THE START OF DOCUMENT REVISIONS FOR GOVERNMENT APPROVAL OF

PROPOSED CHANGES. SUBSEQUENT SUBMISSIONS DUE 2 DAYS AFTER RECEIPT OF

COMMENTS

BLK 14: ELECTRONIC MEDIA: THE NOR SHALL BE SUBMITIED IN MS OFFICE 2010 APPLICATIONS

OR ADOBE PDF AND ATIACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN

SECTION G, GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND

RESPONSIBLITIES.

15. TOTAL ---"' 0 2 0

G. PREPARED BY H. DATE I . Ai)/~

J . DATE

MURILLO.CLAIRE.M.127624 ==•~":".:.;'Z::"

11/6/2017 ~ 11/1 /1 7-0443

-U1".(ft.o-"'UM.i.O.QAN.M.11~J o.- ~1111.M1'06:1D.OSW , /

- PREVIOUS EDITlbN MAY BE USEtr" Page 1Q of 2.1 Pages

DD FORM 1423 1, FEB 2001

17. PRICE GROUP

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.

A . CONTRACT LINE ITEM NO. IB. ~HIBIT I c. CATEGORY:

TOP_ TM -- OTHER X-QCIC

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A012 QUALITY ASSURANCE PROGRAM PLAN QUALITY ASSURANCE PLAN (OAP) FOR HARDWARE

4. AUTHORITY (Data Acquisition Document No ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-QCIC-81794 SOW PARA. C4.7.3.2, C4.5.3.5 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED 1TIME SEE BLK 16 b. COPIES

8.APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

D (SEE BLK 16)

NIA SEE BLK 16

Draft

Reg Repro

16. REMARKS COR 0 1

TPOC 2 1

BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 5 DAYS FROM

RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5 SEE BLK 16

DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS

WITHIN 5 DAYS, THE DELIVERY IS APPROVED.

BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12,13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE SCHEDULED DATE FOR

TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW PARAGRAPH C4.5

(AND SUBPARAGRAPH$). SUBSEQUENT DRAFT SUBMISSION DUE 1 DAY PRIOR TO THE

SCHEDULED DATE FOR TIM#2. FINAL SUBMISSION DUE 5 DAYS FOLLOWING RECEIPT OF

GOVERNMENT COMMENTS RES UL TING FROM TIM#2.

BLK 14: ELECTRONIC MEDIA: THE OAP SHALL BE SUBMITTED IN MS OFFICE 2010 APPLICATIONS

AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,

GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.

15. TOTAL

_.,.. 2 2 0

G. PREPARED BY H. DATE 1.~EDBY J . DATE

MURILLO.CLAIRE.M.127

~ .... .,,.~QAltt.Ml11'624044)

'ifi_ ,, IJ/7/R ONc-US....U.S..~l-0.0.-'ltl. Ji .'ZC ,, ..2 6240443 ou-USH, cno-MUllllUOClAIRE_M 11762.0UJ 11/6/2017 O.te >Ot1l1 061 4:06.50-o$'00' /

DD FORM 1423 1, FEB 2001 - PREVIOUS EDl'tlON MAY BE USEO- Page 11 of ll Pages

17. PRICE GROUP

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.

A . CONTRACT L.INE ITEM NO. I B. i:xHIBIT I c. CATEGORY:

TOP __ TM _x_ OTHER

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DAT A ITEM 3. SUBTITLE

A013 COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND

ASSOCIATED SUPPLEMENTAL DATA

4. AUTHORITY (Data Acquisd10n Document No) , 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-TMSS-80527 SEE BLK 16 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

D (SEE BLK 16)

N/A SEE BLK 16

Draft

Reg Repro

16. REMARKS COR 0 1

BLK 4: TAILORING TO REMOVE All REQUIREMENTS RELATED TO INTERACTIVE ELECTRONIC TPOC 1 1

TECHNICAL MANUALS (IETM) AND TO REMOVE REQUIREMENT FOR PAPER COPIES.

SEE BLK 16

BLK5. SOW PARAGRAHPS C4.5.3.5, C4.8.3 5, C4.9.2

BLK 8 APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 10 DAYS FROM

RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 15

DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS

WITHIN 10 DAYS, THE DELIVERY IS APPROVED.

BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE. OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318. DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12,13: FIRST DRAFT SUBMISSION DUE 15 DAYS PRIOR TO THE DELIVERY OF PROTOTYPES

PER DELIVERY ORDER SOW PARAGRAPH C4.7 (AND SUBPARAGRAPHS). FINAL AND

SUBSEQUENT SUBMISSIONS DUE 15 DAYS AFTER RECEIPT OF COMMENTS.

BLK14 ELECTRONIC MEDIA: THE MANUAL INFORMATION SHALL BE SUBMITIED IN MS WORD

2010ANDATIACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,

GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.

15. TOTAL ---"" 1 2 0

G. PREPARED BY H. DATE

I. A l JO) EDBY J . DATE

\1)1/Jt MURILLO.CLAIRE.M.127624 =.'.°::',~':'..;::'' 11/6/2017 ~)~ 0443

........S....t~OOJ,lllLM.1211l2..a.MJ ·~ o.i: ... 201r11ot1•-01•s~oo

- PREVIOUS EDITIO'°N MAY BE USED- Page ll of il Pages

DD FORM 1423 1, FEB 2001

17. PRICE GROUP

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwtthstanding any other provision of law, no person shall be subject to any penatty for failing to comply wtth a collection of information if tt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.

A . CONTRACT LINE ITEM NO. 18. ~XHIBIT IC. CATEGORY:

TOP _ TM -- OTHER X -IPSC

0 , SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A014 SYSTEM/SUBSYSTEM DESIGN DESCRIPTION (SSDD)

HARDWARE DESIGN DESCRIPTION (HOO) FOR

HANDHELO HARDWARE DEVICE

4. AUTHORITY (Data Acquistlion Document No ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Ol-IPSC-81432A SOW PARA. C4 8 3.3, C4.5.3.5 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED HIME SEE BLK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

D (SEE BLK 16)

N/A SEE BLK 16

Draft

Reg Repro

16. REMARKS COR 0 1

TPOC 2 1

BLK 4: TAILORING TO INCLUDE THE HANOHELO HARDWARE DEVICE AS THE SYSTEM. THE

SPECIFICATION SHALL INCORPORATE ALL REQUIREMENTS FROM SOW PARAGRAPH C4.2 (AND SEE BLK 16

SUBPARAGRAPHS) AND C4.3 (AND SUBPARAGRAPHS).

BLK 8 APPROVAL OF TECHNICAL CONTENT AND FORMAT GOVERNMENT HAS 5 DAYS FROM

RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 5

DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS

WITHIN 5 DAYS, THE DELIVERY IS APPROVED.

BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12, 13: FIRST DRAFT SUBMISSION DUE 15 DAYS AFTER THE TECHNICAL INTERCHANGE

MEETING #1 (TIM#1 ) PER DELIVERY ORDER SOW PARAGRAPH C4.4 (AND SUBPARAGRAPHS).

SUBSEQUENT DRAFT SUBMISSIONS DUE 15 DAYS AND AGAIN 1 DAY PRIOR TO THE SCHEDULED

DATE FOR TECHNCIAL INTERCHANGE MEETING #2 (TIM#2) PER DELIVERY ORDER SOW

PARAGRAPH C4.5 (AND SUBPARAGRAPHS). FINAL SUBMISSION DUE 15 DAYS PRIOR TO RECIEPT

OF PROTOTYPE HARDWARE.

BLK 14: ELECTRONIC MEDIA: THE HOD SHALL BE SUBMITTED IN MS OFFICE 2010 APPLICATIONS

AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G,

GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.

15. TOTAL ---"' 2 2 0

G. PREPARED BY H. OATE

1.AP;p~~~

J . DATE

MURILLO.CLAIRE.M .127624 =.-::,=:.,,":'=' IJ )1/r+ 0443 .....u\H,<,_.,,,._..0.QMMM 1l7t240oWJ

11/6/2017 O.t• 10111 1.o6 14:0t:M .OSW

DD FORM 1423 1, FEB 200 - 1 PREVIOUS EDITION MAY BE USED Page ll of 21 Pages

17. PRICE GROUP

The public reporting burden for this collection of infonnation is estimated to average 110 hours per response, including the lime for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0166). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information If tt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contractlng Officer for the Contract/PR No. listed In Block E.

A . CONTRACT LINE ITEM NO. ,B. ~XHIBIT ,C. CATEGORY:

TOP _ TM _x_ OTHER

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-401 7-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A01 6 OPERA TING, SUPPORT, HEAL TH, AND SAFETY (OSH&S) HANDHELD HARDWARE DEVICE SYSTEMS HAZARD

HAZARD ANALYSIS REPORT ANALYSIS (SHA)

4. AUTHORITY (Data Acqu1s1tion Document No ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-SAFT-81841 SOW PARAGRAPH C4.9.1 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ONE/R SEE BLK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

A

D (SEE BLK 16)

NIA SEE BLK 16

Draft

Reg Repro

16. REMARKS COR 0 1

BLK 4: TAILORING TO COMPLY WITH MIL-STD-882E TASKS AS SPECIFIED IN THE SOW

TPOC 1 1

REFERENCE IN BLK 5.

SEE BLK 16

BLK 8: APPROVAL OF TECHNICAL CONTENT AND FORMAT. GOVERNMENT HAS 10 DAYS FROM

RECEIPT TO REVIEW, COMMENT AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 10

DAYS TO SUBMIT REVISIONS. IF THE GOVERNMENT DOES NOT SUBMIT REVISION REQUESTS

WITHIN 10 DAYS, THE DELIVERY IS APPROVED.

BLK g: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND US DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE, OCTOBER 2017

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RO, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLKS 12, 13: FIRST SUBMISSION DUE CONCURRENTLY WITH DELIVERY OF PROTOTYPE

HARDWARE. SUBSEQUENT SUBMISSIONS DUE 10 DAYS AFTER RECEIPT OF COMMENTS.

BLK 14 ELECTRONIC MEDIA: THE REPORT SHALL BE SUBMITIED IN MS WORD 2010 AND

ATIACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES LISTED IN SECTION G, GOVERNMENT

CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND RESPONSIBLITIES.

15. TOTAL ---~ 1 2 0

G. PREPARED BY H. DATE

I.~;; ~

J . DATE

MURILLO.CLAIRE.M. 12762

0.,.W,16gned~Ml..ll&J.0~12~) 11/ '1/ FI ON c-US.o-4.J.S.~-000.°"-l'IG, UJ.-..__ 40443 ~~~OCLAIMMl2762.0UJ 11/6/2017 0...1017110l1•11U OUG'

DD FORM 1423-1 , FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of ll Pages

17. PRICE GROUP

The public reporting burden for this collection of information is estimate<! to average 110 hours per response, Including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penatty for failing to comply with a collection of information if tt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E.

A. CONTRACT LINE ITEM NO. I B. ~XHIBIT I c. CATEGORY:

TOP __ TM -- OTHER X-QCIC

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A017 ACCEPTANCE TEST REPORT

4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-QCIC-81891 SOW PARAGRAPH C4.7.3.3 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASGEN SEE BLK 16 b. COPIES

8. APPCODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a ADDRESSEE Final

NIA

D (SEE BLK 16)

NIA N/A

Draft

Reg Rep<o

16. REMARKS COR 0 1

BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE TPOC 0 1

AND U.S. DOD CONTRACTORS ONLY ADMINSTRA TIVE OR OPERATIONAL USE, OCTOBER 2017.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE SEE BLK 16

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157

BLK 12: FIRST SUBMISSION DUE CONCURRENTLY WITH HARDWARE PRODUCTS DELIVERED TO

THE GOVERNMENT

BLK 14: ELECTRONIC MEDIA: THE REPORT SHALL BE SUBMITTED IN MS OFFICE 2010

APPLICATIONS OR ADOBE PDF AND ATTACHED TO EMAIL NOTIFICATION TO THE ADDRESSEES

LISTED IN SECTION G, GOVERNMENT CONTRACT ADMINISTRATIVE POINTS OF CONTACT AND

RESPONSIBLITIES.

15. TOTAL ---II> 0 2 0

G. PREPARED BY H. DATE

l .A~d~

J . DATE

MURILLO.CLAIRE.M.1276240 ~-::::",....:::..":'=:..,.._ 11)1/11 443

~O.ClAlllMIJHl-40A<IJ 11/6/2017 D.Ml>01111.0.1•·1Ul6 ~'00'

DD FORM 1423 1, FEB 200 . 1 PREVIOUS EDITroN MAY BE USED Page ~ of 21 Pages

17. PRICE GROUP

The public reporting burden for this collection of infonnation is estimated to average 110 hours per response. including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information. including suggestions for reducing the burden. to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law. no person shall be subject to any penalty for failing to comply with a collection of infonnation if tt does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contractina Officer for the Contract/PR No. listed In Block E.

A . CONTRACT LINE ITEM NO. I B. ~XHIBIT I C. CATEGORY:

TOP __ TM - - OTHER X - SESS

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

IDENTITY DOMINANCE SYSTEM (IDS) N00178-18-R-4017-0001 SELECTED PRIME CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A020

CONFIGURATION STATUS ACCOUNTING (CSA)

INFORMATION

4. AUTHORITY (Data Acqws1tion Document No ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-SESS-81253C SOW PARAGRAPH C4.8.7 NSWC DAHLGREN, H10

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASGEN SEE BLK 16 b. COPIES

8. APP CODE 11 . AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE Final

NIA

0 (SEE BLK 16)

N/A NIA

Draft Reg Repro

16. REMARKS COR 0 1

BLK g: DISTRIBUTION STATEMENT 0 : DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE TPOC 0 1

AND US. DOD CONTRACTORS ONLY ADMINSTRATIVE OR OPERATIONAL USE. OCTOBER 2017

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL SURFACE WARFARE SEE 8LK 16

CENTER, DAHLGREN DIVISION, CODE H14, 18372 FRONTAGE RD, SUITE 318, DAHLGREN,

VIRGINIA 22448-5157.

BLK 12 FIRST SUBMISSION DUE CONCURRENTLY WITH HARDWARE PRODUCTS DELIVERED TO

THE GOVERNMENT

BLK 14 ELECTRONIC MEDIA. THE DATA SHALL BE SUBMITTED IN MS OFFICE 2010