N0016719Q01370005.pdf
PDF 312 KB Posted
- Attached to
- FEMAP Software Maintenance
- Solicitation number
- N0016719Q0137
About this file
RFQ Amendment 5
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Encl._3_-_SAP_Brand_Name_21_March_2017_-_FEMAP_Rev_signed.pdf | ||
| N0016719Q01370003.pdf | ||
| Wage_determination.pdf | ||
| N0016719Q01370002.pdf | ||
| N0016719Q01370001.pdf | ||
| N0016719Q0137_RFQ.pdf | ||
| FEMAP_brandname_posting_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300782920
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise solicitation instructions and evaluation to incorporate a Low est Price, Technically Acceptable
(LPTA) aw ard determination. No other changes have been made to terms and conditions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jun-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0016719Q0137
X 9B. DATED (SEE ITEM 11)
10-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jun-2019
CODE
NAVAL SURFACE WARFARE CENTER CARDEROCK
MICHAEL JONES
757-492-4141, MICHAEL.L.JONES5@NAVY.MIL
2600 TARAWA CT, BLDG 1602, RM 112
VIRGINIA BEACH VA 23459
N00167 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0016719Q0137
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
52.212-1 ADDENDUM
(m) Quote Preparation and Submission Instructions.
(1) Quotes are due no later than 27 June 2019 at 1000 (10:00 AM) Eastern Standard Time.
Email is the only acceptable method of submission. All quotes must be emailed with the RFQ Number in the subject line. Contractors are responsible for verifying receipt of their quotes to this office before quote due date and time.
(2) Comprehensive responses to the requirements of this Request for Quote (RFQ) are required to enable the
Government to evaluate the Quoter’s capability and understanding to accomplish the stated requirements.
(n) Quote Format and Content
Electronic quotes shall contain separate files for each volume. Individual emails shall not exceed 10MB.
VOLUME I - INTRODUCTION
The quoter shall provide the following information:
1. Contractor Name, Commercial and Government Entity (CAGE) Code, Dun and Bradstreet (DUNs) Number, and
Tax Identification Number (TIN).
2. Name, telephone numbers, and email address of person(s) to be contacted for clarification or questions pertaining to the quote.
3. FILL IN CLAUSES: Quoters must be registered in the System for Award Management (SAM) to be eligible for award; Quotes received without the completed copy of all fill-in provisions or completed SAM representation may be considered non-compliant. Quotes determined non-compliant may not be evaluated for award.
Quotes shall be submitted in accordance with the instructions herein. The quote shall be valid for no less than 60 days from the date of RFQ closing, a statement affirming this fact shall be included in the Introduction. The quote shall provide comprehensive responses to the areas provided for in this section. The quote shall be a complete response to the Attachment 1 Performance Work Statement and the requirements of this RFQ, taking into consideration required quantities and delivery schedules specified in this solicitation.
4. Terms and Conditions: The Quoter must include a statement that it either (a) agrees to the terms and conditions of this solicitation (which consists of the entire RFQ, including all documents, exhibits, and other attachments that are incorporated therein by reference and made a part thereof) and any solicitation amendments; or (b) takes exceptions to any terms or conditions of the solicitation, and clearly identifies those exceptions. Exceptions to any of the terms and conditions of this RFQ may be considered by the Government to be unacceptable.
5. Specify quote validity period.
(o) Restriction on disclosure and use of data. Quoters that include in their quotes data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall –
(1) Mark the title page with the following legend:
This quote includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed -- in whole or in part -- for any purpose other than to evaluate this quote. If, however, a contract is awarded to this offeror as a result of -- or in connection with -- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this quote.
(p) To be considered timely. E-mail quote must be received in its entirety in the designated E-mail inbox by the due date and time for final quote submission. An E-mail quote that resides on a Government server, but has not appeared in the designated E-mail inbox by the due date and time for quote submission will be considered late. Therefore, it is incumbent upon the Quoter to ensure that its entire quote is received by the Agency by the designated due date.
VOLUME II –Price
Submission Requirements: The Quoter shall complete the pricing schedule included in this solicitation. The
Government may require additional “other than cost and pricing data” prior to award.
VOLUME III –Technical
Submission Requirements: The Quoter shall submit the following documentation to clearly identify that they are an authorized distributor of the requested Siemens PLM FEMAP, FEMAP w/NX NASTRAN and NX
NASTRAN License.
- The Quoter has received authorization to transfer the license in the schedule from the current incumbent* (authorization is defined as an e-mail from the incumbent contractor specifying approval of said action), and/or
- The Quoter has received authorization to transfer the license from a Siemens PLM Channel VP
(authorization is defined as an e-mail from said party specifying approval of said action), and
- Approval must be for a service/maintenance period starting 1 July 2019.
*The incumbent contractor is identified herein: Previous contract # N0016718P0151 was performed by
PAYDARFAR Industries, Inc. (DBA Saratech).
End of provision)
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
a) Basis for Award
The Government has determined that an award to the responsible Quoter that submits the Lowest-Priced, Technically Acceptable (LPTA) quote in response to this solicitation will represent the best value to the
Government. Quotes will be evaluated to determine the LPTA quote based on the following factors:
Factor 1 Price
Factor 2 Technical Capability/Approach
A quote must be rated "ACCEPTABLE" for each non-price factor to be eligible for award. An
"UNACCEPTABLE" rating for any non-price factor will result in the entire quote being rated
"UNACCEPTABLE" overall; an overall rating of "UNACCEPTABLE" makes a quote ineligible for award.
A quote must contain sufficient information to enable evaluators to determine acceptability; if there is insufficient information to determine acceptability of the quote, the quote will be rated “UNACCEPTABLE” overall. Each of the evaluation factors will be rated as set forth below. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability.
The Government will evaluate the lowest priced quote for technical acceptability. If it is not acceptable, the
Government will evaluate the next lowest quote for technical acceptability, and so forth, to determine the lowest-priced, technically acceptable quote, at which point all evaluations will stop.
The Government reserves the right to request that the awardee reduce its total price, or adjust CLIN prices with no change to total price, in order to reduce administrative costs and avoid unnecessary burdens for the agency pursuant to FAR 13.002.
(b) Evaluation Factors
Factor 1: Price
Price will be evaluated for reasonableness in accordance with FAR 13.106-3(a). Quoters responding to this solicitation are advised that, prior to award, the government may request quoters to submit information/data to support price reasonableness such as copies of paid invoices for the same or similar items, sales history for the same or similar items, price list with effective date and/or copies of catalog pages along with any applicable discounts.
Factor 2: Technical Capability
The Government will evaluate the lowest priced Quoter for acceptability of Technical Capability. If the quote is not found to be acceptable, the Government will evaluate the next lowest quote for acceptability of technical capability, and so forth, to determine the lowest-priced quote that is acceptable for Technical
Capability, at which point evaluators will evaluate of the acceptability of that quoter’s Past Performance.
Technical Capability evaluations will result in one of the following ratings:
TABLE 1 - TECHNICAL RATINGS
Rating Description
Acceptable Quote clearly meets the minimum requirements of the solicitation.
Unacceptable Quote does not clearly meet the minimum requirements of the solicitation.
Minimum Requirements:
The following are the minimum requirements a quote must meet to be deemed acceptable for the Technical
Capability factor:
- The Quoter has received authorization to transfer the license in the schedule from the current incumbent (authorization is defined as an e-mail from the incumbent contractor specifying approval of said action), and/or
- The Quoter has received authorization to transfer the license from a Siemens PLM Channel VP
(authorization is defined as an e-mail from said party specifying approval of said action), and
- Approval must be for a service/maintenance period starting 1 July 2019.
(c) Contract Award
The Government shall mail or email a written notice of award to the successful quoter. Once an authorized representative of the successful quoter has signed the award, a binding contract is formed; the signature represents that the Quoter accepts all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Please notify the Government that the contract has been signed by returning the signed contract via mail or email within 5 business days of receiving the award notice.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it.