Conformed N00024-23-R-5108 through Amendment 0002.docx
DOCX document 321 KB Posted
- Attached to
- Solicitation for Electronic Warfare Training Systems (EWTS) II Federal contract opportunity
- Solicitation number
- N00024-23-R-5108
About this file
This document is a conformed solicitation for electronic warfare training systems. The solicitation is seeking proposals to continue the Navy's migration from legacy Battleforce Electronic Warfare Trainer systems to new BEWT II systems, develop enhanced capabilities for the Surface Electronic Warfare Team Trainer software, develop the Combined Integrated Air and Missile Defense and Anti-Surface Warfare Trainer, and provide engineering support, upgrades, repairs, and technical assistance for electronic warfare training systems installed on ships and at shore sites. Proposals are due by the date specified in the solicitation for the base period of performance and multiple option periods. The Naval Sea Systems Command is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002423R5108
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0001
| 35,573 |
| Labor Hours |
Engineering/Level of Effort (LOE)
CPFF
FOB: Origin (Shipping Point)
PSC CD: 6940
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0002
Lot
DATA NSP
FFP
DATA CDRLs are not separately priced Section F delivery date will be updated to match the life of the contract based on actual option exercise dates for the option CLINs.
Note: D FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0003
| 1 |
| Each |
| OPTION |
| Other Direct Costs(ODC)/Material |
COST
Note: B, C
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0004
| 1 |
| Each |
| OPTION |
| ODC - Travel |
COST
Note: B, C
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0005
| 5 |
| Each |
| OPTION |
| BEWT II Production |
FFP
Battle Force Electronic Warfare Trainer (BEWT) Note: A, B NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0006
| 1 |
| Each |
| OPTION |
| Storage/Warehousing |
FFP
Note: B
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0007
| 8,200 |
| Labor Hours |
| OPTION |
| Depot Repair/ISEA Support |
CPFF
In-Service Engineering Agent (ISEA) Note: B
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0008
| 1 |
| Each |
| OPTION |
| First Article Unit (FAU) - BEWT II |
FFP
Note: B
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1001
| 35,573 |
| Labor Hours |
| OPTION |
| Engineering/Level of Effort (LOE) |
CPFF
Note: B
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1003
| 1 |
| Each |
| OPTION |
| Other Direct Costs (ODC)/Material |
COST
Note: B, C
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1004
| 1 |
| Each |
| OPTION |
| ODC - Travel |
COST
Note: B, C
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1005
| 5 |
| Each |
| OPTION |
| BEWT II Production |
FFP
Battle Force Electronic Warfare Trainer (BEWT) Note: A, B NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1006
| 1 |
| Each |
| OPTION |
| Storage/Warehousing |
FFP
Note: B
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 1007
| 8,200 |
| Labor Hours |
| OPTION |
| Depot Repair/ISEA Support |
CPFF
In-Service Engineering Agent (ISEA) Note: B
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2001
| 35,573 |
| Labor Hours |
| OPTION |
| Engineering/Level of Effort (LOE) |
CPFF
Note: B
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2003
| 1 |
| Each |
| OPTION |
| Other Direct Costs (ODC)/Material |
COST
Note: B, C
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2004
| 1 |
| Each |
| OPTION |
| ODC - Travel |
COST
Note: B, C
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2005
| 5 |
| Each |
| OPTION |
| BEWT II Production |
FFP
Battle Force Electronic Warfare Trainer (BEWT) Note: A, B NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2006
| 1 |
| Each |
| OPTION |
| Storage/Warehousing |
FFP
Note: B
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 2007
| 8,200 |
| Labor Hours |
| OPTION |
| Depot Repair/ISEA Support |
CPFF
In-Service Engineering Agent (ISEA) Note: B
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3001
| 35,573 |
| Labor Hours |
| OPTION |
| Engineering/Level of Effort (LOE) |
CPFF
Note: B
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3003
| 1 |
| Each |
| OPTION |
| Other Direct Costs (ODC)/Material |
COST
Note: B, C
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3004
| 1 |
| Each |
| OPTION |
| ODC - Travel |
COST
Note: B, C
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3005
| 5 |
| Each |
| OPTION |
| BEWT II Production |
FFP
Battle Force Electronic Warfare Trainer (BEWT) Note: A, B NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3006
| 1 |
| Each |
| OPTION |
| Storage/Warehousing |
FFP
Note: B
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 3007
| 8,200 |
| Labor Hours |
| OPTION |
| Depot Repair/ISEA Support |
CPFF
In-Service Engineering Agent (ISEA) Note: B
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4001
| 35,573 |
| Labor Hours |
| OPTION |
| Engineering/Level of Effort(LOE) |
CPFF
Note: B
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4003
| 1 |
| Each |
| OPTION |
| Other Direct Costs (ODC)/Material |
COST
Note: B, C
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4004
| 1 |
| Each |
| OPTION |
| ODC - Travel |
COST
Note: B, C
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4005
| 5 |
| Each |
| OPTION |
| BEWT II Production |
FFP
Battle Force Electronic Warfare Trainer (BEWT) Note: A, B NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4006
| 1 |
| Each |
| OPTION |
| Storage/Warehousing |
FFP
Note: B
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 4007
| 8,200 |
| Labor Hours |
| OPTION |
| Depot Repair/ISEA Support |
CPFF
In-Service Engineering Agent (ISEA) Note: B
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
SECTION B: NOTES
NOTE A
Table B-1 below establishes stepladder pricing for Option Contract Line Item Number(s) (CLINs) X005. The use of “X” represents a CLIN series. For example, X005 represents CLINs 0005, 1005, 2005, 3005, 4005.
The Section B amounts shall be established through unilateral modification in accordance with Section I clause 52.217-7 Var I Option for Increased Quantity—Separately Priced Line Item (NAVSEA Variation I) and the stepladder pricing in the tables below. The Government may procure a selection of the items identified in the tables below. Furthermore, the Government has the right to unilaterally increase the quantity procured for each of the specific hardware items identified in the tables (Option CLINs X005) as long as it occurs before the latest option exercise date stated under Section I clause 52.217-7 Var I Option For Increased Quantity—Separately Priced Line Item (NAVSEA Variation I).
For funding and administrative purposes, at the time of option exercise and quantity purchase increases, the Contracting Officer may unilaterally establish separately priced contract line items (CLINs) or subcontract line items (SLINs). The Section B firm-fixed-price (FFP) amount and the funding provided in each modification shall be unilaterally established based on the stepladder pricing in the tables below.
Quantities stated under Section B above indicate the anticipated maximum quantities for that base or option period.
The Government is not obligated to order the maximum anticipated quantities identified under Section B above.
TABLE B-1:
BEWT II Production
| QTY |
| CLIN |
| QTY |
| CLIN |
| QTY |
| CLIN |
| QTY |
| CLIN |
| QTY |
| CLIN |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 2 |
| 2 |
| 2 |
| 2 |
| 2 |
| 3 |
| 3 |
| 3 |
| 3 |
| 3 |
| 4 |
| 4 |
| 4 |
| 4 |
| 4 |
| 5 |
| 5 |
| 5 |
| 5 |
| 5 |
NOTE B
Option item to which the option clause in SECTION I applies and which is to be supplied only if and to the extent said option is exercised.
NOTE C
Other direct costs (ODCs) and Travel associated with CLIN X001 and X007 are to be included on a cost-only basis (non-fee-bearing), allocable to CLINs X003, and X004 respectively. See Federal Acquisition Regulation (FAR) 16.302 for a description of this cost-only contract type. Section C provides additional details regarding the ODCs and incidental materials and Travel included under these CLINs. Cost only line item to which fee shall not apply.
The Contractor may invoice for allowable costs up to the CLIN amount, subject to the Limitation of Costs/Limitation of Funds clauses.
| ODC Material |
| Travel |
| CLIN |
| Cost Only |
| CLIN |
| Cost Only |
| 0003 |
| $ 1,000,000 |
| 0004 |
| $ 75,000 |
| 1003 |
| $ 1,000,000 |
| 1004 |
| $ 75,000 |
| 2003 |
| $ 1,000,000 |
| 2004 |
| $ 75,000 |
| 3003 |
| $ 1,000,000 |
| 3004 |
| $ 75,000 |
| 4003 |
| $ 1,000,000 |
| 4004 |
| $ 75,000 |
NOTE D
CLIN 0002, CDRLs, are Not Separately Priced (NSP). For data collection purposes the Offeror shall complete the “Price Group” and “Estimated Total Price”, blocks 17 and 18 respectively, of each data item on the Contract Data Requirements List(s), Exhibits A, B and C.
CLAUSES INCORPORATED BY FULL TEXT
B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35; however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.
(End of text)
B-232-H003 PAYMENTS OF FEE (S) (COMPLETION) (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be equal to percent ( %) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost And Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable (percentage of fee payable is based on fee dollars divided by estimated cost dollars including facilities capital cost of money). Fee shall not be applied on Facilities Capital Cost of Money per FAR 15.404-4(c)(3) and DFARS 215-404-71-4. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.
(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, per the clause of this contract entitled "Limitation of Funds" (FAR 52.232-22) or "Limitation of Cost" (FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.
(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) per paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.
(End of Text)
B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.
B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)
The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
Section C - Descriptions and Specifications
C.1.0 SCOPE/BACKGROUND
This Statement-of-Work (SOW) describes the systems, supplies and services to be furnished, manufactured, performed or processed to meet the training requirements of the United States (US) Navy, Foreign Military and US Coast Guard. The scope of this contract is to continue the US Navy’s migration from legacy Battleforce Electronic Warfare Trainer (BEWT) systems to the new and developing BEWT II systems; continue development of enhanced capabilities of the Surface Electronic Warfare Team Trainer (SEWTT) software; continue the development of the Combined Integrated Air and Missile Defense and Anti-Surface Warfare Trainer (CIAT) training system; develop future training capabilities, such as Mk53(Nulka), MH60R, Specific Emitter Identification (SEI), High Gain High Sensitivity, Soft Kill Coordinator (SKC) and Electronic Attack (EA), Laser Detect and Engage (LDE), and Electro-Magnetic Spectrum Visualization Tool (ESVT) etc.; incorporate an enhanced After Action review with electronic scoring; deliver BEWT II systems to the US Coast Guard and US Navy; deliver training systems to CIAT training locations worldwide; provide Engineering expertise to the US Navy as required to advance all forms and facets of combat system training, both Electronic Warfare and Non-Electronic Warfare; and provide updates, repair, technical and engineering support services as required to the US Navy.
C.2.0 APPLICABLE DOCUMENTS FOR INCORPORATION AND REFERENCE
The following documents are applicable to the tasks described herein and are for use by the Contractor as required in the fulfillment of the SOW.
* Contractor is advised that the latest effective date, as of the date of the solicitation, of the mandatory and guidance documents below are to be used.
| DOCUMENTS |
| MANDATORY |
| GUIDANCE |
C.2.1 Cyber Security
| DoD Instruction 8500.01, Cybersecurity of 14 March 2014 |
| X |
| SECNAVINST 5239.3C, Department of the Navy Information Assurance (IA) Policy, 02 May 2016 |
| X |
SECNAV M-5239.2 DON Cyberspace Information Technology (IT) and CSWF Management and Qualification Manual, 27 Jun 2016
X
| SECNAV 5239.20A DON Cyberspace IT and CSWF Management and Qualification, 10 Feb 2016 |
| X |
NAVSEAINST 9400.02A NAVSEA PIT Control Systems Cybersecurity Governance and Guidance, 20 Sep 16
X
| Department of the Navy Chief Information Officer Memorandum 02-10, Information Assurance Policy Update for Platform Information Technology 26 April 2010, with Enclosure (1), PIT Definitions for DON, and Enclosure (2), DON Platform IT IA Guidance |
| X |
| DoD Directive 8140.05, Cyberspace Workforce Management of 11 August 2015 |
| X |
DoD Manual 8570.1-M, Information Assurance Workforce Improvement Program of 19 Dec 05 (Incorporating Change 4, 10 Nov 2015)
X
| Navy C&A and Navy ODAA, C&A Guidance for PIT Interconnection of 20 Jan 09 |
| X |
| CJCSINST 6510.01F, Information Assurance (IA) and Computer Network Defense, 9 Feb 2011 |
| X |
| DODINST 8580.1, Information Assurance (IA) in the Defense Acquisition System of 09 July 04 |
| X |
| SECNAV M-5239.1 Department of the Navy Information Assurance Program, Information Assurance Manual of Nov 05 |
| X |
| SECNAV 5239.22 DON Cybersecurity Safety Program (CYBERSAFE), 15 Nov 2016 |
| X |
| DISA IAVA Process Handbook, Version 3.0, 14 Feb 2007 |
| X |
| NAVSEA Afloat Information Assurance (IA) Implementation Manual 9400.2-M, April 2012 |
| X |
| SECNAV 5510.36A DON Information Security Policy, 6 Oct 2006 |
| X |
| Test Procedure Preparation Directive NAVSEA T9050-AA-DIR-010 |
| X |
| NAVSEA S9AA0-AA-SPN-010/GEN-SPEC |
| X |
| PEO IWS Instruction 5000.8 |
| X |
| PEOIWSINST 5234.1, Software Measurement Policy, dated 31 Jan 2012 |
| X |
| PEOIWSINST 5239.1, PEO IWS Surface Navy Combat System Cybersecurity |
| X |
| Security Technical Implementation Guides (STIGs) |
| X |
| Surface Navy Combat Systems Software Product Line Architecture, Architecture Description Document, Version 1.0, dated 31 July 2009 |
| X |
Total Ship Test Program Manual, NAVSEAINST S9095 AD-TRQ-010/TSTP
X
NIST Special Publication (SP) 800-53
X
NIST Special Publication (SP) 800-53A
X
CNSS Instruction No. 1253
X
NAVSEA Afloat PIT RMF Business Rules Interim v1.1, 14 Nov 2016
X
SECNAV M-5510.36 DON Information Security Program Manual, June 2006
X
DONCIO Memo – DON Implementation of the Risk Management Framework (RMF) for DOD Information Technology, 20 May 2014
X
DONCIO Memo - RMF Process Guide v1.0, 13 Dec 2016
X
| AEGIS Security Classification Guide 03-011.04 |
| X |
C.2.2 System Safety
| Mil-Std 882E (current version E) (Department of Defense Standard Practice System Safety) |
| X |
| OPNAV INST 5100.Navy System Safety Policy (Program Milestones) System Safety Working Group |
| X |
NAVSEA INST 9410.2A NSWC Certification Policy, Risk Assessments, Software Trouble Reports
X
NAVSEA PEO IWS Instruction 5000.8 NAVSEA PEO IWS Risk Management Policy (Standard Chemical Avoidance)
X
| NAVSEA SW020-AH-SAF-010 Weapon System Safety Guidelines Handbook |
| X |
Navy Weapon System Safety Program, NAVSEAINST 8020.6E, X
| NAVSEA INST 5100.12B System Safety Engineering Program Requirements |
| X |
| NAVSEA INST 5100.12M System Safety Engineering Manual |
| X |
MIL STD 6016F Interoperability / Force Level Safety
X
JSWRB / JS-SSA Joint Service Weapon Safety Review Board (JSWRB) Endorsement of Joint Services Software Safety Authority (JS-SSA)
X
NOSSA Letter N32-1581 dated 10 Oct 08 Department of Navy Systems Of Systems (SOS)
X
OPNAV INST 5100.24C Environmental Safety Occupational and Health Considerations in Navy Capabilities and Systems Engineering Process
X
NAVSEA OP 5, Vol 1, Revision 7, Ch 14 Ammunition and Explosives Safety Ashore
X
NAVSEA INST OP 4 NAVSEA Explosives Safety Afloat
X
OPNAV INST 5100.23G Navy Occupational Safety and Health Program Manual
X
| NOSSA TECHNICAL MANUAL S9310-AQ-SAF-010 Department of Navy Lithium Batteries |
| X |
| STANAG 4404 Training Safety Precepts Combat System and Combat System Elements and Design Requirements |
| X |
| OPNAV INST 1500.75A High Risk Training Policy and Procedures |
| X |
| SEC NAV INST 5100.10K Department of Navy Safety Policy |
| X |
Joint Software Systems Safety Engineering Military Handbook 454B DoD Handbook Guidance on Software Safety Design
X
NAVSEA S2020-AH-SAF-010 Guidelines for Electronic Equipment
X
OPNAV INST 5100.24C Environmental Safety Occupational and Health Considerations in Navy Capabilities and Systems Engineering Processes
X
| OPNAV INST 1500.76C Naval Training Systems Requirements, Acquisition and Management |
| X |
| NAVSEA Hazardous Material (HM) Avoidance Process Technical Manual (T9070-AL-DPC-020/077-2 |
| X |
| OPNAV INST 1500.76C CNO Naval Training Systems Requirements, Acquisition and Management |
| X |
Allied Ordnance Publication (AOP 52) Assessment of Munitions Related Computing Systems North Atlantic Treaty Organization (NATO) (SSSTRP requested Architectural Analysis, via MIL STD 882E, Task 205)
X
C.2.3 Test & Evaluation
NAVSEA Instruction 9410.2A, Naval Warfare Systems Certification Policy (NWSCP)
X
PEO IWS Instruction 4730.1A, Combat System Certification Process, January 2005
X
PEOIWS Training Systems Directorate, Training Systems Certification Process, December, 2009
X
| NAVSEA Instruction 4215.1, Implementing Automated Test and Re-Test Tools in NAVSEA Acquisition Programs, June 10, 2010 |
| X |
| PEO IWS INSTRUCTION 9800.1, AEGIS Integration Event (AIE) Process, JAN 23, 2012 |
| X |
Incorporating Test and Evaluation into Department of Defense Acquisition Contracts Guide of October 2011
X
PEOIWSINST 4130.1B, IWS Enterprise Configuration Control Process (ECCP), SEP 14, 2011
X
PEO IWS Instruction 4732.1, Element Certification policy (Draft)
X
PEO IWS Instruction 4731.1, Combat System Stress and Endurance Test Requirements for Surface Programs (Draft)
X
S9095-AD-TRQ-010/TSTP Total Ship Test Program (TSTP) MIL-HDBK-61(SE) Configuration Management Guidance (para 6.2 and 6.3)
X
C.2.4 Logistics
DoD Guide to Uniquely Identifying Items, v2.5 September 15, 2012
X
| DoD Instruction 5000.64 Accountability and Management of DoD-Owned Equipment and Other Accountable Property, May 19, 2011 |
| X |
| DoD Instruction 4140.01 DOD Supply Chain Material Management Regulation, December 14, 2011 |
| X |
| MIL-STD-31000 Technical Data Packages, Detail Specification, dated 9 Jul 2004 |
| X |
| MIL-STD-129R Military Marking For Shipment and Storage, Sep 2007 |
| X |
NAVSO P-3692 Department of the Navy Guide for Conducting Independent Logistics Assessment, Revision 8, September 2012
X
| SECNAVINST 4105.1 Independent Logistics Assessment and Certification Requirements November 9, 2012 |
| X |
Government Electronics and Information Technology Association (GEIA) SAE-GEIA-STD-0007, “Logistics Product Data” 1 AUG 2007
X
C.2.5 Systems Engineering
| Government Electronics and Information Technology Association (GEIA) GEIA-STD-0007, “Logistics Product Data” 1 AUG 2007 |
| X |
| PEO Integrated Warfare Systems, Tailored Technical Review Manual, Version 2.0, 18 DED 2009 |
| X |
C.2.6 Software Engineering
| IEEE 12207, "Standard for Information Technology - Software Life Cycle Processes" |
| X |
| IEEE1278 Distributed Interactive Simulation (DIS) Standards |
| X |
| IEEE1516 Standard For Modeling And Simulation (M&S) High Level Architecture (HLA) Framework And Rules |
| X |
C.2.7 Human System Engineering
| MIL-STD-1472G |
| X |
| MIL-STD-46855A DoD Standard Practice Human Engineering Requirements for Military Systems, Equipment and Facilities |
| X |
MIL-HDBK-1908B NOTE 1
X
| ASTM-F1166 HUMAN Engineering Design for Marine Systems, Equipment and Facilities, HFS100 American National Standard for HUMAN Factors Engineering of Visual Display Terminal Workstations |
| X |
BFTT Human Integration - Computer Interface (HCI) Design Guide
X
| MIL-STD 2525C DoD Interface Standard Common Warfighter Symbology |
| X |
Workstation Production Methodology and Programmer’s Handbook, Revision 2, 01 March 2004
X
C.2.8 EW Training Systems Documents
| Integrated Training Systems / PEO IWS Tailored Technical Review Manual (TRM) – Tailored 13 February 2013 |
| X |
C.2.9 Other Government Documents
BFTT Operational Requirement Document (ORD) 21 March 1992
X
C.2.10 Commercial Standards and Specifications
| SQL for databases (e.g., SQL for databases ANSI ISO/IEC 9075-1, ISO/IEC 9075- 2, ISO/IEC 9075-3, ISO/IEC 9075-4, ISO/IEC 9075-5) |
| X |
| HTML for presentation layer (e.g., XML 1.0 www.webstandards.org) |
| X |
| XML for data transfer |
| X |
| Web services for remote system calls |
| X |
| ISO/IEC 19501:2005 Information technology – Open Distributed Processing – Unified Modeling Language (UML) Version 1.4.2 |
| X |
| ASME Y14.100-2004 Engineering Drawing Practices |
| X |
| IEEE/EIA Std 12207-2008 Systems and Software Engineering |
| X |
| ISO 9001:2000 Quality Management Systems -Requirements, dated 12 Dec 2000 |
| X |
| ISO 10007:2003Quality Management-Guidelines for Configuration Management |
| X |
| JAVA SWING Application Program Interface, Addition 7 |
| X |
| ANSI/ISO/ASQ 9001-2008 Quality Management Systems |
| X |
| CMMI-DEV V1.3 or higher |
| X |
| EIA/IS-632 |
| X |
| IEEE 1220 |
| X |
| IEEE Std 24765:2010 |
| X |
Note 1: Standards that are not specified within this contract or that are modified must be submitted via e-mail to and approved by the Integrated Warfare System (IWS) 1IT Principle Assistant Program Manager (PAPM) and the Procurement Contracting Officer (PCO) prior to use.
Note 2: Documents listed are current as of the date of this solicitation. If a more current version becomes available the Contractor shall notify via e-mail IWS 1IT, the Contracting Officer Representative (COR), and the PCO prior to use.
Availability of Documents.
Copies of military handbooks, instructions, standards and specifications and DoD adopted non-Government standards may be obtained in accordance with Federal Acquisition Regulation (FAR) Subpart 52.211-2. Copies of specifications, standards, and data item descriptions cited in this solicitation, if listed in the DoD Index of Specifications and Standards (DoDISS) or the Acquisition Management Systems and Data Requirements Control List, DoD 5010.12-L (Dec 2003) may be obtained from:
(a) ASSIST database via the Internet at (https:www.assit.dla.mil/online/start/)
(b) DoD issuances (https://www.esd.whs.mil/DD/DoD-Issuances)
(c) DON issuances (https://www.secnav.navy.mil/doni/classified.aspx)
(d) PEO IWS documents (Please email the Contracting Officer Representative (COR))
(e) By submitting a request to the Department of Defense Single Stock Point (DoDSSP) Building 4, Section D 700 Robbins Avenue Philadelphia, PA 19111-5094 Telephone (215) 697-2667/2179, Facsimile (215) 697-1462
(f) Naval Systems Data Support Activity (NSDSA) website at: https://nsdsa2.phdnswc.navy.mil/
(g) DoD Information Technology Standards Registry at: https://disronline.disa.mil
Copies of non-Government publications not listed in the DoDISS may be obtained from the respective industry association.
Note: Document Precedence In the event of conflict between the Mandatory and Guidance documents in the preceding paragraphs, the order of precedence shall be the Mandatory documents and then any other Guidance document(s).
C.3.0 REQUIREMENTS
C.3.1 GENERAL REQUIREMENTS- PROGRAM MANAGEMENT – Applicable to all CLINs and (if exercised) Option CLIN(s)
NOTE: As stated in Note A, the use of “X” represents a CLIN series. For example, X005 represents CLINs 0005, 1005, 2005, 3005, 4005.
The Contractor shall perform program management functions to ensure all the contract requirements are met in accordance with the Contract Data Requirements List (CDRL package) – Exhibit A, Exhibit B and Exhibit C. The Contractor management functions include, but are not limited to:
a. Manage and maintain DD Form 1423 CDRL to ensure compliance with development and delivery requirements.
b. Maintain information liaison with all stakeholders.
c. Track and maintain records of direction and authorization from Contracting Officer Representative (COR), Alternate Contracting Officers Representative (ACOR), Program Management Office (PMO), Procuring Contracting Officer (PCO), Administrative Contracting Officer (ACO) and Technical Instruction (TI).
d. Development and tracking of cost data as a management element of the program.
e. Complete inspection and test records.
f. Provide and maintain a Quality Management System (QMS) that meets or exceeds those standards identified by MIL-PRF-31032 GF Hybrid 18 Layer standards, MIL-PRF-55110 standards, 31032 GI 8-layer standards, AS9100D with ISO 9001:2015 standards, and PCB Board UL - USA standards.
g. Maintain auditable records of all costs charged to this contract.
h. Manage production flow to ensure delivery requirements are met.
i. Manage execution of the Technical Instructions.
j. Manage contract funding to ensure that appropriations are expended in an allowable manner and Limitation of Funds and Cost Clauses are followed.
k. Manage data call responses.
l. Ensure management practices as necessary to execute this contract in a cost effective and professional manner.
m. Provide and maintain a Contractor Counterfeit Electronic Part Detection and Avoidance System that meets or exceeds those standards identified in DFARS 246.870-3, DFARS 231.205-71, DFARS 252.246-7007, DFARS 252.246-7008, and DFARS 252.244-7001.
n. Maintain and keep account for all Government Furnished Property (GFP) and Government Furnished Information (GFI) to ensure records and disposition are accurate.
The Government reserves the right to attend meetings between the prime and any of its subcontractors. The Government requires fourteen (14) calendar days’ notice prior to any prime and subcontractor meetings. The Contractor shall plan to host a one-day Post Award Kickoff Meeting in accordance with NAVSEA text C-242-H002 Post Award Meeting. The Contractor shall participate in semi-annual program reviews.
PRODUCTION PROCESS IS AS FOLLOWS:
After award of the contract or contract modification containing funded production CLINs, (X005), the Government will provide a Technical Instruction (TI), in accordance with NAVSEA text C-242-H003 – Technical Instructions, containing final production unit configuration, delivery dates and delivery locations.
The Contractor will build, test and deliver in place units that comply with the requirements defined in the applicable TI, TDP and testing documents. Units that pass the Factory Acceptance Test (FAT), Attachment J-06, will be accepted by the Government via form DD250. The accepted units will then be transferred, via form DD1149, back to the Contractor for completion of any Hull Specific Variations (HSV)-configuration customization to match each ships specific build requirements defined in the applicable TI. The Contractor will use Labor CLINs X001 and other direct costs CLINs X003 to complete the required HSV.
C.3.1.1 Contractor Communication The Contractor shall communicate to IWS 1IT and document its plans, processes and approaches to meet all program and contract requirements. The Contractor’s Program Management team members shall each possess and maintain Project Management Professional (PMP) certification. The Contractor shall use a metrics-based management approach for planning, scheduling and technical, cost, risk, and quality monitoring/reporting of program-wide visibility of plan versus actual efforts under this contract. The Contractor shall establish, deliver and maintain a program management process that outlines performance against cost schedule and technical objectives. (CDRL A001, A003)
3.1.1.1 The Contractor shall provide support to the IWS 1IT Integrated Product Team (IPT). The Contractor shall tailor, maintain and deliver (as requested) to the Government its current Systems Engineering Plan (SEP) ensuring that it incorporates the items identified in the IWS 1IT Technical Review Manual (TRM) (Attachment J-10) and IWS 1IT SEP Inclusion List (Attachment J-11). (CDRL A014)
3.1.1.2 The Contractor shall deliver (as requested) the Contractor’s current Configuration Management Plan (CMP) (MIL-STD-3046) (CDRL A018) that describes the Contractor’s configuration management program, and the methods, procedures and controls, effective configuration identification, change control, status accounting, and audits of the total configuration, including hardware, software and firmware. The principle use is to provide the Government a basis for review, evaluation and monitoring of the Configuration Management (CM) program and its proposed components.
3.1.1.3 The Contractor shall develop, tailor, maintain and deliver (as requested) to the Government a Product Road Map (PRM) (CDRL A055) for each separately funded developmental TI executed and all funded production CLINs. The Contractor shall develop, tailor, maintain and deliver to the Government all associated Technical Data Packages (TDP) (CDRL B007).
3.1.1.4 The Contractor shall develop, maintain and deliver (as requested) to the Government a Project Plan for each project funded and defined in a TI by IWS 1IT as shown in the SAMPLE Project Plan (Attachment J-12). (CDRL A014) C.3.1.2 Program Management Meetings and Technical Reviews
3.1.2.1 Post Award Kick-off Meeting – The Contractor shall provide a detailed briefing on its management and contract execution strategy at the Post-Award Kick-off Meeting to be held within thirty (30) calendar days of contract award and in accordance with NAVSEA text C-242-H002 Post Award Meeting. The Contractor shall plan for a one-day Post Award Kick-off Meeting to be held at the Contractors facility. As options under the contract are executed, the Government reserves the right to conduct additional kick-off meetings.
3.1.2.2 Program Management Reviews – The Contractor shall conduct semi-annual Program Management Reviews (PMR), beginning ninety (90) calendar days after award. The Contractor shall document the PMRs, which may be conducted via a Government approved online utility tool or other Government-approved means, with agendas, minutes and presentation materials delivered IAW (CDRLs A007). The purpose of the reviews is to ensure the management approach remains sound, meets the requirements, and is properly documented. The Contractor shall develop and deliver minutes of meetings, in accordance with (CDRL A002) or as directed by the COR for all meetings that have a formal agenda. The PMRs shall include but are not limited to the following:
· The objectives and scope of the work for each requirement;
· Review of metrics;
· Confirmation of resolved issues and managing outstanding issues. This shall include status of significant problems faced by the program manager and current plans to resolve the problems or mitigate their impacts.
· Identification and evaluation of risk factors, mitigations, and address areas where risk has changed;
· Identification of cost and schedule variance;
· Identification of problems with Government Furnished Information or Equipment, impact, and work-around or solutions;
· Identification of production status;
· Review of Action Items (AIs).
3.1.2.3 Technical Reviews – The Contractor shall schedule all Technical Reviews in the IMS. The technical packages for formal review shall be developed and delivered in accordance with the TI, available electronically to Government Team ten (10) business days prior to the review.
3.1.2.4 The Contractor shall host and support Technical Interchange Meetings (TIMs) and milestone reviews for development tasking and production quarterly, or as needed on an emergent basis to address critical program issues.
C.3.1.3 Integrated Digital Data Environment The Contractor shall utilize the secure Integrated Training Systems (ITS) Teams portal operated by Integrated Warfare Systems 1IT, that provides ready access to create, store, access, manipulate, and exchange digital data via NIPRNET. The working guide is provided as Total Ship Training Capability (TSTC) Teams Quick Reference Guide (Attachment J-13). No CLASSIFIED information, documents, software code, or other data shall be loaded to or saved on the TSTC Teams portal. The Contractor shall provide e-mail notification to addressees (see Exhibit A Attachment 1) within five (5) calendar days of when a deliverable is posted or updated.
All items posted by the Contractor to the ITS Teams portal, including drafts of deliverables that are not final versions, shall be considered delivered for purposes of the DFARS data rights clauses (and subject to the same rights asserted for final deliveries). However, these non-final versions shall not constitute acceptance for purposes of Section E or the DFARS data rights clauses.
Section 3.1 Deliverables IAW CDRLs:
| A001 |
| DI-FNCL-80166C |
| PROGRAM COST AND TECHNICAL DATA REPORTS (FINANCIAL & TECHNICAL STATUS REPORT) |
| A002 |
| DI-ADMN-81505 |
| REPORT, RECORD OF MEETING/MINUTES |
| A003 |
| DI-MGMT-81928 |
| CONTRACTOR’S PROGRESS AND STATUS REPORT |
| A004 |
| DI-MISC-80508B |
| TECHNICAL REPORT – STUDY/SERVICES (ANALYSIS REPORTS) |
| A005 |
| DI-MGMT-80596 |
| GOVERNMENT FURNISHED INFORMATION DEFICIENCY REPORT (DEFICIENCY/ DISCREPANCY REPORTS) |
| A006 |
| DI-NDTI-80809B |
| TEST/INSPECTION REPORT |
| A007 |
| DI-ADMN-81373 |
| PRESENTATION MATERIAL (PRESENTATION AND BRIEFING MATERIAL) |
| A008 |
| DI-MISC-80508B |
| TECHNICAL REPORT – STUDY/SERVICES (HARDWARE TROUBLE REPORTS (HTR)) |
| A009 |
| DI-QCIC-80553A |
| ACCEPTANCE TEST PLAN (PRODUCTION ACCEPTANCE TEST PLAN (PATP)) |
| A010 |
| DI-SESS-80639E |
| ENGINEERING CHANGE PROPOSAL (ECP) |
| A011 |
| DI-SESS-81830 |
| AS BUILT CONFIGURATION LIST - COMMON (ABCL-C) |
| A012 |
| DI-MGMT-8227 |
| DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS) HEALTH ASSESSMENT REPORT (DMS ENGINEERING, MODELING AND HEALTH ASSESMENT) |
| A013 |
| DI-MGMT-81804A |
| ITEM UNIQUE IDENTIFICATION (IUID) MARKING ACTIVITY, VALIDATION AND VERIFICATION REPORT |
| A014 |
| DI-MISC-80508B |
| TECHNICAL REPORT – STUDY/SERVICES |
| A015 |
| DI-SESS-80255B |
| FAILURE SUMMARY AND ANALYSIS REPORT (CORRECTIVE ACTION SUMMARY REPORT) |
| A016 |
| DI-MGMT-80269 |
| STATUS OF GOVERNMENT FURNISHED EQUIPMENT (GFE) REPORT (GOVERNMENT FURNISHED EQUIPMENT (GFE) REPORT) |
| A017 |
| DI-NDTI-80603A |
| TEST PROCEDURE |
| A018 |
| DI-SESS-81875 |
| CONFIGURATION MANAGEMENT PLAN |
| A019 |
| DI-IPSC-81434A |
| INTERFACE REQUIREMENTS SPECFICATION (IRS) |
| A020 |
| DI-IPSC-81436A |
| INTERFACE DESIGN DESCRIPTION (IDD) |
| A021 |
| DI-IPSC-81438A |
| SOFTWARE TEST PLAN (STP) |
| A022 |
| DI-IPSC-81440A |
| SOFTWARE TEST REPORT (STR) |
| A023 |
| DI-IPSC-81431A |
| SYSTEM/SUBSYSTEM SPECIFICATION (SSS) |
| A024 |
| DI-IPSC-81432A |
| SYSTEM/SUBSYSTEM DESIGN DESCRIPTION (SSDD) |
| A025 |
| DI-MGMT-81797 |
| PROGRAM MANAGEMENT PLAN |
| A026 |
| DI-MGMT-81861C |
| INTEGRATED PROGRAM MANAGEMENT DATA AND ANALYSIS REPORT (IPMDAR) (INTEGRATED MASTER SCHEDULE) |
| A027 |
| DI-HFAC-81743A |
| HUMAN SYSTEMS INTEGRATION PROGRAM PLAN |
| A028 |
| DI-IPSC-81437A |
| DATABASE DESIGN DESCRIPTION (DBDD) |
| A029 |
| DI-IPSC-81438A |
| SOFTWARE TEST PLAN (STP) |
| A030 |
| DI-IPSC-81427B |
| SOFTWARE DEVELOPMENT PLAN (SDP) |
| A031 |
| DI- IPSC-81435B |
| SOFTWARE DESIGN DESCRIPTION (SDD) |
| A032 |
| DI-IPSC-81442A |
| SOFTWARE VERSION DESCRIPTION (SVD) |
| A033 |
| DI-IPSC-81443A |
| SOFTWARE USER MANUAL (SUM) |
| A034 |
| DI-IPSC-81433A |
| SOFTWARE REQUIREMENTS SPECIFICATION (SRS) (ELEMENT B5's) |
A035
INTENTIONALLY LEFT BLANK
| A036 |
| DI-SESS-8l785A |
| SYSTEMS ENGINEERING MANAGEMENT PLAN (SEMP) |
| A037 |
| DI-ILSS-80095 |
| INTEGRATED LOGISTICS SUPPORT PLAN |
| A038 |
| DI-ILSS-80872 |
| TRAINING MATERIALS (TRAINING DATA PRODUCT) |
| A039 |
| DI-IPSC-81488 |
| COMPUTER SOFTWARE PRODUCT (SOFTWARE SOURCE CODE AND DOCUMENTATION) |
| A040 |
| DI-IPSC-81756 |
| SOFTWARE DOCUMENTATION (SOFTWARE DOCUMENTATION AND TEST READINESS) |
| A041 |
| DI-MGMT-81842 |
| VULNERABILITY SCAN COMPLIANCE (VSC) REPORT (SYSTEM SECURITY MANAGEMENT) |
| A042 |
| DI-MGMT-81843 |
| INFORMATION ASSURANCE (IA) TEST REPORT |
| A043 |
| DI-MGMT-81844 |
| INFORMATION ASSURANCE (IA) TEST PLAN |
| A044 |
| DI-MGMT-81845 |
| INFORMATION ASSURANCE (IA) DESIGN REVIEW INFORMATION PACKAGE (DRIP) |
| A045 |
| DI-NDTI-80809B |
| TEST/INSPECTION REPORT (SOFTWARE) |
| A046 |
| DI-NDTI-80809B |
| TEST/INSPECTION REPORT (HARDWARE) |
| A047 |
| DI-MISC-81283 |
| SPECIFICATION REQUIREMENT VERFICIATION MATRIX |
| A048 |
| DI-MGMT-81844 |
| INFORMATION ASSURANCE (IA) TEST PLAN (CYBERSECURITY TEST PLAN) |
| A049 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (GOVERNMENT FUNISHED INFORMATION DEFICIENCY REPORT) |
| A050 |
| DI-SAFT-81065 |
| SAFETY STUDIES REPORT |
| A051 |
| DI-MGMT-82002B |
| CYBERSECURITY IMPLEMENTATION PLAN |
| A052 |
| DI-QCIC-81794A |
| QUALITY ASSURANCE PROGRAM PLAN (QAPP) (QUALITY MANAGEMENT PLAN) (QMP) |
| A053 |
| DI-MGMT-81808 |
| CONTRACTOR’S RISK MANAGEMENT PLAN |
| A054 |
| DI-SESS-81613A |
| RELIABILITY AND MAINTAINABILITY (R&M) PROGRAM PLAN |
| A055 |
| DI-IPSC-82297 |
| PRODUCT ROADMAP |
| A056 |
| DI-MGMT-82274 |
| DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS) LIFE CYCLE MANAGEMENT DATA (DMS ENGINEERING, MODELING AND HEALTH ASSESMENT) |
| A057 |
| DI-MISC-80508B |
| TECHNICAL REPORT - STUDY/SERVICES (OPSEC OPERATIONS TRAINING MANUAL) |
| B001 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (TECHNICAL DATA PACKAGE (TDP)) |
| B002 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (PRODUCTION DRAWINGS) |
| B003 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (PRODUCT DRAWINGS/ MODELS AND ASSOCIATED LIST) |
| B004 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (CONCEPTUAL DESIGN DRAWINGS/MODELS) |
| B005 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS) |
| B006 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (ENGINEERING DOCUMENTATION PRODUCT DRAWINGS) |
| B007 |
| DI-ADMN-80776B |
| TECHNICAL DATA PACKAGE (TDP) |
| B008 |
| DI-SESS-81000F |
| PRODUCT ENGINEERING DESIGN DATA AND ASSOCIATED LISTS |
| B009 |
| DI-SESS-81002F |
| DEVELOPMENTAL DESIGN DRAWINGS AND ASSOCIATED LISTS |
| C001 |
| DI-TMSS-81677B |
| SYSTEM TECHNICAL MANUAL (SANITIZED) (TECHNICAL MANUALS) |
C.3.2 FIRST ARTICLE UNIT
C.3.2.1 FIRST ARTICLE UNIT PRODUCTION - Applicable to CLIN 0008
The Contractor shall produce, test, and deliver first article unit (FAU) consistent with the system specifications and technical direction identified in the Build-to-Print documentation provided in Attachment J-02.
C.3.2.2 FIRST ARTICLE TESTING
The Contractor shall perform FAU testing of the BEWT II using Attachment J-06, BEWT II Factory Acceptance Test (FAT) Procedure with Instructions. The Contractor shall ensure compliance with the provided Attachment J-06 instructions and Federal Acquisition Regulation (FAR) 52.209-3 First Article Approval-Contractor Testing.
The Contractor shall develop and deliver First Article Unit Test (FAUT) reports in accordance with
CDRL A006.
Section C.3.2 Deliverables IAW CDRLs:
| A006 |
| DI-NDTI-80809B |
| TEST/INSPECTION REPORT |
C.3.3 TRAINING (BEWT II) SYSTEM PRODUCTION
C.3.3.1 BATTLEFORCE ELECTRONIC WARFARE TRAINING (BEWT II) SYSTEM PRODUCTION – If exercised, Applicable to CLIN series X005
The Contractor shall produce, test, and deliver training systems consistent with the system specifications and technical direction identified in the Build-to-Print documentation provided in Attachment J-02. The Contractor shall implement and maintain UIID marking as required by DFARS 252.211-7003 “ITEM UNIQUE IDENTIFICATION AND VALUATION.” System baseline, software version, delivery date and receiving location shall be as directed in the modification exercising the option for each system.
The Contractor shall evaluate all Cyber Security guidance changes discovered under C.3.1.5 for impact to system production. Any required design changes shall be documented in the Engineering Change Process (ECP) and submitted to the Government using the established process.
The BEWT II system is Grade B Shock, Power Qualification, and Electro Magnetic Interference (EMI) certified in accordance with MIL-S-901D, Medium Weight Shock Machine (MWSM), Grade B, Type A, Class I equipment; MIL-STD-1399, Section 300B; and MIL-STD-461 F (Surface Ships). Specific configurations and delivery instructions for all production units will be identified by a TI.
The Contractor shall perform Factory Acceptance Testing (FAT) using BEWT II Factory Acceptance Test Procedures (Attachment J-06).
In the event that production is impacted due to diminishing manufacturing sources and material shortages (DMSMS) or other matters related to parts issues, the Contractor shall notify the COR and PMO, via email, within five (5) working days of receipt of notification.
C.3.3.2 PROTOTYPE AND MISCELLANEOUS PRODUCTION - CLIN 0001, and if exercised, CLINS series X001, X003, and X007.
The Contractor shall procure parts and components to assemble, integrate, test, and label prototype and miscellaneous production units to meet the requirements as defined in the TI. The assembled systems shall be labeled with label plates in accordance with the Item Unique Identification (IUID) requirements pursuant to DFARS 252.211-7003. All production units shall be stored until shipment. The storage space shall be dry and climate controlled (Air conditioning and Heat) and secured with access control. All allowable and allocable costs for production of prototypes and miscellaneous items are allocable to Labor CLINs X001, X007 and other direct costs CLINs X003. The Contractor shall make no changes to the system, system parts and components without Government Approval.
C.3.3.3 PRODUCTION FACILITIES Applicable to all CLINs and (if exercised) Option CLIN(s)
The Contractor shall provide the following Production Facility capabilities:
a. 120VAC 60Hz, 1-phase electrical power available in the facility.
b. Capability to safely load and unload from covered and uncovered trucks, crated or uncrated electronic equipment.
c. A production area to support production preparation as necessary to meet the estimated annual production requirement as identified in the TI.
d. Access to secured storage sufficient in size to support the estimated annual production requirement and pre-acceptance storage of (one) 1 to five (5) units.
e. Facility to support the integration of equipment, hardware, components, and test of limited production runs.
f. Ability to fabricate foundations, chassis, front panels, Input/Output (I/O) panels, brackets and other sheet metal components; including machining, bending, drilling, welding, punching, cleaning, anodizing, priming, painting, engraving and silk-screen marking either in-house or via vendor.
g. Ability to fabricate, assemble, test and perform continuity checks on connectors, cables, wire and cable harnesses either in-house or via vendor.
Section C.3.3 Deliverables IAW CDRLs:
| B001 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (TECHNICAL DATA PACKAGE (TDP)) |
| B002 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (PRODUCTION DRAWINGS) |
| B003 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (PRODUCT DRAWINGS/ MODELS AND ASSOCIATED LIST) |
| B004 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (CONCEPTUAL DESIGN DRAWINGS/MODELS) |
| B005 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS) |
| B006 |
| DI-ADMN-80925A |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS (ENGINEERING DOCUMENTATION PRODUCT DRAWINGS) |
| B007 |
| DI-ADMN-80776B |
| TECHNICAL DATA PACKAGE (TDP) |
| B008 |
| DI-SESS-81000F |
| PRODUCT ENGINEERING DESIGN DATA AND ASSOCIATED LISTS |
| B009 |
| DI-SESS-81002F |
| DEVELOPMENTAL DESIGN DRAWINGS AND ASSOCIATED LISTS |
| C001 |
| DI-TMSS-81677B |
| SYSTEM TECHNICAL MANUAL (SANITIZED) (TECHNICAL MANUALS) |
C.3.4 SYSTEMS ENGINEERING, DESIGN, DEVELOPMENT, IMPLEMENTATION, TEST, AND SUPPORT (Level Of Effort)
C.3.4.1 SAFETY Applicable CLIN 0001, and if exercised, to CLIN series X001
The Contractor shall design all systems and components to provide the users the ability to maintain positive control over the capability to inject synthetic information into a shipboard combat system. A Permission-To-Train (PTT) authorization is required from the combat system before simulators and stimulators can inject synthetic data into the combat system. This authorization must be capable of being retracted automatically if safe conditions are no longer being met. A designated operator must also be able to retract this permission. Loss of PTT must cause simulation and stimulation of combat system elements to immediately cease. Training and stimulation to the combat system can resume once PTT is restored.
Systems Engineering tasking will be directed by the Government through the use of TIs as defined in Section C NAVSEA Text “ C-242-H003” TECHNICAL INSTRUCTIONS.”
C.3.4.2 DEVELOPMENT AND SUPPORT Applicable to CLIN 0001, and if exercised, CLIN series X001
The Government will task the Contractor, via TI, to provide engineering support. The engineering efforts will include, but not limited to, the following:
1. Surface Electronic Warfare Team Trainer (SEWTT),
2. Battleforce Electronic Warfare Trainer II (BEWT II),
3. Combined Integrated Air and Missile Defense (IAMD) and Anti-Surface Warfare (ASW) Trainer (CIAT),
4. Nulka/Countermeasures
5. BEWT Legacy and BEWT II In-Service Engineering Agent (ISEA) sustainment and support.
3.4.2.1 SEWTT
The SEWTT trains AEGIS and SSDS EW watch standers, individually and as a Team, when interfaced with the BFTT system, through the stimulation of the SLQ 32V6 tactical electronic warfare consoles both onboard ships and at shore-based facilities. The SLQ 32V6 is the processing and human interface portion of the most recent upgrade to the Navy’s electronic warfare tactical capability being undertaken. This multi-year multi-phase upgrade is known as the Surface Electronic Warfare Improvement Project (SEWIP). SEWTT is a Computer System Configuration Item (CSCI) integrated into the SLQ 32V6 software.
3.4.2.2 BEWT II
The BEWT trains AEGIS and SSDS watch standers, individually and as a Team when interfaced with the BFTT system, through the stimulation of the SLQ 32A and SLQ 32B tactical electronic warfare consoles both onboard ships and at shore-based facilities. The latest version of the BEWT system is the BEWT II. The BEWT II adds capability, enhances fidelity of the training experience, and significantly reduces production and sustainment costs from the BEWT Legacy by moving all the processes into a laptop and Integration Management Unit (IMU).
3.4.2.3 CIAT
The CIAT trains AEGIS IAMD and ASW watch standers individually and as a team, in a high fidelity, shore-based training environment that will replicate the environmental and tactical conditions of real-world operations. The trainer will require trainees to respond to the threats with approved Navy and Joint doctrine and capability as they would in live combat operations.
3.4.2.4 Nulka/Countermeasures
Countermeasures include Nulka and other active and passive devices and capabilities that individually and as a group are used by the ship to deflect or dissuade a hostile missile away from the ship. This training component will be designed for integration into BEWT II and SEWTT.
3.4.2.5 BEWT Legacy and BEWT II ISEA
The BEWT Legacy and BEWT II ISEA sustainment and support is provided to ship and shore as required to insure uninterrupted operation of the training systems.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .