20201223--20R5602-0005.pdf
PDF 465 KB Posted
- Attached to
- Ship Self Defense System (SSDS) Technical Insertion 2016 (TI-16) Hardware Production and Engineering Services Federal contract opportunity
- Solicitation number
- N00024-20-R-5602
About this file
This is a request for proposal for Ship Self Defense System (SSDS) Technical Insertion 2016 (TI-16) hardware production and engineering services. The Navy seeks production of SSDS system hardware including tactical shore site material and assembly, integration, testing and shipment. Engineering services include problem resolution, diminishing manufacturing sources support, repairs, engineering changes and production reporting. Offerors must meet security clearance requirements by award. Proposals are due December 23, 2020. The contract will have cost reimbursement and firm-fixed-price line items. The Navy will provide technical data packages and hold configuration management boards. Questions are due by December 30, 2020. The solicitation and attachments are in the Bidder's Library, requiring a terms of use agreement.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002420NR41521
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to invite Industry partners to submit additional questions until 11:59 PM EST, December 30, 2020. Section
L, paragraph 1.4, is updated accordingly.
1. CONTRACT ID CODE PAGE OF PAGES
1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Dec-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002420R5602
X 9B. DATED (SEE ITEM 11)
03-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Dec-2020
CODE
NAVAL SEA SYSTEMS COMMAND
1333 ISAAC HULL AVENUE
WASHINGTON NAVY YARD DC 20376
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002420R5602
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
1.0 GENERAL INFORMATION
For proposal purposes, the estimated date of contract award is July 2021. The Government reserves the right to award sooner or later if necessary. The start and end dates will be updated accordingly upon contract award.
The Government will not entertain any proposed revisions to the terms and conditions contained in this solicitation submitted as part of the Offeror’s proposal, including any attachment or exhibit referenced therein. Therefore, any offer that includes “redlines,” condition(s) of offer, or any other deviation from the requirements of the solicitation may be rejected by the Government.
Each Offeror is required to submit a proposal that is sufficiently detailed and complete to fully demonstrate an understanding of, and compliance with, all of the requirements of the solicitation. Proposals shall contain only material directly related to this acquisition. Offerors shall submit all information required by this solicitation.
Offeror’s proposals shall be based on the requirements contained in this solicitation (including those documents, exhibits, and other attachments to the solicitation identified in Section J). Offerors shall submit a proposal encompassing all of the line items listed in Section B of this solicitation. FAILURE TO FOLLOW THE
INSTRUCTIONS OR CONFORM TO ALL REQUIREMENTS OUTLINED IN THIS SOLICITATION
MAY RESULT IN REJECTION OF THE OFFEROR’S PROPOSAL.
Proposals submitted in response to the solicitation must contain a complete description of all pertinent aspects of the effort proposed by the Offeror. Offerors shall not assume that previously submitted data or prior experience presumed to be known to the Government (e.g., previous projects performed for the Government) will be considered as part of the proposal.
General statements such as, “the Offeror understands,” “the Offeror can or will comply with the requirements,”
“standard procedures will be used,” “well-known techniques will be used,” or statements which merely paraphrase the solicitation in whole or in part do not constitute compliance with the requirements for proposal content. Data previously submitted, or presumed to be known (e.g., data or services previously submitted or performed for the
Government) cannot be considered as part of the proposal unless explicitly incorporated into the proposal.
Discussions of each topic in the proposal shall exhibit continuity and logical progression.
In the event that any portion of the proposal is written by anyone who is not an actual employee of the Offeror submitting the proposal, the Offeror shall furnish a certificate attesting to this, which must be signed by an authorized official of the Offeror and shall indicate the person’s name, employment capacity, the name of this person’s firm, relationship of that firm to the Offeror, and which portion of the proposal was written by that person.
The Government is competing the TI-16 requirement to the maximum extent practical but Offerors are advised that there is potential for execution of within scope contract modifications after contract award in accordance with FAR
52.243-1 and FAR 52.243-2. One potential after award change could include an update to the TI-16 technical data packages (TDP) (J-02), which if executed would be in accordance with FAR 52.243-1. Additionally, due to the dynamic marketplace there is potential for post award modifications due to diminishing manufacturing sources and material shortages (DMSMS) or other engineering issues. Although the Government seeks to mitigate DMSMS issues that cause changes to the TDPs, the Government may address DMSMS issues by modifying the contract after award for an ECP in accordance with Section C.3.2.10.2 and the CMP. The Government will evaluate proposals in accordance with Section L and Section M to include reasonableness (where applicable), cost realism (where applicable), and unbalanced pricing to select the best value to the Government.
1.1 GOVERNMENT-WIDE POINT OF ENTRY (GPE)
This solicitation will be made available only through the World Wide Web on the Governmentwide point of entry
(GPE), at https://beta.sam.gov/. From time to time, the Government may post additional information to the GPE relating to this solicitation (e.g. responses to questions, solicitation amendments, etc.). It is the responsibility of prospective Offerors to monitor the GPE for any such information.
1.2 COMMUNICATIONS WITH THE GOVERNMENT
Unless otherwise specified, the Naval Sea Systems Command Procuring Contracting Officer and Contract
Specialists are the sole points of contact for this acquisition (hereafter “Government Points of Contact”).
Ms. Stacy Crisman
Procuring Contracting Officer stacy.crisman1@navy.mil
(202) 781-2015
Ms. Patti Pace
Contract Specialist patricia.pace@navy.mil
(202) 781-2856
Ms. Elizabeth Feliciano
Contract Specialist
Elizabeth.feliciano1@navy.mil
(202) 781-1049
1.3 AVAILABILITY OF ATTACHMENTS AND BIDDER’S LIBRARY
The Government will make available to Offerors a Bidder’s Library containing information to assist in the preparation of a proposal. The Bidder’s Library will also contain certain solicitation attachments that cannot be posted to the GPE. Documents in the Bidder’s Library may contain classified data and/or technical data whose export is restricted by the Arms Export Control Act (Title, U.S.C. Section 2751 et seq. or Executive Order 12470).
To request access to the Bidder’s Library, please submit a request via email to the Government Points of Contact identified in 1.2 above. Please reference the name of your company and “N00024-20-R-5602 Bidder’s Library
Access Request” (without quotes) in the subject line of the message. In the body of the email, provide the name and email address of a company individual who will receive a secure download link for the Bidder’s Library materials.
If the Government has already granted your company access to the Bidder’s Library for this procurement, please indicate this also in the body of the email.
The Government will verify the request for access. Upon successful verification, the Government will provide a copy of a Terms of Use Agreement (TOUA) (Attachment J-15) that must be signed by an authorized representative of the prospective Offeror and returned to the Government. Upon receipt of a duly executed Terms of Use
Agreement, the Government will provide via email to the designated company representative a secure download link for the Bidder’s Library. Over the course of the procurement, the Government may provide Bidder’s Library updates or additional materials to the same designated company representative.
By submitting a proposal, Offerors certify that they will destroy restricted information obtained in connection with solicitation N00024-20-R-5602 and any and all copies, notes, or other materials produced using the classified or other restricted information provided in connection with solicitation N00024-20-R-5602 within 90 days from contract award if they are deemed an unsuccessful Offeror. In the event that restricted information is requested and obtained but no proposal is submitted, any and all copies, notes, or other materials produced using the classified or other restricted information provided in connection with solicitation N00024-20-R-5602 shall be destroyed within
90 days from proposal due date and notification shall be made to the Contracting Officer.
The deadline to request access to the controlled solicitation documents and Bidder’s Library shall be the same as the deadline to submit bidder’s questions regarding this solicitation.
1.4 SUBMISSION OF QUESTIONS AND COMMENTS
Offerors shall submit written questions and comments related to this solicitation using the Bidder’s Question
Submittal Form (Attachment J-12) for this solicitation. For ease of Government review and to minimize response time, Offerors shall submit this form in the original file format. Do not convert the form to Portable Document
Format (PDF). To ensure the Government understands the context of the question, Offerors shall detail the applicable document name, document date or version, page, paragraph, clause or other specific citation to which the question applies. Information contained in the Government’s responses to bidder’s question shall not supersede any information contained in the solicitation (including amendments). In the event of a discrepancy between a response to a bidder’s question and the content of the solicitation, the latter shall take precedence.
Offerors shall not submit comments, questions, or inquiries to any Government representative other than the
Government Points of Contact identified in Section 1.2, above.
The Government intends to distribute bidder’s questions and associated responses via public posting to the
BETA.SAM website. The Government does not anticipate any classified questions related to this procurement, however, any question or response that contains classified or controlled unclassified information will not be posted publicly, but rather will be posted in the bidder’s library or sent directly to those Offerors who have an executed
TOUA and meet the security requirements detailed herein.
In the event that a prospective Offeror wishes to submit a comment or question that the prospective Offeror believes addresses a subject that is specific or proprietary to the Offeror, then the Offeror shall mark the question accordingly on the submission form and provide justification to support its claim. If the Government concurs with this identification, the Government will respond only to that potential Offeror. If the Government does not concur with this identification, it will inform the submitting Offeror and will not provide any further response. The Offeror may resubmit the question without the proprietary marking.
Offerors shall submit in accordance with this section any questions or suggestions related to the terms and conditions of this solicitation prior to the deadline for questions.
The deadline for receipt of questions is 11:59 PM, EST, December 30, 2020. Any questions received after this date may not be answered prior to receipt of proposals.
1.4.1 UNCLASSIFIED QUESTIONS
Submit written unclassified questions related to this solicitation via email to the Government Points of Contact identified in Section 1.2, above. Reference “N00024-20-R-5602 Question from [name of Offeror]” (without quotes or brackets) in the subject line of the message.
1.5 SOLICITATION SECURITY CLASSIFICATION
Offerors must meet all clearance requirements detailed in the DD Form 254 (Attachment J-01) by the date of contract award. The Government does not anticipate a need for Offerors to submit classified material in any proposal volume. OFFERORS SHALL NOT PLACE ANY CLASSIFIED INFORMATION IN ANY
PORTION OF ITS PROPOSAL.
1.6 AWARD WITHOUT DISCUSSIONS
Pursuant to the provision under this section entitled FAR 52.215-1, “Instructions to Offerors – Competitive
Acquisition,” the Government intends to award a single contract on the basis of a proposal submission without conducting discussions with Offerors, but reserves the right to conduct discussions per FAR 15.306 “Exchanges with Offerors After Receipt of Proposals” if determined by the Contracting Officer to be necessary. Each Offeror shall submit only one proposal. No alternate proposals will be accepted, and the submission of multiple proposals will result in rejection of the proposal. Therefore, each Offeror’s proposal submission shall contain the
Offeror’s best terms from a price and technical standpoint. However, the Government may contact any, all, or a limited number of Offerors with questions concerning their proposals as permitted under FAR Part 15. Upon the conclusion of discussions, if they occur, the Government will request Final Proposal Revisions (FPRs) from all
Offerors still within the competitive range.
2.0 GENERAL PROPOSAL INSTRUCTIONS
The completion and submission to the Government of an offer shall indicate the Offeror’s unconditional acceptance of the terms and conditions in the solicitation.
The Government encourages Offerors to contact the Government Points of Contact (see Section 1.2, above) via email to request an explanation of any aspect of these instructions as outlined in Section 1.4 above.
Offerors shall take care to submit a legible, neat, orderly, concise and comprehensive proposal. Elaborate brochures or artwork, or expensive visual or presentation aids beyond those sufficient to present a complete and comprehensive proposal are unnecessary. Clarity is essential. The use of brochures shall be minimized and if used will count against page limits.
2.1 PROPOSAL STRUCTURE, FORMAT, AND PAGE COUNTS
Offerors shall structure proposal submittals such that the required content is organized as follows:
VOLUME TITLE PAGE LIMIT ELECTRONIC COPIES
I
Technical Approach 100 Total 1
Elements A, B, D None 1
Element C, Sample Problem 30-page limit 1
II Past Performance See Note 1 1
III Management Approach 35-page limit 1
IV Supplemental Information None 1
V Data Rights None 1
VI Cost/Price Proposal
None
VII Completed SF 33 None 1
Note 1: The total page limit for this volume will vary depending on the number of subcontractors for which the
Offeror must provide past performance information. The past performance narrative for the Offeror shall not exceed six (6) pages in length. The past performance narrative for applicable subcontractors shall not exceed two (2) pages in length for each subcontractor. Therefore, the page limit for this volume shall be (6 + 2x), where x represents the number of applicable subcontractors. For further details, see the instructions for Volume II.
Offerors are advised that the quality of information contained in a proposal is significantly more important than quantity. In this respect, Offerors shall strictly observe the page count limitations for each volume. Pages in excess of the applicable page count limit will be removed by the PCO from the back of the respective volume prior to evaluation and shall not be read or evaluated by the Government. It is not necessary to supply the maximum number of pages allowed for each volume; fewer pages may be submitted. Offerors shall organize proposal content sections using index pages with clear cross-referencing to the table of contents. All pages shall be consecutively numbered within each volume (e.g., 1,2,3,…), with the exception of the Cost/Price Volume. For the Cost/Price Volume only, pages must be numbered consecutively within each section, but page numbering may restart at the beginning of each section.
The below content will be exempt from the page count limitations:
Cover letter
Table of contents
Title pages
Index pages
Glossary
7017 Assertions List, 7028 Assertions List, Supplemental Information Statement, Commercial Restrictions
List, Non-Standard or Commercial Licenses Attached to the Commercial Restrictions List (Volume V)
7017 Assertions List License Upgrade Option, 7028 Assertions List License Upgrade Option, Supplemental Information Statement, Commercial Restrictions List License Upgrade Option, Non-
Standard or Commercial Licenses Attached to the Commercial Restrictions List License Upgrade Option, (Volume V)
When evaluating an offer, the Government may consider how well the Offeror complied with these instructions.
The Government may consider any failure on the part of an Offeror to comply with these instructions to be an indication of how the Contractor will comply with contract requirements during contract performance. Therefore, the Government encourages Offerors to contact the Government Points of Contact (see Section 1.2, above) to request an explanation of any aspect of these instructions following the process outlined in Section L 1.4 above.
2.2 LABELING
The first page of each proposal volume shall display the information required by FAR 52.215-1(c)(2) and shall also contain the volume number, volume title, security classification level of the volume and serial/copy number. If an
Offeror wishes to restrict the disclosure or use of its proposals, the Offeror shall use the legend permitted by FAR
52.215-1(e) and prominently indicate the specific pages and paragraphs that contain proprietary information. Each page of an Offeror’s proposal shall be labeled with the Offeror’s name, solicitation number and date corresponding to the date of the proposal.
All information relating to contract cost or pricing data shall be included only in the section of the proposal designated as the Cost/Price Proposal Volume. UNDER NO CIRCUMSTANCES SHALL OFFERORS
INCLUDE CONTRACT COST AND PRICING DATA IN VOLUMES I THROUGH V. In the event that cost and pricing data are included in Volumes I through V, that data may be excluded from the evaluation.
2.3 PAGE SIZE AND FORMAT
The narrative material in each proposal shall be single-spaced, typed in 12-point Times New Roman font.
Formatting, excluding charts and graphs, shall be 8 1/2 × 11 inches (standard letter size) with a minimum margin of
1 inch around the page. Text within tables, diagrams, pictorial charts, or graphic material may use no smaller than
8-point font in Times New Roman or Arial typeface.
Every section, figure, and table shall be numbered; paragraphs within sections do not need to be numbered.
Proposal material shall be formatted for double-sided pages only and in a single column on each page in accordance with FAR 52.204-4.
Submitted electronic files shall not be compressed. Included files shall be created/prepared using Microsoft Office
2010 compatible applications. Spreadsheets, worksheets, and workbooks shall be prepared and submitted in
Microsoft Excel compatible format. Schedules shall be created and submitted using Microsoft Project compatible applications. Graphics, photographs, and other data beyond the capability of Microsoft Office 2010 compatible applications may be submitted in Adobe Acrobat format. Submitted electronic files shall be limited to the following extensions:
.docx Microsoft Word
.xlsx Microsoft Excel
.pptx Microsoft PowerPoint
.pdf Adobe Acrobat
.mmp Microsoft Project
Pricing information for the supplies and services solicited here shall only be included within the files containing
Volume VI: Cost/Price Proposal. Inclusion of pricing information in any other volume may result in the Offeror’s proposal being rejected, and the Offeror being determined ineligible for award. If doubt exists as to what constitutes pricing information, Offeror’s are strongly encouraged to submit a question in accordance with Section L.1.4.
Tabloid size formatting may be used for charts and graphs where necessary to depict organization, layout, or implementation schedules. Charts and graphs shall be uncomplicated to preserve clarity. Extensive written text or tabular data, beyond that reasonably required for clarity, shall not be included in the charts and graphs. Each non-blank side of a tabloid page will count as two (2) pages for page count purposes. Entire proposal is limited to a total of 20 tabloid sheets. Tabloid sheets contained in the Cost/Price Proposal (Volume VI) do not count towards the 20 tabloid sheet limit.
2.4 PROPOSAL SUBMISSION
Proposals in response to this solicitation shall be submitted to the Government no later than the time specified in Block 9 of the SF 33. “Local time” shall refer to the time zone for Washington, DC.
The Government requests one (1) electronic copy of the Offeror’s complete proposal to be sent through the DoD
SAFE website : https://safe.apps.mil. Offerors wishing to submit a proposal in response to this notification shall notify the Government Points of Contact identified in Section 1.2, above, via email no later than three business days prior to the proposal deadline of this solicitation and no earlier than 14 calendar days prior to the proposal deadline. The subject line in the email should read as follows: “N00024-20-R-5602 PROPOSAL.” The
Government Points of Contact will then send the document drop off request via email through DoD SAFE website.
The Offeror will receive an automated email and instructions for uploading the file(s).
Offerors shall provide their name and e-mail address as contact information so the Government can generate a pick-up request from the DoD SAFE application to be sent to the Offeror, which is valid for 14 calendar days. Offerors shall address their package with the RFP number and Offeror’s company name. Offerors shall click the "Confirm
Delivery" button within the DoD SAFE app in order to receive a confirmation of pick up by the Government. The
DoD SAFE system records the time that files are submitted for transmission. Offerors are responsible for ensuring that they submit their proposal and generate a submittal time prior to the proposal submission date and time. In the event of a dispute of proposal time submission, the pick-up e-mail with the system generated drop off time within the body of the e-mail shall serve as the official time that the proposal was submitted to the Government. Late proposal submissions will be handled in accordance with FAR 52.215-1.
In the rare event the DoD SAFE portal is down or inaccessible, an Offeror shall immediately notify the cognizant
Contracting Officer via e-mail prior to the solicitation closing date and time. The Offeror shall also contact the DoD
SAFE helpdesk to register a help ticket/notice that the portal is down or inoperable prior to the closing time and date. In the rare event of a portal malfunction, arrangements must be made with the Contracting Officer cognizant https://safe.apps.mil/ for the solicitation prior to the solicitation closing date and time in order to submit a proposal electronically outside the portal. Failure to submit a complete proposal prior to the solicitation closing date and time may render the proposal late and unacceptable.
2.5 MAJOR AND MINOR SUBCONTRACTORS
For the purposes of this solicitation, major subcontractors are defined as any subcontractor proposed to perform 10% or more of the total proposal price under any individual contract line item. For the purposes of this solicitation, minor subcontractors are defined as any subcontractor who is not a major subcontractor.
2.6 SUBCONTRACTOR PROPOSALS
All subcontractors may submit proposals or supporting information directly to the Government. The prime Offeror is responsible for the timeliness of any subcontractor submissions. Failure to submit subcontractor proposals by the proposal due date may render the entire proposal, including the prime Offeror’s proposal unacceptable.
3.0 PROPOSAL CONTENT REQUIREMENTS
Offerors shall provide the information requested in the following paragraphs in the volumes indicated. If additional information is provided in other volumes or sections, Offerors shall provide clear references to the location in the proposal where the information may be found.
An Offeror’s proposal shall be sufficiently detailed to enable Government evaluation board members to make a thorough evaluation against specific factors established in Section M, and to arrive at a sound determination as to whether or not the prospective Offeror will be able to perform in accordance with the stated requirements.
Discussions of each topic in the proposal shall exhibit continuity and logical progression. Data shall be organized to enable Government personnel to thoroughly evaluate the proposal. A concise, legible, neat, orderly and comprehensive proposal is required. The Government does not assume the duty to search for data to cure problems it finds in proposals. Failure to conform to all requirements of this solicitation may form the basis for rejection of the proposal.
3.1 VOLUME I: FACTOR 1 – TECHNICAL APPROACH
Do not include cost or price information in this volume. The information contained in this volume shall enable
Government personnel to thoroughly evaluate and arrive at a sound determination of whether or not the proposal meets the requirements of the solicitation. To this end, this volume shall be specific, detailed, and complete enough to demonstrate clearly and fully that the Offeror understands the objectives and has a thorough understanding of the solicitation requirements for accomplishing the efforts under this solicitation and the technologies involved.
Proposals may include block diagrams, flow diagrams, sketches, drawings, schematics, and interface descriptions required to describe the Offeror’s proposed concept. The technical section must be sufficient to show how the
Offeror proposes to comply with the Government's requirements and must include a full explanation of the methodology and procedures to be followed. The Offeror must also identify and evaluate any risks associated with the Offeror’s proposed approach and propose mitigation steps to minimize the Government’s risk in accepting the
Offeror’s proposed solution.
The Offeror must clearly state any and all assumptions made in developing the proposed solution. Attachment J-02 provides a complete list of all Government Furnished Information (GFI) that the Government intends to provide under this contract. The Offeror shall not assume the use of any GFI not listed in Attachment J-02. The Technical
Approach Volume shall address the following elements:
Element A: Manufacturing/Production Plan
Element B: Configuration Management Plan
Element C: Sample Problem
Element D: Personnel
3.1.1 ELEMENT A: MANUFACTURING/PRODUCTION PLAN
The Offeror shall demonstrate specific knowledge, experience, and capability to perform all tasks outlined in the
Section C SOW in accordance with this RFP. The Offeror shall provide a Manufacturing/Production plan with
Integrated Master/Management Schedule (IMS) that demonstrates the Offeror’s ability to produce SSDS MK2 system hardware. The Manufacturing/Production plan and/or IMS shall be based upon the technical documentation provided herein as Attachment J-02 and TDPs posted in the Bidder’s Library and the content below:
a. Provide solutions for possible technical challenges and recommend approaches to solving those challenges such as production defects and early defect containment.
b. Provide a description of the Offeror’s supply chain management system(s), including acquisition of material, material control, and inventory management in accordance with the TDPs and Critical Item
Development Specifications (CIDS).
c. Provide, by name, all subcontractors or suppliers the Offeror plans to partner or team with.
d. Contain sequence and schedule of events at contractor and subcontractor levels that define use of materials, fabrications flow, test equipment, test software, tools, facilities, inspections, and personnel.
1. Manufacturing capabilities must show the degree of applicability, levels of technology, adaptability, innovation, production capacity, quality, or other pertinent characteristics found in the Offeror’s manufacturing and fabrication capabilities and manufacturing processes.
2. Provide production line and test line capacity cycle time to determine the potential impact on production efficiency, bottlenecks, lot sizes, or other factors related to the quantity, quality, and speed of production and testing.
e. Include major process activities and production metrics in the manufacturing/production plan and IMS to meet production requirements that satisfy quality and meet required delivery dates.
f. Address the development, integration, configuration management, and use of software/firmware within all applicable hardware items.
g. Discuss production facility capacity and list any special facilities required to implement the manufacturing plan.
h. Identify any facility upgrades required to manufacture SSDS Hardware in accordance with the TDPs.
i. Discuss experience within the last 3 years directly related to the production of hardware based upon the use of Government furnished Level III TDPs and compliance with MIL-STD 31000B.
j. The Offeror shall submit a detailed Bill of Material (BOM) for one shipset under CLIN 0001. The BOM shall not be priced. The Offeror’s BOM shall demonstrate a complete technical understanding of the SSDS
MK2 TDPs. The BOM shall be provided in Supplemental Information in Volume IV and will not be included in the page count.
k. Specifically discuss the requirements for production acceptance and delivery of SSDS Hardware in accordance with the TDP.
l. Provide a draft of CDRL A017, DMSMS Health Status Report, to identify any End of Life (EOL) items in the TDP.
The IMS and DMSMS Health Status Report shall be submitted as supplemental information in Volume IV as an appendix to the Manufacturing/Production Plan.
3.1.2 ELEMENT B: CONFIGURATION MANAGEMENT PLAN
The Offeror shall demonstrate specific knowledge, experience, and capability to perform all the tasks outlined in the
SOW in Section C. The Offeror shall explain its approach to manage engineering changes and update production requirements as part of the configuration management process outlined in the Section C SOW.
a. The Offeror shall discuss the Offeror’s plan to support the Government-chaired configuration management process as defined in Section C, including engineering changes and variances in a change management approach. The discussion should address both changes requested by the Offeror, and changes required by the Government.
b. The Offeror shall provide a Configuration Management Plan that addresses the end to end configuration control for SSDS MK2 system equipment and at a minimum shall include:
1. Configuration Mechanisms such as Configuration Control Boards (CCBs).
2. Change Documentation such as Engineering Change Proposals (ECPs) and Request for Variance
(RFVs).
3. Configuration Status Accounting.
4. Implementation of Government Approved Change(s) from identification of change to production implementation
5. Strategy and plan to proactively mitigate obsolescence.
6. DMSMS processes and propose actions in terms of effectiveness in mitigation of DMS impacts to lifecycle support of the equipment produced on this contract.
7. Change Control and Configuration Management processes for systematic, well-managed approaches to design changes, adaptations, and varied ship system configurations.
c. The Offeror shall provide their proposed approach to detection and avoidance of counterfeit materials installed in equipment covered by this contract.
3.1.3 ELEMENT C: SAMPLE PROBLEM
The Sample Problem represents the type and complexity of work likely to be required of the Offeror during contract performance. The Offeror shall demonstrate the ability to concurrently execute multiple efforts required to meet sample problem requirements. The Offeror shall provide a Traceability Matrix for the below Sample Problem and shall address items 1 through 10, as appropriate, and cross reference the applicable SOW paragraphs, RFP instructions, CDRLs, and technical documentation.
Sample Problem – Proposed Diminishing Manufacturing Sources and Material Shortages (DMSMS) Design
Solution
The ALTERED ITEM, SWITCH MODULE, THEMIS (Mellanox Switch), is a component in both Auxiliary
Processing Cabinets (APCs) and is being phased out of production (e.g. going End Of Life (EOL)). A total of two
(2) Mellanox switches are required in each APC cabinet. The Offeror shall identify and develop a DMS replacement solution for the Mellanox switch. The EOL component is part/drawing number 8600906-910 and is found on using Attachment J-02, Tab 1. Assume that this sample problem is concurrent with ongoing production efforts.
The Offeror shall specifically describe technical efforts required to develop, integrate, and manage the implementation of the solution. Discussion shall include impacts to the related NAVY system, and approach to maintain compliance to the form, fit, and function requirements of the Attachment J-02 TDP.
1. The Offeror’s Basis of Estimates shall be detailed to allow for the Government to evaluate the Offeror’s knowledge of work requirements and reference historical examples where the Offeror accomplished similar efforts. This information shall not contain any cost information, but shall reflect Basis of Estimates (BOE) including Level of Effort estimates.
a. The efforts shall be broken down to the Work Breakdown Structure and labor categories proposed.
b. The BOE shall include all subcontracted efforts with their applicable sub totals for the resultant contract.
c. Provide a Bill of Material (BOM) which will identify all changed hardware items by part name, part number, quantity, and vendor in its proposed system.
2. Provide a labor and skill mix for this Sample Problem on CLIN 0003 Engineering Services
3. Provide a detailed Integrated Master Schedule and supporting documentation to account for all tasks which shall:
a. Identify all critical events, to include procurements, design reviews, testing, deliveries of hardware, software, and documentation;
b. Discuss causes of possible schedule slips and contingency plans; and
c. Identify the “critical path”
4. Describe interaction with the Navy during the task being discussed, including:
a. Program Reviews
b. Program Office interface
c. NAVSEA Contracts Directorate personnel
d. DCMA representatives
e. Technical Design Agent (TDA)
f. Navy on-site support
g. Software Design Agent (Combat System Engineering Agent (CSEA))
5. Discuss approaches used in performance of the Statement of Work to:
a. Identify issues;
b. Take corrective actions;
c. Ensure contractual compliance;
d. Control cost growth; and
e. Maximize use of readily available technical solution(s).
6. Describe how ship-specific issues will be addressed in system design.
7. Describe the execution of Configuration Management (CM) responsibilities down to the Configuration Items
(CI), as it relates to the sample problem.
a. Describe CM of TDPs
b. Demonstrate an understanding of the Government Data Management processes and interaction with
Government personnel and infrastructure.
c. Clearly describe how to address a Government directed change versus a contractor initiated change.
8. Provide a description of the processes to be used for designing in high Reliability, Maintainability, and
Availability (RMA), and how best to allocate these requirements in the system.
a. The Offeror shall describe how diagnostic design will analyze failure modes and effects on critical system functions.
b. The Offeror shall describe how the RMA information will be communicated at the expected educational levels and maintenance skills of fleet operators.
9. The Offeror shall not include cost data in this section but must address life cycle cost impacts such as price scale factors, labor hours, combined efforts such as depot maintenance, and other factors impacting life cycle cost.
10. The Offeror shall address the pedigree of the proposed items including use on other systems, level of integration and testing conducted, Manufacturing Readiness Level (MRL) self-assessment, and Technology Readiness
Level (TRL) self-assessment.
3.1.4 ELEMENT D: PERSONNEL
a. Staffing Plan: The Offeror shall complete and provide Attachment J-13, Staffing Plan and Key Personnel
Resumes in Volume IV Supplemental Information (excluded from page count), that demonstrates how the
Offeror will provide staffing in order to fulfill all requirements of the SOW. The Notional Labor Category Mix chart below is the Government’s recommended labor mix. The Notional Labor Category Mix chart lays out the categories for work to be performed under this solicitation. The personnel being proposed shall meet the minimum requirements as specified in Attachment J-05 at the time of proposal submission.
The Offeror shall:
1. Propose a Staffing plan that is consistent with the Offeror’s technical approach, as described in Volume I.
2. Propose a Staffing plan that is clearly traceable to the Cost/Price Proposal Volume (Volume VI). The
Government estimated labor mix for Level of Effort (LOE) contract line items is provided below. The
Offeror shall propose each LOE CLIN using the Government estimated hours in the Notional Labor
Category Mix chart for each Fiscal Year unless adequately justified in accordance with paragraph (c) below.
3. Propose a Staffing Plan that clearly identifies the labor skill mix (i.e., junior, mid-level, and senior personnel) for each labor category identified, and this mix must align with the Cost Volume.
4. Identify any implementation risks and propose steps to mitigate these risks. In addition, provide an explanation (if used previously) of whether the techniques and methods identified for risk mitigation have been successfully used by the Offeror.
5. Propose a ramp up schedule of personnel. Provide a timeframe when staffing actions will be completed to fully support the contract.
b. Key Personnel: The Offeror shall use Attachment J-05, Key Personnel Definitions, which includes the
Government’s Key Personnel labor categories to assist in the development of the Sample Staffing Plan, Attachment J-13. The Offeror shall provide a resume under Volume IV, Supplemental Information, for each individual identified as Key Personnel. For any proposed Key Personnel who do not currently work for the
Offeror or subcontractor, the Offeror shall provide documentary evidence of the individual’s availability to support these requirements (e.g., work agreements, contracts, or letters of intent).
The Offerors shall only propose Key Personnel resumes for individuals that, at the time of proposal submission the Offeror has a good faith expectation of providing at award. The qualifications listed in each individual proposed key personnel resume, not the specific individual, are the materially relevant aspects of the proposed key personnel partially forming the basis of award under the clause entitled C-237-H002, Substitution of Key
Personnel. Therefore, even if a proposed key individual becomes unavailable to the Offeror between proposal submission and award, the Government will evaluate and make its award decision based on the qualifications listed on the proposed resume(s). When the Government awards a contract under those circumstances, the
Government will require the awardee to use the qualifications listed on the relevant proposed key personnel resume as the basis for replacing that individual during contract performance. The Offeror shall make no substitution of key personnel without prior notification to and concurrence of the Contracting Officer.
c. The Government recommends the use of the Notional Labor Category Mix chart below in configuring the proper mix for each LOE CLIN. The Offeror can deviate from the number of labor hours by labor category chart below, but must remain within the 58,800 hours per option year, but the Offeror shall provide a narrative for each of the CLINs being deviated to support the proposed mix and explain how the deviated mix meets the requirements. However, the Offeror shall not deviate from the labor categories listed below and the skill level requirements provided in Attachment J-05. The Offeror shall also use the Position Title as listed in Attachment
J-05. If the Offeror has a different labor category or position title, the Offeror shall use the closest category/position title provided by the Government. For evaluation purposes, a man-year is defined as 1920 hours.
NOTIONAL LABOR CATEGORY MIX (X003 SERIES CLINS)
Labor Category
LOE Labor hours per year
Senior Program Manager (Key Personnel) 480
Senior Program Management/Support 240
Mid-Level Program Management/Support 4,320
Junior Program Management/Support 2,880
Senior Production - Operations Manager (Key Personnel) 480
Mid-Level Supply Chain Manager (Key Personnel) 480
Senior Engineer 3,840
Mid-Level Engineer 11,520
Junior Engineer 5,280
Senior Testing/Quality Control 1,920
Mid-Level Testing/Quality Control 6,720
Junior Testing/Quality Control 3,360
Field Services Technician 8,640
Manufacturing Technician 8,640
The Offeror shall provide a mapping of any company-specific labor categories it, or one of its Subcontractors, proposes in the Staffing Plan to these Government labor categories. This mapping shall include a description, similar in detail to the Government labor categories, of the requirements/qualifications associated with each company-specific labor category contained in the Offeror’s Staffing Plan, including company-specific labor categories proposed by subcontractors. Mapping shall be clearly described in the Staffing Plan.
3.2 VOLUME II: FACTOR 2 – PAST PERFORMANCE
3.2.1 PAST PERFORMANCE NARRATIVE REQUIREMENTS FOR PRIME OFFERORS
Do not include cost or price information in this volume. In the Past Performance Volume, the Offeror shall demonstrate through its past performance on efforts of similar size, scope, and complexity that the Offeror will be able to perform the requirements outlined in this solicitation. The information submitted shall not exceed six (6) pages in length, and should discuss at least three (3) recent and relevant contract efforts. The Offeror shall clearly describe how each prior contract effort is recent and relevant in terms of period of performance, similarity of product/service/support to this solicitation, complexity, dollar value, contract type, use of key personnel (for services), and extent of subcontracting/teaming.
The Offeror shall provide information that depicts its depth of past performance and qualification under contracts that have helped to establish its management and technical capability for the scope of work and variety of skill categories and manning levels proposed to perform work consistent with the size and scope of this requirement. The
Offeror shall place particular emphasis on both recent and relevant current Navy efforts.
Recent past performance is defined as past performance occurring within the last three years, calculated from the due date for receipt of proposals. For each contract cited as recent and relevant past performance, the Offeror shall provide:
a. Contract Number/Task Order Number
b. Contract Type
c. Requiring Activity/Program Office
d. Program Name
e. Total Contract Value
f. Period of Performance
g. Contact details for the Contracting Officer, including: (a) name, (b) phone number, and (c) email address.
h. Contact details for the Contracting Officer's Representative, including: (a) name, (b) phone number, and (c) email address.
i. Contact details for the Program Manager, including: (a) name, (b) phone number, and (c) email address.
j. Data regarding performance against Small Business Subcontracting Plan goals. If a Small Business
Subcontracting Plan was incorporated in the contract (see FAR 52.219-9):
1. The stated goal--expressed in terms of total percentage of total planned subcontracting dollars--for the use of small business.
2. The actual performance--expressed in terms of total percentage of total planned subcontracting dollars--for the use of small business.
3. The stated goal--expressed in terms of total percentage of total planned subcontracting dollars--for the use of veteran-owned small business.
4. The actual performance--expressed in terms of total percentage of total planned subcontracting dollars--for the use of veteran-owned small business.
5. The stated goal--expressed in terms of total percentage of total planned subcontracting dollars--for the use of service-disabled veteran-owned small business.
6. The actual performance--expressed in terms of total percentage of total planned subcontracting dollars--for the use of service-disabled veteran-owned small business.
7. The stated goal--expressed in terms of total percentage of total planned subcontracting dollars--for the use of HUBZone small business.
8. The actual performance--expressed in terms of total percentage of total planned subcontracting dollars--for the use of HUBZone small business.
9. The stated goal--expressed in terms of total percentage of total planned subcontracting dollars--for the use of small disadvantaged business.
10. The actual performance--expressed in terms of total percentage of total planned subcontracting dollars--for the use of small disadvantaged business.
11. The stated goal--expressed in terms of total percentage of total planned subcontracting dollars--for the use of women-owned small business.
12. The actual performance--expressed in terms of total percentage of total planned subcontracting dollars--for the use of women-owned small business.
k. A past performance narrative addressing the following:
1. Description of work performed and how the scope of the Contract/Task Order identified relates to the requirements described in the Statement of Work in regards to size and scope.
2. The Offeror’s past performance in fulfilling critical requirements and processes and its ability to understand and resolve technical risk issues within its organizational structure, including interaction with its subcontractors.
3. The Offeror shall discuss its past performance in meeting contract delivery schedules.
4. The Offeror shall discuss past performance in managing the configuration of systems similar to the size and complexity of the system contracted-for here.
5. As required by DFARS 215.303(c)(i), the Offeror shall provide information on its past performance demonstrating compliance with the requirements of FAR 52.219-8 and FAR 52.219-9.
3.2.2 PAST PERFORMANCE NARRATIVE REQUIREMENTS FOR PROPOSED
SUBCONTRACTORS
The Offeror must also submit the past performance information required by paragraph 3.2.1, above, for each proposed major subcontractor. The information submitted for each subcontractor shall not exceed two (2) pages in length, and shall discuss at least one (1) recent and relevant contract effort.
3.2.3 PAST PERFORMANCE EVALUATIONS MAY CONSIDER INFORMATION FROM OTHER
SOURCES
The Government may use past performance information obtained from sources other than the sources identified by the Offeror, and the information obtained may be used for the responsibility determination (see FAR part 9) and the adjectival rating for the past performance factor.
3.3 VOLUME III: FACTOR 3 – MANAGEMENT APPROACH
Do not include cost or price information in this volume. The Offeror shall describe their approach and ability to effectively manage all efforts required by this solicitation. This volume shall address the following elements:
Element A: Management Plan
Element B: Management Process
Element C: Small Business
3.3.1 ELEMENT A: MANAGEMENT PLAN
The Offeror shall not submit the entire Management Plan with the proposal, but only provide a proposed approach in detail for the items below. The Offeror shall provide the following:
a. Organizational Structure and Chart: This shall include details on the positions of authority, responsibility for identifying and resolving problems, and communication flow on the…