MultnomahLodge-DWGS-22x36-20210122.pdf

PDF 34 MB Posted

Attached to
Multnomah Falls Lodge Electrical Upgrades
Solicitation number
1240BH21R0011
Issued by

About this file

This document provides details for a federal contract opportunity to perform electrical upgrades at the Multnomah Falls Lodge. The USDA Forest Service is soliciting proposals to demolish and install new electric components including replacement of all electric panels, installation of an automatic transfer switch, emergency shut-off switch and strobe lights, as well as new distribution panels, main switchboard, panelboard, lighting, and other electrical equipment. The project is located at the Multnomah Falls Lodge in Bridal Veil, Oregon and has an estimated value between $1,000,000 to $5,000,000. A pre-bid site visit is scheduled for April 28, 2021 and a pre-bid conference call is scheduled for May 4, 2021. Offerors must be registered in the System for Award Management database to be considered for award.

View the file

Other files

File Type Posted
MFL Solicitation.pdf PDF
SF24-Bid Bond Form.pdf PDF
Wage Determination.pdf PDF
MFL Electrical Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA MAP VICINITY MAP

PROJECT

AREA

PROJECT

AREA

SHEET INDEX

COLUMBIA RIVER GORGE NATIONAL SCENIC AREA

ELECTRICAL UPGRADE AND STANDBY GENERATOR

MULTNOMAH COUNTY, OREGON

JANUARY 202

UNITED STATES FOREST SERVICE

PROJECT APPROVALS

FOR CONSTRUCTION

KRISTIN AUSTIN Digitally signed by KRISTIN AUSTIN Date: 2021.03.08 14:25:11 -08'00'

CHRISTY CHEYNE Digitally signed by CHRISTY CHEYNE Date: 2021.03.08 15:08:33 -08'00'

CHRISTY DARDEN Digitally signed by CHRISTY DARDEN Date: 2021.03.11 14:27:23 -08'00'

1 CONTRACT BID SCHEDULE

FOR CONSTRUCTION

MULTNOMAH FALLS

LODGE

TOE OF SLOPE

US HIGHWAY 30

SERVICE DRIVE

MAINTENANCE

BUILDING

GREASE TRAP

COLLECTION

STORAGE

SS

SS

SS

SS

SS SS

SS

SS SS

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

MULTNOMAH FALLS

LODGE

TOE OF SLOPE

US HIGHWAY 30

EXISTING

TRANSFORMER

SERVICE DRIVE

MAINTENANCE

BUILDING

GREASE TRAP

COLLECTION

STORAGE

SS

SS

SS

SS

SS SS

SS

SS SS

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

EXISTING

PROPANE TANK

SHEET NOTES:

A

PLAN VIEW

SECTION AA END VIEW

A

2 GROUND WELL DETAIL

1 VAULT DETAIL

1 EXISTING SLAB

2 CONCRETE REPAIR DETAIL

3 LAP SPLICE REQUIREMENTS

" M

IN

CLASS B,

4"-0 CRUSHED ROCK

3.5' MIN.

8" M

IN

TRENCH FOUNDATION

STABILIZATION, AS REQUIRED

6" MIN. BEDDING

PER SECTION

31-23-33

AC PAVEMENT OR

CONCRETE

TOP OF SUBGRADE

FINISH GRADE

SLOPE PER

OSHA

REQUIREMENTS

Extg. pvmt.

Seal surface over joint with tack material and sand (AC patch only)

Undisturbed base (Extg.)

Compacted aggregate base, as specified

Compacted trench backfill as specified

12" min.

12" min.

Min. width=Roller width plus 2" m in

Trench width (Actual)

Pvmt. replacement, see general notes

NOTES:

1. All existing AC or PCC pavement shall be sawcut prior to repaving.

2. Place AC mix minimum thkn. of 4" or the thkn.

of the removed pavement, whichever is greater. Compact as specified.

8 TYPICAL PIPE OR CONDUIT PENETRATION

9 ELECTRICAL CONDUIT LINE DETAIL

11 AC PAVEMENT SECTION

10 SAWCUT DETAIL

1 EXISTING SITE ELECTRICAL LAYOUT

1 ENALRGED NEW SITE ELECTRICAL PLAN 2 RESPONSIBLITY MATRIX

3 LIGHT FIXTURE SCHEDULE

1 NORTH ELEVATION 2 WEST ELEVATION

1 BASEMENT ELECTRICAL DEMOLITION PLAN

2 ENLARGED SNACK BAR ELECTRICAL DEMOLITION PLAN

1 BASEMENT POWER PLAN

2 ENLARGED SNACK BAR POWER PLAN 3 ELECTRICAL ROOM ELEVATIONS

1 EXISTING BASEMENT LIGHTING PLAN

1 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

1 FIRST FLOOR POWER PLAN

1 EXISTING FIRST FLOOR LIGHTING PLAN

1 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

2 ENLARGED SECOND FLOOR ELECTRICAL DEMOLITION PLAN

1 SECOND FLOOR POWER PLAN

3 ENLARGED SECOND FLOOR POWER PLAN

2 SECOND FLOOR ROOFTOP POWER PLAN

1 EXISTING SECOND FLOOR LIGHTING PLAN

1 THIRD FLOOR ELECTRICAL DEMOLITION PLAN

1 THIRD FLOOR POWER PLAN

1 EXISTING THIRD FLOOR LIGHTING PLAN

1 DEMOLITION ONE-LINE DIAGRAM

2 EXISTING DISTRIBUTION SWITCHBOARD BREAKER LAYOUT

1 NEW ONE-LINE DIAGRAM2 BUILDING LOAD SUMMARY

1 EXISTING ELECTRICAL SYSTEM SHORT CIRCUIT ANALYSIS

1 EQUIPMENT ELECTRICAL SCHEDULE

2 MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE

2 (D)PANEL 'C' - KITCHEN STORAGE ROOM

1 (D)PANEL 'AA' - KITCHEN STORAGE ROOM

1 (D)PANEL 'COMP' - ABOVE KITCHEN WALK-IN COOLER

1 (N)PANEL 'C' - KITCHEN STORAGE

2 (D)PANEL 'HP920604' - OUTSIDE BASEMENT ELECTRICAL

1 (D)PANEL 'HP920594' - OUTSIDE BASEMENT ELECTRICAL

1 (N)PANEL 'H' - OUTSIDE BASEMENT ELECTRICAL ROOM

1 (D)PANEL 'J' - BASEMENT ELECTRICAL ROOM

1 (N)PANEL 'J' - BASEMENT ELECTRICAL ROOM

2 (D)PANEL 'N' - SECOND FLOOR OFFICE

1 (D)PANEL 'M' - SECOND FLOOR OFFICE

1 (N)PANEL 'M' - SECOND FLOOR HALLWAY

1 (D)PANEL 'NN' - OUTSIDE BASEMENT ELECTRICAL ROOM

1 (N)PANEL 'N' - OUTSIDE BASEMENT ELECTRICAL ROOM

2 (N)PANEL 'Q' - BASEMENT ELECTRICAL ROOM

1 (D)PANEL 'Q' - BASEMENT ELECTRICAL ROOM

1 (D)PANEL 'R' - BASEMENT ELECTRICAL ROOM

1 (N)PANEL 'R' - BASEMENT ELECTRICAL ROOM

1 (D)PANEL 'SB1' - BASEMENT GIFT SHOP STORAGE

1 (N)PANEL 'SB1' - BASEMENT GIFT SHOP STORAGE

1 (D)PANEL 'SB2' - BASEMENT GIFT SHOP STORAGE

1 (N)PANEL 'SB2' - BASEMENT GIFT SHOP STORAGE

1 (D)PANEL 'SB3' - BASEMENT GIFT SHOP STORAGE

1 (N)PANEL 'SB3' - BASEMENT GIFT SHOP STORAGE

2 (N)PANEL 'T' - EXTERIOR STORAGE BUILDING

1 (D)PANEL 'T' - BASEMENT OLD PUMP ROOM

1 (D)DISTRIBUTION PANELBOARD 'DP1' - BASEMENT ELECTRICAL ROOM 2 (N)DISTRIBUTION PANELBOARD 'DP1' - BASEMENT ELECTRICAL ROOM

1 (D)DISTRIBUTION PANELBOARD 'DP2' - BASEMENT ELECTRICAL ROOM 2 (N)DISTRIBUTION PANELBOARD 'DP2' - BASEMENT ELECTRICAL ROOM

1 HVAC SINGLE POWER CONTROL ENCLOSURE LAYOUT

2 HVAC SINGLE POWER CONTROL ENCLOSURE SCHEMATIC

3 HVAC DOUBLE POWER CONTROL ENCLOSURE LAYOUT

4 HVAC DOUBLE POWER CONTROL ENCLOSURE SCHEMATIC

2 HVAC TRIPLE POWER CONTROL ENCLOSURE LAYOUT1 HVAC TRIPLE POWER CONTROL ENCLOSURE SCHEMATIC

PLAN VIEW

N

SOUTH END VIEW EAST SIDE VIEW

S

E W

TOP

No. 64-352P

BASE

No. 644-B

1 UNDERGROUND SPLICE VAULT ISOMETRIC 2 UNDERGROUND SPLICE VAULT BOX DETAILS

1 HVAC CONTROL SYSTEM ADDITIONS OVERVIEW

1 EXISTING SEWAGE BOOSTER CONNECTION 2 EXISTING J-BOX (PREVIOUS PANEL 'A') OVERFILL

File details come from the government source that posted it. Updated .