Monthly Maintenance Checklist.pdf
PDF 421 KB Posted
- Attached to
- Air Conditioning Maintenance and Service State and local contract opportunity
- Solicitation number
- BPM041280
- Issued by
- Washington County, Maryland
About this file
This document is a monthly maintenance checklist for an air conditioning system at the Western Maryland Hospital Center. The checklist covers various maintenance tasks to be performed on the air handler, compressor/condenser unit, refrigerant monitor, and cooling tower on a monthly basis from March through November. The contract opportunity, provided by the State of Maryland and Washington County, is for the provision of air conditioning maintenance, preventive maintenance, startup/shutdown services, and emergency service 24/7/365 at the Western Maryland Hospital Center.
The checklist details the specific inspections, cleaning, and testing required for the air conditioning equipment, including checking the blower motor, evaporator coil, fan blades, and compressor. The contract opportunity indicates that the selected vendor will be responsible for these monthly maintenance activities, as well as any necessary repairs or adjustments to ensure the proper operation of the system.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| A-C Quarterly Maintenance.pdf | ||
| Chiller Annual Maintenance 1.pdf | ||
| Chiller Startup.pdf | ||
| OBD Approved Bid Form.docx | DOCX document | |
| OBD Approved RFB.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Year Month/Day
1 2 3
Check Blower Motor and bearings for any unusual sounds or vibrations.
In Air Handler control panel, check wiring terminations for tightness, and ensure all cover screws are in place
Inspect all wiring terminations and ensure connections are tight.
Ensure all enclosure panel screws and fan screen screws are in place and secure.
Inspect evaporator coil, basin and drain pipe, clean or clear any blockages .
Inspect fan blades and motor bearings, testing for balance and/or wear. Balance or repair as needed
Inspect condenser coil for dirt or foreign debris, clean coil as needed
Inspect compressor and condenser fan motor contactors. Note any problems here.
Display ppm reading, adjust to zero if needed
Check alarm function, ensure exhaust fans starts in alarm condition
Kitchen Air Handler and Compressor/Condenser Unit
Inspect internal water distribution and spray pattern, make note of any irregularities
Check inlet screens for any blockage, remove leaves and debris, note scale buildup
Refrigerant Monitor As Found As Left
Cooling Tower
Clean Sump Screen
Check operating level in sump and adjust as needed
Check Purge System, record number of cycles
Check oil in Purge, replace if needed
Condenser Water Flow (GPM)
Take Amperage Readings on Motor
Condenser Leaving Water Temp
Evaporator Water Flow (GPM)
Evap Entering Water Temp
Condenser Entering Water Temp
Chilled Water Setpoint
Evap Leaving Water Temp
Checklist for Monthly Maintenance on all Equipment to be completed once each month from March thru November
Chiller TRANE Model No. CVHE040GA3H03UK2186Q7 Serial No. L01F09288
1st reading 2nd reading 3rd reading
File details come from the government source that posted it. Updated .