Chiller Annual Maintenance 1.pdf

PDF 458 KB Posted

Attached to
Air Conditioning Maintenance and Service State and local contract opportunity
Solicitation number
BPM041280
Issued by
Washington County, Maryland

About this file

This document is a maintenance checklist for a chiller and cooling tower system as part of a state and local contract opportunity in Washington County, Maryland. The contract is for providing air conditioning maintenance, preventive maintenance, startup/shutdown services, and emergency service 24/7/365 to the Western Maryland Hospital Center. The checklist outlines detailed inspection and maintenance tasks to be performed on the chiller and cooling tower, including checking temperatures, pressures, oil levels, motors, and cleaning condenser and evaporator tubes. The contract requires the vendor to provide findings and test results in a separate report to be submitted before leaving the site.

The state and local contract opportunity does not provide specific pricing terms, set asides, incumbent information, or funding details. The contract is for an unspecified term, with no mention of renewal options.

View the file

Other files for this state and local contract opportunity

Other files attached to Air Conditioning Maintenance and Service, newest first.
File Type Posted
A-C Quarterly Maintenance.pdf PDF
Chiller Startup.pdf PDF
Monthly Maintenance Checklist.pdf PDF
OBD Approved Bid Form.docx DOCX document
OBD Approved RFB.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Year Month/Day

1 to 2 2 to 3 1 to 3

1 to 2 1 to 3 2 to 3

1 to 4 2 to 5 3 to 6

1 - GND 2-GND 3-GND

Check when completed

Check when completed

Check when completed

Take Megher Readings on Oil Pump Motor 1 2 3

Inspect Oil Heater Leads and Tighten as necessary Check when completed

100% Oil Change in Oil Sump Check when completed

Check Low Refrigerant Temperature Sensor for proper setpoint F setpoint F Trip point

Check Leaving Evaporator Water Temperature Sensor setpoint F setpoint F Trip point

Check Condenser Water Loop Hi/Low Pressure Switch High Trip Low Trip

Check Chilled Water Loop Hi/Low Pressure Switch High Trip Low Trip

Remove Head and Clean Evaporator Tubes (every 3 years)

Adjust Flow Pressure Switch as needed

Check proper operation of emergency exhaust fan

Check voltages and clean cabinet

Refrigerant Monitor Replace Inlet and Charcoal Filters

Check/Calibrate "zero" cycle pH of refrigerant as tested

Gas should be clear and bright, report any variance here

Remove Head and Clean Condenser Tubes

Test heat trace on outside piping, ensure it is working at correct setting

Notes:

List Filters, Gages, and Gaskets used in this visit to be completed before start-up (March 15 each year)

TRANE Model No. CVHE040GA3H03UK2186Q7 Serial No. L01F09288

EVAPCO Model No. A19-7N Serial No. 5-13220

Check Vibration Switch and adjust for proper operation

Clean inlet screens, check for blockage that impedes airflow

Test sump heating elements (2 locations) and check thermostat setting

Test Evaporator Tubes using Eddy Current (every 3 years)

Megher Readings on Motor

Cooling Tower

Checklist for Annual Maintenance on Chiller & Cooling Tower

Chiller

Take Continuity Readings on Motor (phase to phase)

All tubes should be brushed once and report any tubes that require chemical cleaning

All tubes should be brushed once and report any tubes that require chemical cleaning

Refrigerant

Provide findings on separate report

Take Megher Readings on Motor

Check Torq on Motor Terminals

Provide findings on separate report

IMPORTANT: Attach any test results or photos to this report. Must be submitted by technician performing the work before leaving site.

Inspect Fan Blades, Clean and Balance if needed

Check Fan Discharge Screen and ensure it is securely attached

Inspect fan grease fittings and tubing and grease fan bearings

Inspect Starter Contacts for Arcing and Wear

Move Vane and verify proper positioning from unloaded to full load

Test Condenser Tubes using Eddy Current (every 3 years)

Megher Readings on Motor

Drain Tower, Clean Basin and Sump Screen

Check Sensors, Clean and Adjust for proper level

Check Fan Belts and Replace if needed